Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “shutdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

PV array simulator development and validation.

The ability to harvest all available energy from a photovoltaic (PV) array is essential if new system developments are to meet levelized cost of energy targets and achieve grid parity with conventional centralized utility power. Therefore, exercising maximum power point tracking (MPPT) algorithms, dynamic irradiance condition operation and startup and shutdown routines and evaluating inverter performance with various PV module fill-factor characteristics must be performed with a repeatable, reliable PV source. Sandia National Laboratories is collaborating with Ametek Programmable Power to develop and demonstrate a multi-port TerraSAS PV array simulator. The simulator will replicate challenging PV module profiles, enabling the evaluation of inverter performance through analyses of the parameters listed above. Energy harvest algorithms have traditionally implemented methods that successfully utilize available energy. However, the quantification of energy capture has always been difficult to conduct, specifically when characterizing the inverter performance under non-reproducible dynamic irradiance conditions. Theoretical models of the MPPT algorithms can simulate capture effectiveness, but full validation requires a DC source with representative field effects. The DC source being developed by Ametek and validated by Sandia is a fully integrated system that can simulate an IV curve from the Solar Advisor Model (SAM) module data base. The PV simulator allows the user to change the fill factor by programming the maximum power point voltage and current parameters and the open circuit voltage and short circuit current. The integrated PV simulator can incorporate captured irradiance and module temperature data files for playback, and scripted profiles can be generated to validate new emerging hardware embedded with existing and evolving MPPT algorithms. Since the simulator has multiple independent outputs, it also has the flexibility to evaluate an inverter with multiple MPPT DC inputs. The flexibility of the PV simulator enables the validation of the inverter's capability to handle vastly different array configurations.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ITER's Tokamak Cooling Water System and the the Use of ASME Codes to Comply with French Regulations of Nuclear Pressure Equipment

During inductive plasma operation of ITER, fusion power will reach 500 MW with an energy multiplication factor of 10. The heat will be transferred by the Tokamak Cooling Water System (TCWS) to the environment using the secondary cooling system. Plasma operations are inherently safe even under the most severe postulated accident condition a large, in-vessel break that results in a loss-of-coolant accident. A functioning cooling water system is not required to ensure safe shutdown. Even though ITER is inherently safe, TCWS equipment (e.g., heat exchangers, piping, pressurizers) are classified as safety important components. This is because the water is predicted to contain low-levels of radionuclides (e.g., activated corrosion products, tritium) with activity levels high enough to require the design of components to be in accordance with French regulations for nuclear pressure equipment, i.e., the French Order dated 12 December 2005 (ESPN). ESPN has extended the practical application of the methodology established by the Pressure Equipment Directive (97/23/EC) to nuclear pressure equipment, under French Decree 99-1046 dated 13 December 1999, and Order dated 21 December 1999 (ESP). ASME codes and supplementary analyses (e.g., Failure Modes and Effects Analysis) will be used to demonstrate that the TCWS equipment meets these essential safety requirements. TCWS is being designed to provide not only cooling, with a capacity of approximately 1 GW energy removal, but also elevated temperature baking of first-wall/blanket, vacuum vessel, and divertor. Additional TCWS functions include chemical control of water, draining and drying for maintenance, and facilitation of leak detection/localization. The TCWS interfaces with the majority of ITER systems, including the secondary cooling system. U.S. ITER is responsible for design, engineering, and procurement of the TCWS with industry support from an Engineering Services Organization (ESO) (AREVA Federal Services, with support from Northrop Grumman, and OneCIS). ITER International Organization (ITER-IO) is responsible for design oversight and equipment installation in Cadarache, France. TCWS equipment will be fabricated using ASME design codes with quality assurance and oversight by an Agreed Notified Body (approved by the French regulator) that will ensure regulatory compliance. This paper describes the TCWS design and how U.S. ITER and fabricators will use ASME codes to comply with EU Directives and French Orders and Decrees.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Degradation mechanisms and accelerated testing in PEM fuel cells

