Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Gear Test Assembly - Status Report For FY2019

The final stages of pre-sodium commissioning were completed for the Gear Test Assembly (GTA) in late 2018 and all the components were moved to building 308 for final preparations for insertion into the Mechanisms Engineering Test Loop (METL). The GTA was fully assembled in the experimental test assembly workstation and all supporting electrical and hardware systems were installed on the METL Mezzanine. The GTA was installed in Test Vessel 1 after performing a final systems check, and the vessel and article were raised to operating temperature and held for two weeks to bake-out any moisture present in the components. Test Vessel 1 was filled with sodium and a purification process was completed using the cold trap system. When the sodium was sufficiently clean, Test Vessel 1 was isolated from the rest of METL, and experimental operation of the GTA commenced. The experimental operations consisted of rotating two shafts using Parker servomotors to apply a prototypic torque of a fuel handling mechanism removing and inserting a sodium fast reactor fuel assembly. This removing and inserting motion was repeated until the system seized, indicating component degradation of either the gears or the bearings in the test gearbox. A total of 19,600 cycles were completed, corresponding to the removal and insertion of 9,800 fuel assemblies. The system was shut down and then prepared for removal. The Flexicask System was successfully used to remove the GTA from Test Vessel 1 while keeping both vessel and article inert during the process. The GTA was installed in the Carbonation System, where the process of slowly reacting the sodium away using moist CO 2 has been started. Once the GTA is fully cleaned, it will be disassembled and the gears will undergo the same NDE process performed before testing to quantify the wear that occurred. A report on this, along with the data analysis from the experimental operations will be submitted in late 2019.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SYS645 Design for Reliability Maintainability and Supportability: H12 Universal Cartridge Carrier (circa 1952)

The initial product specification' for the H12 Universal Cartridge Carrier (UUC) was released in October 1952 and is the twelfth piece of H-Gear (sequentially numbered) ever developed. It is the oldest piece of H-Gear currently in use. To gain perspective on the number of H-Gear since designed, the most currently developed and deployed H-Gear is the H1768, Inspection Stand. The UUC, (commonly referred to as just the "H12") has since been renamed to the H12 Adjustable Hand Truck. It was developed to support various maintenance operations for ordnance assembly and disassembly. This paper will provide evidence (where available) for the H12s current state of reliability, maintainability, and sustainability (RMA). Where documented evidence is not available, conclusions will be drawn based on its continued effective use over the past 67-years of service.

42 ENGINEERING↗

Efficient Binary Static Code Data Flow Analysis Using Unsupervised Learning

The ever increasing need to ensure that code is reliably, efficiently and safely constructed has fueled the evolution of popular static binary code analysis tools. In identifying potential coding flaws in binaries, tools such as IDA Pro are used to disassemble the binaries into an opcode/assembly language format in support of manual static code analysis. Because of the highly manual and resource intensive nature involved with analyzing large binaries, the probability of overlooking potential coding irregularities and inefficiencies is quite high. In this paper, a light-weight data, unsupervised data flow methodology is described which uses highly-correlated data flow graph (CDFGs) to identify coding irregularities such that analysis time and required computing resources are minimized. Such analysis accuracy and efficiency gains are achieved by using a combination of graph analysis and unsupervised machine learning techniques which allows an analyst to focus on the most statistically significant flow patterns while performing binary static code analysis.

97 MATHEMATICS AND COMPUTING↗

Nonlinear Feature Extraction and Energy Dissipation of Foam/Metal Interfaces

The physical mechanisms of energy dissipation in foam to metal interfaces must be understood in order to develop predictive models of systems with foam packaging common to many aerospace and aeronautical applications. Experimental data was obtained from hardware termed Ministack, which has large, unbonded interfaces held under compressive preload. This setup has a solid aluminum mass placed into two foam cups which are then inserted into an aluminum can and fastened with a known preload. Ministack was tested on a shaker using upward sine sweep base acceleration excitations to estimate the linearized natural frequency and energy dissipation of the first axial mode. The experimental system was disassembled and reassembled before each series of tests in order to observe the effects of the assembly to assembly variability on the dynamics. Additionally, Ministack was subjected to upward and downward sweeps to gain some understanding of the nonlinearities. Finally, Ministack was tested using a transient input, and the ring down was analyzed to find the effective stiffness and damping. There are some important findings in the measured data: there is significant assembly to assembly variability, the order in which the sine sweeps are performed influence s the dynamic response, and the system exhibits nontrivial damping and stiffness nonlinearities that must be accounted for in modeling efforts .

