Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “safety engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Characterization of shape memory alloys for safety mechanisms.

Shape memory alloys (SMAs) are metals that exhibit large recoverable strains and exert large forces with tremendous energy densities. The behavior of SMAs is thermomechanically coupled. Their response to temperature is sensitive to their loading condition and their response to loading is sensitive to their thermal condition. This coupled behavior is not to be circumvented, but to be confronted and understood, since it is what manifests SMA's superior clamping performance. To reasonably characterize the coupled behavior of SMA clamping rings used in safety mechanisms, we conduct a series of experiments on SMA samples. The results of the tests will allow increased fidelity in modeling and failure analysis of parts.

42 ENGINEERING↗

Selection of wires and circuit protective devices for STS Orbiter vehicle payload electrical circuits

Electrical designers of Orbiter payloads face the challenge of determining proper circuit protection/wire size parameters to satisfy Orbiter engineering and safety requirements. This document is the result of a program undertaken to review test data from all available aerospace sources and perform additional testing to eliminate extrapolation errors. The resulting compilation of data was used to develop guidelines for the selection of wire sizes and circuit protection ratings. The purpose is to provide guidance to the engineering to ensure a design which meets Orbiter standards and which should be applicable to any aerospace design.

Gaston, Darilyn M.↗

The NASA Jitter Handbook Development Activity: A Multidisciplinary Collaborative Effort

Spaceflight missions hosting high-performance vibration-sensitive optical sensor payloads with stringent pointing stability requirements are especially challenged in the areas of predicting, managing, controlling, and testing spacecraft line-of-sight (LoS) jitter. The community recognizes that this is a formidable multidisciplinary engineering task. However, while some textbooks and references in the aerospace literature may touch on the subject of jitter, important details of specific flight proven methodologies and techniques used by today’s jitter engineering practitioners are not readily accessible. There is no know engineering reference document with guidelines and best practices for managing and mitigating space-craft jitter. To fill this knowledge gap the NASA Engineering and Safety Center (NESC) has undertaken the task of developing a NASA Jitter Handbook which would include lessons learned and best practices for design, analysis, and test, along with operational guidelines to mitigate jitter. In this paper the plan for this handbook development will be described along with the envisioned handbook framework, key NASA stakeholders, and potential envisioned jitter engineering case studies. Opportunities exist technical collaboration on this handbook with NASA-external organizations.

Christopher D'Souza↗

NASA's Software Safety Standard

NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those requirements. This allows the projects leeway to meet these requirements in many forms that best suit a particular project's needs and safety risk. In other words, it tells the project what to do, not how to do it. This update also incorporated advances in the state of the practice of software safety from academia and private industry. It addresses some of the more common issues now facing software developers in the NASA environment such as the use of Commercial-Off-the-Shelf Software (COTS), Modified OTS (MOTS), Government OTS (GOTS), and reused software. A team from across NASA developed the update and it has had both NASA-wide internal reviews by software engineering, quality, safety, and project management. It has also had expert external review. This presentation and paper will discuss the new NASA Software Safety Standard, its organization, and key features. It will start with a brief discussion of some NASA mission failures and incidents that had software as one of their root causes. It will then give a brief overview of the NASA Software Safety Process. This will include an overview of the key personnel responsibilities and functions that must be performed for safety-critical software.

