Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pump systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Magnetic Field, Force, and Inductance Computations for an Axially Symmetric Solenoid

The pumping of liquid oxygen (LOX) by magnetic fields (B field), using an array of electromagnets, is a current topic of research and development at Kennedy Space Center, FL. Oxygen is paramagnetic so that LOX, like a ferrofluid, can be forced in the direction of a B field gradient. It is well known that liquid oxygen has a sufficient magnetic susceptibility that a strong magnetic gradient can lift it in the earth's gravitational field. It has been proposed that this phenomenon can be utilized in transporting (i.e., pumping) LOX not only on earth, but on Mars and in the weightlessness of space. In order to design and evaluate such a magnetic pumping system, it is essential to compute the magnetic and force fields, as well as inductance, of various types of electromagnets (solenoids). In this application, it is assumed that the solenoids are air wrapped, and that the current is essentially time independent.

Lane, John E.↗

NASA Goddard Thermal Technology Overview 2019

This presentation summarizes the current plans and efforts at NASA/Goddard to develop new thermal control technology for anticipated future missions. It will also address some of the programmatic developments currently underway at NASA, especially with respect to the NASA Technology Development Program and will highlight some of the latest flight project activities at GSFC. While funding for basic technology development is still scarce, significant efforts are being made in direct support of flight programs. New technology development continues to be driven by the needs of future missions, and applications of these technologies to current Goddard programs will be addressed. Many of these technologies also have broad applicability to DOD, DOE, and commercial programs. Partnerships have been developed with the Air Force, Navy, and various universities to promote technology development. Technology development activities supported by the internal research and development (IRAD) program, the Small Business Innovative Research (SBIR) program, and other technology development programs are reviewed in this presentation. Specific technologies addressed include; micro-channel heat transfer, latest developments of electro-hydro-dynamically pumped systems, Atomic Layer Deposition (ALD), thermal control coatings, and various other research activities.

Butler, Dan↗

Apparatus and process for passivating an SRF cavity

An apparatus and process for the production of a niobium cavity exhibiting high quality factors at high gradients is provided. The apparatus comprises a first chamber positioned within a second chamber, an RF generator and vacuum pumping systems. The process comprises placing the niobium cavity in a first chamber of the apparatus; thermally treating the cavity by high temperature in the first chamber while maintaining high vacuum in the first and second chambers; and applying a passivating thin film layer to a surface of the cavity in the presence of a gaseous mixture and an RF field. Further a niobium cavity exhibiting high quality factors at high gradients produced by the method of the invention is provided.

36 MATERIALS SCIENCE↗

Impact of Installation Faults on Heat Pump Performance

Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHP pump system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improving Steam System Performance: A Sourcebook for Industry, Second Edition

This sourcebook is designed to provide steam system users with a reference that describes the basic steam system components, outlines opportunities for energy and performance improvements, and discusses the benefits of a systems approach in identifying and implementing these improvement opportunities. The sourcebook is divided into three main sections: steam system basics, performance improvement opportunities, and where to find help.

steam, steam system, steam system performance, AMO↗

Portfolio Analysis of Renewable Energy Opportunities: Preprint

Time Warner Cable (TWC), now Charter Communications (CC), partnered with the National Renewable Energy Laboratory (NREL) to assess the technical and economic potential for solar photovoltaic (PV), wind, and ground-source heat-pump systems at 696 TWC facilities. NREL identified 306 sites where adding a renewable energy system would provide cost savings over the project life-cycle. In general, the top sites have some combination of high electricity rates ($0.16-$0.29/kWh), significant state incentives, and favorable net-metering policies. If all projects were implemented via third-party power purchase agreements, TWC/CC would save $37 million over 25 years and meet 10.5% of their energy consumption with renewable energy. This paper describes the portfolio screening methodology used to identify and prioritize renewable energy opportunities across the TWC sites, as well as a summary of the potential cost savings that may be realized by implementing these projects. This may provide a template for other companies interested in identifying and prioritizing renewable energy opportunities across a large number of geographically dispersed sites. Following this initial portfolio analysis, NREL will be conducting in-depth analysis of project development opportunities at ten sites and evaluating off-grid solutions that may enable carbon emission reduction and grid independence at select facilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitivity analysis of design parameters in RowWise borehole layout for ground heat exchangers

Ground source heat pump systems offer a promising pathway toward energy-efficient building heating and cooling. The performance and cost-effectiveness of these systems heavily depend on the design of the ground heat exchanger (GHE), particularly the spatial placement of boreholes used in large commercial buildings. Among various borefield layout strategies, the RowWise approach generates and optimizes borehole configurations within irregular polygonal land boundaries, providing land-use efficiency and installation flexibility. While multiple geometric design parameters constrain the RowWise layout, their influence on the system thermal performance and total drilling requirements remains unclear. Thus, this study presents a sensitivity analysis of key design parameters influencing the RowWise layout of vertical borehole GHEs, including the perimeter spacing ratio, borehole spacing, borehole field rotation angle, and borehole length. GHEDesigner and Ray Tune are employed to generate and assess different RowWise configurations. A series of parametric simulations was conducted to quantify the impact of each parameter on geometric distribution, economic cost, and computational speed. The results provide critical insights into the sensitivity and relative importance of different design parameters of RowWise method, offering practical guidance for designers aiming to optimize GHE layouts by balancing thermal efficiency, land constraints, and economic feasibility.