42 ENGINEERING↗

Investigation of Energy Dissipation Behavior in Threaded Joints Under Impact Loading Using a Kolsky Tension Bar

Threaded joints are a common fastening method in applications where disassembly may be required. With a fair amount of investigation of static behavior of threaded joints, less emphasis has been placed on the behavior of threaded joints subjected to transient impact loads. Understanding how energy is transferred across threaded joints under impact loading conditions is critical for improved design and optimization for extreme mechanical environments. Many factors, such as pre - torque, pre - tension load, and impact speed can affect how energy is transferred or dissipated across threaded joins. In addition, high-fidelity numerical simulation of mechanical response of threaded components under blast or impact loading requires reliable experiments and subsequent analyses. In this study, the energy dissipation behavior through a threaded joint under impact loading conditions is investigated using a Kolsky tension bar. The aim is to study possible energy dissipation behavior in both time and frequency domains while the threaded joint remains intact. New analytical methods to understand both time-and frequency-domain behavior of threaded joints are presented. Energy dissipation characteristics through steel-to-steel and steel-to-aluminum threaded joints were then investigated with varying parameters such as pre-torque and impact velocity.

42 ENGINEERING↗

Testing of an Iodine and Tritium Capture System for an NO₂-Based Tritium Pretreatment Process

The reprocessing of used nuclear fuel would release volatile radionuclides into the off-gas streams of a processing plant, including ³H, ¹⁴C, ⁸⁵Kr, and ¹²⁹I. One potential simplification to the management of the off-gas streams could be achieved through an efficient tritium pretreatment (TPT) step in which the UO₂ fuel is oxidized by either air or NO₂ before dissolution. The oxidation of the UO₂ fuel matrix will result in the release of tritium from the fuel. Upfront release of tritium from the fuel in a pretreatment step with subsequent tritium abatement can minimize or eliminate the distribution of tritium throughout a plant. This can decrease or eliminate the need for tritium capture on multiple off-gas streams and prevent distribution to the aqueous inventory. The use of NO₂ as the oxidant in an advanced tritium pretreatment (ATPT) allows for the oxidation to be performed at lower temperatures and may also result in the quantitative release of iodine from the fuel. The ATPT off-gas will contain up to 75 vol% NO₂ gas. Spencer et al. identified the most promising iodine sorbent as silver nitrate-impregnated alumina (AgA) and the most promising tritium sorbents as 3Å molecular sieve (3Å MS) and silica gel for radionuclide capture from ATPT off-gas streams. An initial series of tests were conducted in fiscal years 2017–2018 with the intent of demonstrating the recovery of iodine and tritium using these sorbents from a recirculating gas stream that simulated the NO₂ recycle loop envisioned for the ATPT system. These initial tests showed low tritium recoveries and significant variations in the iodine recovery on the AgA. Ultimately it was concluded, following disassembly of the system, that corrosion within the system was partially the cause of the poor recovery of both species. All components of that system were disposed of at the end of the analysis. One of the conclusions drawn from the initial tests pointed to the reconsideration of the materials of construction. Based on that recommendation a new test bed for the advanced TPT off-gas system, that addresses the issues identified in the fiscal years 2017 and 2018 scoping tests, was designed and constructed. The test bed used high nickel alloys wherever possible to address the previously observed corrosion issues, a redesigned surge tank to permit ease of purging, an improved feed injection system and a more modular system design that allowed testing of incremental increases in system complexity to allow the isolation of any element that results in changes to recovery of target species. Accompanying that design, a multifaceted test plan was completed. The overarching goals of this test series were two-fold. The first goal was to demonstrate the ability to recover both the iodine and tritium that would be released during TPT in a manner that the releases from the fuel can be quantified. The second goal was to demonstrate that the combined recovery system could operate in any of the three proposed TPT modes (once-through air or O₂, recirculating air or O₂, or recirculating NO x ). A total of 22 tests were completed. Ten tests examined tritium behavior under varying operating parameters, 8 tests examined iodine behavior under varying operating parameters, and 4 tests examined both tritium and iodine behavior. Silica gel was used for the tritium sorbent, and AgA or Ag-mordenite (AgZ) was used as the iodine sorbent. The following conclusions were drawn: Full recovery is achieved for both sorbates when no sorbent is in place indicating no accumulation within the test system. In even the simplest of the configurations (i.e., no sorbents in the columns), iodine is more difficult to transport and recover from the system than tritium. Analysis of the AgA iodine sorbent beds from the integrated tritium and iodine tests indicate quantitative iodine recovery can be achieved (within anticipated experimental errors). This system may provide a means for the quantification of the iodine released by the ATPT process within the experimental uncertainties. This would support 0.33 to 1.00 kg demonstrations of the ATPT process with actual used nuclear fuel. Iodine penetrated further into AgZ than into AgA when operated in gas recirculation mode. Tritium adsorbs to and cannot be fully recovered from the 10-cm column of silica gel at regeneration temperatures up to 140 °C.; Tritium adsorbs to and cannot be recovered from the 10-cm column of AgA at desorption temperatures up to 200 °C. Co-adsorbed tritium was recovered to a greater extent from AgZ than from AgA, but recovery was not complete. No visible corrosion was observed in the test system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Antarctica Radiological Source Removals (Final Report)