Ramsay, Christopher M.↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

Results from NASA Agile Teams Study

In order to meet the demands of the current global economy, a study of agile teams at NASA was conducted by the NASA Engineering and Safety Center (NESC) to explore how the Agency can become more adaptable and flexible due to several influences, including the maturity and availability of digital tools and NASA’s increased reliance on commercial providers. NESC Technical Discipline Teams (TDTs) perform annual studies to understand the needs of their stakeholders, establish a state of the discipline, and inform strategic planning efforts. As part of the 2022 interview series, the Systems Engineering TDT utilized the dissertation work of Dr. Jackelynne Silva-Martinez that focused on NASA agile teams. The Systems Engineering TDT partnered with the Software and Human Factors TDTs on the formulation of interview questions and subsequent solicitation of customer inputs, which helped attract diverse agile teams across the Agency. 34 participants were interviewed, including civil servants and contractors, with open-ended questions related to their teams’ adoption and transition to agile. Participants were also questioned about their perceptions of the implementation of agile approaches across the Agency. Results showed a consistent framing of agile as incremental knowledge growth, a way of showing progress, and as the incorporation of frequent customer feedback. However, participants emphasized a lack of a common understanding of agile across the Agency, which sometimes caused managers and engineers to be reluctant to accept and support them. Results also showed the most successful agile teams had formal training with over five years of agile experience, used retrospectives, and tailored their agile processes for their specific situation and needs. This paper provides details of the interview responses gathered in the study and suggests actions for NASA to become more agile.

NASA↗

The Dust in the Atmosphere of Mars and Its Impact on the Human Exploration of Mars: A NESC Workshop

The NASA Engineering and Safety Center (NESC) Chief Scientist provided support to produce an NESC final report on the "Dust in the Atmosphere of Mars and Its Impact on Human Exploration" workshop held June 1315, 2017, in Houston, TX. This report follows the standard NESC report format to describe the findings, observations, and NESC recommendations developed by the workshop participants. The key stakeholders for the final report are the Mars mission designers and engineers for the precursor missions and the crewed mission, and the NESC. Further stakeholders are the mission planners deciding on the payload selections for the Mars missions.

Winterhalter, Daniel↗

Engineered Option Treatment of Remediated Nitrate Salts: Surrogate Batch-Blending Testing

This report provides results from batch-blending test work for remediated nitrate salt (RNS) treatment. Batch blending was identified as a preferred option for blending RNS and unremediated nitrate salt (UNS) material with zeolite to effectively safe the salt/Swheat material identified as ignitable (U.S. Environmental Protection Agency code D001). Blending with zeolite was the preferred remediation option identified in the Options Assessment Report and was originally proposed as the best option for remediation by Clark and Funk in their report, Chemical Reactivity and Recommended Remediation Strategy for Los Alamos Remediated Nitrate Salt (RNS) Wastes, and also found to be a preferred option in the Engineering Options Assessment Report: Nitrate Salt Waste Stream Processing. This test work evaluated equipment and recipe alternatives to achieve effective blending of surrogate waste with zeolite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Photovoltaic power system reliability considerations

This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

Lalli, V. R.↗

Improving Limit Surface Search Algorithms in RAVEN Using Acceleration Schemes: Level II Milestone

The RAVEN code is becoming a comprehensive tool to perform Probabilistic Risk Assessment (PRA); Uncertainty Quantification (UQ) and Propagation; and Verification and Validation (V&V). The RAVEN code is being developed to support the Risk-Informed Safety Margin Characterization (RISMC) pathway by developing an advanced set of methodologies and algorithms for use in advanced risk analysis. The RISMC approach uses system simulator codes applied to stochastic analysis tools. The fundamental idea behind this coupling approach to perturb (by employing sampling strategies) timing and sequencing of events, internal parameters of the system codes (i.e., uncertain parameters of the physics model) and initial conditions to estimate values ranges and associated probabilities of figures of merit of interest for engineering and safety (e.g. core damage probability, etc.). This approach applied to complex systems such as nuclear power plants requires performing a series of computationally expensive simulation runs. The large computational burden is caused by the large set of (uncertain) parameters characterizing those systems. Consequently, exploring the uncertain/parametric domain, with a good level of confidence, is generally not affordable, considering the limited computational resources that are currently available. In addition, the recent tendency to develop newer tools, characterized by higher accuracy and larger computational resources (if compared with the presently used legacy codes, that have been developed decades ago), has made this issue even more compelling. In order to overcome to these limitations, the strategy for the exploration of the uncertain/parametric space needs to use at best the computational resources focusing the computational effort in those regions of the uncertain/parametric space that are “interesting” (e.g., risk-significant regions of the input space) with respect the targeted Figures Of Merit (FOM): for example, the failure of the system, subject of the analysis. These methodologies are named, in the RAVEN environment, adaptive sampling strategies. These methodologies infer system responses from surrogate models constructed from already existing samples (produced using high fidelity simulations) and suggest the most relevant location (coordinate in the input space) of the next sampling point to be explored in the uncertain/parametric domain. When using those methodologies, it is possible to understand features of the system response with a small number of carefully selected samples. This report focuses on the development and improvement of the limit surface search. The limit surface is an important concept in system reliability analysis. Without going into the details, which will be covered later in the report, the limit surface could be briefly described as an hyper-surface in the system uncertainty/parametric space separating the regions leading to a prescribed system outcome. For example, if the uncertainty/parametric space is the one generated by the reactor power level and the duration of the batteries, the system is a nuclear power plant and the system outcome discriminating variable is the clad failure in a station blackout scenario, then the limit surface separates the combinations of reactor power level and battery duration that lead to clad failure from the ones that do not.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

