Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “programming systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

The ICARUS light detection system (Fermilab Italian summer student program 2023)

The ICARUS T600 detector is the largest Liquid Argon Time Projection Chamber ever used on a neutrino beam, and it acts as the far detector of the Short Baseline Neutrino program at Fermilab. Its purpose is the study of the possibility of the existence of a fourth sterile neutrino in the O(eV2) mass range that could take part in the neutrino oscillations. The light detection system of the ICARUS detector plays the role of localising in space and time the neutrino interactions taking place inside the detector, collecting the argon scintillation photons generated when an event occurs. This light detection system also has a crucial role in the trigger system and the rejection of the huge amount of background cosmic events, working together with the trigger request signals sent by the beam complex. In August 2023 part of the cables that are used to carry the signals from the photomultipliers to the electronics were replaced with a new model, because a deterioration of the quality of the signal inside the cables had previously been observed. An analysis of the performance of the new cables was carried out, comparing laser run data collected before and after the change of the cable model, and it was proved that the introduction of the new cables lead to a general improvement of the quality of the signals reaching the electronics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Systems Integration Fact Sheet

This fact sheet is an overview of the Systems Integration subprogram at the U.S. Department of Energy SunShot Initiative. The Systems Integration subprogram enables the widespread deployment of safe, reliable, and cost-effective solar energy technologies by addressing the associated technical and non-technical challenges. These include timely and cost-effective interconnection procedures, optimal system planning, accurate prediction of solar resources, monitoring and control of solar power, maintaining grid reliability and stability, and many more. To address the challenges associated with interconnecting and integrating hundreds of gigawatts of solar power onto the electricity grid, the Systems Integration program funds research, development, and demonstration projects in four broad, interrelated focus areas: grid performance and reliability, dispatchability, power electronics, and communications.

solar energy, systems integration, sunshot initiat↗

Metadata compression

A computer-executable method, system, and computer program product for managing a Parallel-Logged File System (PLFS) on a data storage system, wherein the data storage system is in communication with an application that updates the data storage system with checkpoint data, the computer-executable method, system, and computer program product comprising receiving a first checkpoint including data from the application; analyzing the data in the first checkpoint to determine whether a pattern exists in the checkpoint data; and upon a positive determination, adding the pattern into PLFS.

97 MATHEMATICS AND COMPUTING↗

Second Line of Defense Spares Program

During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

Henderson, Dale L.↗

Exploring Multiscale Earth System and Human-Earth System Dynamics in the Puget Sound Region

With its mountain-to-coast hydroclimate, strong influence of Pacific Ocean weather systems and climate patterns, and unique land use history with strong rural-to-urban gradients, the Puget Sound region is a natural laboratory for studying a number of complex processes in, and interactions among, different Earth and human systems. A 1-year scoping study was initiated by the Earth and Environmental Systems Modeling program of the Department of Energy’s Office of Science Biological and Environmental Research. It was intended to elucidate and highlight the rich opportunities Puget Sound offers to advance our understanding of and ability to simulate Earth system changes and human-Earth system interactions. A literature review, multi-day community workshop, and external input were used to develop this scoping study report. The report first summarizes scientific understanding and knowledge gaps associated with major regional systems, including atmosphere and climate, the land surface, coastal and marine processes, and human systems, as well as how these systems are changing over time. It then highlights some of the most notable extreme events in the region, including heat waves, atmospheric rivers, droughts, and wildfires. Finally, key research opportunities for Earth and environmental systems modeling in, above, and around Puget Sound are highlighted.

54 ENVIRONMENTAL SCIENCES↗

Poster - 09: A MATLAB-based Program for Automated Quality Assurance of a Prostate Brachytherapy Ultrasound System

Purpose: A robust Quality Assurance (QA) program is essential for prostate brachytherapy ultrasound systems due to the importance of imaging accuracy during treatment and planning. Task Group 128 of the American Association of Physicists in Medicine has recommended a set of QA tests covering grayscale visibility, depth of penetration, axial and lateral resolution, distance measurement, area measurement, volume measurement, and template/electronic grid alignment. Making manual measurements on the ultrasound system can be slow and inaccurate, so a MATLAB program was developed for automation of the described tests. Methods: Test images were acquired using a BK Medical Flex Focus 400 ultrasound scanner and 8848 transducer with the CIRS Brachytherapy QA Phantom – Model 045A. For each test, the program automatically segments the inputted image(s), makes the appropriate measurements, and indicates if the test passed or failed. The program was tested by analyzing two sets of images, where the measurements from the first set were used as baseline values. Results: The program successfully analyzed the images for each test and determined if any action limits were exceeded. All tests passed – the measurements made by the program were consistent and met the requirements outlined by Task Group 128. Conclusions: The MATLAB program we have developed can be used for automated QA of an ultrasound system for prostate brachytherapy. The GUI provides a user-friendly way to analyze images without the need for any manual measurement, potentially removing intra- and inter-user variability for more consistent results.