The durability of PEM fuel cells is a major barrier to the commercialization of these systems for stationary and transportation power applications. Although there has been recent progress in improving durability, further improvements are needed to meet the commercialization targets. Past improvements have largely been made possible because of the fundamental understanding of the underlying degradation mechanisms. By investigating component and cell degradation modes; defining the fundamental degradation mechanisms of components and component interactions new materials can be designed to improve durability. Various factors have been shown to affect the useful life of PEM fuel cells. Other issues arise from component optimization. Operational conditions (such as impurities in either the fuel and oxidant stream), cell environment, temperature (including subfreezing exposure), pressure, current, voltage, etc.; or transient versus continuous operation, including start-up and shutdown procedures, represent other factors that can affect cell performance and durability. The need for Accelerated Stress Tests (ASTs) can be quickly understood given the target lives for fuel cell systems: 5000 hours ({approx} 7 months) for automotive, and 40,000 hrs ({approx} 4.6 years) for stationary systems. Thus testing methods that enable more rapid screening of individual components to determine their durability characteristics, such as off-line environmental testing, are needed for evaluating new component durability in a reasonable turn-around time. This allows proposed improvements in a component to be evaluated rapidly and independently, subsequently allowing rapid advancement in PEM fuel cell durability. These tests are also crucial to developers in order to make sure that they do not sacrifice durability while making improvements in costs (e.g. lower platinum group metal [PGM] loading) and performance (e.g. thinner membrane or a GDL with better water management properties). To achieve a deeper understanding and improve PEM fuel cell durability LANL is conducting research to better define fuel cell component degradation mechanisms and correlate AST measurements to component in 'real-world' situations.

30 DIRECT ENERGY CONVERSION↗

The refurbished Z facility : capabilities and recent experiments.

The Z Refurbishment Project was completed in September 2007. Prior to the shutdown of the Z facility in July 2006 to install the new hardware, it provided currents of {le} 20 MA to produce energetic, intense X-ray sources ({approx} 1.6 MJ, > 200 TW) for performing high energy density science experiments and to produce high magnetic fields and pressures for performing dynamic material property experiments. The refurbishment project doubled the stored energy within the existing tank structure and replaced older components with modern, conventional technology and systems that were designed to drive both short-pulse Z-pinch implosions and long-pulse dynamic material property experiments. The project goals were to increase the delivered current for additional performance capability, improve overall precision and pulse shape flexibility for better reproducibility and data quality, and provide the capacity to perform more shots. Experiments over the past year have been devoted to bringing the facility up to full operating capabilities and implementing a refurbished suite of diagnostics. In addition, we have enhanced our X-ray backlighting diagnostics through the addition of a two-frame capability to the Z-Beamlet system and the addition of a high power laser (Z-Petawatt). In this paper, we will summarize the changes made to the Z facility, highlight the new capabilities, and discuss the results of some of the early experiments.

25 ENERGY STORAGE↗

What HERA May Provide?

More than 100 people participated in a discussion session at the DIS08 workshop on the topic What HERA may provide. A summary of the discussion with a structured outlook and list of desirable measurements and theory calculations is given. The HERA accelerator and the HERA experiments H1, HERMES and ZEUS stopped running in the end of June 2007. This was after 15 years of very successful operation since the first collisions in 1992. A total luminosity of {approx} 500 pb{sup -1} has been accumulated by each of the collider experiments H1 and ZEUS. During the years the increasingly better understood and upgraded detectors and HERA accelerator have contributed significantly to this success. The physics program remains in full swing and plenty of new results were presented at DIS08 which are approaching the anticipated final precision, fulfilling and exceeding the physics plans and the previsions of the upgrade program. Most of the analyses presented at DIS08 were still based on the so called HERA I data sample, i.e. data taken until 2000, before the shutdown for the luminosity upgrade. This sample has an integrated luminosity of {approx} 100 pb{sup -1}, and the four times larger statistics sample from HERA II is still in the process of being analyzed.