Xu, Dikai [Purdue University]↗

Systems and devices for pumping and controlling high temperature fluids

The disclosed technology includes pumps, pipes, valves, seals, and systems for pumping and controlling high temperature fluids, such as liquid tin, at temperatures of between 1000-3000° C. The systems and device may be partially or entirely constructed using brittle materials, such as ceramics, that are capable of withstanding extreme heat without significantly degrading, and may be secured using components made of refractory metals, such as tungsten. The systems and devices may utilize static and dynamic seals made from brittle materials, such as graphite, to enable the high temperature operation of such pumps, pipes, valves, and systems without leakage.

Henry, Asegun↗

Design and Modeling of a Prototype Floating Membrane Reservoir System Application for Pumped Storage Hydropower

Design and modeling were performed for a prototype floating membrane reservoir system for closed-loop pumped storage hydropower (PSH) application. Typically, new construction of PSH requires high up-front development costs and long investment return periods. The proposed floating membrane reservoir system innovative technology would eliminate the need for highly disruptive and costly reservoir construction. Such modular systems may ultimately provide reliable, flexible power generation and can be replicated multiple times to increase energy storage capacity. This paper documents the modeling response analysis completed to refine and validate the design prior to the testing of the prototype. Computational fluid dynamics modeling efforts were completed to assess hydrostatic and hydrodynamic forces acting on the reservoir for several deployment and alignment arrangements. The system stability was evaluated using material stress and frequency response analysis. The conclusions, based on hydrodynamic and structural response modeling, support a decision to move forward with construction, deployment, and testing of the innovative prototype floating reservoir system.

Hadjerioua, Boualem↗

Diode Pumped Alkaline Laser System: A High Powered, Low SWaP Directed Energy Option for Ballistic Missile Defense High-Level Summary - April 2017

The Diode-Pumped Alkali Laser (DPAL) system is an R&D effort funded by the Missile Defense Agency (MDA) underway at Lawrence Livermore National Laboratory (LLNL). MDA has described the characteristics needed for a Boost Phase directed energy (DE) weapon to work against ICBM-class threat missiles. In terms of the platform, the mission will require a high altitude Unmanned Aerial Vehicle (UAV) that can fly in the “quiet” stratosphere and display long endurance – i.e., days on station. In terms of the laser, MDA needs a high power, low size and weight laser that could be carried by such a platform and deliver lethal energy to an ICBM-class threat missile from hundreds of kilometers away. While both the military and industry are pursuing Directed Energy for tactical applications, MDA’s objectives pose a significantly greater challenge than other current efforts in terms of the power needed from the laser, the low size and weight required, and the range, speed, and size of the threat missiles. To that end, MDA is funding two R&D efforts to assess the feasibility of a high power (MWclass) and low SWaP (size, weight and power) laser: a fiber combining laser (FCL) project at MIT’s Lincoln Laboratory, and LLNL’s Diode-Pumped Alkali Laser (DPAL) system.

42 ENGINEERING↗

Study of a heat rejection system using capillary pumping

Results of an analytical study investigating the application of capillary pumping to the heat rejection loop of an advanced Rankine cycle power conversion system are presented. The feasibility of the concept of capillary pumping as an alternate to electromagnetic pumping is analytically demonstrated. Capillary pumping is shown to provide a potential for weight and electrical power saving and reliability through the use of redundant systems. A screen wick pump design with arterial feed lines was analytically developed. Advantages of this design are high thermodynamic and hydrodynamic efficiency, which provide a lightweight easily packaged system. Operational problems were identified which must be solved for successful application of capillary pumping. The most important are the development of start up and shutdown procedures, and development of a means of keeping noncondensibles from the system and of earth-bound testing procedures.

Neal, L. G.↗

Scoping Study of Integrated Geothermal CO 2 Heat Pump and Water Well System in Cold Climate Region

This study evaluates the feasibility of using ground-source heat pumps (GSHPs) integrated with water wells for residential heating demands in cold regions of the United States. Four different heat pump systems were evaluated and compared: a CO 2 air-source heat pump (ASHP), a R-410A ASHP, a CO 2 GSHP integrated with well water, and a R-410A GSHP integrated with well water. Simulations were conducted at both equipment and building integration levels, followed by a nationwide analysis across 10 selected cities. Results indicate that integrating GSHP technology with existing water wells (e.g., artesian, bedrock, drilled, and collector wells) is a feasible heating solution because of their high flow rates, good water quality, stable temperatures, and low environmental impact. Although R-410A systems demonstrate higher efficiency, CO 2 systems are more suitable for heating from contamination-free and energy security perspective. The CO 2 GSHPs maintain better performance in colder climates compared with that of ASHPs, providing higher coefficient of performance and environmental benefits because CO 2 refrigerant leakage would not contaminate well water. A national analysis confirms that CO 2 GSHPs outperform furnaces, especially in cold climates, making them a promising solution for residential heating.

