Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Free piston linear motor compressor and associated systems of operation

A linear motor compressor including a compressor housing and a cylinder housing having a plurality of opposing compression chambers. A piston freely reciprocates within the cylinder housing using a linear electric motor. A piston position feedback control system provides adaptive current output as a function of position feedback and/or velocity feedback from the piston and/or the electric motor, to directly power and control the electric motor, wherein the piston reciprocates without assistance from a mechanical spring or other equivalent centering force.

Stair, Jason↗

Precision redshift-space galaxy power spectra using Zel'dovich control variates

Numerical simulations in cosmology require trade-offs between volume, resolution and run-time that limit the volume of the Universe that can be simulated, leading to sample variance in predictions of ensemble-average quantities such as the power spectrum or correlation function(s). Sample variance is particularly acute at large scales, which is also where analytic techniques can be highly reliable. This provides an opportunity to combine analytic and numerical techniques in a principled way to improve the dynamic range and reliability of predictions for clustering statistics. In this paper we extend the technique of Zel'dovich control variates, previously demonstrated for 2-point functions in real space, to reduce the sample variance in measurements of 2-point statistics of biased tracers in redshift space. We demonstrate that with this technique, we can reduce the sample variance of these statistics down to their shot-noise limit out to k ~ 0.2 h Mpc -1 . This allows a better matching with perturbative models and improved predictions for the clustering of e.g. quasars, galaxies and neutral Hydrogen measured in spectroscopic redshift surveys at very modest computational expense. We discuss the implementation of ZCV, give some examples and provide forecasts for the efficacy of the method under various conditions.

79 ASTRONOMY AND ASTROPHYSICS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Distributed Wind Turbine Controls Series: Part 4-Wind Energy in Microgrids – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

In recent years, the technical capabilities and requirements for distributed wind turbines to provide ancillary services beyond maximum energy production has increased. Ancillary services, leveraged through advanced wind turbine controls, can support grid stability, reliability, and resilience. In the context of a microgrid, wind turbines can provide ancillary services that are useful in both islanded and grid-connected modes, as demonstrated in previous parts of this report series. This report focuses on how wind turbines with advanced controls and power electronics can support the stability of the microgrid during transitions from grid-connected to island mode, and back. This report documents simulation results from a model of the National Renewable Energy Laboratory (NREL) Flatirons Campus containing NREL's 600-kilowatt Controls Advanced Research Turbine. Using this turbine, we demonstrate through desktop simulation how a wind turbine can support the voltage and frequency of a microgrid during transitions - from making planned transitions seamless to keeping all loads online during some unplanned transitions to supporting black start in the event of an open transition (blackout).

17 WIND ENERGY↗

Model Predictive Voltage Control of Large-Scale PV or Hybrid PV-BESS Plants

Increased penetration level of inverter-based resources (IBRs) and renewable energy in the power grid has called for more requirements from the control of IBRs. In this paper, the voltage-reactive power control of a photovoltaic (PV) power plant or hybrid PV-battery energy storage system (BESS) plant connected to a bulk power grid, whilst meeting the grid requirements, is studied. In this paper, a continuous-set model predictive control (MPC) formulation is proposed for voltage-reactive power control. For the same, an aggregated dynamic PV plant model is developed based on the recursive system equivalencing method. The formulation is then implemented in PSCAD simulation on a 125 MW PV plant or hybrid PV-BESS plant. The MPC implementation achieves 10.13% voltage improvement based on PSCAD simulation results in a balanced fault case study. Simulation results further demonstrate that MPC provides improved voltage support over the conventional proportional-integral (PI) controller post-fault occurrence.

