Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Project Interface Requirements Process Including Shuttle Lessons Learned

Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

Bauch, Garland T.↗

A Primary Care Approach to the Diagnosis and Management of Peripheral Arterial Disease

The objectives of this work are: (1) Be able to recognize characteristic symptoms of intermittent claudication (2) Diagnose PAD on the basis of history, physical exam, and simple limb blood pressure measurements (3) Recognize the significance of peripheral artery disease as a marker for coronary or cerebrovascular atherosclerosis (4) Provide appropriate medical management of atherosclerosis risk factors-- including use of antiplatelet therapy to reduce risk of myocardial infarction, stroke and death (5) Manage symptoms of intermittent claudication with program of smoking cessation, exercise, and medication The diagnosis of intermittent claudication secondary to peripheral artery disease (PAD) can often be made on the basis of history and physical examination. Additional evaluation of PAD is multi-modal and the techniques used will vary depending on the nature and severity of the patient's presenting problem. Most patients can be appropriately managed without referral for specialized diagnostic services or interventions.

Dawson, David L.↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗

Development of Management Metrics for Research and Technology

Professor Ted Sheskin from CSU will be tasked to research and investigate metrics that can be used to determine the technical progress for advanced development and research tasks. These metrics will be implemented in a software environment that hosts engineering design, analysis and management tools to be used to support power system and component research work at GRC. Professor Sheskin is an Industrial Engineer and has been involved in issues related to management of engineering tasks and will use his knowledge from this area to allow extrapolation into the research and technology management area. Over the course of the summer, Professor Sheskin will develop a bibliography of management papers covering current management methods that may be applicable to research management. At the completion of the summer work we expect to have him recommend a metric system to be reviewed prior to implementation in the software environment. This task has been discussed with Professor Sheskin and some review material has already been given to him.

Sheskin, Theodore J.↗

Crew Exploration Vehicle Environmental Control and Life Support Fire Protection Approach

As part of preparing for the Crew Exploration Vehicle (CEV), the National Aeronautics and Space Administration (NASA) worked on developing the requirements to manage the fire risk. The new CEV poses unique challenges to current fire protection systems. The size and configuration of the vehicle resembles the Apollo capsule instead of the current Space Shuttle or the International Space Station. The smaller free air volume and fully cold plated avionic bays of the CEV requires a different approach in fire protection than the ones currently utilized. The fire protection approach discussed in this paper incorporates historical lessons learned and fire detection and suppression system design philosophy spanning from Apollo to the International Space Station. Working with NASA fire and materials experts, this approach outlines the best requirements for both the closed out area of the vehicle, such as the avionics bay, and the crew cabin area to address the unique challenges due to the size and configuration of the CEV.

Lewis, John F.↗

A Brief Description of My Projects

My internship was in the IDC which consist of a machine shop and an array of design space. During my tour I worked on a wide variety of projects some of which included design, research, machining and fabrication. I gained further knowledge on some machines that I have had prior experience on such as the lathe and Hurco CNC machines. The first thing we did was complete our checkout in the machine shop which went pretty well, since I was already familiar with most of the machines. I also did a couple of practice parts on some of the machines, I made a name block on the CNC machine and I also used the vertical milling machine to complete this project. One of the other projects that I did was machine a hammer with my initials with the use of the lathe and CNC machine, this project took much longer since I had to set up a cylindrical piece on the CNC machine. The first project that I began work on was the Systems Engineering & Management Advancement Program (SEPMAP) Hexacopter project and helped them to assemble and modify one of their particle capture doors on their boxes. After a while we ended up helping them make a hinge and holes to reduce the weight of their design. We helped the NASA Extreme Environment Mission Operations (NEEMO) team a bit with some of their name tags and assembly of some of their underwater parts. One of the more challenging projects was a rail that came in with a rather weirdly drawn part. The biggest project that I worked on was the solar array project. Which consisted of a variety of machining and 3D printing and it took me about 3 different times of re-designing to come up with a final prototype. Along with this project I also had to complete a project in which I had to modify a thermos. This was rather simple since I just had to draw up a part and print it out on the 3D printer. I also learned how to use Pro E/Creo parametric to design a square block and print it on the 3D Printer. All of these projects increased my experience on all of the machines and equipment that I used. I also got to tweak my design skills and better understand how to modify my designs and how to improve those specific designs.