43 PARTICLE ACCELERATORS↗

Essay: In Memory of Robert Siemann

Bob Siemann came to SLAC from Cornell in 1991. With the support from Burton Richter, then Director of SLAC, he took on a leadership role to formulate an academic program in accelerator physics at SLAC and the development of its accelerator faculty. Throughout his career he championed accelerator physics as an independent academic discipline, a vision that he fought so hard for and never retreated from. He convinced Stanford University and SLAC to create a line of tenured accelerator physics faculty and over the years he also regularly taught classes at Stanford and the U.S. Particle Accelerator School. After the shutdown of the SSC Laboratory, I returned to SLAC in 1993 to join the accelerator faculty he was forming. He had always visualized a need to have a professional academic journal for the accelerator field, and played a pivotal role in creating the journal Physical Review Special Topics - Accelerators and Beams, now the community standard for accelerator physics after nine years of his editorship. Today, Bob's legacy of accelerator physics as an independent academic discipline continues at SLAC as well as in the community, from which we all benefit. Bob was a great experimentalist. He specialized in experimental techniques and instrumentation, but what he wanted to learn is physics. If he had to learn theory - heaven forbid - to reach that goal, he would not hesitate one second to do so. In fact, he had written several theoretical papers as results of these efforts. Now this is what I call a true experimentalist! Ultimately, however, I think it was experimental instruments that he loved most. His eyes widened when he talked about his instruments. Prompted by a question, he would proceed to a nearby blackboard, with a satisfying grin, and draw his experimental device in a careful thinking manner, then describe his experiment and educate the questioner with some insightful physics. These moments were most enjoyable, to him and the questioner alike. When I think of Bob today, it is these moments that first come to mind, and it is these moments I will miss the most. I should like to mention another curious thing about Bob, namely he had a special talent of finding persuasive arguments that went his way. It was difficult to argue with Bob because it was so difficult to win. Generally quiet otherwise, he was too good and too methodical a debater. I had never seen him losing a debate on a policy issue or in a committee setting. However, when it comes to physics, his soft spot, he occasionally let go some weakness. When so doing, he would lose the debate, but his grin revealed that the loss was more than compensated by the physics he gained together with his debater. It is hard to believe that the office around the corner is now empty. The dear colleague we have come to know, to talk to, and to seek advice from, together with the feet-on-the-desk posture and the familiar grin, are no longer there. I wonder, who will now occupy that office next? And who will continue to carry on Bob Siemann's legacy? Many of us are waiting.

43 PARTICLE ACCELERATORS↗

Top Quark Production at the Tevatron

The top quark is the most recently discovered of the standard model quarks, and because of its very large mass, studies of the top quark and its interactions are important both as tests of the standard model and searches for new phenomena. In this document, recent results of analyses of top quark production, via both the electroweak and strong interactions, from the CDF and D0 experiments are presented. The results included here utilize a dataset corresponding to up to 6 fb{sup -1} of integrated luminosity, slightly more than half of the dataset recorded by each experiment before the Tevatron was shutdown in September 2011.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Upgrade fo the CMS Hadron Outer Calorimeter with SIPMs

The CMS Hadron Outer Calorimeter (HO) is undergoing an upgrade to replace the existing photodetectors (HPDs) with SIPMs. The chosen device is the Hamamatsu 3 x 3mm 50 {mu}m pitch MPPC. The system has been developed to be a 'drop-in' replacement of the HPDs. A complete control system of bias voltage generation, leakage current monitoring, temperature monitoring, and temperature control using solid state Peltier coolers has been developed and tested. 108 channels of the system have been installed into CMS and operated for more than 2 years. The complete system of about 2200 channels is in production and will be installed in the next LHC long shutdown scheduled for 2013. The CMS central calorimeter consists of a detector inside the solenoidal magnet, HB, and a component outside the magnet, the Outer Hadron Calorimeter, HO [1]. The HO is installed inside the magnet flux return yoke and provides for typically 3{lambda} of additional absorber to the calorimetric measurement. The outer calorimeter is composed of one or more layers of scintillator with wavelength shifting fiber readout into photodetectors. Figure 1 (a) shows the schematic layout of the calorimeters in CMS and shows the location of the HO scintillator layers. The front end electronics are placed inside the CMS detector, close to the scintillators. Figure 1(b) shows a photograph of the scintillators. Note the four wavelength shifting fibers per tile. The tile size creates a projective tower with the HB. Currently the photodetector used is the HPD but for performance and operational reasons it is desired to upgrade these with SIPMs. The CMS HCAL group has developed a drop-in replacement for the HPD using SIPMs. SIPMs are very suitable for this application because of several factors: The radiation levels are modest with a lifetime expected fluence of less than 5*10{sup 11} neutrons (E > 100 KeV) per cm{sup 2}. The energy flux into HO is small, the rate of larger energy depositions is low, and the required dynamic range is modest. The HO is in the return magnetic field of up to 2KG and the photodetector needs to operate in that environment. Finally, the available physical volume for the photodetectors is small.

