Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Computational physics and applied mathematics capability review June 8-10, 2010 (Advance materials to committee members)

Los Alamos National Laboratory will review its Computational Physics and Applied Mathematics (CPAM) capabilities in 2010. The goals of capability reviews are to assess the quality of science, technology, and engineering (STE) performed by the capability, evaluate the integration of this capability across the Laboratory and within the scientific community, examine the relevance of this capability to the Laboratory's programs, and provide advice on the current and future directions of this capability. This is the first such review for CPAM, which has a long and unique history at the laboratory, starting from the inception of the Laboratory in 1943. The CPAM capability covers an extremely broad technical area at Los Alamos, encompassing a wide array of disciplines, research topics, and organizations. A vast array of technical disciplines and activities are included in this capability, from general numerical modeling, to coupled mUlti-physics simulations, to detailed domain science activities in mathematics, methods, and algorithms. The CPAM capability involves over 12 different technical divisions and a majority of our programmatic and scientific activities. To make this large scope tractable, the CPAM capability is broken into the following six technical 'themes.' These themes represent technical slices through the CP AM capability and collect critical core competencies of the Laboratory, each of which contributes to the capability (and each of which is divided into multiple additional elements in the detailed descriptions of the themes in subsequent sections): (1) Computational Fluid Dynamics - This theme speaks to the vast array of scientific capabilities for the simulation of fluids under shocks, low-speed flow, and turbulent conditions - which are key, historical, and fundamental strengths of the laboratory; (2) Partial Differential Equations - The technical scope of this theme is the applied mathematics and numerical solution of partial differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics; (3) Monte Carlo - Monte Carlo was invented at Los Alamos, and this theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology; (4) Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling; (5) Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling; and (6) Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1, 2, 3, and 6. Because these capability reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other 5 themes). Yearly written status reports will be provided to the Capability Review Committee Chair during off-cycle years.

99 GENERAL AND MISCELLANEOUS↗

Computational physics and applied mathematics capability review June 8-10, 2010

Los Alamos National Laboratory will review its Computational Physics and Applied Mathematics (CPAM) capabilities in 2010. The goals of capability reviews are to assess the quality of science, technology, and engineering (STE) performed by the capability, evaluate the integration of this capability across the Laboratory and within the scientific community, examine the relevance of this capability to the Laboratory's programs, and provide advice on the current and future directions of this capability. This is the first such review for CPAM, which has a long and unique history at the Laboratory, starting from the inception of the Laboratory in 1943. The CPAM capability covers an extremely broad technical area at Los Alamos, encompassing a wide array of disciplines, research topics, and organizations. A vast array of technical disciplines and activities are included in this capability, from general numerical modeling, to coupled multi-physics simulations, to detailed domain science activities in mathematics, methods, and algorithms. The CPAM capability involves over 12 different technical divisions and a majority of our programmatic and scientific activities. To make this large scope tractable, the CPAM capability is broken into the following six technical 'themes.' These themes represent technical slices through the CPAM capability and collect critical core competencies of the Laboratory, each of which contributes to the capability (and each of which is divided into multiple additional elements in the detailed descriptions of the themes in subsequent sections), as follows. Theme 1: Computational Fluid Dynamics - This theme speaks to the vast array of scientific capabilities for the simulation of fluids under shocks, low-speed flow, and turbulent conditions - which are key, historical, and fundamental strengths of the Laboratory. Theme 2: Partial Differential Equations - The technical scope of this theme is the applied mathematics and numerical solution of partial differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics. Theme 3: Monte Carlo - Monte Carlo was invented at Los Alamos. This theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology. Theme 4: Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling. Theme 5: Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling. Theme 6: Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The Laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1,2, 3, and 6. Because these reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other five themes). Yearly written status reports will be provided to the CPAM Committee Chair during off-cycle years.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

