Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic methods”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Intent Modeling and Conflict Probability Calculation for Operations in Upper Class E Airspace

This work presents a probabilistic operational intent model for vehicles operating in upper Class E airspace. A hybrid method is developed to calculate the intent conflict probability leveraging and extending past works on probabilistic conflict computation. Simulation results verify that the probabilistic intent model can accurately encompass the uncertain positions of each vehicle type, that are a result of wind prediction errors and vehicle performance. A comparison with past methods showed that the proposed hybrid method captures the intent conflict probability with better accuracy, especially for a larger look-ahead horizon, and computational time is reasonable for real-time applications. An example is presented to illustrate the use of the intent conflict probability in strategic planning applications.

Air traffic management, operational intent, confli↗

Predictive and Cooperative Voltage Control with Probabilistic Load and Solar Generation Forecasting

This paper proposes predictive cooperative voltage control method in a power system with high penetration of photovoltaic (PV) units. Cooperative distributed control of the reactive power output of PV inverters is coordinated with operation of voltage regulators (VRs) to maintain system voltages within an appropriate bandwidth. Probabilistic forecasting of the solar power generation and the loads is applied to estimate voltage changes which, in turn, are used to set the VR tap positions for preventing large voltage fluctuations with the lowest risk considering the voltage distribution estimation. The fine tuning of voltage adjustment is achieved by cooperative control of PV inverters to maintain a uniform voltage profile across the system. The proposed method is tested on the modified IEEE 123-node test feeder with high PV penetration using real insolation data and with constant loads replaced by several different load profiles. Simulation results demonstrate the effectiveness of the coordinated approach for voltage control with cooperative PV and predictive VR controls taking into account probabilistic load and solar power forecasts.

Cooperative Control↗

Probabilistic evolution of stochastic dynamical systems: A meso-scale perspective

Stochastic dynamical systems arise naturally across nearly all areas of science and engineering. Typically, a dynamical system model is based on some prior knowledge about the underlying dynamics of interest in which probabilistic features are used to quantify and propagate uncertainties associated with the initial conditions, external excitations, etc. From a probabilistic modeling standing point, two broad classes of methods exist, i.e. macro-scale methods and micro-scale methods. Classically, macro-scale methods such as statistical moments-based strategies are usually too coarse to capture the multi-mode shape or tails of a non-Gaussian distribution. Micro-scale methods such as random samples-based approaches, on the other hand, become computationally very challenging in dealing with high-dimensional stochastic systems. In view of these potential limitations, a meso-scale scheme is proposed here that utilizes a meso-scale statistical structure to describe the dynamical evolution from a probabilistic perspective. The significance of this statistical structure is twofold. First, it can be tailored to any arbitrary random space. Second, it not only maintains the probability evolution around sample trajectories but also requires fewer meso-scale components than the micro-scale samples. To demonstrate the efficacy of the proposed meso-scale scheme, a set of examples of increasing complexity are provided. Connections to the benchmark stochastic models as conservative and Markov models along with practical implementation guidelines are presented.

97 MATHEMATICS AND COMPUTING↗

Reducing model error using optimized galaxy selection: weak lensing cluster mass estimation

Galaxy clusters are one of the most powerful probes to study extensions of General Relativity and the Standard Cosmological Model. Upcoming surveys like the Vera Rubin Observatory’s Legacy Survey of Space and Time are expected to revolutionise the field, by enabling the analysis of cluster samples of unprecedented size and quality. To reach this era of high-precision cluster cosmology, the mitigation of sources of systematic error is crucial. A particularly important challenge is bias in cluster mass measurements induced by the mismodelling of photometric redshift estimates of source galaxies. This work proposes a method to optimise the source sample selection in cluster weak lensing analyses drawn from wide-field survey lensing catalogs to reduce the bias on reconstructed cluster masses. We use a combinatorial optimisation scheme and methods from variational inference to select galaxies in latent space to produce a probabilistic galaxy source sample catalog for highly accurate cluster mass estimation. We show that our method reduces the critical surface mass density Σ crit relative modelling bias on the 60-70% level, while maintaining up to 90% of galaxies. We highlight that our methodology has applications beyond cluster mass estimation as an approach to jointly combine galaxy selection and model inference under sources of systematics.

