Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Assessment on Transport of Radioactive Species from Nuclear Facilities - 17079

It is generally recognized that radioactive nuclides are most hazardous fission products that could be released in the event of reactor accidents. The reactor coolant system of a pressurized water reactor (PWR) nuclear plant exhibits radioactivity from various sources. These radiation sources consist of the fission products from fuel element and activated products from corrosion products. The complex infrastructure of the processes does not allow detailed measurement of activity until after the reactor is shutdown. All of the components that require dismantling will be radioactive which was caused by neutron activation during operation, contamination by corrosion products, contamination by damaged by fuel rods and leaks by equipment. Due mainly to the various operation modes and their aging, there are the increasing needs to carry out repair works that are not sufficiently provided for by the original design. Many difficulties are involved in these tasks, namely, high radiation doses, cramped areas, hard to reach components, coupled with stringent quality conditions. The need to simulate the behavior of corrosion products in a nuclear power plant environment has attracted many researchers' attention. It has performed the in-depth reviews of the various theories and physics associated with the corrosion products transportation, the laboratory loop testing, and the field measurements in operating plants. Before we start the decommissioning of nuclear power plants, workers, the public and the environment shall be properly protected from radiation hazards. For this purpose, a safety assessment should be carried out relating to the potential hazards that may occur during the decommissioning. The radiological hazards involved in the decommissioning activities also should be identified, and be taken into account in the safety assessment. The radiation conditions of the primary circuit are determined by the activity of corrosion and fission products that have accumulated on the internal surfaces of the components. Therefore the estimation of contamination on the components is very important and, may be the first step in the reactor operation and decommissioning of components. The predominant radionuclide in the PWR primary coolant is Co-60, although Co-58 contributes significantly to radioactivity level at the early stage of a reactor operation. Since Co-60 is produced from the in-core Co-58, which is the source of cobalt in a reactor coolant system, many researchers have investigated its transmutation in the core, its transport around the system, and its subsequent deposition on surfaces. The major parameter influencing the behavior of radioactivity, such as Co-60 in the coolant, is the corrosion product oxides. The objective of this work is to analyze the corrosion product activity transported in the primary circuit by using a multi-region model. This model, which is incorporated with the mass and activity transport between the dissolved corrosion products in the coolant and the surface, describes the specific activity of corrosion products in coolant and on the surfaces according to the operation modes as well as decommissioning stage. In order to evaluate the analysis of the corrosion products in an integral type reactor, a multi-region mass balance model is applied. The specific activities of the various species on the surface of core and steam generator throughout the effective full power hours, 15,000 hours, are simulated for the various modes of operations. As a result, the specific activities of corrosion products from the surface of primary circuit were shown as very low compared to those of other commercial nuclear power plants. In this simulated reactor, a significant reduction of specific activities from the activated corrosion products is obtained due to the introduction of titanium alloy to the steam generator tube and the avoidance of boric acid induced corrosion. From this result we conclude that we are able to predict the level of radioactive nuclides generated by corrosion products in a primary circuit according to the various modes of operations by using multi-region model. In this point of view it is concluded that this multi-region model can be used as an engineering tool for analysis of the corrosion products within the primary coolant for the nuclear power plants. It is also considered that it is possible to extend to a calculation tool for estimating the radiological hazards involved in the decommissioning activities in terms of safety assessment. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

The DISTINCTIVE University Consortium: An Overview - 18102

The UK government remains committed to nuclear energy having an important role to play in delivering a secure, low carbon and affordable energy future. Successful delivery of their strategy recognises the need for underpinning research, in addition to the provision of a skilled workforce and international collaboration as key enablers. One crucial area is the decommissioning and clean-up of all existing civil nuclear licensed sites and the implementation of geological disposal of highly active wastes, with the Nuclear Decommissioning Authority responsible for the delivery of policy aims with respect to legacy wastes. A central component of public acceptance of this strategy is a demonstrated ability to safely manage and dispose of waste, with acceptance linked to having scientifically robust routes for its safe clean-up and disposal. Similarly, the UK Engineering and Physical Sciences Research Council (EPSRC) strategy is to maintain investment in nuclear fission, with the development of approaches for implementing safe, cost-effective clean-up, decommissioning and waste disposal of existing and future nuclear sites and facilities a strategic focus. The EPSRC-supported DISTINCTIVE (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) consortium is carrying out research that addresses the broad area of nuclear waste and decommissioning, bringing together academic researchers from 11 of the UK's leading research intensive universities and key industry partners. When allied to the strong links of the partners with the industrial and international R and D community, the project provides an excellent route for building a greater capacity for R and D within the UK, underpinning the strategic needs noted. The consortium also addresses the skills agenda in training a significant number of researchers with high level skills of direct relevance to nuclear waste and decommissioning. This paper describes the aims and objectives of the work being undertaken, and the technical work underway within each of the research theme areas: AGR, Magnox and exotic spent fuels; PuO{sub 2} and fuel residues; legacy ponds and silo wastes; and structural integrity. Projects using radioactive materials are also considered. As the project enters its final year, consideration is given to the impacts of the project for both academic and non-academic beneficiaries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greater Efficiency in the Management of Low-Level Radioactive Material - 18305

