Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Foundation heat exchangers for residential ground source heat pump systems Numerical modeling and experimental validation

A new type of ground heat exchanger that utilizes the excavation often made for basements or foundations has been proposed as an alternative to conventional ground heat exchangers. This article describes a numerical model that can be used to size these foundation heat exchanger (FHX) systems. The numerical model is a two-dimensional finite-volume model that considers a wide variety of factors, such as soil freezing and evapotranspiration. The FHX numerical model is validated with one year of experimental data collected at an experimental house located near Oak Ridge, Tennessee. The model shows good agreement with the experimental data-heat pump entering fluid temperatures typically within 1 C (1.8 F) - with minor discrepancies due to approximations, such as constant moisture content throughout the year, uniform evapotranspiration over the seasons, and lack of ground shading in the model.

15 GEOTHERMAL ENERGY↗

Recent Approaches to Modeling Transport of Mercury in Surface Water and Groundwater - Case Study in Upper East Fork Poplar Creek, Oak Ridge, TN - 13349

In this case study, groundwater/surface water modeling was used to determine efficacy of stabilization in place with hydrologic isolation for remediation of mercury contaminated areas in the Upper East Fork Poplar Creek (UEFPC) Watershed in Oak Ridge, TN. The modeling simulates the potential for mercury in soil to contaminate groundwater above industrial use risk standards and to contribute to surface water contamination. The modeling approach is unique in that it couples watershed hydrology with the total mercury transport and provides a tool for analysis of changes in mercury load related to daily precipitation, evaporation, and runoff from storms. The model also allows for simulation of colloidal transport of total mercury in surface water. Previous models for the watershed only simulated average yearly conditions and dissolved concentrations that are not sufficient for predicting mercury flux under variable flow conditions that control colloidal transport of mercury in the watershed. The transport of mercury from groundwater to surface water from mercury sources identified from information in the Oak Ridge Environmental Information System was simulated using a watershed scale model calibrated to match observed daily creek flow, total suspended solids and mercury fluxes. Mercury sources at the former Building 81-10 area, where mercury was previously retorted, were modeled using a telescopic refined mesh with boundary conditions extracted from the watershed model. Modeling on a watershed scale indicated that only source excavation for soils/sediment in the vicinity of UEFPC had any effect on mercury flux in surface water. The simulations showed that colloidal transport contributed 85 percent of the total mercury flux leaving the UEFPC watershed under high flow conditions. Simulation of dissolved mercury transport from liquid elemental mercury and adsorbed sources in soil at former Building 81-10 indicated that dissolved concentrations are orders of magnitude below a target industrial groundwater concentration beneath the source and would not influence concentrations in surface water at Station 17. This analysis addressed only shallow concentrations in soil and the shallow groundwater flow path in soil and unconsolidated sediments to UEFPC. Other mercury sources may occur in bedrock and transport though bedrock to UEFPC may contribute to the mercury flux at Station 17. Generally mercury in the source areas adjacent to the stream and in sediment that is eroding can contribute to the flux of mercury in surface water. Because colloidally adsorbed mercury can be transported in surface water, actions that trap colloids and or hydrologically isolate surface water runoff from source areas would reduce the flux of mercury in surface water. Mercury in soil is highly adsorbed and transport in the groundwater system is very limited under porous media conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determination from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Construction and Social Experiences in Residential Remediation Sites - 13423

Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

54 ENVIRONMENTAL SCIENCES↗

Treatment of Bottled Liquid Waste During Remediation of the Hanford 618-10 Burial Ground - 13001

A problematic waste form encountered during remediation of the Hanford Site 618-10 burial ground consists of bottled aqueous waste potentially contaminated with regulated metals. The liquid waste requires stabilization prior to landfill disposal. Prior remediation activities at other Hanford burial grounds resulted in a standard process for sampling and analyzing liquid waste using manual methods. Due to the highly dispersible characteristics of alpha contamination, and the potential for shock sensitive chemicals, a different method for bottle processing was needed for the 618-10 burial ground. Discussions with the United States Department of Energy (DOE) and United States Environmental Protection Agency (EPA) led to development of a modified approach. The modified approach involves treatment of liquid waste in bottles, up to one gallon per bottle, in a tray or box within the excavation of the remediation site. Bottles are placed in the box, covered with soil and fixative, crushed, and mixed with a Portland cement grout. The potential hazards of the liquid waste preclude sampling prior to treatment. Post treatment verification sampling is performed to demonstrate compliance with land disposal restrictions and disposal facility acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Successful Communications Program Based on the Needs and Characteristics of the Affected Communities - 13152