79 ASTRONOMY AND ASTROPHYSICS↗

Impacts of hybridization and forecast errors on the probabilistic capacity credit of batteries

Battery storage is increasingly identified as being among the least-cost mix of technologies in the evolving U.S. electricity mix. This study explores the marginal capacity credit of batteries using a probabilistic, reliability-based, effective firm capacity method, which we apply for multiple battery power ratings, durations, coupling types, deployment locations, and dispatch profiles within a test system that is based on the Texas Interconnection in the year 2024. We find that the capacity credits for all battery durations depend on their ability to predict the timing of reliability events. Even 1-2 h forecast errors - resulting in early or delayed battery discharging relative to the onset of a reliability event - lead pronounced capacity credit reductions, especially for 4-h duration batteries. Coupling batteries with solar mitigates the uncertainty associated with a shorter-duration battery's availability during reliability events, primarily due to the relatively high solar capacity credit in our test system. Coupled (or hybrid) system designs with oversized solar arrays, the ability to charge the coupled battery with grid energy, and larger batteries lead to the greatest capacity credit benefits of hybridization. We do not see evidence that the hybrid capacity credit exceeds the sum of the separate battery and solar capacity credits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A dendritic strontium river isoscape for fisheries applications in the Sacramento River basin, California, USA

Objective Understanding the origins and movements of fish is fundamental to effective conservation and fisheries management. Strontium isotope ratios ( 87 Sr/ 86 Sr) in otoliths provide a powerful tracer of natal origin and migratory pathways. However, existing 87 Sr/ 86 Sr isoscapes for the Sacramento River basin, an ecosystem that supports ecologically and economically important salmon populations, rely on discrete classification approaches that overlook unsampled habitats and do not incorporate spatial uncertainty. Our objective was to develop a continuous, network-explicit 87 Sr/ 86 Sr isoscape with quantified uncertainty to fill in data gaps and enable probabilistic assignments of fish origin and movement. Methods We used river water 87 Sr/ 86 Sr data from 106 sites (1997–2021) to develop spatial stream network models that use dendritic connectivity and watershed characteristics (lithology, bedrock age, and land cover) to predict river water 87 Sr/ 86 Sr throughout the basin. Models were fitted using maximum and restricted likelihood and were evaluated via Akaike’s information criterion and leave-one-out cross validation. We produced both historical (pre-dam) and present-day (below-dam) isoscapes, delineated uncertainty-informed isotopic ranges using k -means clustering, and applied a proof-of-concept Bayesian assignment to estimate natal origins and early rearing habitats for two endangered winter-run Chinook Salmon Oncorhynchus tshawytscha. Results Cross validation indicated strong performance of the 87 Sr/ 86 Sr model (leave-one-out cross validation: R 2 = 0.91; root mean square error = 0.0005). Uncertainty-informed clustering identified 19 isotopic “suites” (reaches with indistinguishable 87 Sr/ 86 Sr values) in present-day anadromous habitats and 25 suites in the historical network. Example natal and early rearing assignments included predictions that challenged expectations for juvenile salmon migration based on predicted river 87 Sr/ 86 Sr compositions. Conclusions This study developed a continuous, network-explicit 87 Sr/ 86 Sr isoscape that integrates existing river data to predict 87 Sr/ 86 Sr in unsampled reaches and the likely achievable range and resolution of otolith-based origin and life history inference. The resulting river isoscape provides a valuable tool to predict salmon movements and identify habitats supporting their survival and growth that otherwise might remain undetected. Coupling these predictions with complementary approaches that ground-truth juvenile presence (e.g., targeted fish surveys) represents an important step toward science-informed restoration and management of critical habitats throughout the Sacramento River basin.

Environmental sciences↗

Advanced Shuttle Strategies for Parallel QCCD Architectures

Trapped ions (TIs) are at the forefront of quantum computing implementation, offering unparalleled coherence, fidelity, and connectivity. However, the scalability of TI systems is hampered by the limited capacity of individual ion traps, necessitating intricate ion shuttling for advanced computational tasks. The quantum charge-coupled device (QCCD) framework has emerged as a promising solution, facilitating ion mobility for universal quantum computation. Current QCCD architectures predominantly feature a linear topology, which is increasingly recognized as inefficient for complex quantum operations. Anticipating the shift toward more efficacious designs, this article introduces an innovative quantum scheduling strategy optimized for parallel QCCD topologies. Our strategy proposes a probabilistic formula for ion movement, alongside ingenious methods for local layer generation and layer compression, yielding a significant reduction in ion shuttle times. Through simulations, we demonstrate that our strategy not only substantially outstrips the linear model but also exhibits better performance over other parallel strategies that employ greedy algorithms. This is achieved through our nuanced resolution of complexities, such as traffic blocks and trap capacity limitations. The consequent reduction in shuttle operations leads to lower energy consumption and an enhancement in the quantum computer's fidelity, ultimately accelerating program execution times.