The World Nuclear Association is the international organization representing the global nuclear industry. Its mission is to promote a wider understanding of nuclear energy among key international influencers by producing authoritative information, developing common industry positions, and contributing to the energy debate. Membership encompasses companies from the whole fuel cycle (from uranium mining through to decommissioning) as well as support services. Through discussions and survey of the Association's Waste Management and Decommissioning Working Group, it is clear that there is an issue relating to the management of cleared and/or low level radioactive material, particularly during decommissioning where it represents more than 90% of all wastes generated. The group has found that the status quo on the reuse, recycling and disposal of cleared and/or low-level radioactive material arising from the civil nuclear industry (all successfully tested and implemented options) is untenable, and believes that this message should be conveyed to relevant influencers internationally. This message is key and features prominently in a methodological guide being prepared by the group's experts on managing waste from decommissioning which will work through case studies (relating to both technical and financial management) and showcase good practice to support the development of a successful decommissioning strategy. There are currently nearly 450 operating civil nuclear power reactors in the world with many associated nuclear fuel cycle and nuclear research facilities. During the operation and subsequent decommissioning of nuclear facilities, cleared and low-level radioactive material is routinely generated from normal activities, including clothes, rags, metal equipment, concrete structures, etc. For low-level radioactive material, most of this material can be freed from its added radioactivity through survey and simple cleanup (decontamination if necessary). When properly managed and regulated these activities pose no real health issues for people or the environment. It is understandable that there are increasing public demands and expectations for the reuse and recycling of valuable resources, which nuclear - like many other sectors - can no longer ignore. There are efficiencies to be found through technical solutions (resulting in waste volume reductions, better sorting of waste, etc.), which would enable mitigation of environmental impacts and increased preservation of these natural resources. In addition, it will reduce volumes for storage and disposal which are rare resources. There must be a balance struck between the availability of disposal, and recycling and reuse, depending on the outcomes of assessments. Both the advantages in terms of preserving natural resources and disposal capacity should enable the industry to gain credibility with stakeholders. Taking Europe as an example, excellence in the implementation of the reuse and recycling of metals and of disposal of very-low waste, would, if widely shared between countries, no doubt lead to greater efficiency. International and national leaders from industry, regulators and governments should enable the concurrent availability of these three safe management options in each country, worldwide. Whenever an option considered is supported by a solid industrial business case, operators and regulators can (and must) concurrently deploy and operate safe reuse, recycling and disposal. This flexible approach should be deployed; the Association is of the firm conviction that the exclusive commitment to a single option cannot be sound on any grounds. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste is our Product. Developing, Implementing and Optimising Waste Management at Dounreay - 19039

