Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Electrically Heated Testing of the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) Experiment Using a Depleted Uranium Core

The Kilopower project aims to develop and demonstrate scalable fission-based power technology for systems capable of delivering 1 to 10 kW of electric power with a specific power ranging from 2.5 to 6.5 W/kg. This technology could enable high-power science missions or could be used to provide surface power for manned missions to the Moon or Mars. NASA has partnered with the U.S. Department of Energy's National Nuclear Security Administration, Los Alamos National Laboratory, Nevada National Security Site (NNSS), and Y−12 National Security Complex to develop and test a prototypic reactor and power system using existing facilities and infrastructure. This technology demonstration, referred to as the "Kilowatt Reactor Using Stirling TechnologY (KRUSTY)," will undergo nuclear ground testing by the end of calendar year (CY) 2017 at the NNSS. The 1-kWe variation of the Kilopower system was chosen for the KRUSTY demonstration. The concept for the 1-kWe flight system consists of a 4 kWt highly enriched uranium-molybdenum reactor operating at 800 degC coupled to sodium heat pipes. The heat pipes deliver heat to the hot ends of eight 125-W Stirling convertors producing a net electrical output of 1 kW. Waste heat is rejected using titanium-water heat pipes coupled to carbon composite radiator panels. The KRUSTY test, based on this design, uses a prototypic highly enriched uranium-molybdenum core coupled to prototypic sodium heat pipes. The heat pipes transfer heat to two Advanced Stirling Convertors (ASC−E2s) and six thermal simulators, which simulate the thermal draw of full-scale power conversion units. Thermal simulators and Stirling engines are gas cooled. The most recent project milestone was the completion of nonnuclear system-level testing using an electrically heated depleted uranium (DU) (nonfissioning) reactor core simulator at the NASA Glenn Research Center. System-level testing has validated performance predictions and has demonstrated system-level operation and control in a test configuration that replicates the one to be used at the Device Assembly Facility (DAF) at the NNSS. Fabrication, assembly, and testing of the DU core has allowed for higher fidelity system-level testing at Glenn, and has validated the fabrication methods to be used on the highly enriched uranium core that will supply heat for the DAF KRUSTY demonstration.

Briggs, Maxwell H.↗

Below Ambient and Cryogenic Thermal Testing

Methods and apparatus for the testing of below-ambient temperature thermal insulation systems have been developed based on boiloff calorimetry. Boiloff calorimetry provides a direct measure of heat flow for below-ambient temperature conditions. The effective thermal conductivity (ke) and heat flux (q) of a test specimen are calculated for a fixed environmental condition (warm boundary temperature; cold boundary temperature; ambient or vacuum pressure). Through its heat of vaporization, liquid nitrogen (LN2) serves as the energy meter. Different apparatus have been built for flat-plate, cylindrical, and pipeline test specimens. Boundary temperatures can range from 353 K down to 77 K (80 C to -196 C). By interposing different insulation layers on the cold boundary, the cryogenic boiloff method is suitable for a wide range of below-ambient temperature applications. A cylindrical apparatus, Cryostat-100, as well as the pipeline test apparatus, Cryostat-P100, are thermally guarded and directly measure absolute thermal performance in watts. Pipe insulation systems can be mechanical, double-walled, or vacuum-jacketed including materials such as foams, cellular glass, aerogel blankets, clam-shell panels, and multilayer insulation. Two test pipelines, 12-meter-long, are mounted between two cold box assemblies. The test pipeline diameter is from 25-mm to 76-mm while the maximum outside diameter including insulation is up to 204-mm. The cold pipe tester design and test methods are discussed, as well as results for select thermal insulation materials. Progress toward a comparative type, bench-top cold pipe tester (Cryostat-P200) is also discussed.

