Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software verification and validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

The Specification-Based Validation of Reliable Multicast Protocol

Reliable Multicast Protocol (RMP) is a communication protocol that provides an atomic, totally ordered, reliable multicast service on top of unreliable IP multicasting. In this report, we develop formal models for RMP using existing automated verification systems, and perform validation on the formal RMP specifications. The validation analysis help identifies some minor specification and design problems. We also use the formal models of RMP to generate a test suite for conformance testing of the implementation. Throughout the process of RMP development, we follow an iterative, interactive approach that emphasizes concurrent and parallel progress of the implementation and verification processes. Through this approach, we incorporate formal techniques into our development process, promote a common understanding for the protocol, increase the reliability of our software, and maintain high fidelity between the specifications of RMP and its implementation.

Wu, Yunqing↗

Systematic Benchmarking of Diagnostic Technologies for an Electrical Power System

Automated health management is a critical functionality for complex aerospace systems. A wide variety of diagnostic algorithms have been developed to address this technical challenge. Unfortunately, the lack of support to perform large-scale V&V (verification and validation) of diagnostic technologies continues to create barriers to effective development and deployment of such algorithms for aerospace vehicles. In this paper, we describe a formal framework developed for benchmarking of diagnostic technologies. The diagnosed system is the Advanced Diagnostics and Prognostics Testbed (ADAPT), a real-world electrical power system (EPS), developed and maintained at the NASA Ames Research Center. The benchmarking approach provides a systematic, empirical basis to the testing of diagnostic software and is used to provide performance assessment for different diagnostic algorithms.

Kurtoglu, Tolga↗

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying↗

Stochastic Verification by Analysis for Autonomous Systems Management Architecture (ASMA)

The Gateway Vehicle Systems Manager (VSM) is the top-level of a distributed, hierarchical software control system. VSM is data-driven and will make decisions related to mission, fault, resource management and vehicle control. These attributes combined with a high degree of autonomy make it susceptible to emergent behavior. In order to achieve the high level of confidence needed in this critical system, the VSM team has developed a multifaceted verification strategy employing traditional verification techniques, simulation, model checking, and runtime verification. Individual algorithms are verified using conventional testing and model checking using assume-guarantee contracts. A discrete event-based simulation approach is being developed to verify timelines. This presentation describes an enhancement to the verification approach using analysis to enhance system robustness by detecting and resolving the potential for emergent behavior. The verification by analysis employs a Software in the Loop (SITL) environment with real flight software executing on emulated processors, simulations of vehicle subsystems, flight dynamics, and human inputs. Since the possible input space and configuration data set are too large for exhaustive testing, a Monte Carlo approach is used to cover feasible scenarios, augmented with corner cases and known higher-risk scenarios. A key problem in using Monte Carlo-based system verification is evaluating test results to ensure that system behavior is correct. The presentation describes the approach the VSM team uses to monitor behavior for compliance with predetermined boundaries and to identify anomalous behavior for further analysis. This presentation describes the multi-level systems approach to verification, and the simulation-based layer that covers the feasible state space: 1. Overview of the Gateway VSM 2. Special challenges due to heterogeneous, hierarchical architecture 3. Modeling and simulation environment using flight software and system simulations 4. Developing input sets to ensure state-space coverage 5. Developing model and data configuration sets to ensure model coverage 6. Interpreting results without predetermined outcomes 7. Lessons learned and future work

Verification and Validation↗

T1 VSAT Fade Compensation Statistical Results

New satellite communication systems are steadily seeking to use higher frequency bands to accommodate the requirements for additional capacity. At these higher frequencies, propagation impairments that did not significantly affect the signal at lower frequencies begin to have considerable impact. In Ka-band. the next logical commercial frequency band to be used for satellite communication, attenuation of the signal due to rain is a primary concern. An experimental satellite built by NASA, the Advanced Communication Technology Satellite (ACTS). launched in September 1993, is the first U.S. communication satellite operating in the Ka-band. In addition to higher carrier frequencies, a number of other new technologies, including on-board baseband processing. multiple beam antennas, and rain fade detection and compensation techniques, were designed into the ACTS. Verification experiments have been conducted since the launch to characterize the new technologies. The focus of this paper is to characterize the method used by the ACTS TI Very Small Aperture Terminal (TI VSAT) ground stations in detecting the presence of fade in the communication signal and to adaptively compensate for it by the addition of burst rate reduction and forward error correction. Measured data obtained from the ACTS program was used to validate the compensation technique. A software process was developed and demonstrated to statistically characterize the increased availability achieved by the compensation techniques in terms of the bit error rate time enhancement factor. Several improvements to the ACTS technique are discussed and possible implementations for future Ka band system are offered.

