Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “progress update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Improving the Identification, Dissemination and Implementation of Deactivation and Decommissioning Lessons Learned and Best Practices

Approximately $150 billion of work currently remains in the United States Department of Energy's (DoE's) Office of Environmental Management (EM) life cycle budget for U.S. projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and to develop a knowledge-management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. This paper discusses DoE's rationale for using lessons learned and best practices to improve safety and performance while reducing life cycle costs for Deactivation and Decommissioning (D and D) projects. It also provides an update on the Energy Facility Contractors Group's (EFCOG's) progress in supporting DoE's efforts. At this juncture the best practice efforts described are in developmental stages; however, the commitment to and the concrete nature of the work thus far is noteworthy in regard to improving the way D and D lessons learned and best practices are identified, disseminated and implemented across the DOE Complex.

99 GENERAL AND MISCELLANEOUS↗

Weekly Update - Neutron Imaging Machine Build

The neutron imaging machine build effort continues to make solid progress in installing equipment, wiring up subsystems, and aligning the overall machine in anticipation of performing the accelerator readiness review for the authorization safety basis.

42 ENGINEERING↗

Progress Report on the University of Arizona NGST Mirror System Demonstrator

We will present an update for the University of Arizona NGST (Next Generation Space Telescope) Mirror System Demonstrator (NMSD). The 2-m, f/5 NMSD mirror uses a 2 mm thick glass substrate and an actuated lightweight structure for surface accuracy and support. We will review the mirror's basic design and summarize the fabrication process. We will also discuss the current results from system integration and testing.

Baiocchi, Dave↗

AIAA ASCEND 2023 Panel Session Proposal: Community Perspectives on Establishing a Government-Funded National Laboratory in a Commercially-Driven LEO Ecosystem

AIAA ASCEND 2023 Panel Session Proposal: Community Perspectives on Establishing a Government-Funded National Laboratory in a Commercially-Driven LEO Ecosystem Submitted by the NASA Office of Technology, Policy, and Strategy March 8, 2023 Session Format: Panel Session Topic: Expanding and Evolving the Space Economy Session Title: Community Perspectives on Establishing a Government-Funded National Laboratory in a Commercially-Driven LEO Ecosystem Short Session Description: NASA is preparing for the retirement of the ISS and transition of government-sponsored low-Earth orbit (LEO) activities to Commercial LEO Destinations (CLDs), which includes a government-funded national lab. This transition necessitates new models to connect government-funded users of the LEO environment to CLDs. This panel will highlight updates on what may constitute a national laboratory, share perspectives from members of LEO user communities, and open the discussion for additional comments. Requested Session Duration: 90 minutes Extended Session Description: NASA is preparing for the retirement of the ISS and transition of low-Earth orbit (LEO) activities to Commercial LEO Destinations (CLDs), including planning for a national laboratory. This transition necessitates new models for connecting government-funded users of the LEO environment to CLDs. NASA has made progress on models and a stepwise strategy to enable this national laboratory. This session will discuss guiding national strategies and highlight perspectives on what constitutes a national laboratory from current user communities. A NASA panel participant will introduce the rationale for continuing a national laboratory utilizing CLDs and speak on progress-to-date. This includes furthering national priorities to continue a space-based microgravity national laboratory. It also may include a brief overview of a study conducted by NASA which elucidates a trade space of models for a national laboratory and highlights from an interagency working group on microgravity for additional context. A moderator and five panelists representing diverse LEO user communities will then share perspectives on topics relating to this new dynamic ecosystem, expectations for models and activities, and other thoughts on NASA’s progress. Panelists may consist of members from the following communities: NASA, other U.S. government agencies, startups, small businesses, academia, and non-profits. The panel then plans to open discussion to the audience for questions, input, and additional feedback. Session Goal(s)/Outcome(s): By hosting a panel session, NASA aims to accomplish two goals. First, NASA wishes to update the community on progress towards establishing a national laboratory in low-Earth orbit. This includes sharing key perspectives heard from stakeholder communities. The second goal is to highlight the collaborative nature of such an undertaking and to facilitate additional discussion with other current and future users of the LEO community. Participants (not exhaustive): Erica Rodgers; Robyn Gatens

Erica Marie Rodgers Heusinkveld↗

Biofuels Campus for Accelerated Development

The award was intended for Biofuels Center of North Carolina to create a functioning Biofuels Company Accelerator, for various companies to work toward establishing biofuels production viability in North Carolina and the southeast. To achieve this outcome, DOE funds were used to refurbish eight existing laboratories for compliance with safety and code regulations. These labs were located in the headquarters building and were originally constructed in 1969 and used extensively until 1994. Completely idled, the laboratories required significant updating and modification to make them functional. According to the Final Progress Report, the project funds were used to renovate the laboratories. Janice Ford was the Technical Project Officer who managed this Congressionally Directed Project. The project’s period of performance was from 11/01/2010 through 10/31/2011. Biofuels Center of North Carolina dissolved 12/10/2013.

