Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Plutonium-238 Loadout Calorimeter Return To Service

The calorimeter in the transfer area in Building 7920 at the US Department of Energy’s Oak Ridge National Laboratory is used to measure the amount of 238 Pu in the Plutonium Heat Source Oxide. The calorimetry measurement is taken after the oxide is packaged in an ORISC (Oak Ridge Inner Shipping Capsule)/FSO (Fuel Storage Outer) assembly before loading into the Containment Vessel and shipping container. The equipment is used in three specific configurations: zero measurement (nothing in the sample cup), FSO measurement (actual measurement of 238 Pu), and reference calibration measurement (using the reference FSO as a known heat source). System checks were performed in July 2023 in preparation for scheduled material loadout. During these checks, personnel discovered that the reference FSO had experienced an electrical short in the heater cable and was no longer functional. The calorimeter was in the reference calibration measurement configuration at this time. Facility management was notified when the damage was discovered. The data from the Yokogawa recorder were pulled and analyzed for a span of time between September 2022 and July 2023. An unusual spike was found in the sample cup temperature data that started on October 19, 2022, and ended on October 20, 2022. The sample cup reached a temperature of 191.1°C. The maximum allowable temperature for the calorimeter thermopile to reach is 220°C based on the manufacturer statement provided in Appendix B of this report [1]. The calorimeter thermopile and the sample cup thermocouple are physically close to each other; therefore, the data suggest that the calorimeter itself never saw a temperature in excess of 191.1°C. Physical damage present on the cable, tape, and insulation suggests that the temperature reached a higher value in some locations within the sample cup than the data shows. Because of this discrepancy, testing of the calorimeter was required to confirm that the calorimeter is functioning the same as it was before the electrical short. The intent of this report is to assess the functionality of the calorimeter and determine if it is acceptable to use for 238 Pu loadout material measurement. Testing showed that the calorimeter is functionally equivalent to the initial calibration that was performed in the summer of 2021, and thus, the calorimeter was cleared to be used for its intended purposes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pulse Detonation Engine Test Bed Developed

A detonation is a supersonic combustion wave. A Pulse Detonation Engine (PDE) repetitively creates a series of detonation waves to take advantage of rapid burning and high peak pressures to efficiently produce thrust. NASA Glenn Research Center's Combustion Branch has developed a PDE test bed that can reproduce the operating conditions that might be encountered in an actual engine. It allows the rapid and cost-efficient evaluation of the technical issues and technologies associated with these engines. The test bed is modular in design. It consists of various length sections of both 2- and 2.6- in. internal-diameter combustor tubes. These tubes can be bolted together to create a variety of combustor configurations. A series of bosses allow instrumentation to be inserted on the tubes. Dynamic pressure sensors and heat flux gauges have been used to characterize the performance of the test bed. The PDE test bed is designed to utilize an existing calorimeter (for heat load measurement) and windowed (for optical access) combustor sections. It uses hydrogen as the fuel, and oxygen and nitrogen are mixed to simulate air. An electronic controller is used to open the hydrogen and air valves (or a continuous flow of air is used) and to fire the spark at the appropriate times. Scheduled tests on the test bed include an evaluation of the pumping ability of the train of detonation waves for use in an ejector and an evaluation of the pollutants formed in a PDE combustor. Glenn's Combustion Branch uses the National Combustor Code (NCC) to perform numerical analyses of PDE's as well as to evaluate alternative detonative combustion devices. Pulse Detonation Engine testbed.

Breisacher, Kevin J.↗

Enhancements to TetrUSS for NASA Constellation Program

The NASA Constellation program is utilizing Computational Fluid Dynamics (CFD) predictions for generating aerodynamic databases and design loads for the Ares I, Ares I-X, and Ares V launch vehicles and for aerodynamic databases for the Orion crew exploration vehicle and its launch abort system configuration. This effort presents several challenges to applied aerodynamicists due to complex geometries and flow physics, as well as from the juxtaposition of short schedule program requirements with high fidelity CFD simulations. NASA TetrUSS codes (GridTool/VGRID/USM3D) have been making extensive contributions in this effort. This paper will provide an overview of several enhancements made to the various elements of TetrUSS suite of codes. Representative TetrUSS solutions for selected Constellation program elements will be shown. Best practices guidelines and scripting developed for generating TetrUSS solutions in a production environment will also be described.