43 PARTICLE ACCELERATORS↗

Reliability and coverage analysis of non-repairable fault-tolerant memory systems

A method was developed for the construction of probabilistic state-space models for nonrepairable systems. Models were developed for several systems which achieved reliability improvement by means of error-coding, modularized sparing, massive replication and other fault-tolerant techniques. From the models developed, sets of reliability and coverage equations for the systems were developed. Comparative analyses of the systems were performed using these equation sets. In addition, the effects of varying subunit reliabilities on system reliability and coverage were described. The results of these analyses indicated that a significant gain in system reliability may be achieved by use of combinations of modularized sparing, error coding, and software error control. For sufficiently reliable system subunits, this gain may far exceed the reliability gain achieved by use of massive replication techniques, yet result in a considerable saving in system cost.

Cox, G. W.↗

Defining structural limit zones

Method for defining limit loads uses probability distribution of largest load occurring during given time intervals. Method is compatible with both deterministic and probabilistic structural design criteria. It also rationally accounts for fact that longer structure is exposed to random loading environment, greater is possibility that it will experience extreme load.

Merchant, D. H.↗

Composite load spectra for select space propulsion structural components

A multiyear program is performed with the objective to develop generic load models with multiple levels of progressive sophistication to simulate the composite (combined) load spectra that are induced in space propulsion system components, representative of Space Shuttle Main Engines (SSME), such as transfer ducts, turbine blades, and liquid oxygen (LOX) posts. Progress of the first year's effort includes completion of a sufficient portion of each task -- probabilistic models, code development, validation, and an initial operational code. This code has from its inception an expert system philosophy that could be added to throughout the program and in the future. The initial operational code is only applicable to turbine blade type loadings. The probabilistic model included in the operational code has fitting routines for loads that utilize a modified Discrete Probabilistic Distribution termed RASCAL, a barrier crossing method and a Monte Carlo method. An initial load model was developed by Battelle that is currently used for the slowly varying duty cycle type loading. The intent is to use the model and related codes essentially in the current form for all loads that are based on measured or calculated data that have followed a slowly varying profile.

Newell, J. F.↗

Probabilistic Determination Of Motions Of Robots

Heuristic-path-planner method reduces computing time. Probability of successful motion of robot through region of space obtained from geometric model and captures effects of objects in region and kinematics of robot arm. Information used to guide on-line search and results, in most cases, in successful determination of path within reasonably short time.

Balaram, J.↗

Analysis of success probability/cost trades for small landers in a Mars network

The premise to be tested in this analysis is whether cost economics may accrue by delivering more landers designed to lower reliability of operation (compared to fewer landers of higher reliability) to obtain a desired probability of achieving a given number of lander successes. Generally, the application in mind is a network of penetrators, although the analysis may apply as well to other small lander concepts or even to simple rovers. The method of analysis is based on a probabilistic model of lander success and a related probabilistic model of project cost including the lander, spacecraft carrier, and integration, but not launch or operations costs. Quantitative results are obtained in a normalized and parametric fashion. Sensitivity to the assumed model parameters is also examined.

Friedlander, Alan L.↗

Probabilistic fracture finite elements

The Probabilistic Fracture Mechanics (PFM) is a promising method for estimating the fatigue life and inspection cycles for mechanical and structural components. The Probability Finite Element Method (PFEM), which is based on second moment analysis, has proved to be a promising, practical approach to handle problems with uncertainties. As the PFEM provides a powerful computational tool to determine first and second moment of random parameters, the second moment reliability method can be easily combined with PFEM to obtain measures of the reliability of the structural system. The method is also being applied to fatigue crack growth. Uncertainties in the material properties of advanced materials such as polycrystalline alloys, ceramics, and composites are commonly observed from experimental tests. This is mainly attributed to intrinsic microcracks, which are randomly distributed as a result of the applied load and the residual stress.

Liu, W. K.↗

Reliability of a Series Pipe Network

The goal of this NASA-funded research is to advance research and education objectives in theoretical and computational probabilistic structural analysis, reliability, and life prediction methods for improved aerospace and aircraft propulsion system components. Reliability methods are used to quantify response uncertainties due to inherent uncertainties in design variables. In this report, several reliability methods are applied to a series pipe network. The observed responses are the head delivered by a main pump and the line head at a desired flow rate. The probability that the flow rate in the line will be less than a specified minimum will be discussed.