60 APPLIED LIFE SCIENCES↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Readiness Assessments Supporting a Nuclear-enabled NASA Mission

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Preparations, Documentation, Readiness Assessments and Conduct of Operations Supporting a Nuclear-enabled NASA Mission Kelly L. Lively, Eric S. Clarke, Robert P. Gomez Idaho National Laboratory, Idaho Falls, ID 83415 208-533-7388; Kelly.Lively@inl.gov Abstract. The Radioisotope Power Systems (RPS) Program, located at Idaho National Laboratory (INL), is responsible for assembling, testing, and delivering plutonium oxide-fueled RPSs for use in powering missions in remote, harsh environments such as deep space. An informative presentation will be given discussing the preparations, documents, readiness assessments, human capital and conduct of operations involved in performing nuclear operations to support providing these systems to end users for the Department of Energy (DOE). DOE is the start-up authority for performing nuclear operations. Readiness for start-up is determined through independent assessment against established acceptance criteria to ensure activities can be performed safely and within a well defined nuclear safety envelope. There is also an RPS Program approval element requiring additional readiness review before nuclear operations can begin. The programmatic readiness review is performed to ascertain readiness to proceed with nuclear operations from the perspective of product quality. The assessments and reviews are conducted in series in the following order of progression: Management Self Assessment (MSA), Contractor Readiness Assessment (CRA), DOE Readiness Assessment (DOE RA) and lastly, the Programmatic Production Readiness Review (PRR). The CRA, DOE RA, and PRR requires an independent technical review team. Twelve assessment criteria are reviewed and a selection of the criteria is identified for review on a graded approach. Typically, the assessments/review criteria requires, at a minimum, review of operating instructions to ensure technical safety requirements are adequately identified, review of training records to ensure personnel are adequately trained to perform the specified work scope, personnel are interviewed to determine adequacy of level of knowledge for work scope, and a high-fidelity performance of the operation to ensure the operating instructions and conduct of operations are adequate to perform the work scope. As each assessment/review is conducted a formal report delineating any issues in the form of findings, observations, and noteworthy practices will be issued. Before start-up approval is obtained all issues must be resolved to the satisfaction of the individual teams. Start-up notification is formally communicated by memorandum from DOE. Programmatic approval is documented in a Segmented Readiness Review where vested Program representatives in the RPS community (to include DOE NE 75 and DOE ID representatives) ensure personnel, documentation, and materials are in place to perform the activity. The four assessments/reviews can be completed in a 16-week period of time, provided ample resources and a relatively small work scope is identified. RPS assembly and testing operations to support the Mars 2020 Mission, the next planned space mission using a nuclear power system, will require about of year of assessments/reviews before the nuclear operations are performed. Keywords: INL, Operations, Assessments, DOE

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

PROLIFERATION RESISTANCE AND PHYSICAL PROTECTION WORKING GROUP: METHODOLOGY AND APPLICATIONS

We summarize the technical progress and accomplishments on the evaluation methodology for proliferation resistance and physical protection (PR and PP) of Generation IV nuclear energy systems. We intend the results of the evaluations performed with the methodology for three types of users: system designers, program policy makers, and external stakeholders. The PR and PP Working Group developed the methodology through a series of demonstration and case studies. Over the past few years various national and international groups have applied the methodology to nuclear energy system designs as well as to developing approaches to advanced safeguards.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Framework For Optimization Of Resources And Economics Ecosystem

The Framework for Optimization of ResourCes and Economics is a collection of software tools, models, and datasets acquired and developed under the Integrated Energy Systems (IES) program to enable analysis of technical and economic viability of myriad IES configurations. FORCE is the consolidating interface and data repository for all the IES toolsets ranging from macro technoeconomic analysis to transient process modeling and experimental validation for integrated energy systems.

