Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

The versatility of a truss mounted mobile transporter for in-space construction

The Mobile Transporter (MT) evolution from early erectable structures assembly activities is detailed. The MT operational features which are required to support astronauts performing on-orbit structure construction or spacecraft assembly functions are presented and discussed. Use of the MT to perform a variety of assembly functions is presented. Estimated EVA assembly times for a precision segmented reflector approximately 20 m in diameter are presented. The EVA/MT technique under study for construction of the reflector (and the entire spacecraft) is illustrated. Finally, the current status of development activities and test results involving the MT and Space Station structural assembly are presented.

Bush, Harold G.↗

Image construction from the IRAS survey and data fusion

The IRAS survey data can be used successfully to produce images of extended objects. The major difficulty, viz. non-uniform sampling, different response functions for each detector, and varying signal-to-noise levels for each detector for each scan, were resolved. The results of three different image construction techniques are compared: co-addition, constrained least squares, and maximum entropy. The maximum entropy result is superior. An image of the galaxy M51 with an average spatial resolution of 45 arc seconds, is presented using 60 micron survey data. This exceeds the telescope diffraction limit of 1 minute of arc, at this wavelength. Data fusion is a proposed method for combining data from different instruments, with different spatial resolutions, at different wavelengths. Direct estimates of the physical parameters, temperature, density and composition, can be made from the data without prior images (re-)construction. An increase in the accuracy of these parameters is expected as the result of this more systematic approach.

Bontekoe, Tj. R.↗

From knowledge presentation to knowledge representation to knowledge construction: Future directions for hypermedia

Relationships between human memory systems and hypermedia systems are discussed with particular emphasis on the underlying importance of associational memory. The distinctions between knowledge presentation, knowledge representation, and knowledge constructions are addressed. Issues involved in actually developing individualizable hypermedia based knowledge construction tools are presented.

Palumbo, David B.↗

Development and mechanical properties of construction materials from lunar simulants

The development of construction materials such as concrete from lunar soils without the use of water requires a different methodology than that used for conventional terrestrial concrete. Currently, this research involves two aspects: (1) liquefaction of lunar simulants with various additives in a furnace so as to produce a construction material like an intermediate ceramic; and (2) cyclic loading of simulant with different initial vacuums and densities with respect to the theoretical maximum densities (TMD). In both cases, bending, triaxial compression, extension, and hydrostatic tests will be performed to define the stress-strain strength response of the resulting materials. In the case of the intermediate ceramic, bending and available multiaxial test devices will be used, while for the compacted case, tests will be performed directly in the new device. The tests will be performed by simulating in situ confining conditions. A preliminary review of high-purity metal is also conducted.

Desai, Chandra S.↗

Improving NAVFAC's total quality management of construction drawings with CLIPS

A diagnostic expert system to improve the quality of Naval Facilities Engineering Command (NAVFAC) construction drawings and specification is described. C Language Integrated Production System (CLIPS) and computer aided design layering standards are used in an expert system to check and coordinate construction drawings and specifications to eliminate errors and omissions.

Antelman, Albert↗

First Lunar Outpost construction analysis

The topics are presented in viewgraph form and include the following: the construction problem with the radiation shielding; preliminary construction analysis; the feasibility analysis of a small lunar tractor-scraper vehicle (LTSV); the scraper preliminary power analysis; LTSV feasibility; a small lunar dragline crane (LDC); a lunar superstructure arch (LSA); and the feasibility analysis of a lunar self-offloading lander crane.

Grasso, Chris↗

A Center for Extraterrestrial Engineering and Construction (CETEC)

A group of knowledgeable scientists and engineers in New Mexico has recognized the need for such a testing capability and has proposed a project to evelop an extraterrestrial surface simulation facility. A group of universities, national laboratories, and private industrial firms is proposing to establish a Center for Extraterrestrial Engineering and Construction (CETEC) and to develop large extraterrestrial surface simulation facilities in which this needed testing can be realistically performed. The CETEC is envisioned to be both a center of knowledge and data regarding engineering, construction, mining, and material process operations on extraterrestrial bodies and a set of extraterrestrial surface simulation facilities. The primary CETEC facility is proposed to be a large domed building made of steel reinforced concrete with more than one acre of test floor area covered with several feet of simulated lunar soil and dust. Various aspects of the project are presented in viewgraph form.