43 PARTICLE ACCELERATORS↗

Observation of Beam ION Instability in Spear3

Weak vertical coupled bunch instability with oscillation amplitude at {mu}m level has been observed in SPEAR3. The instability becomes stronger when there is a vacuum pressure rise by partially turning off vacuum pumps and it becomes weaker when the vertical beam emittance is increased by turning off the skew quadrupole magnets. These confirmed that the instability was driven by ions in the vacuum. The threshold of the beam ion instability when running with a single bunch train is just under 200 mA. This paper presents the comprehensive observations of the beam ion instability in SPEAR3. The effects of vacuum pressure, beam current, beam filling pattern, chromaticity, beam emittance and bunch-by-bunch feedback are investigated in great detail. In an electron accelerator, ions generated from the residual gas molecules can be trapped by the beam. Then these trapped ions interact resonantly with the beam and cause beam instability and emittance blow-up. Most existing light sources use a long single bunch train filling pattern, followed by a long gap to avoid multi-turn ion trapping. However, such a gap does not preclude ions from accumulating during one passage of the single bunch train beam, and those ions can still cause a Fast Ion Instability (FII) as predicted by Raubenheimer and Zimmermann. FII has been observed in ALS, and PLS by artificially increasing the vacuum pressure by injecting helium gas into the vacuum chamber or by turning off the ion pumps in order to observe the beam ion instability. In some existing rings, for instance B factory, the beam ion instability was observed at the beginning of the machine operation after a long period of shutdown and then it automatically disappeared when the vacuum was better. However, when the beam emittance becomes smaller, the FII can occur at nominal conditions as observed in PLS, SOLEIL and SSRF. This paper reports the observations of beam ion instabilities in SPEAR3 under different condition during a period of one year, which includes single bunch train instability (FII) and multi-bunch train instability. Note that the instability may be not the same even with the same beam due to the change of the vacuum with time. SPEAR3 has a circumference of 234 m with a harmonic number of 372. SPEAR3 runs with six bunch train filling pattern in order to suppress the possible beam ion instability. Table 1 lists the main parameters of SPEAR3. The vacuum of SPEAR3 ranges from 0.1 to 0.5 nTorr, which varies from section to section.

43 PARTICLE ACCELERATORS↗

NOvA detector technology with intial performance from the surface prototype

NOvA, the NuMI Off-Axis {nu}{sub e} Appearance experiment, will study {nu}{sub {mu}} {yields} {nu}{sub e} oscillations characterized by the mixing angle {Theta}{sub 13}. Provided {Theta}{sub 13} is large enough, NOvA may ultimately determine the ordering of the neutrino masses and measure CP violation in neutrino oscillations. A complementary pair of detectors will be constructed {approx}14 mrad off beam axis to optimize the energy profile of the neutrinos. This system consists of a surface based 14 kTon liquid scintillator tracking volume located 810 km from the main injector source (NuMI) in Ash River, Minnesota and a smaller underground 222 Ton near detector at the Fermilab. The first neutrino signals at the Ash River Site are expected prior to the 2012 accelerator shutdown. In the meantime, a near detector surface prototype has been completed and neutrinos from two Fermilab sources have been observed using the same highly segmented PVC and liquid scintillator detector system that will be deployed in the full scale experiment. Design and initial performance characteristics of this prototype system are being fed back into the design for the full NOvA program.

43 PARTICLE ACCELERATORS↗

Intial performance from the NOvA surface prototype detector

NOvA, the NuMI Off-Axis {nu}{sub e} Appearance experiment, will study {nu}{sub {mu}} {yields} {nu}{sub e} oscillations characterized by the mixing angle {Theta}{sub 13}. Provided {Theta}{sub 13} is large enough, NOvA may ultimately determine the ordering of the neutrino masses and measure CP violation in neutrino oscillations. A complementary pair of detectors will be constructed {approx}14 mrad off beam axis to optimize the energy profile of the neutrinos. This system consists of a surface based 14 kTon liquid scintillator tracking volume located 810 km from the main injector source (NuMI) in Ash River, Minnesota and a smaller underground 222 Ton near detector at the Fermilab. The first neutrino signals at the Ash River Site are expected prior to the 2012 accelerator shutdown. In the meantime, a near detector surface prototype has been completed and neutrinos from two Fermilab sources have been observed using the same highly segmented PVC and liquid scintillator detector system that will be deployed in the full scale experiment. Design and initial performance characteristics of this prototype system are being fed back into the design for the full NOvA program.