Frick, KonorL↗

Loss of Coolant High Burnup (LOC-HBu) Program

LOC-HBu is a joint experimental program (JEEP) operating within the Nuclear Energy Agency’s (NEA’s) framework for irradiation experiments II (FIDES-II). LOC-HBu is dedicated to the understanding of light water reactor (LWR) fuel performance at high burnup under loss of coolant accident (LOCA) conditions. LOC-HBu aims to support burnup extension needs by addressing identified R&D priorities to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. The need for such experiments was identified in the United States by the Fuel Performance Testing Technical Expert Group (FPTTEG) under the Electric Power Research Institute (EPRI)’s Collaborative Research on Advanced Fuel Technologies (CRAFT) framework. A combined in-pile and furnace testing program plan was developed by researchers at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) which was reviewed and approved by the FPTTEG Combined TREAT-LOC and SATS LOCA Experiment Plan. The first 4 tests identified in this plan are being put forward by the U.S. Department of Energy (U.S. DOE) and INL for inclusion in the FIDES-II second triannual work period. The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program was specifically developed to address data gaps and opportunities identified via detailed review of the existing public knowledge base on LOCA FFRD, as well as reviewing specific experimental development activities regarding prototypic LOCA conditions for light-water reactor (LWR) systems. The program will systematically investigate the impacts of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions not yet fully investigated. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessing Energy Infrastructure Devices for Vulnerabilities

Industrial control systems prove to be vital to the health and security of the nation in our critical infrastructure. Critical infrastructure includes the most foundational systems to support modern civilization which includes water and wastewater systems, communications, and the electricity we use to name a few sectors. However, these devices' overall composition remains largely unknown and are untested from a cyber security perspective. As part of the Cyber Testing for Resilient Industrial Control Systems (CyTRICS) program, I analyzed one such energy infrastructure device to better understand how it functions, what hardware and software components are present within it, and assess it for security vulnerabilities. To achieve this, I reverse engineered binary files using Ghidra to understand system functionality and learned more about how to collaborate with other researchers on a shared Ghidra project. I learned more about how web sockets function and how to interact with them through Python to test if they are secure or not. This work led me to assess possible vulnerabilities in this device and provide a better understanding of its composition and function, which are essential to INL's mission of securing our nation's energy infrastructure.

99 - GENERAL AND MISCELLANEOUS↗

Assigning unique identification numbers to new user accounts and groups in a computing environment with multiple registries

A method, system, and program storage device for creating a new user account or user group with a unique identification number in a computing environment having multiple user registries is provided. In response to receiving a command to create a new user account or user group, an operating system of a clustered computing environment automatically checks multiple registries configured for the operating system to determine whether a candidate identification number for the new user account or user group has been assigned already to one or more existing user accounts or groups, respectively. The operating system automatically assigns the candidate identification number to the new user account or user group created in a target user registry if the checking indicates that the candidate identification number has not been assigned already to any of the existing user accounts or user groups, respectively.

DeRobertis, Christopher V↗

Tank Side Cesium Removal System Project and Technology Maturation Program - 19519

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce Low Activity Waste (LAW) from Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where the hazardous constituents in the LAW will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes cesium from supernatant tank waste using non-elutable cesium ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, a tailored Technology Maturation/Testing Plan (TMP) has been developed to identify principal Technology Elements (TEs) for the proposed process, designate Critical Technology Elements (CTEs), identify gaps in the existing knowledge base and identify the necessary activities to mature the technologies for successful deployment of TSCR. The project scope and technology maturation approach are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Side Cesium Removal System Project and Technology Maturation Program - 20101

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce a Low Activity Waste (LAW) feed from existing mixed Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where it will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes undissolved solids and cesium from tank waste supernatant using non-elutable ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, technology testing has been performed to answer design questions and reduce risk. The project scope and technology testing approach are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of Local Law Enforcement Aerial Resources in Consequence Management (CM) Response