Leigh, Gerald G.↗

Formed platelet combustor liner construction feasibility, phase A

Environments generated in high pressure liquid rocket engines impose severe requirements on regeneratively cooled combustor liners. Liners fabricated for use in high chamber pressures using conventional processes suffer from limitations that can impair operational cycle life and can adversely affect wall compatibility. Chamber liners fabricated using formed platelet technology provide an alternative to conventional regeneratively cooled liners (an alternative that has many attractive benefits). A formed platelet liner is made from a stacked assembly of platelets with channel features. The assembly is diffusion bonded into a flat panel and then three-dimensionally formed into a section of a chamber. Platelet technology permits the liner to have very precisely controlled and thin hot gas walls and therefore increased heat transfer efficiency. Further cooling efficiencies can be obtained through enhanced design flexibility. These advantages translate into increased cycle life and enhanced wall compatibility. The increased heat transfer efficiency can alternately be used to increase engine performance or turbopump life as a result of pressure drop reductions within the regeneratively cooled liner. Other benefits can be obtained by varying the materials of construction within the platelet liner to enhance material compatibility with operating environment or with adjoining components. Manufacturing cost savings are an additional benefit of a formed platelet liner. This is because of reduced touch labor and reduced schedule when compared to conventional methods of manufacture. The formed platelet technology is not only compatible with current state-of-the art combustion chamber structural support and manifolding schemes, it is also an enabling technology that allows the use of other high performance and potentially low cost methods of construction for the entire combustion chamber assembly. The contract under which this report is submitted contains three phases: (1) phase A - feasibility study and technology development; (2) phase B - sub-scale fabrication feasibility; and (3) phase C - large scale fabrication validation. This report covers the Phase A activities, which began in December of 1988.

Hayes, W. A.↗

Assessment of the Lunar Surface Layer and in Situ Materials to Sustain Construction-related Applications

Present and future technologies to facilitate lunar composition and resource assessment with applications to lunar surface construction are presented. We are particularly interested in the construction activity associated with lunar-based astronomy. We address, as an example, the use of ground-probing radar to help assess subsurface conditions at sites for observatories and other facilities.

Johnson, Stewart W.↗

Vertical regolith shield wall construction for lunar base applications

Lunar bases located on the lunar surface will require permanent protection from radiation and launch ejecta. This paper outlines a method of providing physical protection using lunar regolith that is constructed in situ as a modular vertical wall using specially devised methods of containment and construction. Deployable compartments, reinforced with corner struts, are elevated and filled by a moving gantry. The compartments interlock to form a stable wall. Different wall heights, thicknesses, and plan configurations are achieved by varying the geometry of the individual compartments, which are made from woven carbon fibers. Conventional terrestrial structural engineering techniques can be modified and used to establish the structural integrity and performance of the wall assembly.

Kaplicky, Jan↗

High resolution images of P/Tempel 1 and P/Tempel 2 constructed from IRAS survey data

Infrared images of P/Tempel 1 and P/Tempel 2 were constructed from IRAS survey data using a computer algorithm based on the Maximum Correlation Method for Image Construction (Aumann et al, 1990). The resulting images are of sufficiently high quality and resolution to delineate coma and tail morphology, and permit accurate photometry of the total dust complex. Comparisons of the infrared colors and photometric profiles of Tempel 1 and Tempel 2 at similar heliocentric distances show that the grains produced by the two comets are quite similar in radiometric and dynamic properties. Tempel 1 is found to produce about 30 percent more dust in its coma and tail than Tempel 2. The comae of Tempel 1 and Tempel 2 are expanding with mean velocities of 5.8 plus or minus 0.07 and 6.1 plus or minus 0.17 m/sec respectively, indicative of the ejection of large grains. The IRAS cataloged infrared fluxes (Walker, 1986) are found to be underestimated by as much as a factor of three for the comets. Therefore, it is essential to create images of the comets to obtain meaningful IRAS photometry.

Walker, Russell G.↗

Design and construction of a prototype ACTS propagation terminal

The launch schedule for the Advanced Communication Technology Satellite (ACTS) spacecraft did not leave sufficient time for completion of the prototype ACTS Propagation Terminals (APT) prior to initiation of the APT production phase. In fact, the approach used was to construct and test all subassemblies of the terminal with special emphasis on the technically challenging portions. These include the RF front end that uses a state-of-the-art down converter which integrates a low noise amplifier, mixer, post amplifier, filter, and local oscillator port frequency doubler into a single small package. In addition, a new digital receiver that uses the latest DSP technology was developed. Both of these subassemblies were thoroughly tested. The highest risk technology in the APT program was the digital receiver. Several candidate algorithms and DSP chips were investigated early on, primarily under JPL sponsorship. A receiver was constructed based on Texas Instruments chip. The final prototype digital receiver was one based on an Analog Devices chip. The design and test results are documented in a report prepared for this grant. A Primary Design Review (PDR) was conducted 30 May 1991, and a Critical Design Review was held 7 Jul. 1992. Final complete documentation of the APT's will appear in the form of three reports: a hardware description report, a report on the data collection code (ACTS VIEW), and a report on the preprocessing code.