43 PARTICLE ACCELERATORS↗

Design and operation specifications of an active monitoring system for detecting southern resident killer whales

Before final approval is given to the Snohomish County Public Utility District No. 1 for deploying the first tidal power devices in the United States in an open water environment, a system to manage the potential risk of injury to killer whales due to collision with moving turbine blades must be demonstrated. The Pacific Northwest National Laboratory (PNNL) is tasked with establishing the performance requirements for, constructing, and testing a prototype marine animal alert system for triggering temporary turbine shutdown when there is risk of collision with a killer whale. To develop a system that relies on active sonar two critical areas must be investigated - the target strength of killer whales and the frequency content of commercially available active sonar units. PNNL studied three target strength models: a simple model, the Fourier matching model, and the Kirchoff-ray mode model. Using target strength measurements of bottlenose dolphins obtained by previous researchers and assuming killer whales share similar morphology and structure, PNNL extrapolated the target strength of an adult killer whale 7.5 m in length at a frequency of 67 kHz. To study the frequency content of a commercially available sonar unit, direct measurements of the signal transmitted by the sonar were obtained by using a hydrophone connected to a data acquisition system in both laboratory and field conditions. The measurements revealed that in addition to the primary frequency of 200 kHz, there is a secondary frequency component at 90 kHz, which is within the hearing range of killer whales. The amplitude of the 90-kHz frequency component is above the hearing threshold of killer whales but below the threshold for potential injuries.

16 TIDAL AND WAVE POWER↗

Pellet interaction with runaway electrons

We describe results from recent experiments studying interaction of solid polystyrene pellets with a runaway electron current channel generated after cryogenic argon pellet rapid shutdown of DIII-D. Fast camera imaging shows the pellet trajectory and continuum emission from the subsequent explosion, with geometric calibration providing detailed explosion analysis and runaway energy. Electron cyclotron emission also occurs, associated with knock-on electrons broken free from the pellet by RE which then accelerate and runaway, and also with a short lived hot plasma blown off the pellet surface. In addition, we compare heating and explosion times from observations and a model of pellet heating and breakdown by runaway interaction. (C) 2011 Elsevier B.V. All rights reserved

43 PARTICLE ACCELERATORS↗

Virtually simulating the next generation of clean energy technologies: NETL's AVESTAR Center is dedicated to the safe, reliable and efficient operation of advanced energy plants with carbon capture

Imagine using a real-time virtual simulator to learn to fly a space shuttle or rebuild your car's transmission without touching a piece of equipment or getting your hands dirty. Now, apply this concept to learning how to operate and control a state-of-the-art, electricity-producing power plant capable of carbon dioxide (CO{sub 2}) capture. That's what the National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training and Research (AVESTAR) Center (www.netl.doe.gov/avestar) is designed to do. Established as part of the Department of Energy's (DOE) initiative to advance new clean energy technology for power generation, the AVESTAR Center focuses primarily on providing simulation-based training for process engineers and energy plant operators, starting with the deployment of a first-of-a-kind operator training simulator for an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture. The IGCC dynamic simulator builds on, and reaches beyond, conventional power plant simulators to merge, for the first time, a 'gasification with CO{sub 2} capture' process simulator with a 'combined-cycle' power simulator. Based on Invensys Operations Management's SimSci-Esscor DYNSIM software, the high-fidelity dynamic simulator provides realistic training on IGCC plant operations, including normal and faulted operations, as well as plant start-up, shutdown and power demand load changes. The highly flexible simulator also allows for testing of different types of fuel sources, such as petcoke and biomass, as well as co-firing fuel mixtures. The IGCC dynamic simulator is available at AVESTAR's two locations, NETL (Figure 1) and West Virginia University's National Research Center for Coal and Energy (www.nrcce.wvu.edu), both in Morgantown, W.Va. By offering a comprehensive IGCC training program, AVESTAR aims to develop a workforce well prepared to operate, control and manage commercial-scale gasification-based power plants with CO{sub 2} capture. The facility and simulator at West Virginia University promotes NETL's outreach mission by offering hands-on simulator training and education to researchers and university students.

