Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Concept selection, optimization, and preliminary design of large wind generators

The development of the conceptual design of high (1000 kW, 18 mph mean wind speed site) and low (100 kW, 12 mph site) power wind generator systems to be integrated into a standard electric utility is discussed. Analyses leading to the selection of the rotor and tower design are outlined. The 1000 kW system selected for further development utilizes an all composite rotor blade design and a steel shell tower. The projected energy cost is 3.5 cents/kW hr. Results of optimization of the rated power, site wind speed, and rated wind speed parameters are summarized.

Meier, R. C.↗

The U.S.-NSF/NASA

The five-year research and development plan of the NSF/NASA Wind Energy Conversion Systems (WECS) program is outlined. The program includes mission studies to determine energy use patterns and requirements and define specific applications for wind energy systems, wind energy resource assessment and development, and development of cost-effective components and subsystems. The program is also directed towards the development of energy storage systems to make wind powered systems firm power sources where appropriate. A 100 kW experimental wind generator (Model Zero) is being designed as a flexible test bed for a variety of system components. Designs will be developed for units in the 50 to 200 kW and 500 to 3000 kW size ranges.

Source record↗

Auxiliary Payload Power System thermal control

The Auxiliary Payload Power System (APPS) provides supplementary power and cooling to Space Processing Application (SPA) experiments to be mounted in the APPS and the Spacelab in the Shuttle Payload Bay. SPA experiment operations are planned for early Shuttle flights. This paper presents thermal control study results for preliminary analysis and design definition of the APPS. A 100/sq m, three-wing, pumped-fluid, deployable radiator with separate APPS equipment and SPA experiments coolant loops was selected as the baseline. The system is capable of rejecting the heat (approximately 26 kw) associated with the production and consumption of approximately 16 kw of electrical power produced by the APPS fuel cells for a worst case radiator orientation. For the most favorable orientation, the heat rejection and power capability approach 38 and 24 kw, respectively. Alternate approaches were evaluated, such as heat pipes for the radiator and alternate fluids for the coolant loops. Emphasis was placed on using Shuttle developed hardware: coolant pumps, heat exchangers, fluids, and radiator technology.

Nagel, R. G.↗

Extended performance solar electric propulsion thrust system study. Volume 5. Capacitor-diode voltage multiplier: Technology evaluation

A 1-kW capacitor-diode voltage multiplier (CDVM) was designed, fabricated and tested to demonstrate the power of feasibility of high power CDVM's and to verify the analytical techniques that had been used to predict the performance characteristics of a 6-kw CDVM. High efficiency (96.2%), a low ratio of component weight to power (0.55 kg/kW), and low output ripple voltage (less than 1%, peak to peak) were obtained during the operation of a 1-kW CDVM various input line, load current, and load fault conditions.

Martinelli, R. M.↗

Space station thermal control surfaces. Volume 1: Interim report

The U.S. space program goals for long-duration manned missions place particular demands on thermal-control systems. The objective of this program is to develop plans which are based on the present thermal-control technology, and which will keep pace with the other space program elements. The program tasks are as follows: (1) requirements analysis, with the objectives to define the thermal-control-surface requirements for both space station and 25 kW power module, to analyze the missions, and to determine the thermal-control-surface technology needed to satisfy both sets of requirements; (2) technology assessment, with the objectives to perform a literature/industry survey on thermal-control surfaces, to compare current technology with the requirements developed in the first task, and to determine what technology advancements are required for both the space station and the 25 kW power module; and (3) program planning that defines new initiative and/or program augmentation for development and testing areas required to provide the proper environment control for the space station and the 25 kW power module.

Maag, C. R.↗

Initial test results with a single-cylinder rhombic-drive Stirling engine

A 6 kW (8 hp), single-cylinder, rhombic-drive Stirling engine was restored to operating condition, and preliminary characterization tests run with hydrogen and helium as the working gases. Initial tests show the engine brake specific fuel consumption (BSFC) with hydrogen working gas to be within the range of BSFC observed by the Army at Fort Belvoir, Virginia, in 1966. The minimum system specific fuel consumption (SFC) observed during the initial tests with hydrogen was 669 g/kW hr (1.1 lb/hpx hr), compared with 620 g/kWx hr (1.02 lb/hpx hr) for the Army tests. However, the engine output power for a given mean compression-space pressure was lower than for the Army tests. The observed output power at a working-space pressure of 5 MPa (725 psig) was 3.27 kW (4.39 hp) for the initial tests and 3.80 kW (5.09 hp) for the Army tests. As expected, the engine power with helium was substantially lower than with hydrogen.

