Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

National Hurricane Program Hurricane Evacuation Study Tool End-User Engagement and Usability Analysis

The Hurricane Evacuation Study (HES) Tool prototype is a key component of the Federal Emergency Management Agency (FEMA) National Hurricane Program (NHP) Technology Modernization (TM) effort. To ensure the HES Tool captured the necessary capabilities and functionality, engagement with potential end-users and key stakeholders was considered a priority throughout development. Pilot studies with representatives from North Carolina and New York City were done to validate the HES Tool process with their current HES undertaking. These pilot studies let the development of additional capabilities and feedback on the needs of diverse regions. A usability study was carried out with key stakeholders identified by NHP leadership through individualized sessions with identified personnel. The results showed the value of the HES Tool compared to the current process as well as key issues that must be addressed to ensure a final transition.

54 ENVIRONMENTAL SCIENCES↗

Tribal Colleges and Universities/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project

The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA's enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at underrepresented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period. The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian advanced manufacturing workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures.

25 ENERGY STORAGE↗

Site Environmental Report–Pantex Plant (CY2020)

The 2020 Annual Site Environmental Report (ASER) summarizes the Pantex Plant’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOEa), and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOEb). These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Pantex Plant Calendar Year 2021 (Annual Site Environmental Report)

The 2021 Annual Site Environmental Report (ASER) summarizes the Pantex Plant’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOEa), and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOEb). These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: Pantex Plant

The 2022 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE O 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report for Pantex Plant, Calendar Year 2023

The 2023 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE O 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report Pantex Plant Calendar Year 2024

The 2024 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE Order (DOE O) 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

A Survey of the U.S. ESCO Industry: Market Growth and Development from 2008 to 2011

In this study, LBNL analyzes the current size of the Energy Service Company (ESCO) industry, industry growth projections to 2011, and market trends in order to provide policymakers with a more indepth understanding of energy efficiency activity among private sector firms. We draw heavily on information from interviews with ESCOs conducted from October 2009 to February 2010 and from our review of publicly available financial information regarding individual ESCOs. A significant ramp-up in energy efficiency activities is occurring at the local, state, and federal level. These activities include the establishment in {approx}18 states of statewide energy savings goals to be obtained from adoption of an Energy Efficiency Resource Standard (EERS), legislative or state regulatory directives to obtain all cost-effective demand-side resources (Barbose et al 2009), and a significant increase in federal funding for energy efficiency programs as part of the American Recovery and Reinvestment Act (ARRA). As part of this increased focus on energy efficiency, policymakers are evaluating the role of private sector companies, including ESCOs, in delivering cost-effective energy savings to end-users. The U.S. ESCO industry has long been recognized for its role in successfully delivering comprehensive energy projects in the public sector. This study analyzes the current size of the ESCO industry, industry growth projections, and market trends in order to provide policymakers with a more in-depth understanding of energy efficiency activity among private sector firms. This study may also be of interest to policymakers abroad who are exploring options to encourage development of a private-sector energy services industry in their own countries. This study draws heavily on information from interviews with ESCOs conducted from October 2009 to February 2010 and is part of a series of ESCO industry reports prepared by Lawrence Berkeley National Laboratory (LBNL) in collaboration with the National Association of Energy Services Companies (NAESCO). The analysis builds on previous ESCO industry reports (see Goldman et al. 2005 and Hopper et al. 2007) and provides updated estimates of ESCO industry revenues and ESCO views on perceived trends in costs and savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Making Commercial Whole Building Program Delivery Easier and Less Risky Greg Thomas, Performance Systems Development

Whole building commercial programs can be challenging to deliver due to their complexity and scope. A broad suite of Federal tools and reference standards can be leveraged to reduce program cost and risk, and improve scalability. The OpenEfficiency Initiative (OEI) is a DoE funded effort to expand the deployment of Federal tools and reference standards into whole building commercial efficiency programs. OEI is developing an open source data exchange platform which is being informed and motivated by pilots.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Technology Performance Exchange [Fact Sheet]

This fact sheet, 'The Technology Performance Exchange' will be presented at the ET Summit, held at the Pasadena Convention Center on October 15-17, 2012. The Technology Performance Exchange will be a centralized, Web-based portal for finding and sharing energy performance data for commercial building technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2012 Market Report on U.S. Wind Technologies in Distributed Applications

At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined in terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $\$$2,540/kW for utility-scale wind turbines, $\$$2,810/kW for mid-sized wind turbines, and $\$$6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $\$$4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S. Department of Agriculture’s Rural Energy for America Program were the main sources of federal funding for distributed wind projects. State and local funding varied across the country, from rebates to loans, tax credits, and other incentives. Reducing utility bills and hedging against potentially rising electricity rates remain drivers of distributed wind installations. In 2012, other drivers included taking advantage of the expiring U.S. Treasury Section 1603 program and a prosperous year for farmers. While 2012 saw a large addition of distributed wind capacity, considerable barriers and challenges remain, such as a weak domestic economy, inconsistent state incentives, and very competitive solar photovoltaic and natural gas prices. The industry remains committed to improving the distributed wind marketplace by advancing the third-party certification process and introducing alternative financing models, such as third-party power purchase agreements and lease-to-own agreements more typical in the solar photovoltaic market. Continued growth is expected in 2013.