09 BIOMASS FUELS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - September 2024 Meeting Notes

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. Commercial nuclear power plants. A collaborative U.S. and Japanese effort was initiated in 2014 by the Department of Energy Office of Nuclear Energy to identify Daiichi examination needs and evaluate recent Daiichi examination data to address these needs. This document summarizes information presented at and findings, action items, and recommendations by U.S. and Japanese experts in reactor safety and plant operations during the September 2024 Forensics Effort meeting. Significant safety insights were obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties and knowledge gaps in severe accident modeling progression, these insights continue to be used to assess whether additional updates are needed in guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional safety and economic benefits to the operating fleet and new light water reactor (LWR) and non-LWR designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

In Pursuit of the FIP Effect in Stellar Coronae

Observational data have been reduced. Sig Gem data have been fitted using the XSPEC software, though the treatment within this software of the Fe transitions arising from the n=2 levels is thought to be sufficiently inaccurate as to affect the results obtained. Data for the same star obtained by EUVE have been extracted from the archive and are being analyzed in order to try and constrain the coronal DEM. Results of the first sets of model fitting have been presented at an AAS meeting; a more substantial presentation of these and updated results in a main-stream referred journal is in progress.

Drake, Jeremy J.↗

Mission Operations Report (MOR) for the Solar, Anomalous, and Magnetosphere Particle Explorer (SAMPEX)

MISSION OPERATIONS REPORTS are published for use by NASA senior management, as required by NASA Headquarters Management Instruction HQMI 8610. lC, effective November 26, 1991. The purpose of these reports is to provide a documentation system that represents an internal discipline to establish critical discriminators selected in advance to measure mission accomplishment, provide a formal written assessment of mission accomplishment, and provide an accountability of technical achievement. Prelaunch reports are prepared and issued for each flight project just prior to launch. Following launch, updating (Post Launch) reports are issued to provide mission status and progress in meeting mission objectives. Primary distribution of these reports is intended for personnel having program/project management responsibilities.

Source record↗

Grid Visualization Tool

The Grid Visualization Tool (GVT) is a computer program for displaying the path of a mobile robotic explorer (rover) on a terrain map. The GVT reads a map-data file in either portable graymap (PGM) or portable pixmap (PPM) format, representing a gray-scale or color map image, respectively. The GVT also accepts input from path-planning and activity-planning software. From these inputs, the GVT generates a map overlaid with one or more rover path(s), waypoints, locations of targets to be explored, and/or target-status information (indicating success or failure in exploring each target). The display can also indicate different types of paths or path segments, such as the path actually traveled versus a planned path or the path traveled to the present position versus planned future movement along a path. The program provides for updating of the display in real time to facilitate visualization of progress. The size of the display and the map scale can be changed as desired by the user. The GVT was written in the C++ language using the Open Graphics Library (OpenGL) software. It has been compiled for both Sun Solaris and Linux operating systems.

Chouinard, Caroline↗

Human-Autonomy Teaming: Supporting Dynamically Adjustable Collaboration

This presentation is a technical update for the NATO-STO HFM-247 working group. Our progress on four goals will be discussed. For Goal 1, a conceptual model of HAT is presented. HAT looks to make automation act as more of a teammate, by having it communicate with human operators in a more human, goal-directed, manner which provides transparency into the reasoning behind automated recommendations and actions. This, in turn, permits more trust in the automation when it is appropriate, and less when it is not, allowing a more targeted supervision of automated functions. For Goal 2, we wanted to test these concepts and principles. We present findings from a recent simulation and describe two in progress. Goal 3 was to develop pattern(s) of HAT solution(s). These were originally presented at HCII 2016 and are reviewed. Goal 4 is to develop a re-usable HAT software agent. This is an ongoing effort to be delivered October 2017.