Cairelli, J. E.↗

Economical photovoltaic power generation with heat recovery

Three designs for conversion of solar radiation to electricity and thermal energy are analyzed. The objective of these converters is to increase the electric and thermal output for each photovoltaic array so as to lower the cell cost relative to the amount of energy delivered. An analysis of the economical aspects of conversion by photovoltaic cells with heat recovery is carried out in terms of hypothetical examples. Thus, it is shown that the original cost of say $40,000 per generated kilowat can be reduced to $572.00 per kilowatt by increasing the original electric output of 1 kW to 10 kW in electricity and 60 kW in thermal energy. The newly derived specific cost is only 1.4 percent of the original one. It is expected that a cost reduction of roughly 2% of the present specific cost per kilowatt will greatly stimulate public acceptance of photovoltaic terrestrial conversion to electricity.

Ascher, G.↗

Large wind turbine generators

The large wind turbine portion of the Federal Wind Energy Program consists of two major project efforts: (1) the Mod-0 test bed project for supporting research technology, and (2) the large experimental wind turbines for electric utility applications. The Mod-0 has met its primary objective of providing the entire wind energy program with early operations and performance data. The large experimental wind turbines to be tested in utility applications include three of the Mod-0A (200 kW) type, one Mod-1 (2000 kW), and possibly several of the Mod-2 (2500 kW) designs. This paper presents a description of these wind turbine systems, their programmatic status, and a summary of their potential costs.

Thomas, R. L.↗

Quiet Clean Short-haul Experimental Engine (QCSEE) main reduction gears test program

Sets of under the wing (UTW) engine reduction gears and sets of over the wing (OTW) engine reduction gears were fabricated for rig testing and subsequent installation in engines. The UTW engine reduction gears which have a ratio of 2.465:1 and a design rating of 9712 kW at 3157 rpm fan speed were operated at up to 105% speed at 60% torque and 100% speed at 125% torque. The OTW engine reduction gears which have a ratio of 2.062:1 and a design rating of 12,615 kW at 3861 rpm fan speed were operated at up to 95% speed at 50% torque and 80% speed at 109% torque. Satisfactory operation was demonstrated at powers up to 12,172 kW, mechanical efficiency up to 99.1% UTW, and a maximum gear pitch line velocity of 112 m/s (22,300 fpm) with a corresponding star gear spherical roller bearing DN of 850,00 OTW. Oil and star gear bearing temperatures, oil churning, heat rejection, and vibratory characteristics were acceptable for engine installation.

Misel, O. W.↗

Effect of water injection and off scheduling of variable inlet guide vanes, gas generator speed and power turbine nozzle angle on the performance of an automotive gas turbine engine

The Chrysler/ERDA baseline automotive gas turbine engine was used to experimentally determine the power augmentation and emissions reductions achieved by the effect of variable compressor and power engine geometry, water injection downstream of the compressor, and increases in gas generator speed. Results were dependent on the mode of variable geometry utilization. Over 20 percent increase in power was accompanied by over 5 percent reduction in SFC. A fuel economy improvement of at least 6 percent was estimated for a vehicle with a 75 kW (100 hp) engine which could be augmented to 89 kW (120 hp) relative to an 89 Kw (120 hp) unaugmented engine.

Warren, E. L.↗

Improvement and scale-up of the NASA Redox storage system

A preprototype full-function 1.0 kW Redox system (2 kW peak) with 11 kW storage capacity has been built and integrated with the NASA/DOE photovoltaic test facility. The system includes four substacks of 39 cells each (1/3 sq ft active area) which are connected hydraulically in parallel and electrically in series. An open circuit voltage cell and a set of rebalance cells are used to continuously monitor the system state of charge and automatically maintain the anode and cathode reactants electrochemically in balance. Technological advances in membrane and electrodes and results of multicell stack tests are reviewed.

Reid, M. A.↗

Study of thermal control systems for orbiting power systems. Materials experiment carrier thermal control system study

Four possible arrangements of the materials experiment carrier (MEC) and power system (PS) thermal control loops were defined which would provide one kW of heat rejection for each kW of power to the MEC payload. These arrangements were compared to the baseline reference concept which provides only 16 kW heat rejection to show the cost of obtaining symmetry in terms of dollars, weight, complexity, growth potential, ease of integration, technology and total launch weight. The results of these comparisons was that the concept which splits the PS thermal control loop into two systems, one to reject PS waste heat and one payload waste heat, appeared favorable. The fluid selection study resulted in recommendation of FC72 as the MEC heat transport fluid based on the thermal and physical characteristics. The coatings reviewed indicated anodized and alodine treated aluminum surfaces or silver teflon are the best choices for the MEC vehicle where durability is an important factor. For high temperature radiators silver teflon or zinc orthotitanate are recommended choices.

