Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Information management system study results. Volume 1: IMS study results

The information management system (IMS) special emphasis task was performed as an adjunct to the modular space station study, with the objective of providing extended depth of analysis and design in selected key areas of the information management system. Specific objectives included: (1) in-depth studies of IMS requirements and design approaches; (2) design and fabricate breadboard hardware for demonstration and verification of design concepts; (3) provide a technological base to identify potential design problems and influence long range planning (4) develop hardware and techniques to permit long duration, low cost, manned space operations; (5) support SR&T areas where techniques or equipment are considered inadequate; and (6) permit an overall understanding of the IMS as an integrated component of the space station.

Source record↗

Software for Managing Parametric Studies

The Information Power Grid Virtual Laboratory (ILab) is a Practical Extraction and Reporting Language (PERL) graphical-user-interface computer program that generates shell scripts to facilitate parametric studies performed on the Grid. (The Grid denotes a worldwide network of supercomputers used for scientific and engineering computations involving data sets too large to fit on desktop computers.) Heretofore, parametric studies on the Grid have been impeded by the need to create control language scripts and edit input data files painstaking tasks that are necessary for managing multiple jobs on multiple computers. ILab reflects an object-oriented approach to automation of these tasks: All data and operations are organized into packages in order to accelerate development and debugging. A container or document object in ILab, called an experiment, contains all the information (data and file paths) necessary to define a complex series of repeated, sequenced, and/or branching processes. For convenience and to enable reuse, this object is serialized to and from disk storage. At run time, the current ILab experiment is used to generate required input files and shell scripts, create directories, copy data files, and then both initiate and monitor the execution of all computational processes.

Yarrow, Maurice↗

Space transportation system as seen by an astronaut

Discussion of the astronaut's role in the Space Shuttle and its associated payload operations. It is shown that there will be a shift in the astronaut's tasks as the Shuttle system matures. The Shuttle is designed for automatic guidance, navigation, and control, and the need for active piloting will accordingly decrease. With the shift to onboard autonomous operation, the system management role will expand. Direct tasks with delivery/recovery and laboratory/observatory payloads will continue to expand throughout the Shuttle program duration through the 1980s.

Haise, F. W., Jr.↗

Team Performance and Error Management in Chinese and American Simulated Flight Crews: The Role of Cultural and Individual Differences

This report describes results of a study conducted for NASA-Langley Research Center. This study is part of a program of research conducted for NASA-LARC that has focused on identifying the influence of national culture on the performance of flight crews. We first reviewed the literature devoted to models of teamwork and team performance, crew resource management, error management, and cross-cultural psychology. Davis (1999) reported the results of this review and presented a model that depicted how national culture could influence teamwork and performance in flight crews. The second study in this research program examined accident investigations of foreign airlines in the United States conducted by the National Transportation Safety Board (NTSB). The ability of cross-cultural values to explain national differences in flight outcomes was examined. Cultural values were found to covary in a predicted way with national differences, but the absence of necessary data in the NTSB reports and limitations in the research method that was used prevented a clear understanding of the causal impact of cultural values. Moreover, individual differences such as personality traits were not examined in this study. Davis and Kuang (2001) report results of this second study. The research summarized in the current report extends this previous research by directly assessing cultural and individual differences among students from the United States and China who were trained to fly in a flight simulator using desktop computer workstations. The research design used in this study allowed delineation of the impact of national origin, cultural values, personality traits, cognitive style, shared mental model, and task workload on teamwork, error management and flight outcomes. We briefly review the literature that documents the importance of teamwork and error management and its impact on flight crew performance. We next examine teamwork and crew resource management training designed to improve teamwork. This is followed by discussion of the potential influence of national culture on teamwork and crew resource management. We then examine the influence of other individual and team differences, such as personality traits, cognitive style, shared mental model, and task workload. We provide a heuristic model that depicts the influence of national culture and individual differences on teamwork, error management and flight outcomes. The results demonstrate the usefulness of the model for future research.

