Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Energy Management Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Evaluating Realized Impacts of DOE/EERE R&D Programs. Standard impact evaluation method

This document provides guidance for evaluators who conduct impact assessments of research and development (R&D) programs for the U.S. Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE). It is also targeted at EERE program staff responsible for initiating and managing commissioned impact studies. The guide specifies how to estimate economic benefits and costs, energy saved and installed or generated, environmental impacts, energy security impacts, and knowledge impacts of R&D investments in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Boston Architectural College Urban Sustainability Initiative

The Boston Architectural College's Urban Sustainability initiative is a demonstration project as defined by the National Energy Technology Laboratory. BAC's proposed project with the U.S. Department of Energy - NETL, is a large part of that overall initiative. The BAC's Urban Sustainability Initiative is a multi-part project with several important goals and objectives that will have a significant impact on the surrounding neighborhood including: energy conservation, reduction of storm water runoff, generation of power through alternative energy sources, elimination/reduction of BAC carbon footprint, and to create a vehicle for ongoing public outreach and education. Education and outreach opportunities will serve to add to the already comprehensive Sustainability Design courses offered at BAC relative to energy savings, performance and conservation in building design. At the finish of these essential capital projects there will be technical materials created for the education of the design, sustainability, engineering, community development and historic preservation communities, to inform a new generation of environmentally-minded designers and practitioners, the city of Boston and the general public. The purpose of the initiative, through our green renovations program, is to develop our green alley projects and energy saving renovations to the BAC physical plant, to serve as a working model for energy efficient design in enclosed 19th century and 20th century urban sites and as an educational laboratory for teaching ecological and sustainable technologies to students and the public while creating jobs. The scope of our project as it relates to the BAC and the U.S. Department of Energy- NETL combined efforts includes: Task I of the project is Phase II (Green Alley). Task I encompasses various renovation activities that will demonstrate the effectiveness of permeable paving and ground water recharge systems. It will aid in the reduction of storm water runoff into the Charles River Basin in one of its most significantly polluted sections and, will provide a green renovation mechanism for the redirected storm water of a public alley way. This activity is designed to improve the quality of water recharging the ground water and protecting the vulnerable wood pilings under many of the historic masonry buildings in Boston's Back Bay. Sustainable design research and system monitoring opportunities will also be incorporated, providing ongoing tools for public outreach and education through innovative signage and "virtual tour" technology. The monitoring will include a "building performance dash board" that reflects real time operating conditions and improvements in environmental and economic performance to be prominently displayed on the face of our 320 Newbury Street building (approximately 1.5 million people walk by annually). The project site and demonstration area is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task II of the project is Geothermal Solution. This task involves the installation of approximately seven Geothermal wells which will tap into the earth's constant underground temperatures to provide air-conditioning and heating for BAC facilities. The environmentally friendly geothermal system uses no fossil fuel, produces no emissions and runs silently, providing a sustainable model for commercial and residential buildings throughout Boston. Ultimately the combination of this project and other projects will assist in making the BAC "carbon-neutral", and could generate enough additional energy to provide free power to the Engine 33 and Ladder 15 Firehouse located at 941 Boylston Street. The project is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task III of the project is the Sustainability Design Curriculum at the BAC. The BAC is the nation’s largest independent, multi-disciplinary college of spatial design, and a leader in sustainable design education. The Sustainabiltiy Design program, in particular, focuses on energy efficiency,energy performance, energy modeling, energy and air quality principles, green building, renewable energy alternatives and much more. Additionally, the Urban Sustainability Initiative has an objective of providing courses relative to the BAC's demonstration project with DOE, the project’s period of performance activities, subsequent performance data and anticipated sustainability teaching tools. In keeping with BAC's practice based curriculum, students have been involved in the discussion and planning of this project since its inception and sustainability issues have become a part of other programs throughout the college as well. Students will continue to benefit from this hands-on learning opportunity. The project is located at 320 Newbury Street Boston, MA 02115. Task IV of the project is Program Management and Reporting. This task will involve BAC's oversight and general management of the entire project including subcontract administration, contracts administration, technical and financial reporting, design and renovation assistance, other deliverables in accordance with the Federal Assistance reporting Checklist and other contractual obligations and provisions.