The UK's Fast Breeder Reactor Research programme was centred at Dounreay, in the very north of Scotland, from 1955. Since 1994, the site has been focused on decommissioning, and represents one of the most complex, technically challenging and hazardous nuclear clean-up projects in Europe. Since 2012, Dounreay Site Restoration Ltd (DSRL) has been contracted by the NDA as the Site License Company to deliver the defined scope of work, under a Target Cost contract, to decommission the site to achieve the Interim End State by 2030-2033, whilst managing the transition of its people. All parties, including DSRL's Parent Body Organisation Cavendish Dounreay Partnership Ltd (a consortium of Cavendish Nuclear, AECOM, and Jacobs), recognise that there are significant technical and regulatory challenges to achieve this, as well as safely managing the transition for our workforce on what is effectively a 'closure' contract. The product of decommissioning is waste; over the course of the programme, a full range of higher activity and lower level radioactive wastes will be generated, and must be safely managed. This paper will address: - The Policy issues relating to radioactive waste management at Dounreay, including particular issues relating to implementation of Scottish policy, including how Waste Management is Optimised. - An overview of the decommissioning programme and the delivery of an Interim End State; - The type, range and nature of radioactive wastes requiring safe management at Dounreay; - Higher Activity Wastes (HAW): - Setting higher activity waste strategy; defining products and interim storage requirements; - Technical, regulatory and stakeholder issues for HAW strategy; - Lower Activity Wastes: - Setting Low Level Waste (LLW) strategy; defining a disposal product and development and status for Dounreay's LLW Disposal Vaults; - Implementing LLW strategy; - Technical, regulatory and stakeholder issues for LLW strategy; - Optimising Waste Management -Optimising waste from generation (from decommissioning workfaces) through to disposal -why, and how; - The Waste Informed Decommissioning model as a methodology and approach; - Impact and importance of Waste Management on a target cost contract; - Establishment of a Waste Optimisation Programme to drive ownership, delivery and culture change; - Management responsibilities and informing organisational design; - Sharing and learning from Best Practice; - The Challenge - how to ensure workforce and teams are engaged in delivering optimisation requirements; - Conclusions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Graphical Dismantling Process Simulation Technology for Flexible Planning of Nuclear Facility

The dismantling of highly radioactive components of the nuclear facility is one of the most difficult activities in decommissioning. In the planning stage, the dismantling scenario including dismantling equipment and processes has a significant effect on the cost and safety of the whole decommissioning. High level radiation of the dismantling object such as a reactor pressure vessel (RPV) and its internals restricts access by human workers, and makes an accident during the dismantling process more difficult to deal with. Decommissioning of nuclear facilities demand a large scale of budget and high level of safety, and therefore the preliminary verification of dismantling scenarios by graphical simulation has special importance at planning stage. In recent years, the manufacturing industry has aggressively adopted the virtual manufacturing technology to verify the facilities and processes with high efficiency. The virtual manufacturing technology was beginning to be adopted in the area of the nuclear facility decommissioning. The dismantling process of the Rotary Specimen Rack (RSR) in the Korea Research Reactor-1 and 2 was established and it was also applied to replace the steam generators on time and on budget in San Onofre Nuclear Generating Station. Current virtual manufacturing technologies are not sufficient for the area of nuclear facility decommissioning because the object segmenting function absolutely required for graphical simulations over various dismantling scenarios is unavailable. This paper proposes a new technology for graphical decommissioning simulator which is able to simulate various dismantling scenarios over nuclear facilities including repetitive object cuttings of heavy and complex structures by applying flexible cutting algorithm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating the Clearance in NPP Residual Material Management

Previous Experiences in decommissioning projects are being used to optimize the residual material management in NPP, metallic scrap usually. The approach is based in the availability of a materials Clearance MARSSIM-based methodology developed and licensed in Spain. A typical project includes the integration of segregation, decontamination, clearance, quality control and quality assurance activities. The design is based in the clearance methodology features translating them into standard operational procedures. In terms of ecological taxes and final disposal costs, significant amounts of money could be saved with this type of approaches. The last clearance project managed a total amount of 405 tons scrap metal and a similar amount of other residual materials occupying a volume of 1500 m{sup 3}. After less than a year of field works 251 tons were finally recycled in a non-licensed smelting facility. The balance was disposed as LILW. In the planning phase the estimated cost savings were 4.5 Meuro. However, today a VLLW option is available in European countries so, the estimated cost savings are reduced to 1.2 Meuro. In conclusion: the application of materials clearance in NPP decommissioning lessons learnt to the NPP residual material management is an interesting management option. This practice is currently going on in Spanish NPP and, in a preliminary view, is consistent with the new MARSAME Draft. An interesting parameter is the cost of 1 m3 of recyclable scrap. The above estimates are very project specific because in the segregation process other residual materials were involved. If the effect of this other materials is removed the estimated Unit Cost were in this project around 1700 euro/m{sup 3}, this figure is clearly below the above VLLW disposal cost of 2600 euro. In a future project it appears feasible to descend to 839 euro/m{sup 3} and if it became routine values and is used in big Decommissioning projects, around 600 euro/m{sup 3} or below possibly could be achieved. A rough economical analysis permits to estimate a saving around 2000 US$ to 13000 US$ per cubic meter of steel scrap according the variability of materials and disposal costs. Many learnt lessons of this practice were used as a feed back in the planning of characterization activities for decommissioning a Spanish NPP and today are considered as a significant reference in our Decommissioning engineering approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Radioactive Waste Storage and Disposal Facilities