Barnes, Tobin↗

UAS Traffic Management Beyond Visual Line of Sight (UTM BVLOS)

NASA is working with Industry and FAA to enable beyond visual line of sight (BVLOS) unmanned aerial systems (UAS) operations wherever it is needed. Prior to NASA involvement, the UAS Traffic Management (UTM) concept and architecture did not exist. Then, a system architecture to support UTM in the nation's airspace was pioneered by NASA and adopted externally. Now, NASA will be a dedicated partner with the ongoing Key Site Operational Evaluation in Texas. NASA is needed to help define how services can be approved and applied to enable BVLOS operations in the nation's airspace.

UTM↗

NASA Schedule Management Handbook

The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

Source record↗

Inter-agency Working Group for Airborne Data and Telemetry Systems (IWGADTS)

The Interagency Coordinating Committee for Airborne Geosciences Research and Applications (ICCAGRA) was established to improve cooperation and communication among agencies sponsoring airborne platforms and instruments for research and applications, and to serve as a resource for senior level management on airborne geosciences issues. The Interagency Working Group for Airborne Data and Telecommunications Systems (IWGADTS) is a subgroup to ICCAGRA for the purpose of developing recommendations leading to increased interoperability among airborne platforms and instrument payloads, producing increased synergy among research programs with similar goals, and enabling the suborbital layer of the Global Earth Observing System of Systems.

Webster, Chris↗

Global Failure Modes in Composite Structures for High Altitudes

This report summarizes the accomplishments under the referenced grant. The work described was started under the guidance and supervision of the late Dr. James Stames as the technical contact. It was aimed at investigating the development of analysis tools to deal with the problem of rupture in reinforced structural skin of future composites-based aircraft. It was of particular interest to assess methods by which failure features reminiscent of cracks in metallic structures would develop and propagate in fiber reinforced structures in interaction with the reinforcing frame. To eventually achieve that goal it was necessary to first understand the stress or strain distribution at the front of such features so that interactions between such features and reinforcing agents could be assessed computationally. Thus the major emphasis here was on the assessment of damage front and methods on how to assess or characterize it. During the conduct of this research program Dr. Stames changed to a different NASA- internal assignment, which divorced him of the direct supervision of this grant. A student who was approximately % into the completion of his Ph.D. research needed to finish this work, and NASA funds were made available under Dr. Damodar Ambur, the successor Branch Manager for Dr. James Starnes, for the completion of this work. The current grant was the thus a new and fmal support increment for completion of the started research. Final reports for previous funding have been completed and submitted. Because of the interconnection of this last phase of the investigation with previous work it is deemed useful to make the Ph.D. thesis by Luis Gonzales the body of this report.

Knauss, W. G.↗

Functional Analysis for an Integrated Capability of Arrival/Departure/Surface Management with Tactical Runway Management

The runway is a critical resource of any air transport system. It is used for arrivals, departures, and for taxiing aircraft and is universally acknowledged as a constraining factor to capacity for both surface and airspace operations. It follows that investigation of the effective use of runways, both in terms of selection and assignment as well as the timing and sequencing of the traffic is paramount to the efficient traffic flows. Both the German Aerospace Center (DLR) and NASA have developed concepts and tools to improve atomic aspects of coordinated arrival/departure/surface management operations and runway configuration management. In December 2012, NASA entered into a Collaborative Agreement with DLR. Four collaborative work areas were identified, one of which is called "Runway Management." As part of collaborative research in the "Runway Management" area, which is conducted with the DLR Institute of Flight Guidance, located in Braunschweig, the goal is to develop an integrated system comprised of the three DLR tools - arrival, departure, and surface management (collectively referred to as A/D/S-MAN) - and NASA's tactical runway configuration management (TRCM) tool. To achieve this goal, it is critical to prepare a concept of operations (ConOps) detailing how the NASA runway management and DLR arrival, departure, and surface management tools will function together to the benefit of each. To assist with the preparation of the ConOps, the integrated NASA and DLR tools are assessed through a functional analysis method described in this report. The report first provides the highlevel operational environments for air traffic management (ATM) in Germany and in the U.S., and the descriptions of the DLR's A/D/S-MAN and NASA's TRCM tools at the level of details necessary to compliment the purpose of the study. Functional analyses of each tool and a completed functional analysis of an integrated system design are presented next in the report. Future efforts to fully develop the ConOps will include: developing scenarios to fully test environmental, procedural, and data availability assumptions; executing the analysis by a walk-through of the integrated system using these scenarios; defining the appropriate role of operators in terms of their monitoring requirements and decision authority; executing the analysis by a walk-through of the integrated system with operator involvement; characterizing the environmental, system data requirements, and operator role assumptions for the ConOps.