15 GEOTHERMAL ENERGY↗

2010 Site Environmental Report

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

54 ENVIRONMENTAL SCIENCES↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring and Evaluation FY08 Annual Report.

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

13 HYDRO ENERGY↗

Consolidation and Centralization of Waste Operations Business Systems - 12319

This abstract provides a comprehensive plan supporting the continued development and integration of all waste operations and waste management business systems. These include existing systems such as ATMS (Automated Transportation Management System), RadCalc, RFITS (Radio Frequency Identification Transportation System) Programs as well as incorporating key components of existing government developed waste management systems and COTS (Computer Off The Shelf) applications in order to deliver a truly integrated waste tracking and management business system. Some of these existing systems to be integrated include IWTS at Idaho National Lab, WIMS at Sandia National Lab and others. The aggregation of data and consolidation into a single comprehensive business system delivers best practices in lifecycle waste management processes to be delivered across the Department of Energy facilities. This concept exists to reduce operational costs to the federal government by combining key business systems into a centralized enterprise application following the methodology that as contractors change, the tools they use to manage DOE's assets do not. IWITS is one efficient representation of a sound architecture currently supporting multiple DOE sites from a waste management solution. The integration of ATMS, RadCalc and RFITS and the concept like IWITS into a single solution for DOE contractors will result in significant savings and increased efficiencies for DOE. Building continuity and solving collective problems can only be achieved through mass collaboration, resulting in an online community that DOE contractors and subcontractors access common applications, allowing for the collection of business intelligence at an unprecedented level. This is a fundamental shift from a solely 'for profit' business model to a 'for purpose' business model. To the conventional-minded, putting values before profit is an unfamiliar and unnatural way for a contractor to operate - unless however; your objective is to build a strong, strategic alliance across the enterprise in order to execute an unprecedented change in waste management, transportation and logistical operations. The success of such an initiative can be achieved by creating a responsible framework by enabling key individuals to 'own' the sustainability of the program. This includes the strategic collaboration of responsible revolutionaries covering application developers, information owners and federal stakeholders to ensure compliance, security and risk management are 'baked' into the process and sustainability is fostered through continued innovation by both technology and application functionality. This ensures that working software can adapt to changing circumstances and is the principle measure of the success of the program. The consolidation of waste management business systems must be achieved in order to realize efficiencies in information technology portfolio management, data integrity, business intelligence and the lifecycle management of hazardous materials within the DOE enterprise architecture. By identifying best practices across the enterprise and aggregating computational and application development resources, you can provide a unified, holistic solution serviceable from a single location while being accessed from anywhere. The business impact of integrating and delivering a unified solution would reduce costs to the Department of Energy within the first year of deployment with increased savings annually. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and maintaining safety at each site while negotiating state and Federal environmental compliance agreements. The program also concentrated on characterizing waste and nuclear materials and assessing the magnitude and extent of environmental contamination. By the late 1990s, EM had made significant progress in identifying and characterizing the extent of contamination and cleanup required and began transitioning from primarily a characterization and stabilization program to an active cleanup and closure program. During that time, EM formulated multi-year cleanup and closure plans, which contributed to cleanup progress; however, reducing the overall environmental risk associated with the cleanup program remained a challenge. In response, the Secretary of Energy directed a review of the EM program be undertaken. The resulting 'Top-to Bottom Review' re-directed the program focus from managing risks to accelerating the reduction of these risks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laboratory Directed Research and Development Program FY 2007 Annual Report