Over 200 local residents streamed through the doors of the Port Hope Lions Centre to see the detailed plans for the historic low-level radioactive waste clean-up project about to take place in their community. The event had a congenial atmosphere as people walked through the hall taking in rows of display panels that explained each element of the project, asked questions of project staff stationed around the room and chatted with friends and neighbours over light refreshments. Later that year, the results of the Port Hope Area Initiative (PHAI) 10. annual public attitude survey revealed an all-time high in community awareness of the project (94%) and the highest levels of confidence (84%) recorded since surveying began. Today, as the PHAI transitions from a decade of scientific and technical studies to implementation, the success of its communications program - as evidenced by the above examples - offers room for cautious encouragement. The PHAI has spent the past 10 years developing relationships with the southern Ontario communities of Port Hope and Port Granby in preparation for Canada's largest low-level radioactive waste environmental restoration project. These relationships have been built around a strong understanding of the communities' individual needs and characteristics and on the PHAI's efforts to consider and respond to these needs. The successes of the past, as well as the lessons learned, will inform the next stage of communications as the projects move into waste excavation and transportation and building of the long-term waste management facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Granby Project Overview - 13208

The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Project was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Decommissioning the Humboldt Bay Power Plant - 13604

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) to Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Freeze Technology for Nuclear Applications - 13590

Freezing of soil materials is a complicated process of a number of physical processes: - freezing of pore water in a thermal gradient, - cryogenic suction causing water migration and - ice formation expanding pores inducing frost heave. Structural changes due to increase of effective stress during freezing also take place. The over consolidation gives a powerful dewatering/drying effect and the freeze process causes separation of contaminates. Artificial ground freezing (AGF is a well established technique first practiced in south Wales, as early as 1862. AGF is mostly used to stabilize tunnels and excavations. During the last ten years underwater applications of freeze technologies based on the AGF have been explored in Sweden. The technology can, and has been, used in many different steps in a remediation action. Freeze Sampling where undisturbed samples are removed in both soft and hard sediment/sludge, Freeze Dredging; retrieval of sediment with good precision and minimal redistribution, and Freeze Drying; volume reduction of contaminated sludge/sediment. The application of these technologies in a nuclear or radioactive environment provides several advantages. Sampling by freezing gives for example an advantage of an undisturbed sample taken at a specified depth, salvaging objects by freezing or removal of sludges is other applications of this, for the nuclear industry, novel technology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mobile platform for radiological characterization of sites under or after decommissioning - 15139

Nowadays, nuclear industry is facing a crucial need in establishing radiological characterization for the assessment and the monitoring of any remediation work. Regarding its experience in this domain, the French Commission for Atomic Energy and Alternative Energies (CEA) of Fontenay-aux-Roses, established an important feedback and developed a sound methodology for radiological characterization. A clean-up project is managed from the initial surface characterization to the final one, once volumes of contaminated soil have been removed. Samples are collected via recognized methods and data is gathered by real-time acquisition with different conveyance such as all-in-vehicles, cart, walking, helicopter or drone. Accurate radiological analyses are performed on site thanks to the mobile laboratories cluster, called SMaRT. It enables to realize long-time gamma spectroscopy, chemical preparation for alpha spectroscopy or beta liquid scintillation counting. Data is processed with geo-statistics via the software Kartotrak, 2D or 3D mapping are created with the associated uncertainty and probability map. Drilling profiles with geological data (layers composition, particles size, etc.) are studied in order to understand the behavior of the contamination in depth. Source term, contaminated volumes and sanitary impact are calculated in order to determine the optimum excavation depth. Finally, data is stored in an online site that insures the traceability of the whole process. This just-in-time production model allows a fast response and control of costs and avoids the disadvantages of radioactive material transport. This whole innovative process, developed inside the mobile platform, requires all these tools that have been used in France and continuously evolving for more than 10 years thanks to a learning organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The SRNL technical assistance program: transferring lessons learned from two decades of remedial successes to the DOE complex - 15438

