Activation in injection area of J-PARC 3-GeV rapid cycling synchrotron and its countermeasures - 25344
The 3-GeV rapid cycling synchrotron in Japan Proton Accelerator Research Complex aims to deliver a 1-MW proton beam to the neutron target and the main ring synchrotron. The existing beam power of the Rapid Cycling Synchrotron is up to 500 kW, and higher radiation doses are concentrated in the injection area. These activations are caused by the interaction between the foil and the beam. To reduce dose exposure to workers near the injection point, we study a new design of the injection scheme to secure sufficient space for radiation shielding and bellows. Experience has shown that eddy currents are generated in the metal flange near the magnet owing to the effect of the pulsed magnetic field used for injection, and the temperature exceeds 100 deg. C. The shield installed in the new injection system needs to have a layer structure, in which an insulator is inserted between iron shields to reduce the eddy current. From the results of the shielding calculation, even if 1 mm of polyethylene was inserted between two 9-mm-thick SUS 316 plates, which serve as shielding material, the shielding performance was reduced only about 5%, and we confirmed that it would function well. (authors)