Fesmire, James E.↗

Restore-L Satellite Servicing Internship Final Report

This paper reviews the Restore-L mission purpose and the necessary research and simulations to meet mission specification for the Propellant Transfer Subsystem (PTS). It is essential the PTS undergoes functionality testing, environmental testing, and calculations to understand the capabilities of the system. For the testing of components from PTS, a proper test setup is required. It is vital for test hardware, such as hoses and valves, to stay in place while the test is being performed. For the test hardware to operate correctly, positioning, orientation, and alignment are critical as well. In addition to the testing, calculations for pressure drop were explored. To meet requirements for test setups, designs for test hardware mounts were sketched, 3D modeled, and manufactured. Using fluid mechanics for calculations, a pressure drop equation was applied with known variables from mission specification. With the test hardware mounts designed and manufactured, the test setup was assembled with mounts installed. Test hardware mounts met all design requirements. Calculation for pressure drop were concluded and an answer was achieved. Meeting design requirement, mission specification, and calculating correct results allow the Restore-L mission to make further progress and help understand the effectiveness of the Propellant Transfer Subsystem.

PTS↗

Pulsed plasma solid propellant microthruster for the synchronous meteorological satellite. Task 4: Engineering model fabrication and test report

Two flight prototype solid propellant pulsed plasma microthruster propulsion systems for the SMS satellite were fabricated, assembled and tested. The propulsion system is a completely self contained system requiring only three electrical inputs to operate: a 29.4 volt power source, a 28 volt enable signal and a 50 millsec long command fire signal that can be applied at any rate from 50 ppm to 110 ppm. The thrust level can be varied over a range 2.2 to 1 at constant impulse bit amplitude. By controlling the duration of the 28 volt enable either steady state thrust or a series of discrete impulse bits can be generated. A new technique of capacitor charging was implemented to reduce high voltage stress on energy storage capacitors.

Guman, W. J.↗

Corrosion Protection and Dissimilar Material Joining for Next Generation Lightweight Vehicles

The Arconic Technology Center working with Honda R&D Americas, LLC and the Ohio State University evaluated the corrosion performance of several multi-material conditions and demonstrated the production worthiness of the Resistance Spot Riveting (RSR™) process. RSR is a new technology being developed by Howmet Fastening Systems (formerly Arconic, Inc.) that employs a fastener that is installed using conventional resistance spot welding equipment to produce multi-material joints. The goal of the 3-year project was to demonstrate the use of RSR to join aluminum to steel and aluminum to carbon fiber composites on a prototype scale. Deployment of this technology would help the automotive industry achieve an additional 10 to 20% weight reduction over high strength steels. These weight-savings to the body in white generally translates to 2.5-5.0% of overall vehicle curb weight. The resulting total weight-savings could provide a 1.5% to 3.0% total improvement in fuel efficiency for vehicles that incorporate RSR for multi-material joining. The RSR technology addresses several production barriers to achieving DOE’s fuel efficiency targets including eliminating the need of additional capital for new joining technologies and the flexibility to process conventional steel and multi-material structures with the same equipment. Additionally, the trend towards ultra-high strength steels limits the availability of conventional joining technologies that can effectively process these multi-material combinations. In order to accomplish these goals, the following program milestones were completed by the team: 1) Developed RSR process parameters, producing multi-material joints for mechanical testing and corrosion assessments. 2) Conducted corrosion evaluation of RSR and baseline joints assembled between automotive type aluminum alloys, steels, and carbon fiber using several corrosion mitigation strategies. 3) Developed a production ready feed system and integrate into a robotic resistance spot welding station to simulate automotive production conditions. 4) Produced demonstration assemblies for testing and evaluation.

36 MATERIALS SCIENCE↗

Kilopower: Small and Affordable Fission Power Systems for Space

The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.

Space nuclear power↗

Cross-stiffened continuous fiber structures

Under NASA's Novel Composites for Wing and Fuselage Applications (NCWFA) program, Contract NAS1-18784, Grumman is evaluating the structural efficiency of graphite/epoxy cross-stiffened panel elements fabricated using innovative textile preforms and cost effective Resin Transfer Molding (RTM) and Resin Film Infusion (RFI) processes. Two three-dimensional woven preform assembly concepts have been defined for application to a representative window belt design typically found in a commercial transport airframe. The 3D woven architecture for each of these concepts is different; one is vertically woven in the plane of the window belt geometry and the other is loom woven in a compressed state similar to an unfolded eggcrate. The feasibility of both designs has been demonstrated in the fabrication of small test element assemblies. These elements and the final window belt assemblies will be structurally tested, and results compared.