During the past decade the U.S. Department of Homeland Security (DHS) was instrumental in enhancing the nation’s ability to detect and prevent a radiological or nuclear attack in the highest risk cities. Under the DHS Securing the Cities initiative, nearly 13,000 personnel in the New York City region have been trained in preventive radiological and nuclear detection operations, and nearly 8,500 pieces of radiological detection equipment have been funded. As part of the preventive radiological/nuclear detection (PRND) mission, several cities have received funding to purchase commercial aerial radiation detection systems. In 2008, the U.S. Department of Energy, National Nuclear Security Administration Aerial Measuring System (AMS) program started providing Mobile Aerial Radiological Surveillance (MARS) training to such assets, resulting in over 150 HAZMAT teams’ officers and pilots from 10 law enforcement organizations and fire departments being trained in the aerial radiation detection. From the beginning, the MARS training course covered both the PRND and consequence management (CM) missions. Even if the law enforcement main focus is PRND, their aerial assets can be utilized in the collection of initial radiation data for post-event radiological CM response. Based on over 50 years of AMS operational experience and information collected during MARS training, this presentation will focus on the concepts of CM response using aerial assets as well as utilizing law enforcement/fire department aerial assets in CM. Also discussed will be the need for establishing closer relationships between local jurisdictions’ aerial radiation detection capabilities and state and local radiation control program directors, radiological health department managers, etc. During radiological events these individuals may become primary experts/advisers to Incident Commanders for radiological emergency response, especially in the early stages of a response. The knowledge of the existence, specific capabilities, and use of local aerial radiation detection systems would be critical in planning the response, even before federal assets arrive on the scene. The relationship between local and federal aerial assets and the potential role for the further use of the MARS training and expanded AMS Reachback capabilities in facilitating such interactions will be discussed.

consequence management, CM, local law enforcement,↗

Preliminary Design of Nuclear Reactor Heat Delivery Systems: Integration with Reference Oil Refinery, Methanol Synthesis, and Hydrogen Production

The Department of Energy’s (DOE) Integrated Energy Systems (IES) program is generating comprehensive analyses validating the opportunity for using nuclear energy in a variety of applications including future clean grids, providing heat for direct use, and providing heat to help reduce emissions in chemical commodities. This work focuses on the preliminary designs of thermal delivery systems that can integrate heat produced from a nuclear core to industrial processes. The key research question that needs to be answered is: what is the prospective method for integrating nuclear generated heat energy into non-electric applications that can facilitate combined heat and power operations by advanced nuclear reactor systems? This research is a composition of case studies showing preliminary conceptual designs for thermal delivery systems integrating advanced nuclear systems with a few industrial systems including high temperature steam electrolysis, a reference oil refinery, and potential future methanol systems that supplant some natural gas use with nuclear energy. Piping and instrumentation diagrams have been developed to show the conceptual integration of nuclear systems with representative industrial systems. Different features of the configurations are dependent on the specific integration requirements including energy source conditions, demand quantity, and require energy application conditions. Design concepts are validated using thermodynamic balance calculations to verify system performance including calculating system losses during transport. Key components: pumps and compressors, heat exchangers, and network piping are reported with key design information and sizing.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Advanced Extreme Environment Wireless Telemetry System for Turbine Blade Instrumentation

As advanced natural gas power generation systems evolve, the thrust for increased efficiencies and reduced emissions results in increasingly harsh conditions inside the turbine environment. These high temperatures, pressures, and corrosive atmospheres result in accelerated rates of degradation, leading to failure of turbine materials and components. The University of Arkansas (UA) and Siemens, in collaboration with the DoE's National Energy Technology Laboratory (NETL), are developing a reliable and long-term monitoring capability in the turbine hot gas path in the form of novel ceramic-based thermocouples and integrated wide band gap instrumentation electronics that will contribute to the overall reliability of gas turbines. When equipped with better monitoring and controls, power plants can operate with increased fuel-burning efficiency, improved process dynamics and gas concentrations, and increased overall longevity of the power plant components. This will result in increased turbine availability and a reduction in outages and maintenance costs. One of the key aspects to driving forward turbine monitoring capability is the development of high temperature capable integrated circuit (IC) electronics. Previous papers have described 500 °C + electronics that were developed primarily from a combination of discrete single transistors combined with supporting high temperature passive components. While these circuits have been tested successfully in high temperature spin test environments, the move to an IC approach will greatly increase the performance and reliability of turbine monitoring systems. This program is developing such capability through the implementation of silicon carbide (SiC) based ICs, and this paper details the initial approach and early testing of the developed devices. This research represents an important step towards the realization of a field deployable high reliability turbine condition monitoring system.

47 OTHER INSTRUMENTATION↗