Stutzman, Warren↗

Progress made in the construction of giant airplanes in Germany during the war

The construction of giant airplanes was begun in Germany in August, 1914. The tables annexed here show that a large number of airplanes weighing up to 15.5 tons were constructed and tested in Germany during the War, and it is certain that no other country turned out airplanes of this weight nor in such large numbers. An examination of the tables shows that by the end of the War all the manufacturers had arrived at a well-defined type, namely an airplane of about 12 tons with four engines of 260 horsepower each. The aircraft listed here are discussed with regard to useful weight and aerodynamic qualities.

Baumann, A↗

Recent Efforts and Experiments in the Construction of Aviation Engines

It became evident during World War I that ever-increasing demands were being placed on the mean power of aircraft engines as a result of the increased on board equipment and the demands of aerial combat. The need was for increased climbing efficiency and climbing speed. The response to these demands has been in terms of lightweight construction and the adaptation of the aircraft engine to the requirements of its use. Discussed here are specific efforts to increase flying efficiency, such as reduction of the number of revolutions of the propeller from 1400 to about 900 r.p.m. through the use of a reduction gear, increasing piston velocity, locating two crankshafts in one gear box, and using the two-cycle stroke. Also discussed are improvements in the transformation of fuel energy into engine power, the raising of compression ratios, the use of super-compression with carburetors constructed for high altitudes, the use of turbo-compressors, rotary engines, and the use of variable pitch propellers.

SCHWAGER↗

Notes on the Construction and Testing of Model Airplanes

Here, it is shown that the construction of an airplane model can and should be simplified in order to obtain the most reliable test data. General requirements for model construction are given, keeping in mind that the general purpose of wind tunnel tests on a model airplane is to obtain the aerodynamic characteristics, the static balance, and the efficiency of controls for the particular combination of wings, tail surfaces, fuselage, and landing gear employed in the design. These parts must be exact scale reproductions. Any appreciable variation from scale reproduction must be in the remaining parts of the model, i.e., struts, wires, fittings, control horns, radiators, engines, and the various attachments found exposed to the wind in special airplanes. Interplane bracing is discussed in some detail.

Diehl, Walter S↗

Mechanical properties of some materials used in airplane construction

Since lightness is desirable in airplane construction, greater stresses must be tolerated than in other kinds of construction. It is therefore necessary to have a more accurate knowledge of the greatest stresses that may occur and of the actual properties of the materials used. The Aeronautic Research Laboratories took the limit of elasticity as the basis of the strength calculations. Many tests were made of different steels, woods, aluminum alloys, and fabrics.

MATERIALS - STRENGTH↗

Overview of the Center for Space Construction

The purpose of this overview is to outline the position of the Center for Space Construction within the context of space-related programs at the University of Colorado. the University's historically strong research and graduate programs in space science and its strong undergraduate aerospace engineering program were the starting point in 1984 for a major expansion of space-related education and research programs at the Boulder campus. This initiative has resulted in a tripling of space-related research as well as a large increase in the enrollment of high quality engineering students, particularly at the graduate level. The Center for Space Construction is a major element of this initiative, since it represents a mechanism for interdisciplinary and system level research and education within the Engineering College, thus filling a major need. Seventeen faculty members and 37 students from 7 academic units are associated with the Center and are interacting with each other and with the CSC Associates (a group of industrial organizations and government laboratories). The first Ph.D. has been awarded to a student working in the Center; the second Ph.D. is expected later this year. Several new courses have been introduced in the College. Finally, excellent research is being conducted and Center participants are publishing in the open literature.

Hearth, Donald P.↗

Increasing accuracy in the assessment of motion sickness: A construct methodology

The purpose is to introduce a new methodology that should improve the accuracy of the assessment of motion sickness. This construct methodology utilizes both subjective reports of motion sickness and objective measures of physiological correlates to assess motion sickness. Current techniques and methods used in the framework of a construct methodology are inadequate. Current assessment techniques for diagnosing motion sickness and space motion sickness are reviewed, and attention is called to the problems with the current methods. Further, principles of psychophysiology that when applied will probably resolve some of these problems are described in detail.

Stout, Cynthia S.↗