On 18 May 2015, the research vessel Akademik Fedorov of the Russian Antarctic Expedition (RAE) delivered four radioisotope thermoelectric generators (RTGs) from Antarctica to the port of St. Petersburg, Russia. The RTGs had been previously used in the work program of the former Soviet Antarctic Expedition (SAE). From the mid-1970s, RTGs have been used to provide autonomous power at geophysical and meteorological stations located in remote regions of Antarctica. The research was completed in the early 1990s, but not all the generators had been removed when the stations were decommissioned. The remaining four unsecured RTGs, with their strontium-90 ( 90 Sr) radiological material and a combined total activity of 80,000 curies (Ci), still posed a potential risk as they could be used for nefarious purposes. Therefore, a plan of action for the removal of the RTGs from Antarctica was developed. This was done within the framework of the international program for the disposal of Russian RTGs. Financial support and technical oversight was provided by the U.S. Department of Energy (DOE), while logistical support was provided by the Russian Antarctic Expedition (RAE) of the Arctic and Antarctic Research Institute (AARI) and by subsidiaries of the Russian Federation’s Rosatom State Corporation. Recovering and repatriating the RTGs from the continent of Antarctica to the Russian Federation proved to be a very difficult task, including satisfying all the legal aspects within a very tight timeframe. This involved indemnification issues, adhering to new laws enacted after the Soviet Union era, and obtaining all the necessary permits and certifications for transport of the RTGs by air, sea, and land. It was an international, collaborative effort involving the cooperation of multiple organizations to complete the legal work and preparation of necessary documents. In addition, AARI needed to create a separate structure within its organization to manage the process, including the provision of special medical screenings, training, and certifications of its institute personnel. This was done so AARI could fulfill its obligation for the safe handling of radioactive materials while in the field. Recovery of the RTGs required overcoming several logistical hurdles. The Akademik Fedorov, which transported the RTGs back to the Russian Federation, required retrofits to accommodate the RTGs for safe and secure transport of radioactive material. The United States Project Team (USPT) inspected the vessel while it was in dry dock in Turku, Finland, being retrofitted with their design. Special sleds had to be designed to transport RTGs, as well as equipment for identifying crevasses in the glaciers, over the Antarctic packed snow and ice. Provision of adequate fuel supplies for the long trek to the interior of Antarctica to recover one of the RTGs also had to be addressed. With the successful recovery, repatriation, and disassembly of the RTGs, the Radioactive Heat Sources (RHSs) were extracted and dispositioned, thus eliminating any risk of these radioactive sources being used for terrorist purposes. Successful completion of the project also fulfilled the requirements of the Protocol on Environmental Protection to the Antarctic Treaty concerning the need to remove unused radioactive materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Disposition Efforts at Los Alamos National Laboratory

Summary: Doing uranium work in a plutonium facility has challenges: NDA is geared to plutonium, Pu contamination, DU discards. The future volume of the feed stream to UED is dependent on pit disassembly. The dilute and dispose Pu disposition option will cause the HEU stream to grow significantly. Shipping HEU metal directly to Y-12 is a long term goal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-1 Irradiated Compact 6-1-1 PIE Report: Evaluation of As-Irradiated Fuel Performance Using Leach Burn Leach, IMGA, Materialography, and X-ray Tomography