The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries for all ORNL LDRD research activities supported during FY 2007. The associated FY 2007 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and an internal evaluation of the program's management process. ORNL is a DOE multiprogram science, technology, and energy laboratory with distinctive capabilities in materials science and engineering, neutron science and technology, energy production and end-use technologies, biological and environmental science, and scientific computing. With these capabilities ORNL conducts basic and applied research and development (R&D) to support DOE's overarching mission to advance the national, economic, and energy security of the United States and promote scientific and technological innovation in support of that mission. As a national resource, the Laboratory also applies its capabilities and skills to specific needs of other federal agencies and customers through the DOE Work for Others (WFO) program. Information about the Laboratory and its programs is available on the Internet at http://www.ornl.gov/. LDRD is a relatively small but vital DOE program that allows ORNL, as well as other DOE laboratories, to select a limited number of R&D projects for the purpose of: (1) maintaining the scientific and technical vitality of the Laboratory; (2) enhancing the Laboratory's ability to address future DOE missions; (3) fostering creativity and stimulating exploration of forefront science and technology; (4) serving as a proving ground for new research; and (5) supporting high-risk, potentially high-value R&D. Through LDRD the Laboratory is able to improve its distinctive capabilities and enhance its ability to conduct cutting-edge R&D for its DOE and WFO sponsors. To meet the LDRD objectives and fulfill the particular needs of the Laboratory, ORNL has established a program with two components: the Director's R&D Fund and the Seed Money Fund. As outlined in Table 1, these two funds are complementary. The Director's R&D Fund develops new capabilities in support of the Laboratory initiatives, while the Seed Money Fund is open to all innovative ideas that have the potential for enhancing the Laboratory's core scientific and technical competencies. Provision for multiple routes of access to ORNL LDRD funds maximizes the likelihood that novel ideas with scientific and technological merit will be recognized and supported.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Idaho National Laboratory Directed Research and Development FY-2009

The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefit each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are appropriately handled. The LDRD Program is assessed annually for both output and process efficiency to ensure the investment is providing expected returns on technical capability enhancement. The call for proposals and project selection process for the INL LDRD program begins typically in April, with preliminary budget allocations, and submittal of the technical requests for preproposals. A call for preproposals is made at this time as well, and the preparation of full proposals follows in June and closes in July. The technical and management review follows this, and the portfolio is submitted for DOE-ID concurrence in early September. Project initiation is in early October. The technical review process is independent of, and in addition to the management review. These review processes are very stringent and comprehensive, ensuring technical viability and suitable technical risk are encompassed within each project that is selected for funding. Each proposal is reviewed by two or three anonymous technical peers, and the reviews are consolidated into a cohesive commentary of the overall research based on criteria published in the call for proposals. A grade is assigned to the technical review and the review comments and grade are released back to the principal investigators and the managers interested in funding the proposals. Management criteria are published in the call for proposals, and management comments and selection results are available for principal investigator and other interested management as appropriate. The DOE Idaho Operations Office performs a final review and concurs on each project prior to project authorization, and on major scope/budget changes should they occur during the project's implementation. This report begins with several research highlights that exemplify the diversity of scientific and engineering research performed at the INL in FY 2009. Progress summaries for all projects are organized into sections reflecting the major areas of research focus at the INL. These sections begin with the DOE-NE Nuclear Science and Technology mission support area, followed by the National and Homeland Security and the Energy and Environmental Science and Technology areas. The major INL initiatives and the INL's Distinctive Signatures areas complete the project summaries. The appendices provide information on project relevance to DOE missions and major national programs as well as an author index, list of refereed publications and index of key terms.

99 GENERAL AND MISCELLANEOUS↗

Achieving the End State for the Pahute Mesa Corrective Action Units at the Nevada National Security Site - 20355

