Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “maintenance engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

US Potable Water Reuse System Costs

This submission contains a set of U.S.-specific potable reuse capital and operations and maintenance (O&M) cost data ($2020) found in published presentations and reports from engineering consulting firms, utility and water agency press releases or websites, and literature. For any unbuilt facilities, the reported costs found in technical documents are mostly engineer estimates and may be subject to change as construction proceeds. This data set contains a mix of both facility specific and total capital costs, which include conveyance infrastructure. Note that this dataset does not include detailed cost breakdowns for each of the facilities. This submission also contains the sources used to build this dataset in pdf format.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

Source record↗

F100 engine diagnostic system status to date

An engine diagnostic system, proposed for the F100 engine, was tested in five specially modified Tactical Air Command F-15 aircraft during a 16-month flight evaluation. After more than 3300 engine operating hours encompassing almost 900 flights during the flight evaluation, these aircraft provided a data base, still being analyzed, that has shown successful demonstration of the original functional characteristics. Four general design requirements, recording engine operating time/low cycle fatigue event detection, engine trim, and trend and performance data collection were demonstrated. Also, validation of maintenance actions taken and indicated needed maintenance were successfully demonstrated.

Boyless, J. A.↗

Cost effective management of space venture risks

The development of a model for the cost-effective management of space venture risks is discussed. The risk assessment and control program of insurance companies is examined. A simplified system development cycle which consists of a conceptual design phase, a preliminary design phase, a final design phase, a construction phase, and a system operations and maintenance phase is described. The model incorporates insurance safety risk methods and reliability engineering, and testing practices used in the development of large aerospace and defense systems.

Giuntini, Ronald E.↗

Automatic programming for critical applications

The important phases of a software life cycle include verification and maintenance. Usually, the execution performance is an expected requirement in a software development process. Unfortunately, the verification and the maintenance of programs are the time consuming and the frustrating aspects of software engineering. The verification cannot be waived for the programs used for critical applications such as, military, space, and nuclear plants. As a consequence, synthesis of programs from specifications, an alternative way of developing correct programs, is becoming popular. The definition, or what is understood by automatic programming, has been changed with our expectations. At present, the goal of automatic programming is the automation of programming process. Specifically, it means the application of artificial intelligence to software engineering in order to define techniques and create environments that help in the creation of high level programs. The automatic programming process may be divided into two phases: the problem acquisition phase and the program synthesis phase. In the problem acquisition phase, an informal specification of the problem is transformed into an unambiguous specification while in the program synthesis phase such a specification is further transformed into a concrete, executable program.

Loganantharaj, Raj L.↗

Structural Life and Reliability Metrics: Benchmarking and Verification of Probabilistic Life Prediction Codes

Over the past two decades there has been considerable effort by NASA Glenn and others to develop probabilistic codes to predict with reasonable engineering certainty the life and reliability of critical components in rotating machinery and, more specifically, in the rotating sections of airbreathing and rocket engines. These codes have, to a very limited extent, been verified with relatively small bench rig type specimens under uniaxial loading. Because of the small and very narrow database the acceptance of these codes within the aerospace community has been limited. An alternate approach to generating statistically significant data under complex loading and environments simulating aircraft and rocket engine conditions is to obtain, catalog and statistically analyze actual field data. End users of the engines, such as commercial airlines and the military, record and store operational and maintenance information. This presentation describes a cooperative program between the NASA GRC, United Airlines, USAF Wright Laboratory, U.S. Army Research Laboratory and Australian Aeronautical & Maritime Research Laboratory to obtain and analyze these airline data for selected components such as blades, disks and combustors. These airline data will be used to benchmark and compare existing life prediction codes.

Litt, Jonathan S.↗

Data Service Provider Cost Estimation Tool

The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

Fontaine, Kathy↗

Anti-Criticality Methods for Nuclear Thermal Rocket Launches and Their Associated Assembly / Disassembly in Space

When launching a nuclear reactor into space for use in a nuclear thermal rocket (NTR), safety to the public is of the outmost importance. Ensuring that the reactor will not go critical in an accident scenario is the biggest risk that must be overcome to protect the public. Use of anti-criticality devices and methods, such as the use of poison materials in the core or loading a select portion of the fuel on orbit, can prevent the reactor from going critical in any accident scenario. However, both methods (unpoisoning / loading fuel into the reactor core on orbit) will likely require the use of In Space Assembly and Manufacturing (ISAM) technology to remove the safeguards and ensure the reactor is fully operational before use. This paper discusses the use of ISAMs to help with the unpackaging of anti-criticality devices on orbit along with ISAMs ability to help verify and preform maintenance and inspection checks of the reactor system before operation and in between engine burns.

nuclear thermal propulsion↗

Mitigating life cycle GHG emissions of roads to be built through 2030: Case study of a Chinese province