The safety of radioactive waste disposal facilities and the decommissioning of complex sites may be predicated on the performance of engineered and natural barriers. For assessing the safety of a waste disposal facility or a decommissioned site, a performance assessment or similar analysis is often completed. The analysis is typically based on a site conceptual model that is developed from site characterization information, observations, and, in many cases, expert judgment. Because waste disposal facilities are sited, constructed, monitored, and maintained, a fair amount of data has been generated at a variety of sites in a variety of natural systems. This paper provides select examples of lessons learned from the observations developed from the monitoring of various radioactive waste facilities (storage and disposal), and discusses the implications for modeling of future waste disposal facilities that are yet to be constructed or for the development of dose assessments for the release of decommissioning sites. Monitoring has been and continues to be performed at a variety of different facilities for the disposal of radioactive waste. These include facilities for the disposal of commercial low-level waste (LLW), reprocessing wastes, and uranium mill tailings. Many of the lessons learned and problems encountered provide a unique opportunity to improve future designs of waste disposal facilities, to improve dose modeling for decommissioning sites, and to be proactive in identifying future problems. Typically, an initial conceptual model was developed and the siting and design of the disposal facility was based on the conceptual model. After facility construction and operation, monitoring data was collected and evaluated. In many cases the monitoring data did not comport with the original site conceptual model, leading to additional investigation and changes to the site conceptual model and modifications to the design of the facility. The following cases are discussed: commercial LLW disposal facilities; uranium mill tailings disposal facilities; and reprocessing waste storage and disposal facilities. The observations developed from the monitoring and maintenance of waste disposal and storage facilities provide valuable lessons learned for the design and modeling of future waste disposal facilities and the decommissioning of complex sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Correlation of Scan and Sample Measurements Using Appropriate Sample Size

At a former nuclear fuel cycle facility, radiological site characterization performed in the 1990's relied on surface soil samples collected and analyzed on a systematic sampling grid, supplemented by 100% scans of the property to identify soil exceeding decommissioning criteria. Biased sampling was performed as indicated by these measurements to provide more precise delineation of material exceeding the decommissioning criteria of 0.37 Bq/g total thorium (the Criteria). All material exceeding the Criteria was to be excavated for shipment to a licensed disposal facility. The site characterization plan called for collection of {approx}100-gram soil samples on a ten-meter grid, at which locations the gamma exposure rate was recorded at a height of 1 meter above grade. While 25-gram aliquots of the soil samples were being counted by gamma spectroscopy, the area was surveyed with a 7.6 cm X 1.27 cm (3'' X 1/2'') NaI gamma detector positioned 1 meter above grade. Count rates were recorded every two seconds while the detector moved at less than one meter per second, resulting in readings at nearly one-meter intervals. Scan records were reviewed; locations exceeding a pre-determined threshold were sampled to identify material exceeding the decommissioning criteria not identified in the systematic sampling effort. Location data (X, Y, and Z) were imported into an interactive database with {mu}R/hr measurements, sample count results, and scan readings. Data was graphically portrayed by color-coding data and superimposing the measurements on maps. Data reviewers could thereby review all types of data superimposed on each other to minimize review time, and to easily identify areas requiring further investigation. Data reviewers observed that in one area covering several acres, scan and sample measurements did not correlate. In some locations, scans indicated near-background gamma count rates while soil samples yielded several times the decommissioning criteria. At other locations, gamma count rates were elevated, but samples yielded background concentrations of thorium. Gamma scans tended to correlate with gamma exposure rate measurements. The lack of correlation between scan and sample data threatened to invalidate the characterization methodology, because neither method demonstrated reliability in identifying material which required excavation, shipment, and disposal. The NRC-approved site decommissioning plan required the excavation of any material that exceeded the Criteria based on either measurement. It was necessary to resolve the differences between the various types of measurements. Health Physics technicians selected 27 locations where the relationship between scan measurements and sample counts was highly variable. To determine if 'shine' was creating this data-correlation problem, they returned to those 27 locations to collect gamma count rates with a lead shielded NaI detector. Figure 2 shows that the shielded and unshielded count rates correlated fairly well for those locations. However, the technicians also noted the presence of 'tar balls' in this area. These small chunks of tarry material typically varied in size from 2 - 10 mm in diameters. Thorium-contaminated tars had apparently been disked into the soil to biodegrade the tar. The technicians evaluated the samples, and determined that the samples yielding higher activity contained more tar balls, and the samples yielding near background levels had fewer or none. The tar was collected for analysis, and its thorium activity varied from 2 - 3 Bq/g (60 - 90 pCi/g) total thorium. Since the sample mass was small, these small tar balls greatly impacted the sample activity. Technicians determined that the maximum particle size was less than 20 mm in diameter. Based on this maximum 'particle size', over one kilogram of sample would be required to minimize the impact of the tar balls on sample results. They returned to the same 27 locations and collected soil samples containing at least one kilogram of material. The samples were thoroughly ground and blended. Aliquots were then counted using 25-gram sample bottles, as in the initial characterization effort. Figure 3 shows the significantly improved correlation between counts per minute (using the original unshielded detector measurements) and soil sample results. Licensed material is not always homogeneously distributed in environmental media. When licensed material becomes concentrated in a particular material type, such as fine-grained soil or (as was the case at this site) hydrocarbon contaminated material, large blended samples may be required to provide adequate correlation between in-situ measurements, such as gamma scans, and sample activity. Sample size should be sufficiently large to yield a sample truly representative of the soil being surveyed, and should be thoroughly blended to ensure homogeneous distribution of the licensed material in the aliquot being analyzed. If blending is not practical, the entire sample should be counted in aliquots, and the average activity should be used as the true volumetric activity of the material being surveyed.