Johnson, Sandra K.↗

Test oracle automation for V&V of an autonomous spacecraft's planner

We built automation to assist the software testing efforts associated with the Remote Agent experiment. In particular, our focus was upon introducing test oracles into the testing of the planning and scheduling system component. This summary is intended to provide an overview of the work.

testing test oracles verification validation analy↗

Code Coverage Status of the ARC Code RCT

The Argonne Reactor Code (ARC) software system supports users in their fast reactor design goals by providing neutronic, thermal-hydraulic, and structural analysis capabilities. REBUS plays a pivotal role in the ARC system as the primary fuel cycle analysis capability for fast reactor problems. Over its 60 year history, ARC software usage with REBUS has been applied to numerous fast and thermal spectrum reactor analysis projects with good to excellent comparison against experiments. The RCT code is a later addition and uses the REBUS restart files to define its input. The RCT code was built to provide pin depletion details on EBR-II models and thus many features of RCT were specifically tailored to the needs of EBR-II models. Additional approximations were invoked which are likely only valid for the EBR-II reactor and the particular fuel management that was done for it. The purpose of the present work is to identify a set of test problems for RCT and assess the code coverage for those test problems. The goal is to document what parts of the existing RCT code are touched by the set of test problems and which are not. Because no detailed verification work has been done on RCT, the existing regression testing suite was chosen for the code coverage assessment. The code coverage analysis of RCT was performed with the Code Coverage Tool of the Intel Fortran compiler which requires modifications to the compilation of RCT. The detailed coverage tables are given for each part of RCT. As will be discussed and shown, some parts of the RCT capability that are known to be used by the EBR-II analysis work are not tested by the regression testing suite. These aspects should be resolved before major source code changes are taken for the RCT software. Because REBUS and DIF3D are not subroutines of RCT, the coverage changes in both of those codes is not altered by RCT. The same is true for all of the modules of DIF3D that are used by RCT such as SYSLIB and SEGLIB.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extended Operation of Stirling Convertors

A high-efficiency 110 W Stirling Radioisotope Generator 110 (SRG110) is being developed for potential NASA exploration missions. The SRG system efficiency is greater than 20%, making it an attractive candidate power system for deep space missions and unmanned rovers. The Department of Energy SRG110 Project team consists of the System Integrator, Lockheed Martin (LM), Stirling Technology Company (STC), and NASA Glenn Research Center (GRC). One of the GRC roles is to provide Independent Verification and Validation of the Stirling TDC s. At the request of LM, a part of this effort includes the Extended Operation of the TDC s in the dynamically balanced dual-opposed configuration. Performance data of Stirling Convertors over time is required to demonstrate that an SRG110 can meet long-duration mission requirements. A test plan and test system were developed to evaluate TDC s #13 and #14 steady-state performance for a minimum of 5000 hours. Hardware, software and TDC preparation processes were developed to support this test and insure safe, round-the-clock operation of the TDC s. This paper will discuss the design and development, and status of the Extended Operation Test.

Roth, Mary Ellen↗

Web Based Tool for Mission Operations Scenarios

A conventional practice for spaceflight projects is to document scenarios in a monolithic Operations Concept document. Such documents can be hundreds of pages long and may require laborious updates. Software development practice utilizes scenarios in the form of smaller, individual use cases, which are often structured and managed using UML. We have developed a process and a web-based scenario tool that utilizes a similar philosophy of smaller, more compact scenarios (but avoids the formality of UML). The need for a scenario process and tool became apparent during the authors' work on a large astrophysics mission. It was noted that every phase of the Mission (e.g., formulation, design, verification and validation, and operations) looked back to scenarios to assess completeness of requirements and design. It was also noted that terminology needed to be clarified and structured to assure communication across all levels of the project. Attempts to manage, communicate, and evolve scenarios at all levels of a project using conventional tools (e.g., Excel) and methods (Scenario Working Group meetings) were not effective given limitations on budget and staffing. The objective of this paper is to document the scenario process and tool created to offer projects a low-cost capability to create, communicate, manage, and evolve scenarios throughout project development. The process and tool have the further benefit of allowing the association of requirements with particular scenarios, establishing and viewing relationships between higher- and lower-level scenarios, and the ability to place all scenarios in a shared context. The resulting structured set of scenarios is widely visible (using a web browser), easily updated, and can be searched according to various criteria including the level (e.g., Project, System, and Team) and Mission Phase. Scenarios are maintained in a web-accessible environment that provides a structured set of scenario fields and allows for maximum visibility across the project. One key aspect is that the tool was built for a scenario process that accounts for stakeholder input, review, comment, and concurrence. By creating well-designed opportunities for stakeholder input and concurrence and by making the scenario content easily accessible to all project personnel, we maximize the opportunities for stakeholders to both understand and agree on the concepts for how their mission is to be carried out.