Abu rub, Omar↗

2.1.3.404 - WEC Array Power Management and Output Simulation Tool

An array of wave energy converter (WEC) devices has variations in power output due to the chaotic nature of the waves. Eliminating or mitigating the power fluctuations is important for reducing the integration impacts of WEC plants in both distribution and transmission grids, and in standalone isolated power systems. Reduced variability of WEC-generated power in combination with energy storage or power management control at each WEC and at the array level will help increasing hosting capacity of distribution feeders for this type of variable renewable generation, and minimization of electric losses. To reduce risks and risk perception, gain key stakeholder acceptance, and enable developers to design effective and compatible energy plants with arrays of WEC devices, it requires the use of modeling tools to simulate the resource environment, device dynamics, utility power system response, as well as the development of an interface for an array controller. The project will create a publicly accessible numerical modeling framework to empower the wave energy sector to design projects of various scales (kW-100s MW), which are optimized on a plant performance basis and are compatible with different power systems and wave conditions. The framework will integrate with WEC-Sim, a wave environment model (SWAN-FUNWAVE), as well as established relevant electrical analysis tools, to model the grid system and interconnection, and optimize power output and power management for the WEC array.

POWER TRANSMISSION AND DISTRIBUTION,TIDAL AND WAVE↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Time-frequency based cyber security defense of wide-area control system for fast frequency reserve

Global power systems are transiting from conventional fossil fuel energy to renewable energies due to their environmental benefits. The increasing penetration of renewable energies presents challenges for power system operation. The efficiency and sufficiency of responsive reserves have become increasingly important for power systems with a high proportion of renewable energies. The Fast Frequency Reserve (FFR), especially the Wide-area Monitoring System (WAMS)-based FFR, is a promising and effective solution to secure and enhance the stability of power systems. However, cyber security has become a new challenge for the WAMS-based FFR system. Cyber attacks on the FFR control system may threaten the safety of power system operation due to the rapid power controllability requirement of FFR. Therefore, to address this problem, a time-frequency based cyber security defense framework is proposed to detect the cyber spoofing of synchrophasor data in WAMS-based FFR control systems. This paper first introduces the Continuous Wavelet Transforms (CWTs) to decompose spoofing signals. Then, the Dual-frequency Scale Convolutional Neural Networks (DSCNN) is proposed to identify the time-frequency domains matrix from two frequency scales. Integrating CWTs and DSCNN, an identification framework called CWTs-DSCNN is further proposed to detect the spoofing attacks in the WAMS-based FFR system. Multiple experiments using the actual data from FNET/GridEye are performed to verify the effectiveness of the framework in securing WAMS-based FFR systems.

25 ENERGY STORAGE↗

Visual Tool for Assessing Stability of DER Configurations on Three-Phase Radial Networks

Here, we present a method and tool for evaluating the placement of Distributed Energy Resources (DER) on distribution circuits in order to control voltages and power flows. Our previous work described Phasor-Based Control (PBC), a novel control framework where DERs inject real and reactive power to track voltage magnitude and phase angle targets. Here, we employ linearized power flow equations and integral controllers to develop a linear state space model for PBC acting on a three-phase unbalanced network. We use this model to evaluate whether a given inverter-based DER configuration admits a stable set of controller gains, which cannot be done by analyzing controllability nor by using the Lyapunov equation. Instead, we sample over a parameter space to identify a stable set of controller gains. Our stability analysis requires only a line impedance model and does not entail simulating the system or solving an optimization problem. We incorporate this assessment into a publicly available visualization tool and demonstrate three processes for evaluating many control configurations on the IEEE 123-node test feeder (123NF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network - that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest-in the sense of electrical distance - from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for realtime operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