Davis, Donald D.↗

Planning and Monitoring for Swarm Search and Service Missions

To transition from control theory to real applications, it is important to study missions such as Swarm Search and Service (SSS) where vehicles are not only required to search an area, but also service all jobs that they find. In SSS missions each type of job requires a group of vehicles to break-off from the swarm for a given amount of time to successfully service it. The required number of vehicles and the service rate are unique to each job type. Once a job has been completed the vehicles are able to return to the swarm for use elsewhere. If not enough vehicles are present in the swarm at the time that the job is identified, that job is dropped without being serviced. Human operators as tasked with effectively planning and managing these complex missions. This work presents a user study that seeks to test the efficacy and ease-of-use of a prediction model known as the Hybrid Model as an aid in planning and monitoring tasks. Results show that the novel computational model aid allows operators to more effectively choose the necessary swarm size to handle expected mission workload, as well as, maintain sufficient situation awareness to evaluate the performance of the swarm during missions.

swarm search and service↗

Planning and Monitoring Multi-Job Type Swarm Search and Service Missions

To transition from control theory to real applications, it is important to study missions such as Swarm Search and Service (SSS) where vehicles are not only required to search an area, but also service all jobs that they find. In SSS missions, each type of job requires a group of vehicles to break off from the swarm for a given amount of time to service it. The required number of vehicles and the service rate are unique to each job type. Once a job has been completed, the vehicles are able to return to the swarm for use elsewhere. If not, enough vehicles are present in the swarm at the time that the job is identified, that job is dropped without being serviced. In SSS missions that occur in open environments, the arrival rate of jobs varies dynamically as vehicles move in and out of the swarm to service jobs. Human operators are tasked with effectively planning and managing these complex missions. This paper presents a user study that seeks to test the efficacy and ease-of-use of a prediction model known as the Hybrid Model as an aid in planning and monitoring tasks. Results show that the novel computational model aid allows operators to more effectively choose the necessary swarm size to handle expected mission workload, as well as, maintain sufficient situation awareness to evaluate the performance of the swarm during missions.

swarm search and service↗

Forming the Future of Agrohydrology

Agricultural water management is increasingly prioritized throughout the world as producers are tasked with meeting growing crop demand while also managing environmental resources more sustainably. Likewise, agriculture is increasingly modifying the terrestrial water cycle. In response to these dynamics, the informal research discipline of agrohydrology continues to grow, fueled by a new era of rapidly evolving research tools and big data availability. While many researchers are actively invested in agrohydrology as a research topic, there remains a gap in formalizing this valuable discipline. This article aims to: (a) identify key research themes in agrohydrology, (b) conceptualize future research topics within each theme, and (c) estimate a timeframe before topics become pressing (i.e., before a topic becomes a limiting factor in advancing water management in an agricultural context). This commentary is meant to guide the trajectory of an evolving discipline of agrohydrology, the practice of agricultural water management at multiple nested scales, and the conversation of the invested public.

54 ENVIRONMENTAL SCIENCES↗

FJET Database Project: Extract, Transform, and Load

The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

excel vba↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable

Hall, Timothy A.↗

Simultaneous personnel and vehicle shift scheduling in the waste management sector

Highlights: • We consider the problem of simultaneously schedule personnel and vehicle shifts in the waste management sector. • We propose both an optimization model and a heuristic approach. • Important monetary savings can be achieved in the waste collection operations. - Abstract: Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Problems and Countermeasures of River Management in the Process of Rapid Urbanization in China

The rapid process of urbanization has led to water pollution, reduction of space areas and channel deposition. However, current river protection and management levels are not suitable for city development level and human demand. Therefore, these problems have not yet been solved. China is still in an era of rapid urbanization, which means that the influence of urbanization in rivers will increase in the future—and the task of river protection and management will be more arduous. In order to meet the challenges and opportunities brought by urbanization and promote the sustainable use and management of river, this study puts forward relevant suggestions on river protection and management, such as river management mechanisms, economic incentive instruments, technical support, transformation of development concepts, improving laws, regulations and policies and stimulating public participation.

54 ENVIRONMENTAL SCIENCES↗

Artificial intelligence - New tools for aerospace project managers

Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.