54 ENVIRONMENTAL SCIENCES↗

Treatment of Asbestos Wastes Using the GeoMelt Vitrification Process

The disposal of waste asbestos from decommissioning activities is becoming problematic in countries which have limited disposal space. A particular challenge is the disposal of asbestos wastes from the decommissioning of nuclear sites because some of it is radioactively contaminated or activated and disposal space for such wastes is limited. GeoMelt{sup R} vitrification is being developed as a treatment method for volume and toxicity minimization and radionuclide immobilization for UK radioactive asbestos mixed waste. The common practice to date for asbestos wastes is disposal in licensed landfills. In some cases, compaction techniques are used to minimize the disposal space requirements. However, such practices are becoming less practical. Social pressures have resulted in changes to disposal regulations which, in turn, have resulted in the closure of some landfills and increased disposal costs. In the UK, tens of thousands of tonnes of asbestos waste will result from the decommissioning of nuclear sites over the next 20 years. In Japan, it is estimated that over 40 million tonnes of asbestos materials used in construction will require disposal. Methods for the safe and cost effective volume reduction of asbestos wastes are being evaluated for many sites. The GeoMelt{sup R} vitrification process is being demonstrated at full-scale in Japan for the Japan Ministry of Environment and plans are being developed for the GeoMelt treatment of UK nuclear site decommissioning-related asbestos wastes. The full-scale treatment operations in Japan have also included contaminated soils and debris. The GeoMelt{sup R} vitrification process result in the maximum possible volume reduction, destroys the asbestos fibers, treats problematic debris associated with asbestos wastes, and immobilizes radiological contaminants within the resulting glass matrix. Results from recent full-scale treatment operations in Japan are discussed and plans for GeoMelt treatment of UK nuclear site decommissioning-related asbestos wastes are outlined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling Structures and Equipment of the MR Reactor and its Loop Facilities at the National Research Center 'Kurchatov Institute' - 12051

