Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Mars Solar Power

NASA missions to Mars, both robotic and human, rely on solar arrays for the primary power system. Mars presents a number of challenges for solar power system operation, including a dusty atmosphere which modifies the spectrum and intensity of the incident solar illumination as a function of time of day, degradation of the array performance by dust deposition, and low temperature operation. The environmental challenges to Mars solar array operation will be discussed and test results of solar cell technology operating under Mars conditions will be presented, along with modeling of solar cell performance under Mars conditions. The design implications for advanced solar arrays for future Mars missions is discussed, and an example case, a Martian polar rover, are analyzed.

Landis, Geoffrey A.↗

Reliability and Maintainability Issues for the Next Linear Collider

Large accelerators for high energy physics research traditionally have been designed using informal best design, engineering, and management practices to achieve acceptable levels of operational availability. However, the Next Linear Collider(NLC) project presents a particular challenge for operational availability due to the unprecedented size and complexity of the accelerator systems required to achieve the physics goals of high center-of-mass energy and high luminosity. Formal reliability and maintainability analysis, design, and implementation will be required to achieve acceptable operational availability for the high energy physics research program. This paper introduces some of the basic concepts of reliability analysis and applies them to the 2.6-cm microwave power system of the two 10-km-long, 250-GeV linacs that are currently proposed for the NLC design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. DOE's Environmental Management Site-Specific Advisory Board: Public Engagement in Cleanup - 18709

This paper provides an overview of the U.S. DOE's Environmental Management Site-Specific Advisory Board (EM SSAB) from its roots in the early 1990's at the Keystone Center to its current activities. The EM SSAB has a unique mandate to provide input regarding the cleanup of nuclear legacy sites in the United States. Chartered under the Federal Advisory Committee Act, the EM SSAB comprises eight local boards. The Office of Environmental Management (EM) has made public participation a fundamental component of its cleanup mission and has found that the EM SSAB has contributed greatly to bringing community input regarding values and priorities to the cleanup decision-making processes. Public participation that involves ongoing community engagement has inherent challenges; the EM SSAB operates with additional challenges that reflect the political and technical nature of U.S. DOE's work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing Noise in BPM Measurements with Variational Autoencoders

Noise in beam measurements is an ever-present challenge in accelerator operations. In addition to the challenges presented by hardware and signal processing, new operational regimes, such as ultra-short bunches, create additional difficulties in routine beam measurements. Techniques in machine learning have been successfully applied in other domains to overcome challenges inherent in noisy data. Variational autoencoders (VAEs) are shown to be capable of removing significant leevels of noise. A VAE can be used as a pre-processing tool for noise removal before the de-noised data is analyzed via other methods, or the VAE can be directly used to make beam dynamics measurements. Here we present the use of VAEs as a tool for addressing noise in BPM measurements.

43 PARTICLE ACCELERATORS↗

Advanced Reactor Control and Operations (ARCO): A University Research Facility for Developing Optimized Digital Control Rooms

The Advanced Reactor Control and Operations (ARCO) facility was constructed in January 2018 to serve as a test bed for advanced reactor control rooms and operator support systems. Since then, it has supported human-machine interface user experience research, fault detection and mitigation technology development, control room concept of operations development, and remote operations research. ARCO serves as the control room for the Compact Integral Effects Test (CIET) facility, which replicates the primary-side flow paths and thermal-hydraulic behavior of a fluoride-salt-cooled high-temperature reactor (FHR) using simulant fluids and scaling principles. New reactor designs feature different operating conditions and scenarios than those in existing reactors. ARCO supports the research and development of digital tools for operator communications, intuitive real-time data analysis, online health monitoring and prognostics, and control room cybersecurity. By integrating these different technologies, ARCO acts as a prototypical control system to iteratively develop methods and tools of operation in advanced small modular nuclear reactors. This paper describes the features of and challenges to operating advanced small modular reactors underlying the design basis for ARCO and its operator support systems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Manufacturing and Materials for Hydropower: Challenges and Opportunities