The AGR-1 irradiation test train consisted of six independently monitored capsules. All capsules contained twelve compacts in three stacks of four compacts each [Pope 2010]. Compact 6-1-1 was located in capsule 6, at the top of the test train. The compact was in stack 1 (one of the two stacks closest to the core) in position 1 (at the bottom of the 4 compact stack). Compact 6-1-1 was identified in the fabrication data package as LEU01-46T-Z32 [Hunn et al. 2006]. Details of the compact fabrication and measured properties can be found in that data package. The compact lot was made using TRISO-coated particles designated as AGR-1 Baseline fuel. These particles contained 19.7% enriched mixed uranium oxideuranium carbide (UCO) kernels with a O/U atomic ratio of ~1.36 and a C/U atomic ratio of ~0.33 [Pope 2010]. Details of the coated particle fabrication and measured properties can be found in the data package for the AGR-1 Baseline particles [Hunn and Lowden 2006]. The compact was irradiated at the INL Advanced Test Reactor (ATR) to an average calculated burn-up of 15.1% fissions per initial metal atom (FIMA) and an average calculated fast fluence of 3.0 x 10 25 n/m 2 [Sterbentz 2011] at a calculated volume averaged and time averaged temperature of approximately 1111°C [Hawkes 2012]. Capsules were disassembled and preliminary compact and graphite holder inspection was performed [Demkowicz et al. 2011]. Compact 6-1-1 was shipped to ORNL and post-irradiation examination (PIE) was performed according to examination plan PLN-3624 [Demkowicz 2010-2]. All the examination plan objectives listed below were completed except item 6, which was deleted due to limited funding. 1. Determine the inventory of fission products retained in the compact matrix, but not contained by the SiC and determine the number of exposed kernels or particles with defective SiC layers using the deconsolidation-leach-burn-leach method. 2. Gamma count all particles to quantify 137Cs inventory for comparison with calculated values and gamma spectrometric measurements made on the whole compact. Also, attempt to quantify the inventory of any other fission products for which gamma emissions are observed. 3. Characterize each particle based on the 137 Cs/ 144 Ce ratio to identify particles with low Cs retention that may be the result of a failed SiC coating. 4. Gamma count a subset of particles to determine the 110m Ag inventory for comparison with calculated values and gamma spectrometric measurements made on the whole compact. Also, attempt to quantify the inventory of other fission products observed. 5. Microscopically inspect selected particles to determine the condition of the kernels and coatings. This could include kernel migration, coating microstructures and defects, fission product attack of the SiC layer, and fission product migration in the coating layers. 6. Perform high temperature fission product release tests on a subset of particles in order to calibrate the collection efficiency of the Core Conduction Cooldown Test Facility (CCCTF) deposition cup for selected fission products. Gamma count particles before and after the heating test to quantify the released fission product fractions. 7. Archive remaining particles for later use. Compact 6-1-1 LBL began with compact deconsolidation in the Building 3525 hot cell, followed by two nitric acid leaches of the particles and matrix residue using a Soxhlet extraction apparatus. The matrix residue was then burned and the ash was leached twice with boiling nitric acid. The deconsolidated particles underwent an IMGA analysis to determine gamma-emitting isotope inventories for individual particles; the most conspicuous elements with reduced inventories, indicating fission product release, were silver and europium. During the IMGA analysis, particles with low silver were identified and a subset of these was set aside for materialography and x-ray. After the completion of the IMGA study, about 10% of the particles (421) were set aside as an archive and the remainder burned back and leached twice in the Soxhlet apparatus. Figure 1 shows a flow chart detailing the PIE of Compact 6-1-1.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Augmented Monitoring and Condition Assessment Program (AMCAP) Material Test Reactor (MTR) (Fuel Inspection Program Report)