DETERMINATION OF THE DISTRIBUTION AND INVENTORY OF RADIONUCLIDES WITHIN A SAVANNAH RIVER SITE WATERWAY

An investigation was conducted to evaluate the radionuclide inventory within the Lower Three Runs (LTR) Integrator Operable Unit (IOU) at the U.S. Department of Energy’s (DOE’s) Savannah River Site (SRS). The scope of this effort included the analysis of previously existing sampling and analysis data as well as additional streambed and floodplain sampling and analysis data acquired to delineate horizontal and vertical distributions of the radionuclide as part of the ongoing SRS environmental restoration program, and specifically for the LTR IOU program. While cesium-137 (Cs-137) is the most significant and abundant radionuclide associated with the LTR IOU it is not the only radionuclide, hence the scope included evaluating all radionuclides present and includes an evaluation of inventory uncertainty for use in sensitivity and uncertainty analyses. The scope involved evaluation of the radionuclide inventory in the P-Reactor and RReactor cooling water effluent canal systems, PAR Pond (including Pond C) and the floodplain and stream sediment sections of LTR between the PAR Pond Dam and the Savannah River. The approach taken was to examine all of the available Sediment and Sediment/Soil analysis data available along the P- and R-Reactor cooling water re-circulation canal system, the ponds situated along those canal reaches and along the length of LTR below Par Pond dam. By breaking the IOU into a series of sub-components and sub-sections, the mass of contaminated material was estimated and a representative central concentration of each radionuclide was computed for each compartment. The radionuclide inventory associated with each sub-compartment was then aggregated to determine the total radionuclide inventory that represented the full LTR IOU. Of special interest was the inventory of Cs-137 due to its role in contributing to the potential dose to an offsite member of the public. The overall LTR IOU inventory of Cs-137 was determined to be 75.5 Ci, which is similar to two earlier estimates. This investigation provides an independent, ground-up estimate of Cs-137 inventory in LTR IOU utilizing the most recent field data.

54 ENVIRONMENTAL SCIENCES↗

Adaptive model training system and method

An adaptive model training system and method for filtering asset operating data values acquired from a monitored asset for selectively choosing asset operating data values that meet at least one predefined criterion of good data quality while rejecting asset operating data values that fail to meet at least the one predefined criterion of good data quality; and recalibrating a previously trained or calibrated model having a learned scope of normal operation of the asset by utilizing the asset operating data values that meet at least the one predefined criterion of good data quality for adjusting the learned scope of normal operation of the asset for defining a recalibrated model having the adjusted learned scope of normal operation of the asset.

97 MATHEMATICS AND COMPUTING↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Adaptive model training system and method

An adaptive model training system and method for filtering asset operating data values acquired from a monitored asset for selectively choosing asset operating data values that meet at least one predefined criterion of good data quality while rejecting asset operating data values that fail to meet at least the one predefined criterion of good data quality; and recalibrating a previously trained or calibrated model having a learned scope of normal operation of the asset by utilizing the asset operating data values that meet at least the one predefined criterion of good data quality for adjusting the learned scope of normal operation of the asset for defining a recalibrated model having the adjusted learned scope of normal operation of the asset.

97 MATHEMATICS AND COMPUTING↗

Fuel Cycle Performance of Thermal Spectrum Small Modular Reactors

Small modular reactors may offer potential benefits, such as enhanced operational flexibility. However, it is vital to understand the holistic impact of small modular reactors on the nuclear fuel cycle and fuel cycle performance. The focus of this paper is on the fuel cycle impacts of light water small modular reactors in a once-through fuel cycle with low-enriched uranium fuel. A key objective of this paper is to describe preliminary reactor core physics and fuel cycle analyses conducted in support of the U.S. Department of Energy Office of Nuclear Energy Fuel Cycle Options Campaign. Challenges with small modular reactors include: increased neutron leakage, fewer assemblies in the core (and therefore fewer degrees of freedom in the core design), complex enrichment and burnable absorber loadings, full power operation with inserted control rods, the potential for frequent load-following operation, and shortened core height. Each of these will impact the achievable discharge burn-up in the reactor and the fuel cycle performance. This paper summarizes the results of an expert elicitation focused on developing a list of the factors relevant to small modular reactor fuel, core, and operation that will impact fuel cycle performance. Preliminary scoping analyses were performed using a regulatory-grade reactor core simulator. The hypothetical light water small modular reactor considered in these preliminary scoping studies is a cartridge type one-batch core with 4.9% enrichment. Some core parameters, such as the size of the reactor and general assembly layout, are similar to an example small modular reactor concept from industry. The high-level issues identified and preliminary scoping calculations in this paper are intended to inform on potential fuel cycle impacts of one-batch thermal spectrum SMRs. In particular, this paper highlights the impact of increased neutron leakage and reduced number of batches on the achievable burn-up of the reactor. Fuel cycle performance metrics for a small modular reactor are compared to a conventional three-batch light water reactor in the following areas: nuclear waste management, environmental impact, and resource utilization. Metrics performance for a small modular reactor are degraded for mass of spent nuclear fuel and high level waste disposed, mass of depleted uranium disposed, land use per energy generated, and carbon emission per energy generated

Worrall, Andrew↗

Development/Modernization of an Advanced Non-Light Water Reactor Probabilistic Risk Assessment