We report the expansion of road networks in emerging economies such as China causes significant greenhouse gas (GHG) emissions. This development is conflicting with China's commitment to achieve carbon neutrality. Thus, there is a need to better understand life cycle emissions of road infrastructure and opportunities to mitigate these emissions. Existing impact studies of roads in developing countries do not address recycled materials, improved pavement maintenance, or pavement-vehicle interaction and electric vehicle (EV) adoption. Combining firsthand information from Chinese road construction engineers with publicly available data, this paper estimates a comprehensive account of GHG emissions of the road pavement network to be constructed in the next ten years in the Shandong province in Northern China. Further, we estimate the potential of GHG emission reductions achievable under three scenario sets: maintenance optimization, alternative pavement material replacement, and EV adoption. Results show that the life cycle GHG emissions of highways and Class 1–4 roads to be constructed in the next 10 years amount to 147 Mt CO2-eq. Considering the use phase in our model reveals that it is the dominant stage in terms of emissions, largely due to pavement-vehicle interaction. Vehicle electrification can only moderately mitigate these emissions. Other stages, such as materials production and road maintenance and rehabilitation, contribute substantially to GHG emissions as well, highlighting the importance of optimizing the management of these stages. Surprisingly, longer, not shorter maintenance intervals, yield significant emission reductions. Another counter-intuitive finding is that thicker and more material-intensive pavement surfaces cause lower emissions overall. Taken together, optimal maintenance and rehabilitation schedules, alternative material use, and vehicle electrification provide GHG reduction potentials of 11%, 4%–16% and 2%–6%, respectively.

54 ENVIRONMENTAL SCIENCES↗

Flight Test of Propulsion Monitoring and Diagnostic System

The objective of this program was to perform flight tests of the propulsion monitoring and diagnostic system (PMDS) technology concept developed by Honeywell under the NASA Advanced General Aviation Transport Experiment (AGATE) program. The PMDS concept is intended to independently monitor the performance of the engine, providing continuous status to the pilot along with warnings if necessary as well as making the data available to ground maintenance personnel via a special interface. These flight tests were intended to demonstrate the ability of the PMDS concept to detect a class of selected sensor hardware failures, and the ability to successfully model the engine for the purpose of engine diagnosis.

Gabel, Steve↗

The ICARE Method

The ICARE method is a flexible, widely applicable method for systems engineers to solve problems and resolve issues in a complete and comprehensive manner. The method can be tailored by diverse users for direct application to their function (e.g. system integrators, design engineers, technical discipline leads, analysts, etc.). The clever acronym, ICARE, instills the attitude of accountability, safety, technical rigor and engagement in the problem resolution: Identify, Communicate, Assess, Report, Execute (ICARE). This method was developed through observation of Space Shuttle Propulsion Systems Engineering and Integration (PSE&I) office personnel approach in an attempt to succinctly describe the actions of an effective systems engineer. Additionally it evolved from an effort to make a broadly-defined checklist for a PSE&I worker to perform their responsibilities in an iterative and recursive manner. The National Aeronautics and Space Administration (NASA) Systems Engineering Handbook states, engineering of NASA systems requires a systematic and disciplined set of processes that are applied recursively and iteratively for the design, development, operation, maintenance, and closeout of systems throughout the life cycle of the programs and projects. ICARE is a method that can be applied within the boundaries and requirements of NASA s systems engineering set of processes to provide an elevated sense of duty and responsibility to crew and vehicle safety. The importance of a disciplined set of processes and a safety-conscious mindset increases with the complexity of the system. Moreover, the larger the system and the larger the workforce, the more important it is to encourage the usage of the ICARE method as widely as possible. According to the NASA Systems Engineering Handbook, elements of a system can include people, hardware, software, facilities, policies and documents; all things required to produce system-level results, qualities, properties, characteristics, functions, behavior and performance. The ICARE method can be used to improve all elements of a system and, consequently, the system-level functional, physical and operational performance. Even though ICARE was specifically designed for a systems engineer, any person whose job is to examine another person, product, or process can use the ICARE method to improve effectiveness, implementation, usefulness, value, capability, efficiency, integration, design, and/or marketability. This paper provides the details of the ICARE method, emphasizing the method s application to systems engineering. In addition, a sample of other, non-systems engineering applications are briefly discussed to demonstrate how ICARE can be tailored to a variety of diverse jobs (from project management to parenting).

Henke, Luke↗

Risk-Informed Operations and Maintenance Decision Making Using Deep Reinforcement Learning

A challenge for operating nuclear power plants is the significant cost of operations and maintenance, at times consuming up to 66% of annual operating costs. This project aims to build a framework for a risk-informed asset-management tool that integrates inspections, repairs, spare-part inventory, supply chain, and business choices to lower overall O&M costs. Our approach uses a combination of data-driven modeling and deep reinforcement learning to create and implement optimal maintenance policies for the existing nuclear fleet, as well as new advanced reactors. The creation of an asset management tool that uses these advanced methods will give operators new capabilities to help reduce the burden of O&M spending in nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of Digital Twin-Informed Predictive Maintenance for Critical Components in Advanced Reactors