Pandya, Mohagna J.↗

NLR HPC Kestrel Jobs Data

Overview: Anonymized job-level records from the Kestrel HPC system at the National Laboratory of the Rockies (NLR). Each record represents a Slurm batch job with scheduling metadata, resource requests, utilization, energy estimates, and efficiency metrics. Sensitive fields (user, account, job name, submit line, working directory, submit script, and job type) are replaced with 7-character cryptographic hashes. System & Timeframe: Kestrel is located at the NLR campus. Standard compute nodes have 104 cores and 256 GB RAM; bigmem nodes have 2,000 GB. GPU nodes (gpu-h100 partition) use NVIDIA H100 GPUs. Data covers jobs submitted August 2023 through December 2025. Funding provided by the U.S. Department of Energy, EERE. Files: esif.hpc.kestrel.job-anon.zip — Anonymized job records (Hive-partitioned Parquet) datacard.md — Full dataset documentation ~11 million rows, 50 variables. Readable with PyArrow, pandas, DuckDB, Apache Spark, or any Parquet-compatible tool. Data Collection: Jobs collected via sacct with timezone-aware export (SLURM_TIME_FORMAT="%Y-%m-%dT%H:%M:%S%z"), loaded into PostgreSQL. Calculated columns updated via database triggers and batch functions. All timestamps use timestamptz and correctly handle DST transitions. Preprocessing: Anonymization of name, user, account, submit_line, work_dir, submit_script, and job_type via 7-char hex hashes Derived columns: queue_wait, cpu_eff, max/min/avg_mem_eff, energy estimates Simplified job state mapping (e.g., "CANCELLED by 132357" → "CANCELLED") Boolean flags: python_job, reframe_job Temporal decomposition: year, month, day, day_of_week, hour, minute from submit_time Shared node tracking: shared_job_count, nodes_shared, jobs_shared Key Variables: Scheduling: job_id, partition, state_simple, submit_time, start_time, end_time, queue_wait Resources: nodes_req/used, processors_req/used, memory_req, wallclock_req/used, gpus_requested Efficiency: cpu_eff, max/min/avg_mem_eff Energy: cpu_energy_tdp_estimated_max/used_watt_hours, consumed_energy_raw_joules, consumed_energy_raw_watt_hours Sharing: shared_job_count, nodes_shared, jobs_shared Partitions: short, standard, debug, gpu-h100 Job States: CANCELLED, COMPLETED, FAILED, PENDING, RUNNING QoS Levels: normal, high Important Notes: Timestamps include timezone offsets; DST transitions are handled correctly, though adding intervals across DST boundaries requires offset adjustment shared_job_count reflects physical node co-residency, not use of the shared partition Job step records and raw Slurm JSONB fields are excluded Do not attempt to re-identify individuals from hashed fields

97 MATHEMATICS AND COMPUTING↗

The characteristics of the planned National Transonic Facility

The National Transonic Facility is a high Reynolds number transonic wind tunnel designed to satisfy the research and development needs of NASA, DOD, and industry. The facility design incorporates the cryogenic approach to achieving high Reynolds numbers with manageable model loads. By using temperature as a test variable, a unique capability to clearly separate aeroelastic, Reynolds number, and Mach number effects will be possible. This capability will open new horizons in transonic aerodynamic research. The tunnel design including unique features and operating envelopes is described. A brief overview of the general operating arrangement and the schedule for facility construction is presented.

Mckinney, L. W.↗

Performance analysis of parallel branch and bound search with the hypercube architecture

With the availability of commercial parallel computers, researchers are examining new classes of problems which might benefit from parallel computing. This paper presents results of an investigation of the class of search intensive problems. The specific problem discussed is the Least-Cost Branch and Bound search method of deadline job scheduling. The object-oriented design methodology was used to map the problem into a parallel solution. While the initial design was good for a prototype, the best performance resulted from fine-tuning the algorithm for a specific computer. The experiments analyze the computation time, the speed up over a VAX 11/785, and the load balance of the problem when using loosely coupled multiprocessor system based on the hypercube architecture.