Boyles, Carole A.↗

Ambient and Cryogenic Alignment Verification and Performance of the Infrared Multi-Object Spectrometer

The Infrared Multi-Object Spectrometer (IRMOS) is a facility instrument for the Kitt Peak National Observatory 4 and 2.1 meter telescopes. IRMOS is a near-IR (0.8 - 2.5 micron) spectrometer with low- to mid-resolving power (R = 300 - 3000). IRMOS produces simultaneous spectra of approximately 100 objects in its 2.8 x 2.0 arc-min field of view using a commercial Micro Electro-Mechanical Systems (MEMS) Digital Micro-mirror Device (DMD) from Texas Instruments. The IRMOS optical design consists of two imaging subsystems. The focal reducer images the focal plane of the telescope onto the DMD field stop, and the spectrograph images the DMD onto the detector. We describe ambient breadboard subsystem alignment and imaging performance of each stage independently, and the ambient and cryogenic imaging performance of the fully assembled instrument. Interferometric measurements of subsystem wavefront error serve to venfy alignment, and are accomplished using a commercial, modified Twyman-Green laser unequal path interferometer. Image testing provides further verification of the optomechanical alignment method and a measurement of near-angle scattered light due to mirror small-scale surface error. Image testing is performed at multiple field points. A mercury-argon pencil lamp provides spectral lines at 546.1 nm and 1550 nm, and a CCD camera and IR camera are used as detectors. We use commercial optical modeling software to predict the point-spread function and its effect on instrument slit transmission and resolution. Our breadboard test results validate this prediction. We conclude with an instrument performance prediction for first light.

Connelly, Joseph A.↗

Intelligent Tools for Planning Knowledge base Development and Verification

A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

errors↗

SynBio QC Dual Barcode QC (DBC) v1.0

This software was designed as a sequence validation tool for the assembly of synthetic constructs, where the constructs have a high degree of similarity and thus are barcoded prior to the sequencing library prep. It demultiplexes each FASTQ file for each barcode, then analyzes the resulting FASTQ files against a list of reference sequences for that barcode/library, combining the results from eight sequencing libraries to generate a summary, and the files needed to view the results in the Integrative Genomics Viewer (IGV) application for manual verification. This was developed for FASTQ files generated by PacBio sequencing, but could be used on any FASTQ files that do not have paired end reads. It can be used to analyze one - eight libraries at a time. Each construct is independently analyzed with only the sequences with the same barcode, in the same pooled library. Then the results are combined into a user friendly summary. This is used to identify which libraries of pooled sequences contains a perfect match, or fixable match to the reference file. This pipeline uses many freely available open source libraries, the value added is that in our application the steps of the pipeline are defined in Workflow Description Language (WDL) and run through the Cromwell workflow engine in Docker containers, for easy distribution and set up, as well as the user friendly html summary that is generated.

Simirenko, Lisa↗

Hardware-in-the-Loop Simulation of Modular Antenna Assembly

Robots are playing an increasing role in space exploration and in-space servicing. Robotic arms are good for performing in-space tasks such as modular assembly. The SPIDER arm (SPace Infrastructure Dexterous Robot) of the OSAM-1 mission represents an example of a system that can perform modular antenna assembly tasks in environmental conditions that would be dangerous for astronauts. One of the WVRTC activities is to perform independent verification and validation of the SPIDER assembly operations. Space robotic systems adopting large manipulators such as the SPIDER arm are complex to test and verify under normal 1-G conditions. Our work involves proof-of-principle testing of a hardware-inthe-loop (HIL) simulator operating in 1-g conditions, which replicates the motion of the space robot end-effector under the same geometric, kinematic and dynamic conditions, and in response to externally applied forces from its space environment. In particular, our software simulates in real-time the robot dynamics inclusive of flexibility, an important aspect in case of a long robotic arms operating in 0-G conditions. For example, the same oscillatory motions of the space manipulator’s end-effector can be mimicked on ground through our industrial manipulator, allowing us to test the feasibility of complex operation such as assembling modular components.

Robotic Assembly↗

Implementation and verification of a user-defined element (UEL) for coupled thermal-hydraulic-mechanical-chemical (THMC) processes in saturated geological media

