Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2019”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

NASA's Space Launch System: Secondary Payload Accommodations in Block 1 and Beyond

Launching from pad 39B at Kennedy Space Center no earlier than December 2019, NASA's Space Launch System (SLS) will send the Orion crew vehicle to a distant retrograde lunar orbit in order to test and validate the new systems developed for SLS, Orion and Kennedy Space Center's Exploration Ground Systems (EGS). In addition to these primary mission objectives, the first integrated fight of NASA's new deep space exploration system, Exploration Mission-1 (EM-1), offers accommodations for 13 6U CubeSats, which will be deployed in deep space after Orion separates from the SLS Interim Cryogenic Propulsion Stage (ICPS). In 2017, the SLS Program, managed by NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, completed the ICPS and delivered it to the EGS Program, which has responsibility for stacking and launch operations. The 13 EM-1 secondary payloads will reside in the Orion Stage Adapter (OSA), which connects the ICPS to Orion's spacecraft adapter. The OSA is essentially complete with preparations being made for transporting the hardware to Kennedy Space Center with accommodations for secondary payload dispensers and with the secondary payload avionics unit installed.

Robinson, Kimberly F.↗

NASA's Space Launch System: Progress Toward Unmatched Exploration Capability

The Space Launch System (SLS) Program delivered the first element of the exploration-class rocket and completed manufacturing of all major structural elements in 2017. The Program continues component integration and testing in 2018 in preparation for the inaugural launch of NASA's new deep space exploration system in fiscal year 2020. SLS represents a new strategic national capability designed for the most challenging human and robotic exploration and is engineered for overall mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2018 and 2019.

Honeycutt, John↗

Applying the SOFIA Coordinate System to the HIRMES Instrument

The High-resolution Mid-infrared Spectrometer (HIRMES) will be in-flight aboard the Stratospheric Observatory for Infrared Astronomy (SOFIA) in late 2019, which will allow for observations of the structure and evolution of protoplanetary disks. SOFIA has a different coordinate system from the system being used to build HIRMES and needs to be defined and applied to HIRMES. This is necessary because the first mirror, which is aiming the incoming light onto the slit wheel by allowing for tip and tilt adjustments, cannot rotate. Thus, the SOFIA coordinate system allows for this additional degree of freedom and allows for the slit wheel to be in line with the telescope. Using a laser radar, multiple measurements around the instrument were taken of tooling balls, which quantified an uncertainty with the measurements. Also, a laser radar was used to scan the entirety of the instrument. The center of the front flange was determined using the measurements and scans of the instrument, which was used to determine the origin of the SOFIA coordinate system and its uncertainty. By knowing the center of the front flange, an off-center, rotated coordinate system was created, matching the mechanics' schematics for the system. Going forward, this coordinate system will allow for continued alignment of the instrument in preparation for flight and for accurate measurements when aboard SOFIA.

Wraback, Elizabeth↗

Mars Sample Return: Grand Challenge for EDL

A year ago, I gave a talk in anticipation of a Mars Sample Return effort at the 9th Ablation Workshop. Since then a lot has happened. "April of this year, after a year of study phase, NASA and ESA (European Space Agency) signed a Statement of Intent (SOI) to jointly develop a Mars Sample Return plan to be submitted to their respective authorities by the end of 2019. This signing is historic, as it signals the desire, the readiness, and the willingness to work together to execute this inspiring mission, we all have the opportunity to tackle this grand challenge. We have the scientific and engineering maturity to identify the critical technologies ready to be applied, and with discipline this campaign can be executed affordably," Jim Watzin, Mars Program Executive, NASA. NASA Centers with JPL (Jet Propulsion Laboratory) leading the charge is in the midst of a pre-formulation phase for executing a Mars Sample Return before the end of next decade. The proposed talk builds on the previous year talk. In light of the agreement between NASA and ESA, NASA has assumed the responsibilities for developing the earth entry vehicle (EEV) that will fly along with a European Spacecraft and return with the sample from Mars. EEV will be deployed for entry into earth. The EEV design, development, testing and certification have to result in a highly reliable sample return system. The entire architecture has to be demonstrated to meet the planetary protection requirement. NASA is considering two distinctly different earth entry vehicle architectures and with each choice, many different ablative TPS (Thermal Protective Shield) candidates. As a result of the NASA-ESA ongoing studies, some of the key entry conditions and design requirements are better understood today and more are being scoped out. The heat-shield ablative TPS choice need to be done with a good understanding as it plays a very significant role in determining the robustness of the EEV. Knowledge about how materials and system perform, and how the features could become flaws and how flaws lead to failure, etc. need to be clearly understood and the knowledge then need to be used to down select the TPS. This proposed talk will provide greater insight into the progress being made and the challenges that need to be tackled.