In 2008 a design of decommissioning of research reactors MR and RFT has been developed in the National research Center 'Kurchatov institute'. The design has been approved by Russian State Authority in July 2009 year and has received the positive conclusion of ecological expertise. In 2009-2010 a preparation for decommissioning of reactors MR and RFT was spent. Within the frames of a preparation a characterization, sorting and removal of radioactive objects, including the irradiated fuel, from reactor storage facilities and pool have been executed. During carrying out of a preparation on removal of radioactive objects from reactor sluice pool water treating has been spent. For these purposes modular installation for clearing and processing of a liquid radioactive waste 'Aqua - Express' was used. As a result of works it was possible to lower volume activity of water on three orders in magnitude that has allowed improving essentially of radiating conditions in a reactor hall. Auxiliary systems of ventilation, energy and heat supplies, monitoring systems of radiating conditions of premises of the reactor and its loop-back installations are reconstructed. In 2011 the license for a decommissioning of the specified reactors has been received and there are begun dismantling works. Within the frames of works under the design the armature and pipelines are dismantled in a under floor space of a reactor hall where a moving and taking away pipelines of loop facilities and the first contour of the MR reactor were replaced. A dismantle of the main equipment of loop facility with the gas coolant has been spent. Technologies which were used on dismantle of the radioactive contaminated equipment are presented, the basic works on reconstruction of systems of maintenance of on the decommissioning works are described, the sequence of works on the decommissioning of reactors MR and RFT is shown. Dismantling works were carried out with application of means of a dust suppression that, in aggregate with standard means at such works of individual protection of the personnel and devices of radiating control, has allowed to lower risk of action of radiation on the personnel, the population and environment at the expense of reduction of volume activity of radioactive aerosols in air. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Immediate Dismantling of a Large Fleet of LWR NPPs: Consequences for Spent Fuel and Waste Management - 16027

The experience feedback shows that the complete dismantling of one Light Water Reactor (LWR) unit is an activity now globally well under control (reactor pressure vessel and its internals removal and cutting included). However some specific industrial difficulties may arise in view of the dismantling of numerous LWR units simultaneously. Indeed more than 300 LWR units are currently operated worldwide, which have been commissioned these last 50 years. So in some countries, many units may be permanently shut down over a period of few years in the next decades. Such a situation addresses the issue of the overall management of large quantities of spent nuclear fuel (SNF) and decommissioning waste for the concerned units. For example, in France, the legislative and regulatory framework for the nuclear facilities favors their dismantling 'as soon as possible' after their permanent shutdown which implies as well to limit the duration of the transition period from operation to decommissioning. Furthermore 58 LWR units have been commissioned between 1977 and 1999 in France - on average more than 2 units per year. In this context, the operator (Electricite de France - EDF) plans to remove quickly the SNF then to perform dismantling actions immediately after the permanent shutdown of the LWR units. One issue is to remove the SNF from all the relevant units, even if this removal is simultaneous in many units (permanently shut down or still under operation). Similar issue has to be taken into account regarding the management of the radioactive waste (RW) produced by the dismantling and clean-up actions, notably the RW that cannot be disposed of in a near surface repository. One method followed by the French technical support organization (Institut de Radioprotection et de Surete Nucleaire - IRSN) to analyze these issues is the use of estimates of flows of SNF and RW. These estimates are based notably on a phasing-scenario and a planning template defined for the decommissioning of the units of one nuclear power plant (NPP) and coupled to an overall schedule for phase out all the units of the fleet. The estimates relative to the next decades can be compared to the current experience feedback of flows of SNF and RW for units under operation, in order to identify risks when facing decommissioning. The risks highlighted are driven by key parameters (as duration of the main dismantling actions) of the estimates which can be adapted to minimize their impact. On this basis, it is possible to identify the key-factors to dismantle each unit of NPPs and phase out the fleet regarding SNF and RW management. It is noteworthy that this work needs to be done in any case upstream the studies and the implementation of dismantling actions. Finally it can be underlined that another issue is the human resources (staff, skills and knowledge) necessary to perform all the decommissioning actions, but this aspect is not addressed in the present paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practice on Facility Characterisation from a Material and Waste End- State Perspective - 16041

Radiological characterisation plays a significant role in the process of decommissioning of shut-down nuclear facilities in order to ensure the protection of the environment and radiation safety. At all stages of a decommissioning programme or project, adequate radiological characterisation is of crucial importance, not least from a material and waste perspective. The radiological characterisation is a key element for planning, controlling and optimising decommissioning and dismantling activities. Experience has shown that data and information from the operation of a facility can - supplemented by recently collected and analysed data and information - be of crucial importance for decisions on waste management and for characterisation of radioactive waste. Once the dismantling has been done, some information may be hard, costly or even impossible to obtain later in the waste management process. This was the reason why the Working Party on Decommissioning and Dismantling (WPDD) of the OECD Nuclear Energy Agency (NEA) decided in late 2013 to extend the mandate of the Task Group on Radiological Characterisation and Decommissioning (TGRCD) for a second phase focusing on nuclear facility characterisation from a waste and material end-state perspective whereas the first phase focused on overall strategies of radiological characterisation. This paper gives an overview of the activities and findings within both phases up to now. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LaserSnake2: Remote High Powered Laser Cutting in Confined Hazardous Spaces - 16161