Human-Autonomy Teaming↗

Some Beam Dynamics and Related Studies of Possible Changes to the ILC Baseline Design

Since the completion of the ILC Reference Design Report (RDR) in 2007, global R and D has continued on all ILC systems in a coordinated program titled Technical Design Phase 1. This program, which is planned and coordinated by the Program Managers and the Technical Area Group Leaders, will transition to a Phase 2 in 2010 which has the goal of producing a more complete Technical Design Report in 2012. In this transition there will be a re-baseline process which will update and or modify the RDR baseline design taking into account progress with systems design and progress with various technologies coming from the continuing R and D programs. The RDR design was considered by some to be a conservative one and many of the topics being studied for inclusion in a new baseline are directed towards more optimum cost versus risk designs. Some of these are engineering systems design modifications, both technical and civil, while others are accelerator parameters, technical system designs and beam dynamics optimizations. A few of the latter are described here.

43 PARTICLE ACCELERATORS↗

Project PARETO – DOE’s Produced Water Optimization Initiative

The data will take the form of a poster communicating DOE’s progress on Project PARETO, including recent developments in the PARETO framework, updates to efforts in water treatment modelling, and a new water sharing extension that facilitates water reuse.

Susarla, Naresh↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report for FRD-17-002)

In the month of April, we planned to have the Site License Agreement with SPI signed and fully executed, make further progress on the market assessment for the Wood-to-Bio-oil Market Report, and hoped to have the subcontracts in place with Iowa State University and Frontline BioEnergy, LLC once we have approval from the CAM. We also plan to have the updated budget from Iowa State in order to send both updated sub-recipient budget sheets to the CAM for approval.We continue to make more progress towards getting our subcontracts in place and received the requested adjustments to ISU’s budget sheets. These were sent to the CAM on 4/30/2020. As the COVID-19 situation is country-wide, we anticipate slower responses from our partners due to similar delays in their organizations to what we are experiencing internally. Although their response times will be slower, both ISU and Frontline are continuing to make good progress on their work for the demonstration in Iowa for this summer, which is assisting with keeping us on schedule for the overall effort. We are continuing to work on the required documents for our subcontracts – though neither will be placed before we receive official approval from our CAM – so that once we have approval, we can place them very quickly.

09 BIOMASS FUELS↗

Update on the Development of Externally Powered Dielectric-Loaded Accelerating Structures

We report on recent progress in a program to develop an RF-driven Dielectric-Loaded Accelerating (DLA) structure, capable of supporting high gradient acceleration. Previous high power tests revealed that the earlier DLA structures suffered from multipactor and arcing at the dielectric joint. A few new DLA structures have been designed to alleviate this limitation including the coaxial coupler based DLA structure and the clamped DLA structure. These structures were recently fabricated and high power tested at the NRL X-band Magnicon facility. Results show the multipactor can be reduced by the TiN coating on the dielectric surface. Gradient of 15 MV/m has also been tested without dielectric breakdown in the test of the clamped DLA structure. Detailed results are reported, and future plans discussed.

43 PARTICLE ACCELERATORS↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

Significant progress has been made to NASA’s Moon to Mars campaign over the last several years, which drives changes to the agency’s current human exploration strategy. With Strategic Analysis Cycle 2021 (SAC21) the team was asked to consider new areas of the trades space not fully understood in the past. Specific to the Mars Ascent Vehicle (MAV), the team was asked to consider a concept based on a nitrogen tetroxide (NTO) and mono-methyl hydrazine (MMH) two stage propulsion system which would utilize surface propellant transfer, as opposed to In Situ Resource Utilization (ISRU). The vehicle supports two crew members from the surface up to 84 hours nominally. This paper presents further details of the current MAV reference design used in NASA’s SAC21, including descriptions of the operations, configuration, subsystem design, and vehicle mass summary. Additional detail is also provided on rational that drove specific design changes since the last MAV concept, published in 2019.

Douglas J. Trent↗

Update on the development of externally powered dielectric-loaded accelerating structures.

We report on recent progress in a program to develop an RF-driven Dielectric-Loaded Accelerating (DLA) structure, capable of supporting high gradient acceleration. Previous high power tests revealed that the earlier DLA structures suffered from multipactor and arcing at the dielectric joint. A few new DLA structures have been designed to alleviate this limitation including the coaxial coupler based DLA structure and the clamped DLA structure. These structures were recently fabricated and high power tested at the NRL X-band Magnicon facility. Results show the multipactor can be reduced by the TiN coating on the dielectric surface. Gradient of 15 MV/m has also been tested without dielectric breakdown in the test of the clamped DLA structure. Detailed results are reported, and future plans discussed.

36 MATERIALS SCIENCE↗