Mraz, Richard T.↗

Ibis Networks/WattIQ (IN2 Final Report)

Ibis Networks is a full-stack cleantech company that provides plug-level energy monitoring and control to solve energy and asset management problems for the enterprise. During DATES – DATES, an NREL research team worked with the Ibis team to validate their product, the InteliSocket. The Ibis InteliSocket is a pass-through plug-load energy monitor and controller that is designed to reduce energy wasted by common 120 V plug-in devices in commercial office buildings, such as computer peripherals, conference room AV equipment, and break-room appliances. The system can shut off supply power to these end uses via remote control, manual switches, pre-set schedules, or automated control algorithms. The scope of this IN2 project was the development and refinement of “smart” learning behavior algorithms (LBAs), which could help installation processes and dramatically expand the sockets’ capabilities and energy-saving potential by suggesting suitable control schedules that are based on monitored use patterns. While Ibis has the analytical and software expertise for algorithm development, the lack of test data, both in a controlled laboratory setting and in real-life deployment scenarios, represented a key barrier toward commercialization of the product. Assistance through the IN2 program provided an opportunity to conduct the needed “trial and error” algorithm development. The project included baseline field-data collection, laboratory testing, and field validation components, all of which were conducted at the NREL campus between April 2017 and July 2019.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Depot-Based Vehicle Data for National Analysis of Medium- and Heavy-Duty Electric Vehicle Charging

Medium- and heavy-duty vehicles (MHDVs) are a major source of greenhouse gases and local criteria air pollutants. Electrifying MHDVs may reduce these harmful emissions, which disproportionately impact disadvantaged communities. Due to their relatively high per-vehicle energy needs, consistent fleet operations, and frequent colocation of multiple vehicles at depots, MHDVs may have more spatially and temporally concentrated charging demands than light-duty passenger electric vehicles. That charging concentration means their electrification may require careful advance planning and coordination to manage potential impacts to the electrical grid via charge management or infrastructure upgrades. However, MHDV duty cycles and parking schedules are highly variable across vocations of operation, and there is a shortage of nationally representative, vocationally diverse public data describing typical MHDV operations. This report summarizes the methodology - designed with national representativeness in mind - used to create a new set of data describing typical daily driving distances, dwell durations, and normalized electric vehicle depot charging load curves for MHDVs. The dataset reflects the subset of MHDV operating patterns that may originate from a consistent depot each day and rely on the same depot for charging. In addition to trucks with depot-centric vocational patterns, the data describes operations of transit buses and school buses, each with a depot-centric focus. The dataset is available to the public and suitable for national analysis. It can inform research, infrastructure planning, and policymaking regarding the electrification of MHDVs.

33 ADVANCED PROPULSION SYSTEMS↗

Depot Charging Schedule Optimization for Medium- and Heavy-Duty Battery-Electric Trucks

Charge management, which lowers charging costs for fleets and prevents straining the electrical grid, is critical to the successful deployment of medium- and heavy-duty battery-electric trucks (MHD BETs). This study introduces an energy demand and cost management framework that optimizes depot charging for MHD BETs by combining an energy consumption machine learning model and a linear program optimization model. The framework considers key factors impacting real-world MHD BET operations, including vehicle and charger configurations, duty cycles, use cases, geographic and climate conditions, operation schedules, and utilities’ time-of-use (TOU) rates and demand charges. The framework was applied to a hypothetical fleet of 100 MHD BETs in California under three different utilities for 365 days, with results compared to unmanaged charging. The optimized charging solution avoided more than 90% of on-peak charging, reduced fleet charging peak load by 64–75%, and lowered fleet energy variable costs by 54–64%. This study concluded that the proposed charge management framework significantly reduces energy costs and peak loads for MHD BET fleets while making recommendations for fleet electrification infrastructure planning and the design of utility TOU rates and demand charges.

Song, Shuhan↗

Aerodynamic loads measurements on externally blown flap STOL models

Small-scale-model data have shown large static loads on the flap system behind the engines. The large-scale-model tests confirmed the magnitude of these loads and indicated that the relative loading of each flap element depends on the engine-wing-flap geometry. Flap response measurements indicated that the unsteady pressure loading excited the natural vibration modes of the flap system on this model. Since this was a boilerplate model, the only conclusion that can be drawn is that the possibility of large vibration loads must be considered for a flight-weight structure. The similarity of the unsteady pressure and flap response spectra for the wind-off and wind-on cases indicated that it may be possible to realistically test flight-weight flap structures on a static test stand rather than endure the extra costs and scheduling problems associated with large-scale wind-tunnel tests. There is a potential flap-temperature problem which if not resolved might preclude the use of materials such as aluminum and the composites in the flap structure.

