Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Efficiency as a Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Recipe for Success: Digital Viewables

The Engineering Services Contract (ESC) and Information Management Communication Support contract (IMCS) at Kennedy Space Center (KSC) provide services to NASA in respect to flight and ground systems design and development. These groups provides the necessary tools, aid, and best practice methodologies required for efficient, optimized design and process development. The team is responsible for configuring and implementing systems, software, along with training, documentation, and administering standards. The team supports over 200 engineers and design specialists with the use of Windchill, Creo Parametric, NX, AutoCAD, and a variety of other design and analysis tools.

design and process development↗

Medium-Range River Flood Forecasts Using a Long Short-Term Memory Network

River flooding and the impacts are a concern for decision makers throughout the United States. Accurate medium-range forecasts (~3-7 days) are critical for providing advanced outlooks to emergency management officials. Unfortunately, accurately forecasting rainfall-runoff and the subsequent rise and fall within rivers remain a challenge in hydrological modeling. While complex physical modeling systems are the standard for representing the hydrological processes, they are computationally demanding and can require extensive calibration. Further, uncertainties remain in the model parameters and input data. The use of machine learning can reduce some of the computational demand while maintaining high accuracy. Therefore, this project makes use of a Long Short-Term Memory (LSTM) network which explicitly accounts for the time-dependent nature of rainfall-runoff modeling. The developed LSTM was trained to predict river gauge height, or stage height, based on time-lagged input features which include: gauge height to initialize the model, the NASA Short-term Prediction Research and Transition Center’s instance of the Land Information System (SPoRT-LIS) relative soil moisture to describe the rainfall infiltration rate, and 6-hr Multi-Radar Multi-Sensor quantitative precipitation estimate (MRMS QPE). The developed LSTM based system is then used to produce 7-day forecasts with a 6-hr temporal resolution using three different quantitative precipitation forecasts (QPF) from the NWS’s Weather Prediction Center (WPC), the NCEP Global Forecast System (GFS) model and the National Blend of Models (NBM). This trained modeling system has been implemented as an experimental product at over 100 different rivers in collaboration with at multiple National Weather Service (NWS) Forecast Offices and River Forecast Centers (RFC) across the eastern half of the United States. The developed LSTM model achieved average Nash-Sutcliffe efficiency (NSE) 0.89 higher than the equivalent medium-range National Water Model ensemble member forecast over a 7-day forecast. In addition to the initial development and evaluation, this project has continued to expand. While the initial model was developed for precipitation dominated basins, expansion of the project has taken it to basins effected by snow melt. This presentation will provide an overview of the project with focus on recent developments on incorporating snow melt processes into the model.

Andrew T. White↗

The Globalstar mobile satellite system for worldwide personal communications

Loral Aerospace Corporation along with Qualcomm Inc. have developed a satellite system which offers global mobile voice and data services to and from handheld and mobile user terminals with omni-directional antennas. By combining the use of low-earth orbit (LEO) satellites with existing terrestrial communications systems and innovative, highly efficient spread spectrum techniques, the Globalstar system provides users with low-cost, reliable communications throughout the world. The Globalstar space segment consists of a constellation of 48 LEO satellites in circular orbits with 750 NM (1389 km) altitude. Each satellite communicates with the mobile users via the satellite-user links and with gateway stations. The gateway stations handle the interface between the Globalstar network and the OSTN/PLMN systems. Globalstar transceivers are similar to currently proposed digital cellular telephones in size and have a serial number that will allow the end user to make and receive calls from or to that device anywhere in the world. The Globalstar system is designed to operate as a complement to existing local, long-distance, public, private and specialized telecommunications networks. Service is primarily designed to serve the rural and thin route communications needs of consumers, government users, and private networks.

Wiedeman, Robert A.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

The InSAR Scientific Computing Environment 3.0: A Flexible Framework for NISAR Operational and User-Led Science Processing

The InSAR Scientific Computing Environment (ISCE) was first developed under the NASA Advanced Information Systems Technology as a flexible, extensible object-oriented framework for Interferometric Synthetic Aperture Radar (InSAR) processing. The ISCE framework uses Python 3 at the workflow level, controlling modules of compiled code for functional processing, and managing inputs, outputs, and other flow control services. The currently released version, called ISCE 2.1, is distributed to the research community through the Western North America InSAR Consortium under a research license. The ISCE team is working on the next generation of the code in order to prepare for the NASAISRO SAR (NISAR) mission operational processing. Innovations in this code include augmentation or conversion of the custom Python framework elements in ISCE with the Pyre framework, new workflows for interferometric and polarimetric stack processing, a more intuitive and graphically based user interface, and flow control for hybrid computing environments including CPU/GPU clusters, logging and error tracking facilities, and new more efficient computational modules that exploit graphical processor units (GPUs) when available. The ISCE 3.0 framework is designed to work in an operational environment as well as on a single user’s laptop or compute cluster, with services to discover capabilities and scale computations accordingly.