LaserSnake2, a UK collaborative project, seeks to deliver remotely operated cutting techniques into high hazard nuclear environments. This paper describes the developments and results of combining proven robotic manipulators with high-powered laser cutting tools, to allow for selective dismantling within complex nuclear process cells. Decommissioning old and poorly catalogued nuclear plant is a problem faced the world over. Designed with little consideration for decommissioning, or adapted significantly from the original drawings, legacy plant and infrastructure is full of spaces where it is undesirable or impossible to send people. Typically, a process cell or cave will require modification to ensure suitability for human entry or deployment of heavy duty equipment to complete the decontamination processes. The process of widening access routes, or selectively moving sections of highly contaminated material, is ideally suited to remote handling technology. The results of TWI's research into fibre-delivered laser cutting techniques, and integration with a dexterous snake-arm robot, are presented. Coupled with novel laser process head design and diffractive optical elements, the result is an integrated system capable of cutting up to 100 mm thick C-Mn steel plate at significant stand-off distances, encompassing the range of infrastructure found in a typical nuclear plant. Two options have been considered for deployment of the laser cutting tool. The first is focused on a fixed installation using a standard industrial robot. The second is a large, highly flexible snake-arm robot capable of entering cluttered cells through existing penetrations. Designed to operate through a standard 11'' MSM port, the 4.5 m snake-arm robot has the capacity to carry grippers, sensors or the laser cutting tool at the tip. The snake-arm is sealed and housed within a glove box for contamination control, allowing operation within a radioactive environment. Significant technical developments and material research are presented which have led to improved operational life, payload and bend. This paper describes the series of inactive trials which have been conducted to demonstrate the LaserSnake2 system's capabilities. These include: horizontal and vertical deployment, underwater operation, object manipulation and laser cutting. With global nuclear decommissioning costs running in to the $trillions, safe and cost efficient tools such as the LaserSnake2 system are essential as part of the decommissioning toolbox. Remote handling can account for up to 20% of a decommissioning project's costs, however significant time and financial savings can be made by utilising this new technology to reduce operator exposure and reach previously inaccessible areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SeeSnake: Radiological Characterisation of Complex Nuclear Spaces - 16162

Decommissioning of retired nuclear plant can be a difficult task for many reasons. A number of locations around the world have active cells awaiting decommissioning without a clear understanding of the internal structure and possible locations of radiological sources. Furthermore, many nuclear plant drawings and models do not reflect the 'as built' dimensions, and precise data required for safe and cost effective decommissioning is not readily available. This presents decommissioning teams with significant challenges when attempting to plan and execute their decommissioning programs. Due to the complex nature and constrained environments typical of legacy nuclear plant, it is often not possible to deploy traditional remote handling/inspection technologies. Even where possible, identifying the correct sensor, or suite of sensors, to characterize the environment is problematic. To address this common issue Create Technologies Ltd (Createc) and OC Robotics collaborated on SeeSnake, a project aimed at leveraging radiometric source mapping with 3D scanning and confined space remote handling. Createc's imaging and sensing systems have strong capabilities in the nuclear industry, led by their N-Visage products, as do OC Robotics' snake-arm robots as a remote deployment platform for confined and hazardous spaces. The snake-arm robot enables access through small penetrations with the ability to navigate internal structures and other obstacles without support from the environment; whilst multiple re-positioning of the N-Visage sensor, integrated with the snake-arm system, enables a thorough 3D map to be created. The SeeSnake project demonstrates the integrated systems ability to capture valuable radiation, visual and positional data enabling the characterization of a complex active environment. To mature the concept into an integrated, functional technology the SeeSnake partners overcame a number of challenges before demonstrating to key stakeholders in the UK nuclear industry. This paper describes these challenges and the solutions implemented, along with the results from early system trials and stakeholder demonstrations. It also addresses the next steps for the SeeSnake technology and identifies a number of applications which will may benefit from its exploitation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulation of the First British Power Reactor to Enter into an Extended Period of 'Care and Maintenance' - 18028

