Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “solar policy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Summer 2024: Solar Industry Update [Slides]

Each quarter, the National Renewable Energy Laboratory (NREL) conducts the Quarterly Solar Industry Update, a presentation of technical trends within the solar industry Each presentation focuses on global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Photovoltaic and Cost Analysis for Winston-Salem, North Carolina

This study assesses the feasibility of solar installations at various sites in Winston-Salem, focusing on factors such as solar resource availability, electricity costs, and rooftop area for photovoltaic systems. The analysis begins by estimating daily energy requirements based on annual electricity use, followed by adjusting for seasonal and operational fluctuations. Using regional solar data from the National Solar Radiation Database (NSRDB), we calculate average peak sun hours to determine effective system sizing. A parametric approach using the System Advisor Model (SAM) refines this sizing process, incorporating a safety margin of 1.2 to address demand peaks. Each PV system is designed to fit available rooftop space, and a coverage threshold of 70% is identified as optimal for maximizing cost savings and sustainability. This threshold allows installations to meet substantial energy demands, supporting energy resilience and enhancing economic returns.

14 SOLAR ENERGY↗

The Land Sparing, Water Surface Use Efficiency, and Water Surface Transformation of Floating Photovoltaic Solar Energy Installations

Floating photovoltaic solar energy installations (FPVs) represent a new type of water surface use, potentially sparing land needed for agriculture and conservation. However, standardized metrics for the land sparing and resource use efficiencies of FPVs are absent. These metrics are critical to understanding the environmental and ecological impacts that FPVs may potentially exhibit. Here, we compared techno-hydrological and spatial attributes of four FPVs spanning different climatic regimes. Next, we defined and quantified the land sparing and water surface use efficiency (WSUE) of each FPV. Lastly, we coined and calculated the water surface transformation (WST) using generation data at the world’s first FPV (Far Niente Winery, California). The four FPVs spare 59,555 m2 of land and have a mean land sparing ratio of 2.7:1 m2 compared to ground-mounted PVs. Mean direct and total capacity-based WSUE is 94.5 ± 20.1 SD Wm−2 and 35.2 ± 27.4 SD Wm−2, respectively. Direct and total generation-based WST at Far Niente is 9.3 and 13.4 m2 MWh−1 yr−1, respectively; 2.3 times less area than ground-mounted utility-scale PVs. Our results reveal diverse techno-hydrological and spatial attributes of FPVs, the capacity of FPVs to spare land, and the utility of WSUE and WST metrics.

14 SOLAR ENERGY↗

Benefits and Critical Knowledge Gaps in Determining the Role of Floating Photovoltaics in the Energy-Water-Food Nexus

Floating solar photovoltaic (FPV) systems have become an increasingly attractive application of photovoltaics (PV) because of land-use constraints, the cost of land and site preparation, and the perceived energy and environmental co-benefits. Despite the increasing interest in FPV systems, a robust validation of their suggested co-benefits and impacts on the nexus of energy, water, and food (EWF) systems is lacking. This information gap makes it challenging for decision makers to justify its adoption—potentially suppressing FPV deployment. To address this gap and to help de-risk this PV deployment opportunity, we (1) review the suggested co-benefits of FPV systems with a focus on the impacts that could alleviate pressures on EWF systems and (2) identify areas where further research is needed to reduce uncertainty around FPV system performance. Our review reveals that EWF nexus-relevant co-benefits, such as improved panel efficiency and reduced land usage, are corroborated in the literature, whereas others, such as water quality impacts, lack empirical evidence. Our findings indicate that further research is needed to quantify the water-related and broader economic, environmental, social, sustainability, justice, and resilience co-benefits and impacts of FPV systems.

14 SOLAR ENERGY↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

U.S. Solar Siting Regulation and Zoning Ordinances

A machine readable collection of documented solar siting ordinances at the state and local (e.g., county, township) level throughout the United States. The data were compiled based on a locality-by-locality review zoning ordinances after completing an initial review of scholarly legal articles. The citations for each ordinance are included in the spreadsheet.

Array↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Development and Validation of Southeast Asia Solar Resource Data [Slides]

Lack of access to high-quality, publicly available, time series solar data to inform decisions that will transform energy sectors in Southeast Asia is a challenge. The solution is to level the playing field by offering free, high-quality, robust solar data to inform private sector investment and policymaking. This is done by (1) leveraging deep NREL expertise in atmospheric science, solar resource assessment, high-performance computing, and cloud-based data dissemination, (2) producing and validating high spatial and temporal resolution solar resource data, (3) making data available on the USAID-funded global Renewable Energy Data Explorer platform, (4) providing capacity building for data and applications, and (5) informing future demand-driven tool development.