GIF sodium fast reactor project R and D on safety and operation

The 'Safety and Operation' project is started in 2009 within the framework of Generation-IV International Forum (GIF) Sodium Fast Reactor (SFR) research and development program. In the safety area, the project involves R and D activities on phenomenological model development and experimental programs, conceptual studies in support of the design of safety provisions, preliminary assessment of safety systems, framework and methods for analysis of safety architecture. In the operation area, the project involves R and D activities on fast reactors safety tests and analysis of reactor operations, feedback from decommissioning, in-service inspection technique development, under-sodium viewing and sodium chemistry. This paper presents a summary of such activities and the main achievements. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Photovoltaic power system reliability considerations

An example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems is presented. This particular application is for a solar cell power system demonstration project designed to provide electric power requirements for remote villages. The techniques utilized involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of fail-safe and planned spare parts engineering philosophy.

Lalli, V. R.↗

Lunar Dust Simulant in Mechanical Component Testing - Paradigm and Practicality

Due to the uniquely harsh lunar surface environment, terrestrial test activities may not adequately represent abrasive wear by lunar dust likely to be experienced in mechanical systems used in lunar exploration. Testing to identify potential moving mechanism problems has recently begun within the NASA Engineering and Safety Center Mechanical Systems Lunar Dust Assessment activity in coordination with the Exploration Technology and Development Program Dust Management Project, and these complimentary efforts will be described. Specific concerns about differences between simulant and lunar dust, and procedures for mechanical component testing with lunar simulant will be considered. In preparing for long term operations within a dusty lunar environment, the three fundamental approaches to keeping mechanical equipment functioning are dust avoidance, dust removal, and dust tolerance, with some combination of the three likely to be found in most engineering designs. Methods to exclude dust from contact with mechanical components would constitute mitigation by dust avoidance, so testing seals for dust exclusion efficacy as a function of particle size provides useful information for mechanism design. Dust of particle size less than a micron is not well documented for impact on lunar mechanical components. Therefore, creating a standardized lunar dust simulant in the particulate size range of ca. 0.1 to 1.0 micrometer is useful for testing effects on mechanical components such as bearings, gears, seals, bushings, and other moving mechanical assemblies. Approaching actual wear testing of mechanical components, it is beneficial to first establish relative wear rates caused by dust on commonly used mechanical component materials. The wear mode due to dust within mechanical components, such as abrasion caused by dust in grease(s), needs to be considered, as well as the effects of vacuum, lunar thermal cycle, and electrostatics on wear rate.