Greene, G. C.↗

Scheduled civil aircraft emission inventories for 1992: Database development and analysis

This report describes the development of a three-dimensional database of aircraft fuel burn and emissions (fuel burned, NOx, CO, and hydrocarbons) from scheduled commercial aircraft for each month of 1992. The seasonal variation in aircraft emissions was calculated for selected regions (global, North America, Europe, North Atlantic, and North Pacific). A series of parametric calculations were done to quantify the possible errors introduced from making approximations necessary to calculate the global emission inventory. The effects of wind, temperature, load factor, payload, and fuel tankering on fuel burn were evaluated to identify how they might affect the accuracy of aircraft emission inventories. These emissions inventories are available for use by atmospheric scientists conducting the Atmospheric Effects of Aviation Project (AEAP) modeling studies. Fuel burned and emissions of nitrogen oxides (NOx as N02), carbon monoxide, and hydrocarbons have been calculated on a 1 degree latitude x 1 degree longitude x 1 kilometer altitude grid and delivered to NASA as electronic files.

Baughcum, Steven L.↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond [Slides]

In wholesale electricity markets today, flexibility from a limited number of distributed energy resources (DERs) is offered daily, and the value of flexibility is not yet recognized for economic hedging of delivery risk. Under a three-year project funded by the ARPA-E PERFORM program, a collaborative team is working towards developing an integrated risk management framework that will leverage flexibility from distributed and bulk resources to cost-effectively and reliably manage delivery risk of intermittent resources. Two concepts are at the core of the proposed integrated risk management framework: (A) flexibility options, which are a novel type of options and enable wholesale electricity market participants to hedge uncertainty by buying flexibility. (B) DER flexibility scores, which provide a way for utilities or aggregators to classify assets in groups with different likelihood of delivering contracted flexibility. This report presentation will focus on the proposed ISO-product "flexibility options," which is complementary to ramp and other products being introduced by ISOs/RTOs to manage net load uncertainties. Participating resources with imbalance risk can buy flexibility options to hedge their production, whereas grid-connected resources that can provide physical flexibility can offer flexibility options. We will present basics of the formulation for a day-ahead ISO market that matches buyers and sellers of this hedge in coordination with existing capabilities to schedule energy and ancillary services, and outline how their settlements mitigate the impact of imbalance risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space shuttle descent design: From development to operations

The descent guidance system, the descent trajectories design, and generating of the associated flight products are discussed. The programs which allow the successful transitions from development to STS operations, resulting in reduced manpower requirements and compressed schedules for flight design cycles are addressed. The topics include: (1) continually upgraded tools for the job, i.e., consolidating tools via electronic data transfers, tailoring general purpose software for needs, easy access to tools through an interactive approach, and appropriate flexibility to allow design changes and provide growth capability; (2) stabilizing the flight profile designs (I-loads) in an uncertain environment; and (3) standardizing external interfaces within performance and subsystems constraints of the Orbiter.

Crull, T. J.↗

A study of pipelining in computing arrays

Scheduling considerations in computing arrays are examined. A simple sufficient condition is developed for determining whether a computing array can be pipelined. If the array cannot be pipelined in the form given, the condition also indicates the direction in which to proceed to make it pipelineable. The overall framework and methodology take a good part of the load off the logical architect of the array, and make the translation from the logical to the physical architecture a mechanical process.

Jagadish, H. V.↗

Stringer Bending Test Helps Diagnose and Prevent Cracks in the Space Shuttle's External Tank

Space Shuttle Discovery's last mission, STS-133, was scheduled to launch on November 5, 2010. Just hours before liftoff, a hydrogen leak at an umbilical connection scrubbed the launch attempt. After the scrub, further inspection revealed a large crack in the foam insulation covering the External Tank, ET-137. Video replay of the launch attempt confirmed the crack first appeared as cryogenic propellants were being loaded into the ET. When the cracked foam was removed, technicians found the underlying stringer had two 9-inch-long cracks. Further inspection revealed a total of 5 of the 108 ET stringers had cracked. NASA and Lockheed Martin immediately launched an aggressive campaign to understand the cracks and repair the stringers in ET-137, targeting February 2011 as the new launch date for STS-133. Responsibilities for the various aspects of the investigation were widely distributed among NASA centers and organizations. This paper will focus on lab testing at Marshall Space Flight Center (MSFC) in Huntsville, Alabama that was intended to replicate the stringer failure and gauge the effect of proposed countermeasures.