distribution service transformer↗

Wind Supply Chain Security: Hardware Enumeration and Analysis

This project, undertaken by Idaho National Laboratory (INL) for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), focused on the enumeration and analysis of six key devices important to wind technologies. The devices analyzed included Beckhoff Bus Terminal Controllers (BK1120 and BC9000), a Beckhoff Economy Built-in Panel PC (CP6231), an N-Tron Managed Industrial Ethernet Switch (711FX3), a Bachmann M1 Gateway, and a Bachmann Smart Power Plant Controller. Device selection was driven by availability and budget constraints, with several components sourced from existing wind farms and others procured through a co-agreement with another WETO-funded project. The project's primary objective was to create a hardware bill of materials (HBOM) for each device, identifying and documenting all components to assess potential security and supply chain risks. A detailed analysis revealed over 750 unique components across the six devices, with 80% successfully identified and accompanied by datasheets. Notably, Texas Instruments emerged as the leading supplier, providing over 16% of the components, followed by ON Semiconductor at 11.3%, Analog Devices at 5.3%, and Renesas Electronics Corp at 4.1%. Other notable vendors included Toshiba Corporation, iC-Haus Corporation, Atmel, Vishay, and STMicroelectronics. The enumeration process involved thorough documentation of each component, including its designation, quantity, identifiers, pin package, description, vendor, model, and country of origin. This process provided valuable insights into the complexity and diversity of the electronic systems within these wind devices. It also highlighted the distinct separation of components between vendors, suggesting a trend of vendor-specific component usage. Key findings from the project emphasized the importance of broadening the scope of vendor analysis in future research to gain a comprehensive understanding of component distribution and commonality. The identification of vendor-specific component usage patterns offers new avenues for research and underscores the significance of continued investigation in this field. Overall, this project provides critical insights into the component composition of wind devices, aiding in the development of improved supply chain management and component sourcing strategies. The results contribute valuable knowledge to the wind technology sector, laying the groundwork for enhanced security and resilience in wind energy systems.

17 - WIND ENERGY↗

Biodegradable transient battery built on core-double-shell zinc microparticle networks

A transient or biodegradable battery is provided having a filament structure that limits the speed of reaction allowing for a longer duration of battery power with a controlled current limit. In one embodiment, the filament may be constructed of zinc microparticles or nanoparticles having a thin outer insulation whereby a chemical reaction at the center core results in the progressive disintegration of the insulation revealing more core material. In one embodiment, microparticles or nanoparticles are coated with outer layers of chitosan and Al2O3 nanofilms, respectively, with designable discharge current and battery lifespan by controlling the exposed cross-sectional area of the zinc microparticle center core and the length of the filament, respectively. This novel structure of biodegradable battery provides improved control of battery life and power output, providing a promising solution to power transient medical implants.

Wang, Xudong↗

Guest Editorial: Special section on Resilient Control of Cyber-Physical Power and Energy Systems

Our power and energy systems are becoming more and more integrated and interconnected. The increasing integration of edge devices and dependence on cyber infrastructure provides both the potential for benefits and risks. The integration enables more dynamic and flexible control paradigms while at the same time increasing the cyberattack surface and uncertainty of behavior. Control methodology in this new world must be designed for resilience and must have the ability to withstand, react, and respond to both physical faults and cyber-induced threats. Finally, understanding system resilience under adverse conditions requires studying control performance and how cyber infrastructure can integrate with and support the overall resilience of the system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adding power of artificial intelligence to situational awareness of large interconnections dominated by inverter‐based resources

Abstract Large‐scale power systems exhibit more complex dynamics due to the increasing integration of inverter‐based resources (IBRs). Therefore, there is an urgent need to enhance the situational awareness capability for better monitoring and control of power grids dominated by IBRs. As a pioneering Wide‐Area Measurement System, FNET/GridEye has developed and implemented various advanced applications based on the collected synchrophasor measurements to enhance the situational awareness capability of large‐scale power grids. This study provides an overview of the latest progress of FNET/GridEye. The sensors, communication, and data servers are upgraded to handle ultra‐high density synchrophasor and point‐on‐wave data to monitor system dynamics with more details. More importantly, several artificial intelligence (AI)‐based advanced applications are introduced, including AI‐based inertia estimation, AI‐based disturbance size and location estimation, AI‐based system stability assessment, and AI‐based data authentication.

24 POWER TRANSMISSION AND DISTRIBUTION↗