All eleven of the British first-generation Magnox nuclear power plants have now ceased operating and are in various stages of decommissioning. The Magnox reactors were graphite moderated, using carbon dioxide as the primary coolant. The reactor cores are contained in steel reactor pressure vessels, except for the last two stations which have pre-stressed concrete pressure vessels. All but two of the Magnox reactor stations have been completely de-fueled. The spent fuel removed has been despatched for reprocessing at Sellafield in the north-west of England. On behalf of the UK government the Nuclear Decommissioning Authority (NDA) is responsible for cleaning up the majority of the civil nuclear legacy. The current NDA decommissioning strategy is to prepare the Magnox reactor sites for an extended period of Care and Maintenance (C and M), during which quiescent safe storage will take place (also known as safe enclosure), whereby the cores and associated structures will accrue the benefits of radioactive decay over a period of decades. This will reduce the radiation doses to workers during final dismantling and site clearance. The two Magnox rector units at the Bradwell licensed nuclear site in the south-east of England are the first scheduled to enter this quiescent safe-storage period. This is planned to commence in the second-half of 2018, and is scheduled to last for around 70 years. The Office for Nuclear Regulation (ONR) is the independent regulatory body, responsible for enforcing safety and security requirements at nuclear installations in Great Britain (GB). This paper outlines the national strategic context and how ONR's regulatory regime is applied to nuclear power plant decommissioning. It addresses some of the specific challenges posed at Bradwell during the preparatory works for entry to C and M and how ONR has addressed these. It describes how this will culminate in a regulatory decision on the acceptability of the safety and security of the Bradwell site to enter this new stage of its life cycle. Over the last few years ONR has assessed and inspected various safety aspects of decommissioning, radioactive waste management and other preparations for Bradwell's entry into C and M. Some of the operator's proposals have provided challenges to ONR, particularly where there have been changes to established approaches taken at other sites, as the licensee seeks to minimise its costs. These have included how far to remove redundant structures, systems and components prior to C and M; how to define interim and end-states for fuel cooling ponds and other contaminated areas; and how to treat and store Intermediate Level Waste (ILW), for which there is no geological disposal facility yet available. ONR has begun its final assessment of safety and security justifications supplied by the site licensee, Magnox Ltd (ML). ONR is using its legal powers conferred to it under the site licence conditions to authorise this first-of-a-kind transition into a 70 year period of safe storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Big Data Framework with Machine Learning for D and D Applications - 19108

The nuclear industry is experiencing a steady increase in maintenance costs even though plants are maintained under high levels of safety, capability and reliability. Nuclear power plants are expected to run every unit at maximum capacity at all times, efficiently utilizing assets with minimal downtime. Surveillance and maintenance of nuclear decommissioning infrastructure provides lot challenges with respect to maintenance or decommissioning of the buildings. There is a need for a framework to analyze the huge amount of data generated by the sensors on the nuclear reactor components as well as structures, to monitor the conditions of these building over a period of time. Emerging technologies such as big data analytics have become a requirement in the nuclear industry to improve structural health monitoring and diagnostics. FIU will make use of existing mature technologies in the areas of imaging, robotics, big data, and machine learning/deep learning to assess the structural integrity of aging facilities at DOE sites. As these facilities await decommissioning, there is a need to understand the structural health of these structures. Many of these facilities were built over 50 years ago and in some cases these facilities have gone beyond the operational life expectancy. In other cases, the facilities have been placed in a state of 'cold and dark' and they are sitting unused, awaiting decommissioning. Finally, some older facilities are one-of-a-kind operational/production facilities supporting critical DOE missions and cannot be shut down. In any of these scenarios, the structural integrity of these facilities may be compromised, so it is imperative that adequate inspections and data collection/analysis be performed on a continuous and ongoing basis. The primary goals of the research include collecting various formats of data such as structured, unstructured and streaming data from the various sensors deployed in buildings, collect videos/pictures from various imaging sources, ingest them using a Hadoop distributed file system and process the data using Spark to perform batch processing and real time analytics. Research and development on various machine learning/deep learning algorithms will also be performed to analyze the heterogeneous data collected from nuclear decommission infrastructure. FIU will design the big data framework to ingest, store and process huge amounts of heterogeneous data collected from many sources and optimize the algorithms to provide insights into the data and predict anomalies observed when compared against baseline conditions. Various modules of this framework will include heterogeneous data sources, message broker, Hadoop distributed file system, Spark for stream and batch processing, machine learning/ deep learning, Cassandra - persistent data store and visualization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