Mars Sample Return: Grand Challenge for EDL↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Commercial Off-The-Shelf GPU Qualification for Space Applications

With increased sensor data rates, and limited downlink capability, NASA missions have increased demands for onboard processing for applications ranging from synthetic aperture radar (SAR) data reduction to hyperspectral image processing and recognition, and even artificial intelligence (AI). Graphics Processor Units (GPUs) offer an attractive processing architecture for many of the applications due to their massive parallelism. As no radiation hardened GPU devices currently exist, any near term GPU-based onboard processors must use commercially available devices. To address this need NASA GSFC is collaborating with Cubic Aerospace Incorporated to, (a) characterize the capability of GPUs to meet the demands of a candidate onboard processing application, thereby demonstrating their ability to improve mission performance, reduce spacecraft SWaP, and potentially enable new missions, and (b) evaluate the radiation tolerance of capable COTS GPU devices to determine their suitability for spaceflight applications and understand any mitigations that are needed. A candidate onboard processing image has been prototyped and evaluated on a commercial GPU board and has demonstrated significantly increased processing throughput. Radiation tests for commercial GPU devices are planned for early fiscal year 2019.

Onboard processing↗

BioSentinel: An Adaptable Platform for Studying the Biological Effects of Deep Space Radiation

NASA's BioSentinel mission is a 6U nanosatellite with autonomous life support that will utilize the budding yeast Saccharomyces cerevisiae to study the DNA damage response to the deep space radiation environment. BioSentinel is planned to launch in 2019 as a secondary payload on the Space Launch System's first Exploration Mission (EM-1), and will undergo a lunar fly-by and enter heliocentric orbit after deployment. As the first biological mission beyond Low Earth Orbit (LEO) in nearly half a century, this mission will help fill critical gaps in knowledge about the effects of uniquely composed, chronic, low-flux deep space radiation on biological systems. Yeast is well-suited for this mission due to its desiccation tolerance and space-flight heritage. As a eukaryotic model organism, it also serves as a robust analog for human cells. Data gathered on this mission will thus inform us of the hazards involved in long-duration human exploration in deep space, and the protections necessary to mitigate them. Due to its low-cost, flexible and advanced technology, the 4U BioSensor payload contained within the nanosatellite is adaptable to other model microorganisms, exploration platforms and environments relevant to human exploration, such as the ISS, the Lunar Orbital Platform - Gateway and future lunar landers. In order to query the DNA damage response to deep space radiation, BioSentinel contains a wild type yeast strain as a positive control, and a radiation sensitive rad51 mutant strain that is defective for DNA repair. Yeast cells are desiccated in microfluidic cards, and rehydrated with growth medium and metabolic indicator dye at the desired time points during the mission. A thermal control system supports these stasis and growth states, and an optical system continuously measures cell growth and metabolism. An onboard radiation spectrometer and dosimeter allows us to correlate the dose, energy and particle-type of deep space radiation to the biological response. Data received from the deep space biosensor will be compared to control payloads on Earth and the ISS. Ongoing science testing for the BioSentinel project includes optimization for cell viability, desiccation tolerance, and long-term biocompatibility, as well as radiation experiments to understand the sensitivity and responsiveness of cells to varying radiation doses and particle types.