01 COAL, LIGNITE, AND PEAT↗

Progress on the upgrade of the CMS Hadron Calorimeter Front-End electronics

We present a scheme to upgrade the CMS HCAL front-end electronics in the second long shutdown to upgrade the LHC (LS2), which is expected to occur around 2018. The HCAL electronics upgrade is required to handle the major instantaneous luminosity increase (up to 5 * 10{sup 34} cm{sup -2} s{sup -1}) and an expected integrated luminosity of {approx}3000 fb{sup -1}. A key aspect of the HCAL upgrade is to read out longitudinal segmentation information to improve background rejection, energy resolution, and electron isolation at the L1 trigger. This paper focuses on the requirements for the new electronics and on the proposed solutions. The requirements include increased channel count, additional timing capabilities, and additional redundancy. The electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ASIC ADC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design, and improvements in the overall readout architecture. We will report on the progress of the designs for these upgraded systems, along with performance requirements and initial design studies.

43 PARTICLE ACCELERATORS↗

Advanced High Temperature Reactor Neutronic Core Design

The AHTR is a 3400 MW(t) FHR class reactor design concept intended to serve as a central generating station type power plant. While significant technology development and demonstration remains, the basic design concept appears sound and tolerant of much of the remaining performance uncertainty. No fundamental impediments have been identified that would prevent widespread deployment of the concept. This paper focuses on the preliminary neutronic design studies performed at ORNL during the fiscal year 2011. After a brief presentation of the AHTR design concept, the paper summarizes several neutronic studies performed at ORNL during 2011. An optimization study for the AHTR core is first presented. The temperature and void coefficients of reactivity are then analyzed for a few configurations of interest. A discussion of the limiting factors due to the fast neutron fluence follows. The neutronic studies conclude with a discussion of the control and shutdown options. The studies presented confirm that sound neutronic alternatives exist for the design of the AHTR to maintain full passive safety features and reasonable operation conditions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RAMI Analysis for Designing and Optimizing Tokamak Cooling Water System (TCWS) for the ITER's Fusion Reactor

U.S.-ITER is responsible for the design, engineering, and procurement of the Tokamak Cooling Water System (TCWS). TCWS is designed to provide cooling and baking for client systems that include the first wall/blanket, vacuum vessel, divertor, and neutral beam injector. Additional operations that support these primary functions include chemical control of water provided to client systems, draining and drying for maintenance, and leak detection/localization. TCWS interfaces with 27 systems including the secondary cooling system, which rejects this heat to the environment. TCWS transfers heat generated in the Tokamak during nominal pulsed operation - 850 MW at up to 150 C and 4.2 MPa water pressure. Impurities are diffused from in-vessel components and the vacuum vessel by water baking at 200-240 C at up to 4.4 MPa. TCWS is complex because it serves vital functions for four primary clients whose performance is critical to ITER's success and interfaces with more than 20 additional ITER systems. Conceptual design of this one-of-a-kind cooling system has been completed; however, several issues remain that must be resolved before moving to the next stage of the design process. The 2004 baseline design indicated cooling loops that have no fault tolerance for component failures. During plasma operation, each cooling loop relies on a single pump, a single pressurizer, and one heat exchanger. Consequently, failure of any of these would render TCWS inoperable, resulting in plasma shutdown. The application of reliability, availability, maintainability, and inspectability (RAMI) tools during the different stages of TCWS design is crucial for optimization purposes and for maintaining compliance with project requirements. RAMI analysis will indicate appropriate equipment redundancy that provides graceful degradation in the event of an equipment failure. This analysis helps demonstrate that using proven, commercially available equipment is better than using custom-designed equipment with no field experience and lowers specific costs while providing higher reliability. This paper presents a brief description of the TCWS conceptual design and the application of RAMI tools to optimize the design at different stages during the project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recirculating Beam Breakup Study for the 12 GeV Upgrade at Jefferson Lab

Two new high gradient C100 cryomodules with a total of 16 new cavities were installed at the end of the CEBAF south linac during the 2011 summer shutdown as part of the 12-GeV upgrade project at Jefferson Lab. We surveyed the higher order modes (HOMs) of these cavities in the Jefferson Lab cryomodule test facility and CEBAF tunnel. We then studied recirculating beam breakup (BBU) in November 2011 to evaluate CEBAF low energy performance, measure transport optics, and evaluate BBU thresholds due to these HOMs. This paper discusses the experiment setup, cavity measurements, machine setup, optics measurements, and lower bounds on BBU thresholds by new cryomodules.

43 PARTICLE ACCELERATORS↗