Buckley, Sean M.↗

Design objectives - Air transportation

The mainline of air transportation is expected to continue to be based on the medium to long haul turbine powered subsonic aircraft. With greater emphasis on energy conservation, there will be considerable interest in making additional progress in propulsion system efficiency. Continued improvement in turbofan engines is expected to occur, but there may be a less conventional approach in the background. Opportunities for expanding short haul air services will certainly materialize. The outlook for supersonic air transport is less clear because of complex political and economic factors.

Beheim, M. A.↗

The effects of geography on spectrum-orbit utilization

With over forty satellites in geostationary orbit, and many more planned, it is becoming increasingly difficult to find suitable orbit positions for new systems operating at 4 and 6 GHz. Efficient spectrum-orbit utilization can be achieved with frequency-reuse techniques - orthogonal polarization, earth-station antenna discrimination, and satellite antenna discrimination - provided that service-area geography is considered. Service arc - that portion of the orbit which affords useful service to all points in a given area - is a function of the area's climate, terrain, and location as well as its size and shape. Of the three techniques, satellite antenna discrimination is the most sensitive to these factors. According to the BSS (broadcasting-satellite service) antenna reference pattern, the maximum discrimination possible is the on-axis gain, which can be as high as 49 dB for a beamwidth of 0.6 degrees, or as low as 32 dB for a 3.5-degree beamwidth. Unlike the Fixed-Satellite Service (FSS), the BSS will normally have beams that cover no more than one or two time zones.

Sawitz, P. H.↗

Transparent Ada rendezvous in a fault tolerant distributed system

There are many problems associated with distributing an Ada program over a loosely coupled communication network. Some of these problems involve the various aspects of the distributed rendezvous. The problems addressed involve supporting the delay statement in a selective call and supporting the else clause in a selective call. Most of these difficulties are compounded by the need for an efficient communication system. The difficulties are compounded even more by considering the possibility of hardware faults occurring while the program is running. With a hardware fault tolerant computer system, it is possible to design a distribution scheme and communication software which is efficient and allows Ada semantics to be preserved. An Ada design for the communications software of one such system will be presented, including a description of the services provided in the seven layers of an International Standards Organization (ISO) Open System Interconnect (OSI) model communications system. The system capabilities (hardware and software) that allow this communication system will also be described.

Racine, Roger↗

Space Shuttle payload accommodation and trends in customer demands

This paper will review payload demands for Shuttle resources and services in the pre-Space Station Freedom time frame. Requests for flight in both the Orbiter cargo bay and middeck will be considered. Factors limiting more efficient use of the Shuttle will also be discussed.

Hedin, Daniel L.↗

Integration of magnetic bearings in the design of advanced gas turbine engines

Active magnetic bearings provide revolutionary advantages for gas turbine engine rotor support. These advantages include tremendously improved vibration and stability characteristics, reduced power loss, improved reliability, fault-tolerance, and greatly extended bearing service life. The marriage of these advantages with innovative structural network design and advanced materials utilization will permit major increases in thrust to weight performance and structural efficiency for future gas turbine engines. However, obtaining the maximum payoff requires two key ingredients. The first key ingredient is the use of modern magnetic bearing technologies such as innovative digital control techniques, high-density power electronics, high-density magnetic actuators, fault-tolerant system architecture, and electronic (sensorless) position estimation. This paper describes these technologies. The second key ingredient is to go beyond the simple replacement of rolling element bearings with magnetic bearings by incorporating magnetic bearings as an integral part of the overall engine design. This is analogous to the proper approach to designing with composites, whereby the designer tailors the geometry and load carrying function of the structural system or component for the composite instead of simply substituting composites in a design originally intended for metal material. This paper describes methodologies for the design integration of magnetic bearings in gas turbine engines.

Storace, Albert F.↗

Enhancing the IGS Data and Products Infrastructure: A Data Center Perspective

The Data Transfer and Data Centers session will present papers on current data center activities as well as various topics geared towards enhancing the availability and acquisition of International Global Positions System Service (IGS) data and products. These topics include: strategies for reducing data file latency at IGS Data Centers, standardization of data file replacement notification methods, improving the efficiency of data file transfer among IGS Data Centers, and defining a network topology for GPS data files for use in applications.

Scharber, Michael↗

Verification and Validation of NASA-Supported Enhancements to PECAD's Decision Support Tools

The NASA Applied Sciences Directorate (ASD), part of the Earth-Sun System Division of NASA's Science Mission Directorate, has partnered with the U.S. Department of Agriculture (USDA) to enhance decision support in the area of agricultural efficiency-an application of national importance. The ASD integrated the results of NASA Earth science research into USDA decision support tools employed by the USDA Foreign Agricultural Service (FAS) Production Estimates and Crop Assessment Division (PECAD), which supports national decision making by gathering, analyzing, and disseminating global crop intelligence. Verification and validation of the following enhancements are summarized: 1) Near-real-time Moderate Resolution Imaging Spectroradiometer (MODIS) products through PECAD's MODIS Image Gallery; 2) MODIS Normalized Difference Vegetation Index (NDVI) time series data through the USDA-FAS MODIS NDVI Database; and 3) Jason-1 and TOPEX/Poseidon lake level estimates through PECAD's Global Reservoir and Lake Monitor. Where possible, each enhanced product was characterized for accuracy, timeliness, and coverage, and the characterized performance was compared to PECAD operational requirements. The MODIS Image Gallery and the GRLM are more mature and have achieved a semi-operational status, whereas the USDA-FAS MODIS NDVI Database is still evolving and should be considered