Saxon, Joseph B.↗

Exploration Exercise System (EES) Development

Exploration class missions will be required to have an exercise device that is lightweight, has a small footprint, and is capable of providing enough physical stimulus and exercise variability to be an effective countermeasure against muscle and bone loss that results from the microgravity environment. Exploration exercise device prototypes should be evaluated on the ground and in-orbit for feasibility of use in microgravity for long and short duration exploration missions and efficacy of the device to maintain multi-system health and performance. The European Enhanced Exploration Exercise Device (E4D) was selected as the exploration prototype device to be evaluated on ISS for efficacy and feasibility of use as a single multi-modality device for the exercise system for exploration missions. This effort supports the continued development, testing, and verification of E4D hardware and software, internal NASA integration (Human Health and Performance, ISS Vehicle Office, Engineering, and Flight Operations), and external integration across NASA, ESA, and the Danish Aerospace Company (DAC). Providing a feasibility and acceptability assessment from a physiological efficacy and hardware durability standpoint are critical for informing use and risk associated with use on exploration missions. Clearly defined objectives from end users, stakeholders, and Subject Matter Experts (SMEs) will be tested by crewmembers during acute use sessions and long duration use of the exercise device while on ISS. This effort will include a flight study where crewmembers will be asked to exercise using only the E4D during the duration of their mission and participate in a battery of physiological testing to evaluate the efficacy. Hardware is scheduled to launch in FY25 followed by 2 years of operational use after activation and checkout. A final recommendation will be provided to the Artemis program on acceptability of the device for exploration missions. The E4D needs a vibration isolation stabilization (VIS) system that serves as a platform for the exercise hardware to protect the vehicle from loads imparted during exercise. Exploration forward VIS systems will need to protect the vehicle and provide sufficient stabilization for the exerciser during performance of all critical exercises. These enabling capabilities need to be achieved within exploration vehicle power, thermal, mass, and volume limitations.

Kent Lawrence Kalogera↗

New Acoustic Arena Qualified at NASA Glenn's Aero-Acoustic Propulsion Laboratory

A new acoustic arena has been qualified in the Aero-Acoustic Propulsion Laboratory (AAPL) at the NASA Glenn Research Center. This arena is outfitted specifically for conducting fan noise research with the Advanced Noise Control Fan (ANCF) test rig. It features moveable walls with large acoustic wedges (2 by 2 by 1 ft) that create an acoustic environment usable at frequencies as low as 250 Hz. The arena currently uses two dedicated microphone arrays to acquire fan inlet and exhaust far-field acoustic data. It was used successfully in fiscal year 2003 to complete three ANCF tests. It also allowed Glenn to improve the operational efficiency of the four test rigs at AAPL and provided greater flexibility to schedule testing. There were a number of technical challenges to overcome in bringing the new arena to fruition. The foremost challenge was conflicting acoustic requirements of four different rigs. It was simply impossible to construct a static arena anywhere in the facility without intolerably compromising the acoustic test environment of at least one of the test rigs. This problem was overcome by making the wall sections of the new arena movable. Thus, the arena can be reconfigured to meet the operational requirements of any particular rig under test. Other design challenges that were encountered and overcome included structural loads of the large wedges, personnel access requirements, equipment maintenance requirements, and typical time and budget constraints. The new acoustic arena improves operations at the AAPL facility in several significant ways. First, it improves productivity by allowing multiple rigs to operate simultaneously. Second, it improves research data quality by providing a unique test area within the facility that is optimal for conducting fan noise research. Lastly, it reduces labor and equipment costs by eliminating the periodic need to transport the ANCF into and out of the primary AAPL acoustic arena. The investment to design, fabricate, and install the new compact arena in fiscal year 2002 has paid dividends in fiscal year 2003 and will for many years to come. It has provided a dedicated, high-quality acoustic arena to support low-speed fan testing for ANCF while minimizing scheduling impacts and improving operational productivity in the AAPL facility.

Wnuk, Stephen P.↗