Underground nuclear testing at the Nevada National Security Site (NNSS) ended in 1992. To address the impact of radionuclide contamination from underground nuclear testing on the groundwater resources of Nevada, the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program created the Underground Test Area (UGTA) activity to characterize the radionuclides in groundwater, understand the nature and extent of radionuclide migration, and forecast the distribution of radionuclides in groundwater for 1,000 years. The UGTA activity is regulated by the Federal Facility Agreement and Consent Order (FFACO), an agreement negotiated between the Nevada Division of Environmental Protection (NDEP), DOE, and the U.S. Department of Defense (DoD). DOE is close to achieving the end state (closure in place with monitoring and institutional control) for three of the five UGTA corrective action units (CAUs) on the NNSS. A number of challenges remain to achieve the end state of the other two CAUs, both located on Pahute Mesa. Pahute Mesa was the location of 82 underground nuclear tests, less than 10% of the total number of tests on the NNSS. Yet, Pahute Mesa contains slightly more than 60% of the total radionuclides (in curies). Based on groundwater sampling in monitoring wells, two radionuclide plumes have migrated several kilometers (km) in groundwater from selected test cavities and have crossed the boundary of the NNSS (yet remain within the boundaries of Federally controlled land). The path to achieve the end state continues to evolve as more data are collected and a better understanding of radionuclide migration in groundwater is developed. DOE has invested in drilling and sampling more than 50 characterization and monitoring groundwater wells over the past 25 years. The data indicate that the primary radionuclide of concern is tritium as it is about 89% of the total radionuclide inventory (in curies). As well, only tritium has been measured in groundwater outside of cavities at concentrations exceeding the Safe Drinking Water Act (SDWA) standard. For one of the tritium plumes that has migrated across the NNSS boundary, the average rate of migration has been measured as about 45 meters (m) per year with the rate of migration at the leading edge of the plume of about 85 meters per year. At that rate of migration, the tritium plume will decay to safe levels and not reach the publicly accessible environment at concentrations above the SDWA standard. Other radionuclides, at concentrations below the SDWA standards, will be monitored to ensure they remain at safe levels. Consequently, the end state path forward for Pahute Mesa has evolved to take full advantage of the data from the monitoring network to constrain uncertainty in model forecasts and to reduce reliance on probabilistic simulations. The focus of the end state approach relies on developing a monitoring well network that is protective of human health by increasing confidence that no radionuclide plume in the groundwater will migrate undetected to the accessible environment, located about 22 km from the nearest up-gradient underground nuclear test. Using the measured data to remove uncertainty, the evaluation of radionuclide migration from Pahute Mesa is directed toward meeting the goals of the end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Implementation of a Comprehensive Program to Deal with Canada's Nuclear Legacy Liabilities

The Government of Canada nuclear legacy liabilities have resulted from 60 years of nuclear research and development (R and D) carried out on behalf of Canada by the National Research Council (1944 to 1952) and Atomic Energy of Canada Limited (AECL, 1952 to present). These liabilities are largely located at AECL research sites, and consist of shutdown research buildings (including several prototype and research reactors), a wide variety of buried and stored wastes, and contaminated lands. The shutdown buildings and contaminated lands need to be safely decommissioned to meet federal regulatory requirements, and long-term solutions need to be developed and implemented for management of the wastes. More than half of the liabilities are the result of Cold War activities during the 1940's, 50's and early 60's. The remaining liabilities stem from R and D for medical isotopes and nuclear reactor technology, as well as national science programs. About 70 percent of the liabilities are located at AECL's Chalk River Laboratories (CRL) in Ontario, and a further 20 percent are located at AECL's shutdown Whiteshell Laboratories in Manitoba. The remaining 10 percent relate largely to three shutdown prototype reactors in Ontario and Quebec, which were key to the developmental stage of Canada's CANDU reactor technology. The inventory of legacy waste includes spent fuel, high-level, intermediate-level and low-level solid and liquid radioactive waste, and wastes (largely contaminated soils) from site clean-up work across Canada. Most of the wastes are in raw, unconditioned form, and limited characterization information is available for the wastes generated in past decades. In many cases unique and potentially costly solutions will be required to recover, handle and process the wastes. In conclusion: the Government of Canada has initiated a program to deal with nuclear legacy liabilities dating back to the Cold War and the birth of nuclear technologies and medicine in Canada. The 5-year start-up phase will address immediate health, safety and environmental priorities, as well as provide the facilities, studies and plans required for subsequent phases. Over the next few years, the long-term strategy will be further developed and refined, and public consultations are planned to inform this work and decisions on the next phase of the strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ENVIRONMENTAL REVIEWS AND CASE STUDIES: The National Park Service Visual Resource Inventory: Capturing the Historic and Cultural Values of Scenic Views