99 GENERAL AND MISCELLANEOUS↗

Space nuclear system thermoelectric NaK pump development

The engineering, design, fabrication, and test history of the dual-throat thermoelectric NaK development pump is summarized, along with the engineering and design status of a similar prototype pump intended for use on the 5-kwe reactor thermoelectric system. The history of dc pump development and testing on previous programs is also summarized.

Johnson, J. L.↗

Characterization and Well Remediation Strategies for Improved Long-term Pump and Treat System Injection Well Performance - 17272

In June of 2012 the CH2M Hill Plateau Remediation Company completed construction of a 2,500 gallon-per-minute (gpm) pump and treat (P and T) system designed to remove technetium-99, uranium, carbon tetrachloride, trichloroethene, nitrate, and total and hexavalent chromium from incoming groundwater. The entire pump and treat system consists of the following primary components: 1) extraction wells (20+); 2) a radionuclide removal facility; 3) a biological system; 4) sludge processing; 5) vapor processing; and 6) injection wells. Overall efficiency of the 200 West P and T has been adversely impacted due to fouling in vertical injection wells where treated water is being reinjected into the subsurface. Fouling of the wells is thought to be caused by bacteria producing extracellular polymeric substances (EPS), as well as high manganese and iron in the biofilm. Due to decreased specific injectivity, all injection wells are on a maintenance schedule requiring rehabilitation. During rehabilitation, the wells are out of service affecting the overall capacity of the P and T, plus the rehabilitation process adds hundreds of thousands of dollars of cost to operate the P and T each year. Chemical and biological foulants may be coming from the P and T or are already present in the subsurface and active pumping has stimulated growth of the microbes present. Chemical and microbiological characterization efforts are in progress for the biological plant and injection well system to determine causative agents in the biofouling. P and T effluent tank samples, injection well distribution tanks, bailed samples from the fouled well, and post-rehabilitation samples were analyzed. Chemical constituents analyzed include, sulfate, phosphorus, chemical oxygen demand, total organic carbon, and iron. Microbial characterization included total heterotrophs, anaerobic heterotrophs, nitrate reducing bacteria, iron reducing bacteria and sulfate reducing bacteria. Molecular biological tools employed included 16S rRNA meta-genomes, and functional gene analysis using qPCR. Chemical analysis of the P and T effluent and injection well tanks showed the presence of ∼6.5 mg/L nitrate, 96 mg/L sulfate and phosphorus levels below 1 mg/L. Bailed samples from the injection well showed similar concentrations for each chemical, but following cleaning, TOC, total iron, manganese and other constituents were higher than prior to cleaning. These data show that bacterial nutrients and metals that may precipitate are present in the well water and are likely the causative agent in the biofouling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel cycle for a fusion neutron source

The concept of a tokamak-based stationary fusion neutron source (FNS) for scientific research (neutron diffraction, etc.), tests of structural materials for future fusion reactors, nuclear waste transmutation, fission reactor fuel production, and control of subcritical nuclear systems (fusion–fission hybrid reactor) is being developed in Russia. The fuel cycle system is one of the most important systems of FNS that provides circulation and reprocessing of the deuterium–tritium fuel mixture in all fusion reactor systems: the vacuum chamber, neutral injection system, cryogenic pumps, tritium purification system, separation system, storage system, and tritium-breeding blanket. The existing technologies need to be significantly upgraded since the engineering solutions adopted in the ITER project can be only partially used in the FNS (considering the capacity factor higher than 0.3, tritium flow up to 200 m{sup 3}Pa/s, and temperature of reactor elements up to 650°C). The deuterium–tritium fuel cycle of the stationary FNS is considered. The TC-FNS computer code developed for estimating the tritium distribution in the systems of FNS is described. The code calculates tritium flows and inventory in tokamak systems (vacuum chamber, cryogenic pumps, neutral injection system, fuel mixture purification system, isotope separation system, tritium storage system) and takes into account tritium loss in the fuel cycle due to thermonuclear burnup and β decay. For the two facility versions considered, FNS-ST and DEMO-FNS, the amount of fuel mixture needed for uninterrupted operation of all fuel cycle systems is 0.9 and 1.4 kg, consequently, and the tritium consumption is 0.3 and 1.8 kg per year, including 35 and 55 g/yr, respectively, due to tritium decay.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