Ewen, John R.↗

Exploration Extravehicular Mobility Unit (xEMU) Helmet and Extravehicular Visor Assembly (EVVA) Chamber B Thermal Vacuum Testing Results

NASA’s Exploration Extravehicular Mobility Unit (xEMU) is the government reference next-generation spacesuit design and is engineered to protect astronauts from extreme lunar environmental temperatures. To evaluate the xEMU hardware thermal requirements, the xEMU Testing Team invented, designed, and executed a dual-suit, uncrewed thermal vacuum (TVAC) test at Johnson Space Center’s (JSC) Chamber B. This paper details the test methodology, hardware setup, and results from the xEMU helmet and extravehicular visor assembly (EVVA). Two helmets/EVVAs were tested simultaneously in Chamber B, with different thermal environments and EVVA configurations. For the helmet/EVVA on the Short xEMU (SxEMU) test article, five thermal profiles were tested during five simulated EVAs, with four different visor and shade configurations. For the helmet/EVVA on the second xEMU, eleven unique thermal profiles were tested including both cold and hot environmental cases over the course of five continuous days of testing, with a single visor and shade configuration. The radiative thermal environment was controlled through exposure to liquid-nitrogen shrouds on the chamber walls and through two separate heater cages surrounding each respective test article. The thermal effects of the Exploration Informatics (xINFO) lights and camera on the helmet/EVVA was also tested. Twenty-two temperature sensors were used to collect data in critical locations in the xEMU helmet/EVVA assembly. This paper will document the testing results and compare the test data against the xEMU helmet/EVVA and system-level thermal models for model validation.

xEMU↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

Thermal Performance of Spandrel Assemblies in Glazed Wall Systems: Laboratory Test Design – Challenges and Test Results

Accurate thermal performance calculation procedures for opaque spandrel areas in curtain wall and window wall systems are essential for rating systems when comparing spandrel systems. However, there is a lack of consensus in thermal modeling needed for accurately characterizing heat transfer through spandrel assemblies due to the complex arrangement of materials and structural components. Several studies indicate that conventional 2D thermal simulations may overestimate R-values by 30% compared to physical testing and 3D simulations. Detailed simulations and well-curated laboratory test data are necessary to build confidence in simulation models, which will later be used to develop correlations to improve widely used conventional 2D thermal simulations. This study aims to experimentally test heat transfer through various spandrel assemblies to validate 3D simulation models. Also, the challenges of conducting a thorough testing design along with the solutions would be documented. The team developed a design for testing spandrel assemblies, making appropriate modifications to the existing heat, air, and moisture (HAM) chamber to accommodate the testing needs. Two moveable baffles were designed and fabricated to guide airflow direction parallel to the test article surface. The data acquisition capabilities in the chamber were upgraded to add more than two hundred sensors to the climate and indoor side of the chamber. The goal is to provide a quality dataset for validating complex 3D modeling simulations, which will be used to develop improved thermal simulation techniques that more accurately represent the thermal behavior of spandrel assemblies and their integration within the building envelope. This paper will summarize the results for the boundary conditions of the testing and the temperature variation across different locations of the spandrel assemblies.

Kunwar, Niraj [ORNL] (ORCID:0000000263457652)↗

Cryogenic Testing of HL-LHC Q1/Q3 Cryo-Assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 Cryo-Assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-Assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressures up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvements for subsequent tests.

Rabehl, R. [Fermilab]↗

Cryogenic testing of HL-LHC Q1/Q3 cryo-assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvement for subsequent tests.