Jett, T.↗

Savannah River nuclear solutions criticality safety training and qualification program and professional development/retention - 14507

Many years ago, at the Savannah River Site, the need for technically competent and qualified criticality safety (CS) staff was identified. Over the intervening years an extensive training and qualification (T and Q) program was developed. In 2008 Savannah River Nuclear Solutions (SRNS), the current site M and O contractor, inherited the T and Q program developed by the prior site contractors. Since then SRNS has initiated changes to the T and Q program to better fit the current regulatory environment, ensuring compliance with ANSI/ANS-8.26 [1], and implementing the idea of continuous improvement. Currently, a significant fraction of the SRNS CS staff either will be or are eligible for retirement. Therefore, SRNS is pursuing recent Nuclear Engineering college graduates and/or experienced criticality engineers. The challenges associated with hiring and maintaining criticality staff include, but are not limited to, increased workforce mobility and increased competition for fewer criticality resources. For example, the recent trend in company benefits is to eliminate longer term benefits such as pensions to make the benefits more transportable in terms of 401 Ks and Health Savings Accounts. In addition, there have been reductions in DOE funding for professional development through participation in ANS committees or attendance at Criticality related conferences. SRNS has investigated a number of possibilities on how to retain CS staff, but in the current environment has not identified any 'golden eggs'. Regardless, SRNS is exploring additional paths to incentivize the engineers to stay long term. SRNS is working to improve/maintain its workforce by creating a CS engineer pipeline. SRNS provides a training budget for new engineers and offers a formalized and mentored training program. For experienced criticality engineers, the SRNS T and Q program is flexible enough to allow 'credit' for previous accomplishments at other sites. SRNS is also striving to be proactive in supporting professional development by identifying specific monies in the planning phases of the annual budget requests. The current posture of SRNS is to maintain 'open' requisitions for both experienced staff looking for other opportunities, and for recent college graduates. As opportunities arise, either from within or without, SRNS evaluates the potential candidates and advances offers of employment. Until the longer term need is met SRNS intends to hire at least two staff members per year. Those staff members then enter the T and Q program and when appropriate, based on their experience and/or training accomplishments, begin assisting the current staff with program/facility CS support. (authors)

42 ENGINEERING↗

MLAS and LAS: Project Comparison of Lessons Learned

The development of new and safer manned space vehicles is a top priority at NASA. Recently two different approaches of how to accomplish this mission of keeping astronauts safe was successfully demonstrated. With work already underway on an Apollo-like launch abort system for the Orion Crew Exploration Vehicle (CEV), an alternative design concept named the Max Launch Abort System, or MLAS, was developed as a parallel effort. The Orion system, managed by the Constellation office, is based on the design of a single solid launch abort motor in a tower positioned above the capsule. The MLAS design takes a different approach placing the solid launch abort motor underneath the capsule. This effort was led by the NASA Engineering and Safety Center (NESC). Both escape systems were designed with the Ares I Rocket as the launch vehicle and had the same primary requirement to safely propel a crew module away from any emergency event either on the launch pad or during accent. Beyond these two parameters, there was little else in common between the two projects, except that they both concluded in successful launches that will further promote the development of crew launch abort systems. This presentation will compare both projects from the standpoint of technical requirements; program management and flight test objectives and highlight the synergistic lessons learned by two engineers who worked on each program.

Dittemore, Gary↗

Testing Strategies and Methodologies for the Max Launch Abort System

The National Aeronautics and Space Administration (NASA) Engineering and Safety Center (NESC) was tasked to develop an alternate, tower-less launch abort system (LAS) as risk mitigation for the Orion Project. The successful pad abort flight demonstration test in July 2009 of the "Max" launch abort system (MLAS) provided data critical to the design of future LASs, while demonstrating the Agency s ability to rapidly design, build and fly full-scale hardware at minimal cost in a "virtual" work environment. Limited funding and an aggressive schedule presented a challenge for testing of the complex MLAS system. The successful pad abort flight demonstration test was attributed to the project s systems engineering and integration process, which included: a concise definition of, and an adherence to, flight test objectives; a solid operational concept; well defined performance requirements, and a test program tailored to reducing the highest flight test risks. The testing ranged from wind tunnel validation of computational fluid dynamic simulations to component ground tests of the highest risk subsystems. This paper provides an overview of the testing/risk management approach and methodologies used to understand and reduce the areas of highest risk - resulting in a successful flight demonstration test.

Schaible, Dawn M.↗