Hydropower is a well-established industry that has been largely contributing to the global generation of clean and renewable energy for more than a century. In the United States in 2021, it accounted for 30% of all renewable energy generation and 6.1% of the total energy portfolio. Hydropower technology and designs have been optimized throughout the years, but manufacturing of hydropower components still relies heavily on traditional methods and materials. Changes in global energy production systems and international supply chain issues are inspiring the manufacturing sector to reconsider their processes. Similarly, the hydropower industry is facing manufacturing challenges stemming from well-known maintenance issues, environmental impact mitigations, and changes in operations. These challenges, along with continued innovation in new hydropower and pumped storage development and modernization of the fleet, present an opportunity for advanced manufacturing and materials (AMM) to provide immense value to the hydropower industry. In support of the US Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), this report aims to characterize the current and emerging manufacturing-related challenges in US hydropower and to identify the high-impact opportunities in AMM that could address these challenges. The results highlighted in this report were collected through literature review, individual stakeholder interviews, and an in-person workshop organized at DOE’s Oak Ridge National Laboratory Manufacturing Demonstration Facility that brought together hydropower industry stakeholders, advanced manufacturing R&D, and the government.

13 HYDRO ENERGY↗

RAPID: Collaboration Results from Three NASA Centers in Commanding/Monitoring Lunar Assets

Three NASA centers are working together to address the challenge of operating robotic assets in support of human exploration of the Moon. This paper describes the combined work to date of the Ames Research Center (ARC), Jet Propulsion Laboratory (JPL) and Johnson Space Center (JSC) on a common support framework to control and monitor lunar robotic assets. We discuss how we have addressed specific challenges including time-delayed operations, and geographically distributed collaborative monitoring and control, to build an effective architecture for integrating a heterogeneous collection of robotic assets into a common work. We describe the design of the Robot Application Programming Interface Delegate (RAPID) architecture that effectively addresses the problem of interfacing a family of robots including the JSC Chariot, ARC K-10 and JPL ATHLETE rovers. We report on lessons learned from the June 2008 field test in which RAPID was used to monitor and control all of these assets. We conclude by discussing some future directions to extend the RAPID architecture to add further support for NASA's lunar exploration program.

Torres, R. Jay↗

SU-E-J-200: Operation of An Electron Accelerator On An Integrated MR-Linac System

Purpose: An integrated MRI guided radiotherapy system poses a challenge of operating a linear accelerator in the presence of a magnetic field as the magnetic force acting on the electrons could Result in radiation source displacement and subsequent reduction of dose output. It was the purpose of this work to test the performance of a linac in the presence of a 1.5T MRI system. Methods: The first experimental MRI guided radiotherapy system at UMC-Utrecht consisting of an Elekta linac rotating around a 1.5T Magnex magnet was examined. A passive magnetic shield was simulated, designed and installed to reduce the influence of the MRI magnet stray field on the electron beamline. The B field inside the shield was measured as a function of gantry angle and measurements of dose rate constancy upon gantry rotation were performed. Results: The magnitude of the magnetic field on the electron beam path without the shield was as high as 70G. It varied by up to 15G with gantry rotation due to the presence of metal beams in the bunker floor which resulted in dose output drop of up to 70% at certain gantry angles. With the prototype shield, field magnitude was reduced to well below 0.5G everywhere along the electron beam path. Field variation with gantry rotation was decreased to below 0.2G and enabled dose output of the linac to be recovered at all gantry angles. The homogeneity of the field inside the MRI magnet has not been compromised. Conclusion: It was demonstrated that the influence of the 1.5T magnet and the bunker design on the linac operation has been minimised. The performance will be further improved on the Elekta Atlantic system which incorporates a newly developed and optimised Philips magnet design and bunker construction. J Harasimowicz, D Roberts, I Shinton and S Sund are employed by Elekta Limited Crawley, H Wang and M Zhong are employed by Elekta Beijing Medical Systems Co. Ltd., J Overweg is employed by Philips Technologie GmbH Forschungslaboratorien.