BioSentinel↗

Landsat 9 TIRS-2 Performance Results Based on Subsystem-Level Testing

Landsat 9 is the next in the series of Landsat satellites and has a complement of two pushbroom imagers: Operational Land Imager-2 (OLI-2) that samples the solar reflective spectrum with nine channels and Thermal Infrared Sensor-2 (TIRS-2) samples the thermal infrared spectrum with two channels. The first builds of these sensors, OLI and TIRS, were launched on Landsat 8 in 2013 and Landsat 9 is expected to launch in December 2020. TIRS-2 is designed and built to continue the Landsat data record and satisfy the needs of the remote sensing community. There are two sets of requirements considered for planning the component, subsystem and instrument level tests for TIRS-2: performance requirements and Special Calibration Test Requirements (SCTR). The performance requirements specify key spectral, spatial, radiometric, and operational parameters of TIRS-2 while the SCTRs specify parameters of how the instrument is tested. Several requirements can only be verified at the instrument level, but many performance metrics can be assessed earlier in prelaunch testing at the subsystem level. A test program called TIRS Imaging Performance and Cryoshell Evaluation (TIPCE) was developed to characterize TIRS-2 spectral, spatial, and scattered-light rejection performance at the telescope and detector subsystem level. There were three thermal vacuum campaigns in TIPCE that occurred from November 2017 to March 2018. This work shows results of TIPCE data analysis which provide confidence that key requirements will be met at instrument level with a few minor waivers. A full complement of performance testing will be done at the TIRS-2 instrument level for final verification in late 2018 through Spring 2019.

scatter↗

UTM UAS Serivce Supplier Development: Sprint 1 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density and large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider(ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the first step in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and the underlying specifications for them, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and proposed specifications for USSs to participate in TCL4. This report describes Sprint One. In this Sprint, the focus was on establishing a baseline for the Application Programming Interfaces (APIs) and their associated data models. In addition, the concept of UAS Volume Reservations (UVR) (areas that impose restrictions on sUAS that are allowed to operate) was tested. NASA provided the specifications and iterated on them with partners while implementers developed to those specifications. NASA then tested each partner's implementation to ensure compatibility with all other implementers. This process helped all stakeholders gain confidence that the foundation for future Sprints was solid.

UAS service supplier↗

Refurbishment of NASA's Johnson Space Center Liquid Nitrogen Bulk Storage Tanks in Preparation for Thermal Vacuum Optical Testing of the James Webb Space Telescope (JWST)

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2019. It is directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. Chamber A utilizes Liquid Nitrogen as a thermal barrier between the 300 Kelvin vessel wall and the 20 Kelvin helium environmental conditioning shrouds. The 155,000 gallon capacity of the six vessels support long duration testing which support low and deep space simulations for today's testing. This paper describe the challenges of refurbishing six liquid nitrogen bulk storage vessels that are 60 year old. The vessels were refurbished in place and focused primarily on the vacuum annulus. The challenges of vessel research, design engineering and project management will be discussed. The refurbishment of the vessels has extended the life of the vessels for another 35-50 years on the vacuum annulus integrity. The survivability of the bulk storage vessels was tested during the historic hurricane Harvey of 2017 during the 100 day JWST thermal-vacuum test.

Garcia, Sammy↗

Enabling Future Venus In-situ Missions: Heat-Shield for Extreme Entry Environment Technology (HEEET) Progress towards TRL 6

Heat-shield for Extreme Entry Environment Technology (HEEET) has been in development since 2014 with the goal of enabling missions to Venus, Outer Planets, and high-speed sample return missions. It is nearing successful completion and will be delivered by March of 2019. The 15 min presentation at the VEXAG will report on the HEEET development completed to-date and remaining testing and documentations prior to delivery of a TRL 6 technology.

Enabling Future Venus In-situ Missions: Heat-shiel↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

Accommodations for Secondary Payloads in NASA's Space Launch System

NASA's new heavy-lift launch vehicle, the Space Launch System (SLS), is moving closer to its planned 2019 launch, with the in-space stage and spacecraft adapters complete and all other major elements of the rocket manufactured and currently being outfitted for flight. Exploration Mission-1 (EM-1), the first flight of SLS and the new Orion crew vehicle, will verify and validate new systems and provide an unparalleled opportunity for 13 6U CubeSat-class payloads to be released into deep space. Payloads are being developed by NASA, industry, international and academic partners and were selected for the EM-1 flight to address strategic knowledge gaps in the agency's plans for human deep space exploration. Destinations range from the lunar surface to an asteroid to an orbit around the Earth-moon L2 libration point. Missions include studying the effects of space radiation on a living organism (yeast), landing the smallest lander to date on the moon, and searching for water in permanently shaded lunar craters. Propulsion technology demonstrations include solar sails, use of inert water to carry out lunar gravity assist maneuvers, and use of new "green" chemical propellants. SLS employs an evolutionary design approach, with an initial capability of at least 26 metric tons (t) to trans-lunar injection (TLI). The later Block 1B configuration, which will become the Agency's workhorse launch vehicle into the 2020s, will lift at least 34 t to TLI in its crew configuration and at least 37 t in the cargo configuration. In addition to greater lift capability, Block 1B will also offer larger payload volume than Block 1 for both co-manifested and secondary payloads. In Block 1B, various combinations of 6U, 12U and 27U payloads may be accommodated in the vehicle's stage adapter. Opportunities for deep space research once out of reach for small science payloads will be within reach, opening many possibilities for exciting new technology demonstrations and scientific missions. This paper will provide an overview of the capabilities and the status of the Block 1 vehicle, with particular emphasis on the secondary payload accommodations and the deployment system. Brief descriptions of the 13 6U EM-1 payloads will be included. In addition, a discussion of the payload developers' responsibilities and the Space Launch System Program's roles and responsibilities in accommodating these and future payloads will be included. Finally, the author will look ahead to SLS Block 1B and missions beyond EM-1 and the opportunities for 6U, 12U and 27U CubeSats.