The Savannah River Site has an established history of developing implementable risk reduction strategies, developing and deploying innovative technological solutions, and collaboratively achieving realistic and protective environmental end states for complex environmental problems. Part of this success results from the strong historical collaboration between site environmental restoration groups and the Savannah River National Laboratory which results in the promulgation of innovative technical approaches and technologies from the laboratory to ongoing remediation campaigns. Much of the underlying research and development effort was funded by DOE's Office on Environmental Management through a series of applied technology demonstration projects (Integrated Demonstration Project, Integrated Programs and the Applied Field Research Site). Concomitant with the research efforts, SRNL has managed a dynamic and efficient national program that provides teams of technical experts with a broad experience base to recommend strategies that reduce risk and/or technical uncertainty for challenging environmental problems at other DOE facilities. At many of these sites, standard remedial approaches (e.g., excavation, pump and treat, soil vapor extraction) have either failed or proved to be too costly, inadequate, or ineffective. Alternatively, other sites struggle with implementation of innovative but less well understood approaches. The technical assistance teams use a structured process that based on several basic concepts, specifically, development of site specific technical frameworks, and careful matching of remedies to site-specific chemical, geological and physical conditions. Development of technical frameworks is a key strategy to apply basic science to an applied field problem. When directed toward understanding complex real-world environmental remediation challenges, frameworks are tools that support practical identification and incorporation of the key-controlling scientific processes and principles. Frameworks can also be used to minimize technical risks, encourage efficiency and effectiveness, and provide the basis for innovative and creative solutions. Efficient and effective environmental cleanup also requires matching the character of remediation and stabilization methods to the nature of the target zone of contamination as the nature of the target zone evolves through the life of the remedial project. A contaminant plume can be divided into the following zones: the source zone, the impact zone, and the transitional zone that then can be used to identify classes of technologies that are appropriate to that zone. For example, physical and chemical methods (e.g., trapping, immobilization, destruction, or isolation) that directly address the source contaminants are often appropriate for the disturbed zone during the remedial process. A variety of methods that include both active treatments (e.g., pump and treat or active bioremediation) and enhanced attenuation technologies (e.g., geochemical manipulation or reactive barriers) are often suitable for the primary contamination zone or impact zone. Various strategies based on natural attenuation processes may be applicable to the primary contamination zone and these methods are typically applied for the transition or baseline portions of the plume. Careful matching of remedies to site-specific conditions is critical to long-term success in environmental cleanup and restoration. The matching process facilitates selection of technologies with particular strengths that align with real-world needs and constraints, encourages strategic use of multiple or combined technologies to address major plume sub-domains, and supports transitioning technologies in space and time as remediation progresses. Since 2006, the SRNL Technical Assistance program has focused on providing support across the DOE complex. During this time, over 25 teams have visited eleven DOE sites and made recommendations that yielded an estimated cost savings of $100 M. Examples will be provided that illustrate key aspects and significant successes of the technical assistance program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of multiple groundwater contaminant plumes extending beyond property boundaries at the young - Rainey STAR Center (Science, Technology, and Research Center) - 15623

The US DOE Pinellas Plant-now known as the Young - Rainey STAR Center, located in Largo, Florida-manufactured components for nuclear weapons from 1956 to 1995. During decades of operations, chlorinated solvents were released from a drum storage area and from underground piping at multiple points adjacent to and beneath a 4.5-hectare (11-acre) building. Two groundwater contaminant plumes associated with contaminant sources beneath the building have been identified, delineated, and are being monitored. During a focused delineation campaign in 2008 to better define the plume boundaries prior to municipal construction projects in the area, the plumes were determined to extend beyond the site boundaries, beneath the adjacent roadway easements, and beneath four adjacent privately owned properties. US DOE has performed a number of activities in response to the discovery of the offsite contaminant plumes, including performing a high-resolution delineation of contaminant plumes; coordinating with local municipalities to complete two linear construction projects requiring dewatering in the vicinity of the plumes; performing risk assessment, risk management, risk communication, and community relations tasks associated with the project; coordinating with state regulators to identify a risk-based corrective action regulatory approach; and coordinating with impacted property owners to develop and implement institutional controls. During the replacement of a 1.2-meter (48-inch) municipal potable water line directly over the contaminant plume area, US DOE (1) constructed infrastructure to receive and treat dewatering effluent at a rate of 20 gallons per minute around the clock for 6 weeks, and (2) conducted breathing-zone air monitoring during excavation of a 3.0-meter (10-foot) deep trench. This degree of diligence was necessary to ensure and document that no site workers were exposed to chlorinated solvent vapors during the construction process, and that a large volume of potentially contaminated groundwater was properly treated and dispositioned. US DOE also took aggressive actions to pro-actively address claims regarding loss of property value on two properties associated with the groundwater contamination, which resulted in a teaming arrangement with each party for future management of the ongoing corrective actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenges of Repository Operation in an Existing Mine - 19339