The AMCAP MTR Fuel Inspection Program, a special inspection program comprised of four inspection campaigns, examined a total of ten (10) pre-selected aluminum-clad, aluminum-based fuel core spent nuclear fuel assemblies (ASNF) stored in the L Area Disassembly Basin (L Basin) at the Savannah River Site. A full description of the inspections and the results are reported. The fuel had been stored in bundled-tube storage (Vertical Tube Storage) for periods of 18 to 21 years. The prior service experience of the individual 10 assemblies varies, but all included irradiation followed by wet storage at international research reactor sites prior to shipment to the US and storage in L Basin. The 10 assemblies were expected to be among the “worst"’ in terms of prior corrosion damage of the entire inventory of the direct-bundle-stored ASNF in L Basin. The inventory of MTR ASNF in L Basin will continue to be stored in the bundled-tube configuration or in slug-storage buckets with inserts pending retrieval for ultimate disposition. The MTR fuel inspections focused on collecting information for characterization of the material condition of the ASNF considering various types of aluminum fuel corrosion degradation of its assembled materials in water storage. A custom-designed Fuel Inspection Table was used to stage the fuel for remote, enhanced visual examination (close-up video imaging & recording) with controlled lighting and positioning that enables reproducibility of imaging conditions. The inspections were conducted by fuel subject matter expert staff from Spent Fuel Project Engineering (SFPE) and the Savannah River National Laboratory (SRNL). Stills captured from the video records were used to compare the corrosion evolution from previous records, as available. This evaluation of the inspection results including the comparison to the previous inspection results demonstrate that the water quality and the storage configuration of ASNF in L Basin do not cause aggressive corrosion degradation of the fuel; mitigation of the prior corrosion degradation of the fuel also appears to have been achieved with the good water quality conditions of L Basin. Recommendations are made for future inspection of the fuel to trend corrosion degradation and demonstrate continued safe wet storage of the ASNF in L Basin. The next fuel examination is recommended to be performed in 5 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application and Certification of Comparative Vacuum Monitoring Sensors for Structural Health Monitoring of 737 Wing Box Fittings

Multi-site fatigue damage, hidden cracks in hard-to-reach locations, disbonded joints, erosion, impact, and corrosion are among the major flaws encountered in today's extensive fleet of aging aircraft and space vehicles. The use of in-situ sensors for real-time health monitoring of aircraft structures are a viable option to overcome inspection impediments stemming from accessibility limitations, complex geometries, and the location and depth of hidden damage. Reliable, structural health monitoring systems can automatically process data, assess structural condition, and signal the need for human intervention. Prevention of unexpected flaw growth and structural failure can be improved if on-board health monitoring systems are used to continuously assess structural integrity. Such systems are able to detect incipient damage before catastrophic failures occurs. Condition-based maintenance practices could be substituted for the current time-based maintenance approach. Other advantages of on-board distributed sensor systems are that they can eliminate costly, and potentially damaging, disassembly, improve sensitivity by producing optimum placement of sensors and decrease maintenance costs by eliminating more time- consuming manual inspections. This report presents a Sandia Labs-aviation industry effort to move SHM into routine use for aircraft maintenance. This program addressed formal SHM technology validation and certification issues so that the full spectrum of concerns, including design, deployment, performance and certification were appropriately considered. The Airworthiness Assurance NDI Validation Center (AANC) at Sandia Labs, in conjunction with Boeing, Delta Air Lines, Structural Monitoring Systems Ltd., Anodyne Electronics Manufacturing Corp. and the Federal Aviation Administration (FAA) carried out a certification program to formally introduce Comparative Vacuum Monitoring (CVM) as a structural health monitoring solution to a specific aircraft wing box application. Validation tasks were designed to address the SHM equipment, the health monitoring task, the resolution required, the sensor interrogation procedures, the conditions under which the monitoring will occur, the potential inspector population, adoption of CVM into an airline maintenance program and the document revisions necessary to allow for routine use of CVM as an alternate means of performing periodic structural inspects. To carry out the validation process, knowledge of aircraft maintenance practices was coupled with an unbiased, independent evaluation. Sandia Labs designed, implemented, and analyzed the results from a focused and statistically-relevant experimental effort to quantify the reliability of the CVM system applied to the Boeing 737 Wing Box fitting application. All factors that affect SHM sensitivity were included in this program: flaw size, shape, orientation and location relative to the sensors, as well as operational and environmental variables. Statistical methods were applied to performance data to derive Probability of Detection (POD) values for CVM sensors in a manner that agrees with current nondestructive inspection (NDI) validation requirements and also is acceptable to both the aviation industry and regulatory bodies. This report presents the use of several different statistical methods, some of them adapted from NDI performance assessments and some proposed to address the unique nature of damage detection via SHM systems, and discusses how they can converge to produce a confident quantification of SHM performance An important element in developing SHM validation processes is a clear understanding of the regulatory measures needed to adopt SHM solutions along with the knowledge of the structural and maintenance characteristics that may impact the operational performance of an SHM system. This report describes the major elements of an SHM validation approach and differentiates the SHM elements from those found in NDI validation. The activities conducted in this program demonstrated the feasibility of routine SHM usage in general and CVM in particular for the application selected. They also helped establish an optimum OEM-airline-regulator process and determined how to safely adopt SHM solutions. This formal SHM validation will allow aircraft manufacturers and airlines to confidently make informed decisions about the proper utilization of CVM technology. It will also streamline the regulatory actions and formal certification measures needed to assure the safe application of SHM solutions.