14 SOLAR ENERGY↗

Community Solar Potential Analysis for Lawrence, Massachusetts

This report was prepared as part of the U.S. Department of Energy's Communities Local Energy Action Program (Communities LEAP) pilot competitive technical assistance for the Lawrence Massachusetts Stakeholder Coalition (LSC). In accordance with Technical Assistance Area 1 (Community Solar Analysis) and in coordination with the LSC, the UMass Clean Energy Extension (CEE) research team conducted a high-level geographic information system (GIS) evaluation of potential community solar (CS) development sites within Lawrence, and its three bordering towns of Andover, North Andover, and Methuen.

14 SOLAR ENERGY↗

Tandem Photovoltaics Core Program Final Technical Report

The Tandem Photovoltaics Core Program was a multi-year initiative aimed at advancing hybrid tandem solar cell technologies to enhance solar module efficiency beyond the limits of single junction devices. This project focused on the development, testing, and scaling of prototype photovoltaic devices, with the goal of achieving commercial relevance and driving industry adoption. The work was divided into three tasks: 1) Comparative Analysis of Tandem Technologies: This task focused on quantifying energy yield under real-world conditions and assessing economic viability of tandems relative to silicon-based modules. The project's modeling framework incorporated performance data, cost of materials, and manufacturing process impacts to optimize tandem designs 2) Tandem Integration and Prototyping: In this task, we developed innovative tandem designs by combining metal halide perovskite (MHP) top cells and silicon (Si) bottom cells. The project focuses on both mechanical integration and direct deposition techniques to enable compatibility with commercially relevant Si technologies, such as passivated contact or PERC cells. 3) Scale-up and Reliability: This task addressed the challenges of large-area fabrication by developing scalable deposition methods and robust interconnection schemes for tandems. The project looked at different accelerated testing such as thermal cycling, damp heat exposure, and potential induced degradation, to ensure long-term stability of devices in field conditions. Tandem solar cells can greatly increase module efficiency beyond conventional single junction (SJ) devices, which are approaching their theoretical limit. There are many ways to fabricate a tandem cell or module in terms of materials used, configuration, and terminal connection. This SETO core project focused critical factors in enabling tandems to enter the market, including hardware integration, technoeconomic analysis (TEA), and energy yield analysis. We focused on MHP/Si hybrid tandem solar cells and modules as a model system for their versatility in module design comparisons, providing valuable insights for other tandem options. While champion cells with areas <1cm2 are regularly demonstrated by groups around the world, it is significantly more challenging to translate these advances into modules, and fewer institutions and companies are working at the module level. This project addressed questions about module fabrication, testing, and reliability that are hard to answer without actually fabricating prototypes. We also performed analysis and road-mapping activities to understand the potential for a wider variety of tandems, including all-perovskite tandems fabricated in collaboration with the Perovskite PV core program. Detailed technical results from this project are described for each task in Section 7.

14 SOLAR ENERGY↗

Q1 2023 U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks With Minimum Sustainable Price Analysis Data File

The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) aims to accelerate the advancement and deployment of solar technology in support of an equitable transition to a decarbonized economy no later than 2050, starting with a decarbonized power sector by 2035. Its approach to achieving this goal includes driving innovations in technology, hardware, and soft cost reductions to make solar affordable and accessible for all. As part of this effort, SETO must track solar cost trends so it can focus its research and development (R&D) on the highest-impact activities. The benchmarks in this report are bottom-up cost estimates of all major inputs to PV and energy storage system installations. Bottom-up costs are based on national averages and do not necessarily represent typical costs in all local markets. Like last year's report, this year's report includes two distinct sets of benchmarks: minimum sustainable price (MSP) benchmarks and modeled market price (MMP) benchmarks. MSP benchmarks can be interpreted as the minimum price a company needs to charge to remain financially solvent in the long term based on the minimum sustainable prices of all inputs including minimum sustainable profit margins. MMP benchmarks can be interpreted as the actual cash sales price a company charges in the given benchmark period. These simplified estimates are useful for tracking technological progress, but they do not reflect all experiences. In fact, no individual estimate under any approach can reflect the diversity of the PV and storage manufacturing and installation industries.

14 SOLAR ENERGY↗

Case Study of the City of Reno: Resilience Valuation and Planning for Solar and Storage on Critical Infrastructure

This case study report documents the City of Reno's efforts to quantify the value of resilience and the entrepreneurial ways through which the City approached the questions of what role solar and storage could play in their resilience efforts and how to value and pay for solar-plus-storage systems. It documents how and why the City of Reno came to the specific conclusion to integrate solar and storage into their Public Safety Center retrofit project and apply for Federal Emergency Management Agency (FEMA) Building Resilient Infrastructure and Communities (BRIC) funding. This report provides an overview for other local governments to draw inspiration from when considering how to prioritize community values and pursue multi-stakeholder dialogue around resilient energy solutions. The City of Reno's experience can serve as a starting point for other communities interested in valuing the resilience benefits of solar and storage.