Moja, D. C.↗

Advanced Interval Management: A Benefit Analysis

This document is the final report for the NASA Langley Research Center (LaRC)- sponsored task order 'Possible Benefits for Advanced Interval Management Operations.' Under this research project, Architecture Technology Corporation performed an analysis to determine the maximum potential benefit to be gained if specific Advanced Interval Management (AIM) operations were implemented in the National Airspace System (NAS). The motivation for this research is to guide NASA decision-making on which Interval Management (IM) applications offer the most potential benefit and warrant further research.

Timer, Sebastian↗

Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative

The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.

Best, Philip J.↗

Managing code transformations for better performance portability

Code optimization is an intricate task that is getting more complex as computing systems evolve. Managing the program optimization process, including the implementation and evaluation of code variants, is tedious, inefficient, and errors are likely to be introduced in the process. Moreover, because each platform typically requires a different sequence of transformations to fully harness its computing power, the optimization process complexity grows as new platforms are adopted. To address these issues, systems and frameworks have been proposed to automate the code optimization process. They, however, have not been widely adopted and are primarily used by experts with deep knowledge about underlying architecture and compiler intricacies. This article describes the requirements that we believe necessary for making automatic performance tuning more broadly used, especially in complex, long-lived high-performance computing applications. Besides discussing limitations of current systems and strategies to overcome these, we describe the design of a system that is able to semi-automatically generate efficient platform-specific code. In the proposed system, the code optimization is programmer-guided, separately from application code, on an external file in what we call optimization programming. The language to program the optimization process is able to represent complex collections of transformations and, as a result, generate efficient platform-specific code. A database manages different optimized versions of code regions, providing a pragmatic approach to performance portability, and the framework itself has separate components, allowing the optimized code to be used on systems without installing all of the modules required for the code generation. We present experiments on two different platforms to illustrate the generation of efficient platform-specific code that performs comparable to hand-optimized, vendor-provided code.

Computer Science↗

Bifacial Photovoltaic Modules and Systems: Experience and Results from International Research and Pilot Applications

Within the framework of IEA PVPS, Task 13 aims to provide support to market actors working to improve the operation, the reliability and the quality of PV components and systems. Operational data from PV systems in different climate zones compiled within the project will help provide the basis for estimates of the current situation regarding PV reliability and performance. The general setting of Task 13 provides a common platform to summarize and report on technical aspects affecting the quality, performance, reliability and lifetime of PV systems in a wide variety of environments and applications. By working together across national boundaries we can all take advantage of research and experience from each member country and combine and integrate this knowledge into valuable summaries of best practices and methods for ensuring PV systems perform at their optimum and continue to provide competitive return on investment. Task 13 has so far managed to create the right framework for the calculations of various parameters that can give an indication of the quality of PV components and systems. The framework is now there and can be used by the industry who has expressed appreciation towards the results included in the high-quality reports. The IEA PVPS countries participating in Task 13 are Australia, Austria, Belgium, Canada, Chile, China, Denmark, Finland, France, Germany, Israel, Italy, Japan, the Netherlands, Norway, Spain, Sweden, Switzerland, Thailand, and the United States of America.

14 SOLAR ENERGY↗

Designing New Materials for Photovoltaics: Opportunities for Lowering Cost and Increasing Performance through Advanced Material Innovations

Within the framework of IEA PVPS, Task 13 aims to provide support to market actors working to improve the operation, the reliability and the quality of PV components and systems. Operational data from PV systems in different climate zones compiled within the project will help provide the basis for estimates of the current situation regarding PV reliability and performance. The general setting of Task 13 provides a common platform to summarize and report on technical aspects affecting the quality, performance, reliability and lifetime of PV systems in a wide variety of environments and applications. By working together across national boundaries we can all take advantage of research and experience from each member country and combine and integrate this knowledge into valuable summaries of best practices and methods for ensuring PV systems perform at their optimum and continue to provide competitive return on investment. Task 13 has so far managed to create the right framework for the calculations of various parameters that can give an indication of the quality of PV components and systems. The framework is now there and can be used by the industry who has expressed appreciation towards the results included in the high-quality reports. The IEA PVPS countries participating in Task 13 are Australia, Austria, Belgium, Canada, Chile, China, Denmark, Finland, France, Germany, Israel, Italy, Japan, the Netherlands, Norway, Spain, Sweden, Switzerland, Thailand, and the United States of America.

14 SOLAR ENERGY↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