Robinson, Kimberly F.↗

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.↗

Planned Improvements to the Venus Global Reference Atmospheric Model

The Venus Global Reference Atmospheric Model (Venus-GRAM) is an engineering-level atmospheric model applicable for engineering design analyses, mission planning, and operational decision making. Missions to Venus have generated a wealth of atmospheric data, however, Venus-GRAM has not been updated since its development and release in 2005. GRAM upgrades and maintenance have depended on inconsistent and waning project-specific support. The NASA Science Mission Directorate (SMD) has agreed to provide funding support in Fiscal Year 2018 and 2019 to upgrade the GRAMs. This presentation will provide an overview of Venus-GRAM and the objectives, tasks, and milestones related to the GRAM upgrades.

Justh, H. L.↗

UTM UAS Service Supplier Development: Sprint 2 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the UTM Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density environments, large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider (ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the second of four planned steps in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and their underlying specifications, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and develop proposed specifications for USSs in order to to participate in TCL4. This report describes Sprint Two. In this Sprint, there was a major theme with four goals. The theme was the development and testing of a new USS discovery system, to better enable USSs to find and communicate with each other. The goals supporting this theme were: participants needed to implement and exercise the discovery service for USS-USS communications; USSs needed to demonstrate strategic deconfliction through operation sharing; the systems were to use discovery to aid in handling off-nominal operations; and finally, there was an investigation of an initial off-nominal reporting capability.

software engineering↗

OSIRIS-REx Encounters Bennu: Initial Assessment from the Approach Phase

The OSIRIS-REx spacecraft launched on September 8, 2016, on a seven-year journey to return samples from asteroid (101955) Bennu. This presentation summarizes the scientific results from the Approach and Preliminary Survey phases. Bennu observations are set to begin on August 17, 2018,when the asteroid is bright enough for detection by the PolyCam. PolyCam and MapCam collect data to survey the asteroid environment for any hazards and characterize the asteroid point-source photometric properties. Resolved images acquired during final approach, starting in late October 2018, allow the creation of a shape model using stereophotoclinometry (SPC), needed by both the navigation team and science planners. The OVIRS and OTES spectrometers characterize the point- source spectral properties over a full rotation period, providing a first look at any features and thermophysical properties. TAGSAM is released from the launch container and deployed into the sampling configuration then returned to the stow position.Preliminary Survey follows the Approach Phase in early December 2018. This phase consists of a series of hyperbolic trajectories that cross over the North and South poles and the equator of Bennu at a close-approach distance of 7 km. Images from these Preliminary Survey passes provide data to complete the 75-cm resolution SPC global shape model and solve for the rotation state. Once the shape model is complete, the asteroid coordinate system is defined for co-registration of all data products. These higher-resolution images also constrain the photometric properties and allow for an initial assessment of the geology. In Preliminary Survey the team also obtains the first OLA data, providing a measure of the surface topography. OVIRS and OTES collect data as "ride-along" instruments, with the spacecraft pointing driven by imaging constraints. These data provide a first look at the spectral variation across the surface of Bennu. Radio science measurements, combined with altimetry and imagery, determine Bennu's mass, a prerequisite to placing the spacecraft into orbit in late December 2018. Together, data from the Approach and Preliminary Survey phases set the stage for the extensive mapping planned for 2019. These dates are the baseline plan. Any contingency or unexpected discovery may change this mission profile.

Lauretta, Dante S.↗