14 SOLAR ENERGY↗

Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations

Solar energy has the potential to be a core energy resource for the southeastern United States. To better understand the implications of higher levels of solar PV (27%-43% of total generation capacity) and electricity storage (13%-49% of peak load) would affect electricity system reliability, costs, and operations in the U.S. Southeast, this study sought to address two main questions. First, how would higher levels of solar PV and electricity storage impact the costs, reliability, and operations of electricity systems in the Southeast in 2035? Second, at different levels of solar PV and electricity storage, what are the benefits of operational coordination among utilities in the Southeast, through more efficient regional dispatch and sharing operating reserves? To answer these questions, the study used detailed capacity expansion and dispatch modeling to develop and examine 15 scenarios with different levels of solar PV, electricity storage, and operational coordination, focusing on the year 2035. The study also evaluates the benefits of operational coordination among utilities through more efficient regional dispatch and reserve sharing, at different levels of solar and storage. The study focuses on five balancing regions that cover Alabama, Georgia, Kentucky, North Carolina, South Carolina, Tennessee, and parts of Mississippi and Missouri.

14 SOLAR ENERGY↗

Supply Chain for Photovoltaics in the United States: 2024 in Review

Solar photovoltaic (PV) and battery energy storage system (BESS) technologies are two immediately available options for meeting U.S. electricity demands, which are increasing due to expansion of loads from end uses including data centers, buildings, vehicles, and factories. Globally, PV and BESS supply chains are dominated by products manufactured in China and elsewhere by Chinese companies. However, U.S. PV and BESS manufacturing have recently grown, with some capacity in each step of the PV supply chain, albeit not enough to currently meet demand with domestic manufacturing alone. This study analyzes U.S. PV supply chains and costs in 2024, for the crystalline silicon and cadmium telluride module supply chains. The full report additionally addresses the PV balance of system, inverter and BESS supply chains. The study concludes with an analysis of technology installation trends, government support for domestic manufacturing, manufacturing jobs, and the domestic content of PV systems installed in the United States in 2024.

14 SOLAR ENERGY↗

A Hybrid Reinforcement Learning-MPC Approach for Distribution System Critical Load Restoration

This paper proposes a hybrid control approach for distribution system critical load restoration, combining deep reinforcement learning (RL) and model predictive control (MPC) aiming at maximizing total restored load following an extreme event. RL determines a policy for quantifying operating reserve requirements, thereby hedging against uncertainty, while MPC models grid operations incorporating RL policy actions (i.e., reserve requirements), renewable (wind and solar) power predictions, and load demand forecasts. We formulate the reserve requirement determination problem as a sequential decision-making problem based on the Markov Decision Process (MDP) and design an RL learning environment based on the OpenAI Gym framework and MPC simulation. The RL agent reward and MPC objective function aim to maximize and monotonically increase total restored load and minimize load shedding and renewable power curtailment. The RL algorithm is trained offline using a historical forecast of renewable generation and load demand. The method is tested using a modified IEEE 13-bus distribution test feeder containing wind turbine, photovoltaic, microturbine, and battery. Case studies demonstrated that the proposed method outperforms other policies with static operating reserves.

distribution system↗

Using probabilistic solar power forecasts to inform flexible ramp product procurement for the California ISO

How can independent system operators (ISOs) take advantage of probabilistic solar forecasts to lower generation costs and improve reliability of power systems? We discuss one three-step approach for doing so, focusing on how such forecasts might help the California Independent System Operator (CAISO) prepare unexpected net load ramps, where net load equals gross demand minus wind and solar production. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty reflected in the forecasted prediction intervals (independent variables) to error distributions for net load ramp forecasts for the CAISO real-time market (dependent variable) using machine learning and quantile regression. Projected ramp forecast errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Detailed descriptions are provided on the quantile regression and kth-nearest neighbor categorization methods for accomplishing that translation. Finally, a multiple time-scale look-ahead market simulation model is applied to a 118-bus IEEE Reliability Test System, modified to represent the CAISO generation mix and demand distributions. The model runs quantify how solar-conditioned ramp requirements can, first, decrease operating costs by reducing requirements compared to often conservative unconditional methods and, second, decrease generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. Solar-conditioned ramp requirements are found to reduce generation operating costs by about 2% for the test system (which would be equivalent to over $\$100$ million per year for a CAISO-size system).

14 SOLAR ENERGY↗

Solar Industry Update: (H2 2020) [Slides]

Each quarter, the National Renewable Energy Laboratory (NREL) conducts the Quarterly Solar Industry Update, a presentation of technical trends within the solar industry, to the solar office staff. Each presentation focuses on global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Forecasting Distributed PV Adoption in Barranquilla, Colombia [Slides]

The objective of the dGen Colombia project is to provide projections to 2050 on distributed PV deployment by sector for a range of scenarios for Barranquilla, Colombia. NREL used the open-source Distributed Generation Market Demand Model (dGen) adapted for international projects for this analysis. As part of this analysis, technical potential, economic potential, and adoption projections of rooftop and groundmount PV for the city of Barranquilla are presented. Five main scenarios and their combinations were modeled to provide insight on the impact of increased demand from electric vehicles, air conditioning, and time-of-use tariffs.

14 SOLAR ENERGY↗