60 APPLIED LIFE SCIENCES↗

Characterization and Recovery of Critical Metals from Municipal Solid Waste Incineration Ashes

The dependence on international supplies and lack of diverse supplies of critical materials (such as rare earth elements, REEs) have prompted the US to explore new sources and develop environmentally friendly technologies for critical metal extraction, processing, and manufacturing. Secondary wastes have been explored for the recovery of REEs. Municipal solid waste (MSW) is a large solid waste stream and may constitute the largest resource for REEs and other critical metals; yet its incineration ashes (MSWI ashes) have received limited attention in terms of critical metal recovery. On the other hand, management of MSWI ashes also presents significant challenges both operationally and financially, such as landfill costs, volume reduction, and contaminant immobilization. To address the challenges associated with the management of and resource recovery from MSWI ashes, this project developed a closed-loop, integrated, scalable, and environmentally friendly waste management and resource recovery system. This system is characterized with maximum recovery of REEs, production of additional salable products, minimal production of secondary waste, and high immobilization of heavy metal contaminants.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Dynamic Modeling and Analysis for Large-Scale Renewable Energy Integration

Lina He will present dynamic modeling techniques for the integration of large-scale renewable energy systems. The presentation will address the challenges associated with high renewable penetration and provide frameworks for ensuring smooth and reliable grid operations.

Dynamic modeling, large-scale renewable integratio↗

Earth Observing System (EOS) Aqua and Aura Space Weather Effects on Operational Collision Avoidance

This presentation will describe recent EOS Aqua and Aura operational collision avoidance experience during periods of solar and geomagnetic storm activity. It will highlight challenges faced by the operations team during short-notice, high-risk predicted close approaches. The presentation will highlight the evolution of the operational collision avoidance process for the EOS Aqua and Aura missions. The presentation will highlight operational challenges that have occurred, process improvements that have been implemented and identify potential future challenges.

Guit, Bill↗

Ultra Low Temperature Ultra Low Power Instrument Packages for Planetary Surfaces

Achievement of solar system exploration roadmap goals will involve robotic or human deployment and longterm operation of surface science packages remote from human presence, thus requiring autonomous, self-powered operation. The major challenge such packages face will be operating during long periods of darkness in extreme cold potentially without the Pu238 based power and thermal systems available to Apollo era packages (ALSEP). Development of such science payloads will thus require considerable optimization of instrument and subsystem design, packaging and integration for a variety of planetary surface environments in order to support solar system exploration fully. Our work supports this process through the incorporation of low temperature operational components and design strategies which radically minimize power, mass, and cost while maximizing the performance under extreme surface conditions that are in many cases more demanding than those routinely experienced by spacecraft in deep space. Chief instruments/instrument package candidates include those which could provide long-term monitoring of the surface and subsurface environments for fundamental science and human crew safety. The initial attempt to design a 10 instrument environmental monitoring package with a solar/battery based power system led to a package with a unacceptably large mass (500 kg) of which over half was battery mass. In phase 1, a factor of 5 reduction in mass was achieved, first through the introduction of high performance electronics capable of operating at far lower temperature and then through the use of innovative thermal balance strategies involving the use of multi-layer thin materials and gravity-assisted heat pipes. In phase 2, reported here, involves strategies such as universal incorporation of ULT/ULP digital and analog electronics, and distributed or non-conventionally packaged power systems. These strategies will be required to meet the far more challenging thermal requirements of operating through a normal 28 day diurnal cycle. The limited temperature range of efficient battery operation remains the largest obstacle.

Clark, P. E.↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Exploring the All-to-All Collective Optimization Space with ConnectX CORE-Direct