Phojanamongkolkij, Nipa↗

Constraint and Flight Rule Management for Space Mission Operations

The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et al, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et al., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et al, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on some of the latest research results as well as the latest challenges still facing the field.

Barreiro, J.↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a coopertive, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a presentation on initial work titled 'Sensitivity Study of Minimum Reserved Airspace in ETM Operations,' and a high level discussion titled 'Separation Management Service Framework for ETM.'

Upper E↗

Risk Management at the Total Project Level

Flight Projects plan their work against challenging technical objectives and tight schedules, and in the new environment of Faster-Better-Cheaper, low, rigid budgets.

Risk Management Space Projects↗

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

aircraft scheduling,traffic flow management,autono↗

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

air traffic control↗

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

air traffic control↗

The new organization: Rethinking work in the age of virtuality

Like two enormous steam engines, throttles wide-open, bells clanging and whistles screeching, careening toward each other down the same track, two powerful forces are about to collide and the point of collision will be smack in the middle of the white-collar workplace. Moreover, once the dust has settled, it is quite likely that we will never be able to think about the white-collar workplace in quite the same way again. The forces couldn't be more different. One force, the theory of complex adaptive systems, has its roots in the radical new sciences of chaos and complexity. The other force, the notion of organizations being learning systems, more like living organisms than 'information factories,' is an outgrowth of the new management thinking of leading organizational theorists like the Claremont Graduate School's Peter Drucker, MIT's Peter Senge, and Hitotsubashi University's Ikujiro Nonaka. Nevertheless, both the new science and the new management thinking seem to point to a similar and perhaps even startling conclusion: the business organization of the 21st century will look nothing like the bureaucratic organizational model that prevails in most companies today, a model that has remained largely unchanged since the manufacturing heydays of 1950s. While the details of the new organization remain sketchy, its rough outline is already beginning to take shape. Rather than simply being flatter through the elimination of layer upon layer of 'middle management,' the new organization is likely to be made up of networks of specialists who will be, for all practical purposes, self-managing. Rather than focusing on issues like re-engineering business processes, a holdover from Taylorism, the focus will be on supporting the continuous learning of an organization's specialists, the sharing of this learning with other specialists, and the embedding of this learning in the organization's physical structure. Finally, rather than viewing themselves as going through relatively long periods of stability punctuated by shorts bursts of 'reorganization,' business enterprises will come to realize that their very survival depends upon their being in a state of continuous organization. The implications of the new organization with respect to how companies approach the planning, design, and management of the technology infrastructure that enables individual learning, self-management, and continuous orgsnization, are both numerous and far-reaching. As part of this technology infrastructure, the white-collar workplace exists in the form it does today as a direct result of management's beliefs about how time, space, and tools ought to be organized and managed in order to accomplish useful intellectual work. Obviously, if these beliefs change radically, as both the new science and the new management thinking suggest is about to happen, then it is almost inevitable that the form and function of the white-collar workplace will change radically, as well. Will there even be a white-collar workplace in the 21st century, in the sense of purpose-built facilities designed to support the co-location of large numbers of white-collar workers? Only time will tell. However, the leading indicators seem to suggest that, as the old saying goes, 'We ain't seen nothin' yet!'

Sutherland, Duncan B., Jr.↗