Small modular reactors (SMRs) and microreactors, along with other advanced reactor (AR) technologies, are key to the future of nuclear energy. For these systems to achieve low operating costs, high reliability, and flexibility across applications, their operation and maintenance must be optimized. Digital twin (DT) technology is one of the technologies that enables real-time (or faster than real-time) monitoring and prognosis of critical components which are vital for operational efficiency, low costs, and enhanced safety of ARs, accelerating their deployment. DT technology provides dynamic virtual representation of physical assets by integrating real-time data, physics-based models, and advanced analytics, which is critical to optimizing the performance of the entire energy system throughout the life cycle. DTs empower engineers and operators to virtually explore different scenarios, configurations, and control strategies, allowing for the identification of optimal solutions that maximize reactor efficiency, safety, and economics.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

Patterson-Hine, Ann↗

Conceptual design and cost analysis of hydraulic output unit for 15 kW free-piston Stirling engine

A long-life hydraulic converter with unique features was conceptually designed to interface with a specified 15 kW(e) free-piston Stirling engine in a solar thermal dish application. Hydraulic fluid at 34.5 MPa (5000 psi) is produced to drive a conventional hydraulic motor and rotary alternator. Efficiency of the low-maintenance converter design was calculated at 93.5% for a counterbalanced version and 97.0% without the counterbalance feature. If the converter were coupled to a Stirling engine with design parameters more typcial of high-technology Stirling engines, counterbalanced converter efficiency could be increased to 99.6%. Dynamic computer simulation studies were conducted to evaluate performance and system sensitivities. Production costs of the complete Stirling hydraulic/electric power system were evaluated at $6506 which compared with $8746 for an alternative Stirling engine/linear alternator system.

White, M. A.↗

Demonstrating the Performance Benefits of the Strutjet RBCC for Space Launch Architectures

The Rocket Based Combined Cycle (RBCC) engine synergistically combines the best elements of airbreathing and rocket propulsion to benefit a wide range of future reusable launch vehicles. Aerojet's Strutjet RBCC offers high I(sub sp) during mid-phase acceleration, and high thrust for boost and final ascent phases. The result is a relatively low gross weight vehicle with lower thrust requirements than comparable all-rocket solutions. Relative to combination propulsion systems, the integrated propulsive elements of the Strutjet reduce engine weight and complexity. In the recent NASA Highly Reusable Space Transportation (HRST) study, vehicles with RBCC-class engines were projected to have lower per flight operations costs than comparable rockets. The more benign operating environment of the RBCC engine primary rockets (2000 psi chamber pressure, lower internal temperatures, gas generator cycle) lead to longer service life, fewer maintenance actions, and increased reliability. Operations costs are typically the most significant contributor to life cycle costs. RBCC-powered vehicles lend themselves naturally to horizontal takeoff, which typically requires less thrust for a given gross vehicle weight when compared to an all-rocket-powered vehicle. The lower thrust requirements reduce engine size and/or quantity, reducing the n of ground personnel and facilities required to maintain the vehicle. The reduced sensitivity to mass fraction also allows the vehicle to be designed with higher margins for improved life and reliability. Because of its multi-mode ascent operation and ability to perform long cruise segments, the strutjet RBCC offers RLV designers a chance to create vehicles with an unprecedented level of mission flexibility. Features such as supersonic cruise, flyback, off-set launch, self-ferry, horizontal takeoff and landing, multi-base operation, and flexible aborts open up a broad range of potential revenue producing missions. The Strutjet can lead to low-cost vehicle designs in traditional areas such as LEO cargo delivery and ISS resupply, and also lead to economically attractive vehicles for small payload missions difficult to achieve with all-rocket solutions. The performance capability of the Strutjet RBCC has been demonstrated in all operating mod underfunding from NASA MSFC and Aerojet as a result of over 1000testsand over 13 years of continuous development-a significant resource investment in the Strutjet engine design.

Johnson, D.↗

Ten questions concerning Large Language Models (LLMs) for building applications

Large Language Models (LLMs) are emerging as powerful AI tools capable of transforming how building information is collected, processed, analyzed, and applied across diverse research areas. Their capabilities can help building operators, facility managers and other stakeholders such as designers, architects and engineers by providing actionable insights for decision-making across planning, construction, operations, and maintenance of buildings and facilities. This paper explores ten key questions concerning the role of LLMs in shaping sustainable, intelligent, and human-centric buildings. From fundamental definitions to advanced applications, we examine how LLMs facilitate decision-making across the life cycle of buildings and energy systems. LLMs can enhance life cycle assessments (LCA), building energy simulations, and real-time data integration, empowering more efficient and adaptive human-AI environments. They can also contribute to streamlining regulatory compliance, improving post-occupancy evaluations, and fostering more inclusive and participatory design processes. Additionally, this paper addresses the ethical challenges posed by LLMs, such as bias, data privacy, and environmental impacts, and explores their potentials in advancing intelligent digital twins (DT) for ongoing building operations and maintenance. Built upon our applied research using LLMs and the review of tools, datasets, and research gaps, we provide a forward-looking perspective on how LLMs can drive innovation, collaboration, and productivity in the built environment while supporting ethical and effective implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