Efficient and accurate modeling of the coupled thermal-hydraulic-mechanical-chemical (THMC) processes in various rock formations is indispensable for designing energy geo-structures such as underground repositories for high-level nuclear wastes. Here, this work focuses on developing and verifying an implicit finite element solver for generic coupled THMC problems in geological settings. Starting from the mass, momentum, and energy balance laws, a specialized set of governing equations and a thermoporoelastic constitutive model is derived. This system is then solved by an implicit finite element (FE) scheme. Specifically, the residuals and the Jacobians are scripted in a user-defined element (UEL) subroutine which is then combined with the general-purpose FE software Abaqus Standard to solve initial-boundary value problems. Considering the complexity of the system, the UEL development follows a stepwise manner by first solving the coupled hydraulic-mechanical (HM) and thermal-hydraulic-mechanical (THM) equations before moving on to the full THMC problem. Each implementation step consists of at least one verification test by comparing computed results with closed-form analytical solutions to ensure that the various coupling effects are correctly realized. To demonstrate the robustness of the algorithm and to validate the UEL, a three-dimensional case study is performed with reference to the in-situ heating test of ATLAS at Belgium in 1980s. A hypothetical radionuclide leakage event is then simulated by activating the chemical-concentration degree of freedom and prescribing a constant high concentration at the heater's surface. The model predicts a limited contaminated regime after six years considering both diffusion and advection effects on species transport.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Develop a Model Component

During my internship at NASA, I was a model developer for Ground Support Equipment (GSE). The purpose of a model developer is to develop and unit test model component libraries (fluid, electrical, gas, etc.). The models are designed to simulate software for GSE (Ground Special Power, Crew Access Arm, Cryo, Fire and Leak Detection System, Environmental Control System (ECS), etc. ~.) before they are implemented into hardware. These models support verifying local control and remote software for End-Item Software Under Test (SUT). The model simulates the physical behavior (function, state, limits and 110) of each end-item and it's dependencies as defined in the Subsystem Interface Table, Software Requirements & Design Specification (SRDS), Ground Integrated Schematic (GIS), and System Mechanical Schematic.(SMS). The software of each specific model component is simulated through MATLAB's Simulink program. The intensiv~ model development life cycle is a.s follows: Identify source documents; identify model scope; update schedule; preliminary design review; develop model requirements; update model.. scope; update schedule; detailed design review; create/modify library component; implement library components reference; implement subsystem components; develop a test script; run the test script; develop users guide; send model out for peer review; the model is sent out for verific~tionlvalidation; if there is empirical data, a validation data package is generated; if there is not empirical data, a verification package is generated; the test results are then reviewed; and finally, the user. requests accreditation, and a statement of accreditation is prepared. Once each component model is reviewed and approved, they are intertwined together into one integrated model. This integrated model is then tested itself, through a test script and autotest, so that it can be concluded that all models work conjointly, for a single purpose. The component I was assigned, specifically, was a fluid component, a discrete pressure switch. The switch takes a fluid pressure input, and if the pressure is greater than a designated cutoff pressure, the switch would stop fluid flow.

Ensey, Tyler S.↗

High-Fidelity Numerical Investigation on Elucidating Sodium Heat Transfer Characteristics for 37-Pin Wire-Wrapped Fuel Bundle in the PLANDTL Facility

This study involved a Reynolds-averaged Navier-Stokes- (RANS-) based computational fluid dynamics (CFD) analysis of the 37-pin wire-wrapped fuel bundle of the PNC Plant dynamics test loop (PLANDTL) facility. Previously, mainly the hydrodynamic phenomena of the wire-wrapped fuel bundle were analyzed, but the present study additionally included heat transfer analysis through conjugate heat transfer. The main purpose of the study was to benchmark the experimental data of the PLANDTL 37-pin wire-wrapped fuel bundle to investigate the heat transfer phenomena. In addition, the aim was to verify the accuracy of the RANS-based CFD analysis method using the STAR-CCM+ simulation software in comparison with the experimental data. The grid used for verification was an innovative grid system consisting of hexahedra using Fortran-based code. The development of the RANS-based CFD methodology included grid sensitivity analysis, turbulence model sensitivity analysis, and turbulent Prandtl number sensitivity analysis. Information on the temperature, mass flow rate, and area of the CFD results for each subchannel was provided for the top of the heated section and is expected to serve as a reference for future studies aiming to perform the validation and verification of a PLANDTL facility. In addition, the dependence of the peak temperature on the azimuth angle of each pin was analyzed.

97 MATHEMATICS AND COMPUTING↗

Verification of RadCAD: Specular Capabilities

As part of the RadCAD's development process, it is necessary to compare RadCAD's results with other radiation tools and exact solutions when and where possible. Form factor algorithms have been previously verified with exact solutions. This paper will consider RadCAD's specular capabilities. First, radiation exchange factors will be compared against exact solutions and results from TRASYS for various geometries. Critical dimensions and optical properties are changed for each geometry. Second, a specular adjunct plate system will be used to verify absorbed heat fluxes. This particular geometric problem has had some attention in the literature. Previous authors have used this problem to validate software results with exact analytical solution. This paper will compare absorbed heat rates against the exact solution and other published results from other thermal radiation tools. The agreement between RadCAD and the exact solutions is good. The maximum error for both specular and diffuse exchange factors for both geometries and all optical properties was 3%. The absorbed fluxes differed by a maximum of 4% for the adjunct plate problem.

Lucas, Sam↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy M. Mclaughlin↗