In 2015, GE Hitachi Nuclear Energy (GEH) teamed with Argonne National Laboratory (Argonne) to perform Research and Development (R&D) of next-generation Probabilistic Risk Assessment (PRA) methodologies for the modernization of an advanced non-Light Water Reactor (non-LWR) PRA. This effort built upon a PRA developed in the early 1990s for GEH’s Power Reactor Inherently Safe Module (PRISM) Sodium Fast Reactor (SFR). The work had four main tasks: internal events development modeling the risk from the reactor for hazards occurring at-power internal to the plant; an all hazards scoping review to analyze the risk at a high level from external hazards such as earthquakes and high winds; an all modes scoping review to understand the risk at a high level from operating modes other than at-power; and risk insights to integrate the results from each of the three phases above. To achieve these objectives, GEH and Argonne used and adapted proven PRA methodologies and techniques to build a modern non-LWR all hazards/all modes PRA. The teams also advanced non-LWR PRA methodologies, which is an important outcome from this work. This report summarizes the project outcomes in two major phases. The first phase presents the methodologies developed for non-LWR PRAs. The methodologies are grouped by scope, from Internal Events At-Power (IEAP) to hazards analysis to modes analysis. The second phase presents details of the PRISM PRA model which was developed as a validation of the non-LWR methodologies. The PRISM PRA was performed in detail for IEAP, and at a broader level for hazards and modes. In addition to contributing methodologies, this project developed risk insights applicable to non-LWR PRA, including focus-areas for future R&D, and conclusions about the PRISM design.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan outlines the strategy, mission, scope, near-term and long-term goals, structure, and organization associated with nuclear fuels and materials research, development, and demonstration activities within the Department of Energy’s (DOE) Nuclear Fuel Cycle and Supply Chain (NFCSC) program. NFCSC has been given responsibility to identify and mature advanced fuel technologies for the DOE using a science-based approach, focused on developing a fundamental understanding of nuclear fuels and materials to drive development of integrated nuclear fuel and materials technology. This science-based approach combines theory, experiments, and multiscale modeling and simulation to achieve a predictive understanding of relevant behaviors ranging from fuel fabrication processes (and their resulting fuel microstructures) through fuel/cladding performance under irradiation (in contrast to more empirical, observation-based approaches frequently used in fuel performance modeling and fuel qualification). The traditional scope of AFC includes the evaluation and development of multiple fuel forms to support two fuel cycle options: once-through and full recycle. The word “fuel” is used generically to include conventional fuels, transmutation targets, and any associated cladding or duct materials. The once-through fuel cycle addresses advanced light water reactor fuels with enhanced performance, extended burnup, and reduced waste generation. In fiscal year (FY) 2012, AFC’s scope expanded to include research, development, and demonstration (RD&D) for light water reactor (LWR) fuels with enhanced accident tolerance. Fuel fabrication activities include the development of innovative methods to enhance process efficiencies, reduce waste, and improve control over as-fabricated fuel microstructural properties to achieve desired in-reactor performance. Using modern modeling and simulation approaches, the objective is to predict fresh fuel properties given the feedstock characteristics and fabrication process parameters. The performance-related activities include small-scale, in-reactor, and out-of-reactor phenomenological testing (distinct from, but synergistic with, integral prototypic testing) and extensive, quantitative characterization (focusing on characterization of fuel and cladding materials at the scale of microstructure) both before and after testing. Larger-scale, prototypic experiments are conducted in concert with phenomenological testing to drive a Fuel Development and Qualification program, incorporating a fundamental understanding of fuel behavior performance characteristics. Then, using the tools developed under the productive science-based approach, fuels will be optimized to meet specific performance requirements, thereby minimizing the need to repeatedly perform large-scale, integral experiments over a wide parametric range as a means of experimental exploration. Two significant initiatives are underway within AFC. First, a gap analysis completed in early FY 2019 identified critical irradiation testing needs that are lacking within the national light water reactor (LWR) fuels testbed since the shutdown of the Halden Reactor in 2018. The identified gaps are for instrumented, prototypic testing of LWR fuels, especially under boiling water reactor conditions, ramp conditions, and conditions leading to fuel failure; these needs exist for supporting current LWR fuels and their possible extension to higher burnups, but are especially urgent relative to near-term development and qualification of accident-tolerant fuels. Recommendations that resulted from the Halden Gap Analysis focused on enhancements at Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) to fill gaps in testing capabilities relative to these needs. Second, a concerted effort to develop and demonstrate a systematic approach to accelerating the development, testing, and qualification of new fuel systems has been initiated. This is highlighted by a test strategy that combines the considerable advances in multiscale, mechanistic fuel modeling of recent years with a MiniFuel separate effects test program in the High Flux Isotope Reactor (HFIR) and a Fission Accelerated Steady-state Testing (FAST) semi-integral accelerated test program in ATR. This approach is being tested/demonstrated using the metallic fuel system, but if successful it is expected to be extensible to multiple fuel types and diverse applications. This document includes an overview of the NFCSC program, a definition of science-based development of nuclear fuels, near-term goals for Advanced LWR fuels (ALFs), and longer-term goals for Advanced Reactor Fuels (ARFs) RD&D. This includes the activities that will be conducted to achieve success toward the grand challenge, as well as the goals and milestones to be achieved over the next few decades of research and development. Long-term goals are based on the DOE Office of Nuclear Energ