Several United States (US) federal agencies have developed visual resource inventory (VRI) and management systems that reflect specific agency missions and visual resource management objectives. These programs have varied in the degree to which they incorporate historic and cultural elements and values into the scenic inventory process. The recent nationwide expansion of renewable energy and associated transmission development is causing an increase in visual impacts on both scenic and historic/cultural resources. This increase has highlighted the need for better integration of visual and historic/cultural resource assessment and management activities for land use planning purposes. The US Department of the Interior National Park Service (NPS), in response to concerns arising from potential scenic impacts from renewable energy, electric transmission, and other types of development on lands and waters near NPS units, has developed a VRI process for high-value views both within and outside NPS unit boundaries. The NPS VRI incorporates historic and cultural elements and values into the scenic resource inventory process and provides practical guidance and metrics for successfully integrating historic and cultural concerns into the NPS’s scenic resource conservation efforts. This article describes the NPS VRI process and compares it with the VRI processes of the US Department of the Interior Bureau of Land Management and the US Department of Agriculture Forest Service, with respect to the incorporation of historic and cultural values. The article discusses why a scenic inventory approach that more robustly integrates the historic and cultural values of the landscape is essential for NPS landscapes, and for fulfillment of NPS’s mission. Inventories are underway at many NPS units, and the results indicate that the VRI process can be used successfully to capture important historic and cultural resource information and incorporate that information into the assessment of the scenic values of views within and outside NPS units. Environmental Practice 18: 166–179 (2016)

cultural↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada, Revision 2

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102), which are currently in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) stage of the Federal Facility Agreement and Consent Order (FFACO) UGTA Strategy. The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in the Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan (DOE/EMNV, 2024a). The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b).

54 ENVIRONMENTAL SCIENCES↗

2009 Site Environmental Report

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

54 ENVIRONMENTAL SCIENCES↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Indoor Radon Measurements from Residential Buildings with Basements in a Community with Potential LLRW Contamination - 19566

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities-Port Hope and Clarington. The PHAI (see reference for internet address) is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. Canadian Nuclear Laboratories (CNL) is implementing the PHAI on behalf of Atomic Energy of Canada Limited, a Federal Crown Corporation. An initial characterization and remediation program in the urban area of Port Hope was conducted from 1976 to 1981. The waste is the result of radium and uranium processing in Port Hope by the former Federal Crown Corporation Eldorado Nuclear Limited between 1933 and 1988. One contaminant of concern in the LLRW is radium-226 (Ra-226) which may lead to elevated indoor levels of radon-222 (Rn-222) indoors. As part of CNL's implementation of the PHAI, Arcadis is conducting the Port Hope Project Property Radiological Survey of approximately 4,800 small-scale sites to identify 1) properties that have not been affected by historic operations and 2) properties that have residual historic low-level radioactive waste impacts requiring remediation either for soils or for interior contamination or both. Over the last six years, a component of the Small Scale Sites (SSS) characterization surveys have measured radon concentrations in essentially all buildings in Port Hope using alpha-track detectors. All properties had subsurface characterization including analytical characterization and lithology following the radon measurement reporting to measure if soil concentrations exceeded the PHAI Cleanup Criteria (PHAI CC) for Ra-226 of 0.29 Bq/g. Buildings with radon gas exceeding a trigger level of 200 becquerels per cubic meter (Bq/m{sup 3}) or those with ventilation systems required investigation of soil concentrations around the perimeter of the building. Ra-226 concentrations above the background level of 0.05 Bq/g due to LLRW sources were forwarded to create remedial action plans (RAPs) to remove the contamination near the building. The SSS surveys provide a substantive data set on the approximately 3,000 properties measured to date with interior Rn-222 gas measurements and descriptions of the physical characteristics of the buildings, the lithology of soils near the buildings and the measurements of Ra-226 concentration in the soils on the property. Consideration of the potential for contribution from non-LLRW Ra-226 from natural sources or coal ash was required on some properties. This paper describes the data and exploratory analysis of the relationship(s) between LLRW and non-LLRW factors that affect the variation in indoor radon concentrations. Historical information on the urban area, the measured Ra-226 concentration and the age of the building were correlated with radon concentrations. A large variety of native soils are found in the complex terrain and the type of native soil was correlated with the radon concentrations. A statistical analysis to address the impact of co-related explanatory variables to model indoor radon concentrations is planned when the SSS activities are complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