A generally accepted principle related to long term management of radioactive waste/ spent fuel is the isolation in a geological repository. In Germany, the disposal operation of low-level waste (LLW) and intermediate-level waste (ILW) started in the Asse II mine in 1967 and in the former German Democratic Republic in the Morsleben repository in 1971. After the German reunification, the responsibility for the existing sites changed several times until the Bundesgesellschaft fuer Endlagerung (BGE) became new license holder for both sites in 2017. The BGE is responsible to carry out the operative tasks of searching for a high-level waste (HLW) repository, the planning and construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository. Nevertheless, the challenges of repository operation in an existing mine have not changed in all these years, as the regulatory framework is mainly written for Nuclear Power Plants (NPPs) and is difficult to adapt for a repository mine. In particular, conditions in a mine are substantially different from 'clean' above-ground nuclear installations. Dust due to mining activities, relatively high temperatures, and a corrosive atmosphere in a salt mine might be present. Therefore, the usability of the repository for several decades during the different operational phases, i.e. planning, construction, emplacement, and closure, can only be ensured by continuous maintenance. Furthermore, the atomic law is applicable for above-ground facilities and the mining law for mines of every description. The difficulty of geological repositories is to ensure that both laws are going to be applied above and below ground with no regulatory framework tailored especially for such sites. A special case is the Asse II mine where the mining law was applied from the very beginning, before the atomic law needed to be established later on and now requires the retrieval of the radioactive waste before decommissioning. In this presentation, similarities and differences in the legal framework of the repositories in the responsibility of BGE and some operational experiences throughout the years are described. This applies to the radiation protection regime, the excavation ratio, the host rock stability and the backfilling concepts of the mining areas. Further challenges arise from the demonstration of long term safety according to the state-of-the-art of science and technology for either existing repositories/ mines or those under construction or planned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A GIS-Based Suitability Analysis of a Phytomanagment Strategy for TCE in Groundwater and Soil Niagara Falls Storage Site, New York - 19385

The large number of complexly contaminated sites throughout the nation has propagated the application of phytoremedial techniques in a wide array of environmental remediation strategies. The use and breeding of vegetation for the in-situ treatment of environmental media (soil, groundwater, sediment) contaminated with organic or inorganic contaminants has shown to provide a low-cost alternative to conventional means of remediating contaminated sites (e.g., groundwater extraction, chemical oxidation or reduction, bioremediation, excavation, etc.). One impediment to effective phytoremediation is the selection of proper plant-species, which is complicated due to the many variables that are required for plant-species viability (i.e. range of soil pH, annual precipitation values, depth to groundwater table, etc.). This study employed the use of a Geographic Information Systems (GIS) to first define the spatial extent of contaminated media (soil and groundwater) at a project site and then support an effective means to optimize phytoremediative techniques to manage these impacts prior to final remediation. Spatial analyses and analytical calculations were coupled to determine an optimal plant species and spacing to maximize the effectiveness of a phytomanagement plan. The incorporation of fuzzy membership functions and fuzzy overlay provide an innovative method to help select the optimal plant-species for phytomanagement planning. Fuzzy membership functions were used to represent the plant growth requirements and provided an intuitive method to represent the uncertainty associated with plant-growth requirements. The fuzzy overlay function then employed a raster-based suitability analysis that together provided decision makers with a scientific solution to optimally design a phytomanagement strategy for site-related volatile organic compound (VOC) impacts. The Niagara Falls Storage Site (NFSS) VOC-impacted groundwater is contained in clayey glacial sediments, which commonly are technically impractical to remediate. Prior on-site studies show that native poplar (cottonwood variants) preferentially translocate or phytoextract the VOCs from the site soils and thus provide a proven mechanism to manage the multi-media impacts. Consequently, the Army Corps of Engineers Buffalo District evaluated phytoremediative approaches as a passive tool to manage the VOCs during the project life cycle prior to final remediation. The fuzzy membership functions and fuzzy overlay modeling of candidate species narrowed the selection to an optimal species and subsequent transpiration modeling estimated the plant spacing for the overall phytomanagement plan. The method employed for this study is easy applied to other phytoremediative and phytomanagement actions derived from hazardous waste decision making. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenges of Air Monitoring at a Soil Remediation Project in a Suburban Setting - 20448

Air monitoring during soil excavation at a chemically and radiologically impacted site in a suburban setting presents unique challenges. Site activities were conducted in a manner that minimized the release of airborne particulates of concern, principally radionuclides of concern (ROC). Dust and air monitoring were performed to ensure the public was not being exposed to the soil contaminants. The project team collected representative air and dust data while being mindful to not impose on the lives of residents in the area. Due to the close proximity to the public, there was a high level of oversight from the client and regulatory agencies. The challenges involved with air sampling at this soil remediation site located in a suburban setting included the number of contaminants, the ranges of risks and hazards presented by the contaminants and the method of remediation, the concerns of the regulators and the public, and the perception of risk from the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