distributed wind↗

Smart Labs Accelerator: I2SL China

Presentation offers an overview of energy-efficient Smart Labs, including the benefits, the program, and what it takes to develop one.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Research Campus Energy: I2SL China

Presentation offers an overview of energy-efficient research campuses, including the benefits, the program, and what it takes to develop one.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WBS 4.2.1.31 Integrated Life Cycle Sustainability Analysis

The main objective of this project (following the 2017 BETO Program Peer-Review) is to provide BETO with a coherent methodology and modeling framework based on life cycle (LCA) and economic input-output analysis, tested and vetted with stakeholders, to better understand the effects of an expanding U.S. bioeconomy at specific levels including economic dimensions such as jobs, gross domestic product (value added), and environmental criteria such as air pollutant emissions, water and land use, ecotoxicity, and others. This supports a 2019 milestone in the BETO MYP and simultaneously addresses a gap previously identified in the BETO program and highlighted, e.g., by BETO Program Peer Reviewers in 2015 and 2017. To fill in this gap, NREL started collaborating with developers of the national level U.S. Environmentally-Extended Input-Output (USEEIO) model in FY18. This peer-reviewed, open source model is based on publicly available data, and developed and maintained by U.S. EPA where it has been the basis for EPA's Sustainable Material Management analyses and program. Also, USEEIO was initially designed for use with EPA's Tool for the Reduction and Assessment of Chemicals and Other Environmental Impacts (TRACI). It aligns well with similar efforts including the Federal LCA Commons and the Sustainable Acquisition Program at the Department of Defense (DoD). In FY18, NREL convened stakeholders from federal agencies, universities, and private sector entities to identify and form a common understanding of (1) models describing the U.S. economy and how to build off of them, (2) a bioeconomy definition for the next modeling steps, (3) the (sub)sectors that can/should be used in the framework, and (4) opportunities for collaboration and data sharing. NREL then created a first order model by disaggregating, i.e., separating the economic activities associated with and attributed to a selected product of the bioeconomy: corn ethanol. Corn ethanol is well studied and has a significant amount of public, validated economic industry information. This is important as disaggregation is a critical step in creating a representative and accurate framework. Corn ethanol served as a validation test case for the method and framework. By the end of FY18, the team was able to generate several scenarios for corn ethanol on national and selected regional levels providing results on the absolute and relative (Megajoule) effects in several environmental and economic impact categories. A second objective of the project is to inform BETO's strategic decision making, specifically its sustainability research portfolio, by engaging in, evaluating, and synthesizing selected global multi-year activities from the perspectives of a variety of complex multilateral and multi-stakeholder processes that pertain to bioenergy. This helps to (1) identify gaps, barriers, and critical areas for future BETO bioenergy and sustainability assessments; (2) identify opportunities and challenges to a sustainable U.S. bioeconomy; and (3) contribute to and disseminate BETO information to and from major global bioenergy and sustainability efforts. This project's work with multilateral organizations ensures that U.S. science-based viewpoints are considered and helps to balance the influence of the large number of countries with the same centralized philosophy. This engagement builds a more solid foundation for sustainable biomass and bioenergy systems in the U.S. and in the world. Working with multi-lateral, international platforms including IEA Bioenergy, Global Bio-Energy Partnership (GBEP), and their partner organizations also allows engagement with important stakeholders including policy makers, industry, NGOs, and academia.

09 BIOMASS FUELS↗

Results of Re-evaluation of FEPs Related to Implementing the ABD Glass Program

The Savannah River Site plans to reprocess defense spent nuclear fuel currently stored in their L-Basin via the Accelerated Basin Deinventory (ABD) Program. The previous plan for the L-Basin spent nuclear fuel was to dispose of it directly in the federal repository without reprocessing. Implementing the ABD Program will result in final disposal of approximately 900 fewer canisters of defense spent nuclear fuel and the production of approximately 521 more canisters of vitrified high-level waste glass with some specific differences from the planned high-level waste glass. Because the 235U in the L-Basin spent nuclear fuel is not intended to be recovered, the fissile mass loading of the vitrified high-level glass waste form to be produced must be increased above the current value of 897 g/m 3 to a maximum of 2,500 g/m 3 . Therefore, implementing the ABD Program would produce a variant of high-level waste glass—the ABD glass—that needs to be evaluated for future repository licensing, which includes both preclosure safety and postclosure performance. This report describes the approach to and summarizes the results of an evaluation of the potential effects of implementing the ABD Program at the Savannah River Site on the technical basis for future repository licensing for a generic repository that is similar to Yucca Mountain and for one that is fully generic. This evaluation includes the effects on preclosure safety analyses and postclosure performance assessment for both repository settings. The license application for the proposed Yucca Mountain repository (DOE 2008), which is serving as a framework for this evaluation, concluded that the proposed Yucca Mountain repository would meet all applicable regulatory requirements. The evaluation documented in this report found that implementing the ABD Program is not expected to change that conclusion for a generic repository similar to Yucca Mountain or for a generic repository with respect to the preclosure safety analyses. With respect to the postclosure performance of a generic repository, no concerns were identified.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