McKellipo, Rodney↗

The Evolution of System Safety at NASA

The NASA system safety framework is in the process of change, motivated by the desire to promote an objectives-driven approach to system safety that explicitly focuses system safety efforts on system-level safety performance, and serves to unify, in a purposeful manner, safety-related activities that otherwise might be done in a way that results in gaps, redundancies, or unnecessary work. An objectives-driven approach to system safety affords more flexibility to determine, on a system-specific basis, the means by which adequate safety is achieved and verified. Such flexibility and efficiency is becoming increasingly important in the face of evolving engineering modalities and acquisition models, where, for example, NASA will increasingly rely on commercial providers for transportation services to low-earth orbit. A key element of this objectives-driven approach is the use of the risk-informed safety case (RISC): a structured argument, supported by a body of evidence, that provides a compelling, comprehensible and valid case that a system is or will be adequately safe for a given application in a given environment. The RISC addresses each of the objectives defined for the system, providing a rational basis for making informed risk acceptance decisions at relevant decision points in the system life cycle.

Dezfuli, Homayoon↗

Cooperative Upper Class E Airspace: Concept of Operations and Simulation Development for Operational Feasibility Assessment

Upper Class E Traffic Management (ETM) is a novel community-based traffic management concept incorporating the FAA, NASA, and industry’s collaborative efforts to support safe, efficient, and scalable future operations in the airspace near and above 60,000 ft. The concept complements Air Traffic Control (ATC) infrastructure and Air Traffic Management (ATM) services by facilitating cooperative operations with ETM provided services. This paper presents an initial Cooperative Separation Management (CSM) concept for High Altitude Long Endurance (HALE) vehicles’ conflict detection and resolution during their extended operations. A prototype simulation platform has been developed to visualize and assess the concept during demonstrations to stakeholders. Further development plans for simulations and the CSM concept are discussed.

upper Class E airspace↗

Cooperative Upper Class E Airspace: Concept of Operations and Simulation Development for Operational Feasibility Assessment

Upper Class E Traffic Management (ETM) is a novel community-based traffic management concept incorporating the FAA, NASA, and industry’s collaborative efforts to support safe, efficient, and scalable future operations in the airspace near and above 60,000 ft. The concept complements Air Traffic Control (ATC) infrastructure and Air Traffic Management (ATM) services by facilitating cooperative operations with ETM provided services. This paper presents an initial Cooperative Separation Management (CSM) concept for High Altitude Long Endurance (HALE) vehicles’ conflict detection and resolution during their extended operations. A prototype simulation platform has been developed to visualize and assess the concept during demonstrations to stakeholders. Further development plans for simulations and the CSM concept are discussed.

upper Class E airspace↗

An operational video data compression system for ATS and ITOS

An operational data compression system has been developed and implemented for transmission of digitized ATS and ITOS-VHRR satellite video data over the wideband communication link between the Wallops Island, Va. Command and Data Acquisition Station and the National Environmental Satellite Service at Suitland, Md. This system uses minicomputers for the coding and decoding of the data to achieve maximum flexibility together with specially designed interface equipment for greater efficiency. No loss in data quality occurs due to the compression, and, in certain cases, data is transmitted which would be otherwise unavailable due to the limited channel capacity. This paper describes the method of compression, the equipment used, and the compression results attained.

Kutz, R. L.↗

Countersink Drill

Efficient drill design for countersinking or metal drilling uses only two flutes instead of three and made of carbide instead of "high-speed" steel. Tool performance and service life increased.

Hernandez, R. J.↗

The space exploration initiative. Operational efficiency panel space-basing technology requirements

The topics covered include the following: (1) space basing technology requirements sources; (2) orbit transfer vehicle (OTV) processing heritage; (3) ground processing progression to space processing; (4) technology requirements for space based OTV servicing and maintenance; (5) design and development schedule for OTV's and OTV accommodations/ support hardware; (6) cryogenic technology test program development; (7) cryogenic propellant transfer, storage, and reliquefaction management summary; (8) propellant transfer technology analysis and ground testing; (8) OTV propellant storage depot development critical scaling relationships; (9) flight experiment options; (10) OTV maintenance; (11) automated fault detection/ isolation and system checkout summary; (12) engine replacement; (13) alternative docking operation; (14) OTV/payload integration; and (15) technology criticality and capability assessment. This document is presented in viewgraph form.

Pena, Luis R.↗