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Investigation of INL Site Implementation of ARG-US

The Packaging Certification and Life Cycle Management department at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US is used to provide necessary data for nuclear facility and system operation and maintenance. ARG-US has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Wet & Dry Fuel Storage Facility in relation to the upcoming DOE Spent (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in the Nuclear Science and Technology Directorate. This investigation is expected to recommend processes or facilities at the INL site at which to implement ARG-US systems. INL has engaged local site technical and oversite representatives, security, nuclear safeguards, and program management to identify good candidates for ARG-US test implementations. INL has identified high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. To these ends, INL suggests 3 program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “tank farm”, and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions needed to complete the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerate Nuclear Research and Development by Reducing Time and Cost Spend in the Pre-conceptual Design Phase of Advanced Reactor Experiments

The design process of every new concept, such as advanced nuclear reactors or associated experiments, starts with the pre-conceptual design phase. In this phase, the viability of a wide range of design options needs to be assessed quickly, to understand the operating envelope and its feasibility. A variety of physics models (thermal-hydraulics, neutronics, mechanical design, etc.) has to be considered at this very first design stage and optimum component sizes and materials (e.g. heat exchangers, piping, turbomachinery, coolant type, etc.) have to be chosen for a given set of boundary conditions (e.g. heat source, heat sink, flow rate, etc.). Detailed solutions such as provided by high fidelity methods like computational fluid dynamics (CFD), Monte Carlo methods, etc. and even lower fidelity tools such as system or subchannel codes, etc. are usually not used during the pre-conceptual design due to the relatively long time needed to create input models, the computational time to obtain a solution and the lack of flexibility to quickly investigate different combinations of components, individual component sizes and material properties. High fidelity tools are usually only employed in the conceptual design and later phases once a base concept has been identified during the pre-conceptual design stage. The current practice during the pre-conceptual design stage is that analysts collect the needed equations, material properties, closure laws, etc. and create ad-hoc solutions form scratch for every new problem. There clearly is a lack of a flexible scoping tool that can be used during pre-conceptional design before higher fidelity tools (as described above) come into play. To reduce user errors in ad-hoc solutions and increase fidelity and efficiency, this project aims to investigate and develop a user-friendly scoping tool to address the thermal-hydraulic designing needs during preconceptual experiment design, i.e. Thermal-hydraulic Research Universal Scoping Tool (TRUST). The success of TRUST will provide the nuclear engineers with an easy-to-use and affordable calculator for early reactor system design and optimization.

42 ENGINEERING↗

POST-IRRADIATION EXAMINATION AND SAFETY TESTING OF AGR-2 PEBBLE BED MODULAR REACTOR FUEL AT OAK RIDGE NATIONAL LABORATORY

A cooperative research and development agreement (CRADA) has been established between Pebble Bed Modular Reactor (PBMR) State Owned Company (SOC) Ltd. of the Republic of South Africa and Battelle Energy Alliance, LLC (BEA), the managing and operating contractor of Idaho National Laboratory (INL). The objective of this agreement is to conduct safety tests and destructive examination on compacts containing tristructural isotropic (TRISO) coated particle fuel that was provided by Necsa (for PBMR and title transferred to the Department of Energy [DOE]) and irradiated in the Advanced Test Reactor (ATR) in Capsule 4 as part of the Advanced Gas Reactor (AGR)-2 experiment performed under a previous CRADA (08-CR-12). The proposed safety testing and post-test examination will assist with assessing fuel performance during high-temperature reactor accident conditions. Due to different capabilities, some work will be performed by DOE’s Oak Ridge National Laboratory (ORNL) under a separate agreement. This statement of work describes the work scope to be performed by ORNL in support of the CRADA. Based on consultation with PBMR and ORNL, INL may modify the scope of work to be performed at ORNL. In particular, data from initial tests and examinations may result in scope modification as necessary.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Human Performance Analysis Depending on Operator Expertise (Student vs. Operator) and Simulator Complexity (Rancor Microworld vs. Compact Nuclear Simulator)