Rabehl, R. [Fermilab] (ORCID:0000000311130030)↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗

The middeck 0-gravity dynamics experiment

The Middeck 0-Gravity Dynamics Experiment (MODE), flown onboard the Shuttle STS-48 Mission, consists of three major elements: the Experiment Support Module, a dynamics test bed providing computer experiment control, analog signal conditioning, power conditioning, an operator interface consisting of a keypad and display, experiment electrical and thermal control, and archival data storage: the Fluid Test Article assembly, used to investigate the dynamics of fluid-structure interaction in 0-gravity; and the Structural Test Article for investigating the open-loop dynamics of structures in 0-gravity. Deployable, erectable, and rotary modules were assembled to form three one- and two-dimensional structures, in which variations in bracing wire and rotary joint preload could be introduced. Change in linear modal parameters as well as the change in nonlinear nature of the response is examined. Trends in modal parameters are presented as a function of force amplitude, joint preload, and ambient gravity. An experimental study of the lateral slosh behavior of contained fluids is also presented. A comparison of the measured earth and space results identifies and highlights the effects of gravity on the linear and nonlinear slosh behavior of these fluids.

Crawley, Edward F.↗

Test results of an organic Rankine-cycle power module for a small community solar thermal power experiment

The organic Rankine-cycle (ORC) power conversion assembly was tested. Qualification testing of the electrical transport subsystem was also completed. Test objectives were to verify compatibility of all system elements with emphasis on control of the power conversion assembly, to evaluate the performance and efficiency of the components, and to validate operating procedures. After 34 hours of power generation under a wide range of conditions, the net module efficiency exceeded 18% after accounting for all parasitic losses.

Clark, T. B.↗

Inflatable Structures: Test Results and Development Progress Since TransHab

JSC's TransHab project was the first successful development program to prove the viability of inflatable habitats for space applications. Although TransHab was cancelled in 2000, significant progress has been made this past year by JSC engineers. Since February 2005, the following test articles have been manufactured and tested: 1 - An 88-in diameter restraint layer was pressure-tested to failure and reached an ultimate pressure of 197psi. This test article demonstrated the ability to build a 35- foot diameter inflatable with a factor of safety of 4.0 at 10.2 psi. 2 - An 88-in diameter restraint layer with a window frame incorporated into the restraint layer was tested to failure and reached an ultimate pressure of 197 psi. This test article demonstrated the ability to incorporate windows and other structural penetrations in the woven restraint layer without reducing its strength. 3 - An 88-inch diameter folding demonstrator that includes a bladder, restraint layer, and all of the MMOD shell layers was manufactured and assembled. This test article demonstrated an improved and simplified shell assembly and folding technique which installs pre-folded shell sections in a controlled manner. 4 - Fifth-scale MMOD hypervelocity test articles have demonstrated fiberglass as a viable material for a MMOD bumper shield which is cheaper and more readily available than previously used materials. In addition, four different full-scale advanced shape inflatable mockups have been manufactured and evaluated for applications such as lunar habitats, airlocks, and transfer tunnels.

Johnson, Chris↗

Brayton cycle heat exchanger and duct assembly (HXDA, preliminary design and technology tests

A preliminary design of the heat exchanger and duct assembly (HXDA) for a 60 kwe, closed loop, Brayton cycle space power system is presented. This system is weight optimized within the constraints imposed by the defined structural and operational requirements. Also presented are the results of several small scale tests, directed to obtaining specific design data and/or the resolution of a design approach for long life Brayton cycle heat exchanger systems.

Coombs, M. G.↗

Reliability of area array packages with 1500-2500 I/Os

This report first provides a literature survey for designing, manufacturing, and reliability test results for area array packages with 1500 to 2500 inputs/outputs (I/Os). It then presents test matrix on design, yield, and workmanship defects on assembly and environmental testing, including thermal cycle and mechanical drop-test evaluation results for FCBGA1704, FPBGA432, and PBGA676 I/Os packages assembled onto printed circuit/wiring boards (PCBs/PWBs). Finally, it summarizes lessons learned from test results for assembly and environmental testing along with optical, scanning electron microscopy (SEM), and x-ray photomicrographs showing damage progress.

Ghaffarian, Reza↗