Harris, Rodney↗

Reliability of a Parallel Pipe Network

The goal of this NASA-funded research is to advance research and education objectives in theoretical and computational probabilistic structural analysis, reliability, and life prediction methods for improved aerospace and aircraft propulsion system components. Reliability methods are used to quantify response uncertainties due to inherent uncertainties in design variables. In this report, several reliability methods are applied to a parallel pipe network. The observed responses are the head delivered by a main pump and the head values of two parallel lines at certain flow rates. The probability that the flow rates in the lines will be less than their specified minimums will be discussed.

Herrera, Edgar↗

Risk-Informed Safety Assurance and Probabilistic Assessment of Mission-Critical Software-Intensive Systems

This report validates and documents the detailed features and practical application of the framework for software intensive digital systems risk assessment and risk-informed safety assurance presented in the NASA PRA Procedures Guide for Managers and Practitioner. This framework, called herein the "Context-based Software Risk Model" (CSRM), enables the assessment of the contribution of software and software-intensive digital systems to overall system risk, in a manner which is entirely compatible and integrated with the format of a "standard" Probabilistic Risk Assessment (PRA), as currently documented and applied for NASA missions and applications. The CSRM also provides a risk-informed path and criteria for conducting organized and systematic digital system and software testing so that, within this risk-informed paradigm, the achievement of a quantitatively defined level of safety and mission success assurance may be targeted and demonstrated. The framework is based on the concept of context-dependent software risk scenarios and on the modeling of such scenarios via the use of traditional PRA techniques - i.e., event trees and fault trees - in combination with more advanced modeling devices such as the Dynamic Flowgraph Methodology (DFM) or other dynamic logic-modeling representations. The scenarios can be synthesized and quantified in a conditional logic and probabilistic formulation. The application of the CSRM method documented in this report refers to the MiniAERCam system designed and developed by the NASA Johnson Space Center.

Guarro, Sergio B.↗

Efficient Calibration of Expensive Computational Models

Accounting for uncertainty when calibrating expensive computational models is a common challenge faced by scientists and engineers. Often Bayesian techniques are adopted to estimate a probability density function over the model parameters given noisy empirical data. The methods used to perform this type of probabilistic calibration are computationally prohibitive in that they require a large number of evaluations of the expensive model. In these cases, surrogate modeling -- that is, using a fast-to-evaluate, lower fidelity stand-in for the original computational model -- may be the only option to alleviate this computational burden. However, the upfront cost of generating training data to build a surrogate model can itself be expensive. As such, it is important to be judicious when selecting training points at which the full-fidelity model is evaluated. Here, an active learning approach is proposed that enables efficient selection of training points using approximate samples of the calibrated parameter probability density function. In this way, the training points can be concentrated in regions where the calibration algorithm requires high model accuracy.

active learning↗

Mission Reliability Estimation for Repairable Robot Teams

A mission reliability estimation method has been designed to translate mission requirements into choices of robot modules in order to configure a multi-robot team to have high reliability at minimal cost. In order to build cost-effective robot teams for long-term missions, one must be able to compare alternative design paradigms in a principled way by comparing the reliability of different robot models and robot team configurations. Core modules have been created including: a probabilistic module with reliability-cost characteristics, a method for combining the characteristics of multiple modules to determine an overall reliability-cost characteristic, and a method for the generation of legitimate module combinations based on mission specifications and the selection of the best of the resulting combinations from a cost-reliability standpoint. The developed methodology can be used to predict the probability of a mission being completed, given information about the components used to build the robots, as well as information about the mission tasks. In the research for this innovation, sample robot missions were examined and compared to the performance of robot teams with different numbers of robots and different numbers of spare components. Data that a mission designer would need was factored in, such as whether it would be better to have a spare robot versus an equivalent number of spare parts, or if mission cost can be reduced while maintaining reliability using spares. This analytical model was applied to an example robot mission, examining the cost-reliability tradeoffs among different team configurations. Particularly scrutinized were teams using either redundancy (spare robots) or repairability (spare components). Using conservative estimates of the cost-reliability relationship, results show that it is possible to significantly reduce the cost of a robotic mission by using cheaper, lower-reliability components and providing spares. This suggests that the current design paradigm of building a minimal number of highly robust robots may not be the best way to design robots for extended missions.

Trebi-Ollennu, Ashitey↗