Human reliability analysis (HRA) evaluates human errors and provides human error probabilities (HEPs) for application in probabilistic safety assessment (PSA), which is a comprehensive safety assessment method for nuclear power plants (NPPs). Generally, HRA methods estimate HEPs based on human reliability data collected from actual historical measurement, simulator experiments, or expert judgement. Most recent HRA data collection studies focus on collecting data via full-scope main control room (MCR) simulators with actual licensed reactor operators. Contrary to this, Idaho National Laboratory (INL) has adopted a different approach, which attempts to collect HRA data based on experiment using simplified simulators and student participants by following the Simplified Human Error Experimental Program (SHEEP). This approach has a couple of advantages compared to full-scope data collection. Representatively, it has relatively low entry point for collecting HRA data, and secures large sample sizes with reasonable cost and labor. In the previous studies, we developed the SHEEP framework, then verified whether the data collected through the framework could support a representative full-scope data collection study, i.e., the Human Reliability Data Extraction (HuREX) study. Also, we analyzed human performance measurements depending on participant type (i.e., student vs. operator). In this paper, we analyze human performance data collected from an experiment comparing operator expertise and simulator complexity when using the more simplified simulator developed by INL, i.e., Rancor Microworld and the less simplified simulator, i.e., Compact Nuclear Simulator (CNS) developed by Korea Atomic Energy Research Institute (KAERI). Analysis of variance (ANOVA) tests and correlation analysis are used for analyzing the experimental data.

99 GENERAL AND MISCELLANEOUS↗

An Experimental Investigation of Human Performance Differences Depending on Simulator Complexity

As a different approach to collect human reliability analysis (HRA) data compared to the full-scope simulator studies, Idaho National Laboratory (INL) has attempted to collect HRA data based on Simplified Human Error Experimental Program (SHEEP), which uses a simplified simulator and student participants. To date, INL has considered the SHEEP approach using simplified simulators such as Rancor Microworld and Compact Nuclear Simulator to complement – not replace – full-scope studies as well as to mainly collect HRA data for estimating nominal/basic human error probabilities (HEPs) needed in the HRA quantification process. This study is a part of the project aiming to suggest how to support full-scope data collection studies based on SHEEP. This paper first introduces major tasks within the SHEEP framework. Then, as one of the major tasks, why and how we have planned to experimentally investigate human performance differences depending on simulator complexity are mainly introduced in this paper.

99 GENERAL AND MISCELLANEOUS↗

Determination of the Distribution and Inventory of Radionuclides within a Savannah River Site Waterway - 13202

An investigation was conducted to evaluate the radionuclide inventory within the Lower Three Runs (LTR) Integrator Operable Unit (IOU) at the U.S. Department of Energy's (DOE's) Savannah River Site (SRS). The scope of this effort included the analysis of previously existing sampling and analysis data as well as additional stream bed and flood plain sampling and analysis data acquired to delineate horizontal and vertical distributions of the radionuclide as part of the ongoing SRS environmental restoration program, and specifically for the LTR IOU program. While cesium-137 (Cs-137) is the most significant and abundant radionuclide associated with the LTR IOU it is not the only radionuclide, hence the scope included evaluating all radionuclides present and includes an evaluation of inventory uncertainty for use in sensitivity and uncertainty analyses. The scope involved evaluation of the radionuclide inventory in the P-Reactor and R-Reactor cooling water effluent canal systems, PAR Pond (including Pond C) and the flood plain and stream sediment sections of LTR between the PAR Pond Dam and the Savannah River. The approach taken was to examine all of the available Sediment and Sediment/Soil analysis data available along the P- and R-Reactor cooling water re-circulation canal system, the ponds situated along those canal reaches and along the length of LTR below Par Pond dam. By breaking the IOU into a series of sub-components and sub-sections, the mass of contaminated material was estimated and a representative central concentration of each radionuclide was computed for each compartment. The radionuclide inventory associated with each sub-compartment was then aggregated to determine the total radionuclide inventory that represented the full LTR IOU. Of special interest was the inventory of Cs-137 due to its role in contributing to the potential dose to an offsite member of the public. The overall LTR IOU inventory of Cs-137 was determined to be 2.87 E+02 GBq, which is similar to two earlier estimates. This investigation provides an independent, ground-up estimate of Cs-137 inventory in LTR IOU utilizing the most recent field data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Decommissioning the Humboldt Bay Power Plant - 13604

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) to Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