42 ENGINEERING↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE

As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gear Test Assembly - Report on Experimental Testing (FY2020)

The Gear Test Assembly (GTA) has completed Campaign #2 of in-sodium testing at the Mechanisms Engineering Test Loop (METL). Campaign #1 was conducted in 2019 and completed 19,600 cycles, correlating to 9,800 fuel assembly maneuvers. Campaign #1 was terminated following a shaft seizure caused by a failed bearing in the sodium gearbox. Campaign #2 was conducted in the spring of 2020 and completed 2,768 cycles, correlating to 1,384 fuel assembly maneuvers. Campaign #2 was terminated following elevated vibration measurements coming from the sodium gearbox. Following cleaning and disassembly, a bearing was found to have failed in the sodium gearbox. Campaign #1 used tapered roller bearings made of 52100 steel with a heat treatment from the manufacturer that allows for operation to 350°C. Campaign #2 used the same tapered roller bearings, but with no heat treatment. A new dynamic shaft seal design was used in Campaign #2 that led to significant reductions in argon consumption and graphite debris generation. A modified external gearbox system led to no external bearing failures and allowed for higher torque output. Finally, modifications to the Carbonation System led to a more effective carbonation process and all-around reduction in turnaround time.

42 ENGINEERING↗

Quarterly update for VTO XFC project

Since the last update, Sandia has performed additional testing on COTS baseline cells, as well as initial testing of University of Michigan baseline graphite anode cells. The COTS cell testing included an extreme stress test using 12C charging, as well as a non-cooled 6C charging test to determine the effectiveness of cooling plates. The Michigan cells were cycled with increasing charge rates to determine rate capability and possible propensity for lithium plating. The COTS cells are 5Ah NMC/Graphite pouches from Kokam with a modest 112 Wh/kg. The University of Michigan cells are NMC ~2.6Ah NMC/Graphite pouches made at the UM Battery Lab, and were designed with a more aggressive energy density. On the horizon, we will be testing additional cells from University of Michigan, including a baseline hard carbon anode cell. We will also disassemble the graphite anode cell, and continue to analyze the dQdV signals obtained during the graphite cell experiment to further understand evidence of possible plating. We also expect to receive cells with improved anodes for eventual testing against baselines.

25 ENERGY STORAGE↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NCERC News (Jan-Mar 2021) [Slides]

The National Criticality Experiments Research Center (NCERC) provides updates on experiments done as part of the HYPATIA and MUSIC campaigns as well as CAAS-3S criticality alarm testing, criticality safety classes, warehouse inventory, and KRUSTY disassembly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dispenser Reliability: Materials R&D. A Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Report

Dispensers are the top cause of maintenance events and down-time at hydrogen fueling stations. In an effort to help characterize and enable improvements in dispenser reliability, an extensive accelerated lifetime testing set-up was designed and built at NREL involving components typically part of dispensing operations at fueling stations. Device Under Test (DUTs) included different components such as normally open valves, normally closed valves, fueling nozzles, breakaways devices and filters. Conditions of testing included pressures, and flow rates similar to light duty fuel cell electric vehicles fueling at -40°C, and -20°C for thousands of cycles in hydrogen. Tested components (failed and non-failed) were disassembled at SNL and polymeric O-rings were carefully retrieved and cataloged for chemical and physical characterization. Data collected was compared to similar O-rings from unexposed or non-tested components for hydrogen effects, and failure modes. Degradation analyses, based on select polymer chemistries common across all component types, their location within components, visual assessment of damage coupled with strong hydrogen effects from chemical characterization, was completed and presented to NREL and DOE. Overall, the failure rate amongst the components was not as high as expected for the test conditions. Among the component types tested, breakaways were the most susceptible to damage under these test conditions, with fueling nozzles a close second. The proper combination of selection of the right polymer and optimum component design was found to make a strong difference in component reliability under severe dispenser operating conditions. Physical degradation of polymers, rather than chemical changes due to low temperature hydrogen exposure, is more prevalent as failure mode for these test conditions. The nature and the extent of the degradation was much less at -20°C as compared to -40°C. The damage and failure rates were higher at lower temperatures than at higher test temperatures. As expected, increasing the number of cycles at the lowest test temperature (-40°C) increased damage. This indicates that cycling at the low temperature of -40°C required by SAE J2601 can reduce component life in fuel dispensing operations

08 HYDROGEN↗