The all-to-all collective communication operation is used by many scientific applications, and is one of the most time consuming and challenging collective operation to optimize. The algorithms for all-to-all operations typically fall into two classes, logarithmic and linear scaling algorithms, with Bruck's algorithm, a logarithmic scaling algorithm, used in many small-data all-to-all implementations. The recent addition of InfiniBand CORE-Direct support for network management of collective communications offers new opportunities for optimizing all-to-all operation as well as supporting truly asynchronous implementations of these operations. This paper presents several new enhancements to the Bruck small-data algorithm that leverage CORE-Direct and other InfiniBand network capabilities to produce efficient implementations of this collective operation. These include RDMA, SR-RNR, and SR-RTR algorithms. In addition, nonblocking implementations of these collective operations are also presented. Benchmark results show that the RDMA algorithm, which uses CORE-Direct capabilities to offload collective communication management to the Host Channel Adapter (HCA), hardware gather support for sending non-continuous data, and low-latency RDMA semantics, performs the best. For a 64 processes and 128 byte-per-process all-to-all, the RDMA algorithm performs 27% better than Bruck's algorithm implementation in Open MPI and 136% better than the SR-RTR algorithm. In addition, the nonblocking versions of these algorithms have the same performance characteristics as the blocking algorithms. Finally, measurements of computation/communication overlap capacity show that all offloaded algorithms achieve about 98% overlap for large data all-to-all, whereas implementations using host-based progress achieve only about 9.5% overlap.

Venkata, Manjunath Gorentla↗

Ubiquitous Wireless Smart Sensing and Control

Need new technologies to reliably and safely have humans interact within sensored environments (integrated user interfaces, physical and cognitive augmentation, training, and human-systems integration tools). Areas of focus include: radio frequency identification (RFID), motion tracking, wireless communication, wearable computing, adaptive training and decision support systems, and tele-operations. The challenge is developing effective, low cost/mass/volume/power integrated monitoring systems to assess and control system, environmental, and operator health; and accurately determining and controlling the physical, chemical, and biological environments of the areas and associated environmental control systems.

Wagner, Raymond↗

Ubiquitous Wireless Smart Sensing and Control. Pumps and Pipes JSC: Uniquely Houston

Need new technologies to reliably and safely have humans interact within sensored environments (integrated user interfaces, physical and cognitive augmentation, training, and human-systems integration tools).Areas of focus include: radio frequency identification (RFID), motion tracking, wireless communication, wearable computing, adaptive training and decision support systems, and tele-operations. The challenge is developing effective, low cost/mass/volume/power integrated monitoring systems to assess and control system, environmental, and operator health; and accurately determining and controlling the physical, chemical, and biological environments of the areas and associated environmental control systems.

Wagner, Raymond↗

Revolutionary Vertical Lift Technology Project: Variable-Speed Power Turbine Technology Demonstration

Demonstrate 50% improvement in efficient operational capability using a Variable-Speed Power Turbine concept. To enable this improvement, thermodynamics mechanical challenges from operating across variable shaft speeds must be accommodated. Also, aerodynamics research for the engine high-efficiency turbine component design must be conducted over a wide range of incidence angle variation.

Susan A Gorton↗

Price Formation and Grid Operation Impacts from Variable Renewable Energy Resources

Increasing amounts of Variable Renewable Energy Resources (VREs) impact electricity markets and their operation. VREs are intermittent, zero marginal cost resources that tend to displace emissions-intensive generators in electricity dispatch, reducing emissions, but impacting price formation, revenue sufficiency, reliability, and market power mitigation processes of electricity markets. But VREs are not the only factor that affects operational and financial challenges in electricity markets. Declining natural gas prices, changing resource mixes, as well as different electricity market designs and regulatory policies all factor into the challenges both electricity market participants and operators face in today’s electricity markets. With this in-depth examination of electricity markets and related literature review, we aim to inform on key challenges of market design and operation for successful integration of large amounts of zero marginal cost resources. We’ve identified several areas, including VREs impact on price formation, revenue sufficiency, reliability, market power monitoring and mitigation, as well as how state-level incentives and market design impact VREs and these challenges. With each key challenge, we survey the literature to answer the question: To what extent is the problem, and how has it evolved over time? We first conduct a thorough review of ongoing challenges in electricity markets to understand the problem and review the empirical literature to capture important findings on how VREs, specifically, impact the problem. From this review, we highlight metrics that are important to understanding VRE integration and how market designs and outcomes are evolving with increasing levels of VREs. We propose several empirical models for future research to determine the impact of VREs on these identified challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