Fleming, M. L.↗

Tests of an overrunning clutch in a wind turbine

An overrunning clutch that slipped freely under reverse torque was tested in the drive train of the Mod-0 wind turbine. In low variable wind conditions, the clutch engaged and disengaged smoothly without perturbation or oscillations. The clutch permitted the generator to be connected to the line using a relay instead of an automatic synchronizer. The alternator was connected to the line when the rpm reached 95% of synchronous speed and it motored to synchronous speed in about 0.15 seconds with a momentary power spike of 50 kW. The performance of the clutch was the same with and without the fluid coupling. The ideal power with the clutch was 5 to 7 kW compared to up to 50 kW without the clutch. The overrunning clutch merits consideration in future wind turbine designs as a means of simplifying the control system, increasing energy capture, and increasing the life of blades and electrical switch gear.

Seidel, R. C.↗

Initial guidelines and estimates for a power system with inertial (flywheel) energy storage

The starting point for the assessment of a spacecraft power system utilizing inertial (flywheel) energy storage. Both general and specific guidelines are defined for the assessment of a modular flywheel system, operationally similar to but with significantly greater capability than the multimission modular spacecraft (MMS) power system. Goals for the flywheel system are defined in terms of efficiently train estimates and mass estimates for the system components. The inertial storage power system uses a 5 kw-hr flywheel storage component at 50 percent depth of discharge (DOD). It is capable of supporting an average load of 3 kw, including a peak load of 7.5 kw for 10 percent of the duty cycle, in low earth orbit operation. The specific power goal for the system is 10 w/kg, consisting of a 56w/kg (end of life) solar array, a 21.7 w-hr/kg (at 50 percent DOD) flywheel, and 43 w/kg power processing (conditioning, control and distribution).

Slifer, L. W., Jr.↗

NASA Redox system development project status

NASA-Redox energy storage systems developed for solar power applications and utility load leveling applications are discussed. The major objective of the project is to establish the technology readiness of Redox energy storage for transfer to industry for product development and commercialization by industry. The approach is to competitively contract to design, build, and test Redox systems progressively from preprototype to prototype multi-kW and megawatt systems and conduct supporting technology advancement tasks. The Redox electrode and membrane are fully adequate for multi-kW solar related applications and the viability of the Redox system technology as demonstrated for multi-kW solar related applications. The status of the NASA Redox Storage System Project is described along with the goals and objectives of the project elements.

Nice, A. W.↗

High power solar array switching regulation

It is pointed out that spacecraft utilization projections for the 1980s and beyond show a trend toward extended lifetimes and larger electric power systems. The need for improved power management and energy transfer arising in connection with this trend has resulted in the conduction of a Solar Array Switching Power Management study. A description is presented of initial development work performed in the study, taking into account the characteristics for three mission classes. Attention is given to the manned LEO platform (250-kW average load), the unmanned GEO platform (50-kW average load), and an ion propulsion orbit transfer vehicle (50- to 250 kW load).

Decker, D. K.↗

A lightweight electronically commutated dc motor for electric passenger vehicles

A functional model breadboard converter and a rare-earth-cobalt, permanent magnet motor; as well as an engineering model converter and PM motor suitable for vehicle installations were developed and tested. The converter and motor achieved an 88% peak efficiency, a maximum output of 26 kW at 26,000 rpm, and a continuous rating of 15 kW. The system also generated power to the source during braking, with a demonstrated peak power available at the converter terminals of approximately 26 kW at 88% efficiency. Major conclusions include: (1) the SAE J227a(D) driving cycle efficiency for the converter/motor is 86% to 88% when energy available for recovery at the converter terminals is included; (2) the converter initial cost is approximately five times that of the permanent magnet motor, but can be reduced by means of LSI logic and integrated liquid cooled semiconductor packages; and (3) an electronically commutated motor with a liquid cooled converter will operate reliably without service or maintenance for the life of a passenger vehicle.

Echolds, E. F.↗

Develop and test fuel cell powered on-site integrated total energy system

Satisfactory performance is reported for the first 12-cell sub-stack of the 5 kW rebuild using improved ABA reactant distribution plates. Construction and test results are described for the first full-sized single-cell test (0.33 m x 0.56 m). Test duration was 450 hours. Plans are outlined for construction and testing of two methanol reformer units based on commercially-available shell-and-tube heat exchangers. A 5 kW-equivalent precursor and a 50 kW-equivalent prototype will be built. Supporting design and single-tube experimental data are presented. Stack support efforts are summarized on corrosion currents of graphite materials and acid-management of single-cell test facilities. Comparative properties are summarized for the two methanol/steam reforming catalysts evauated under Task V (now completed); T2107RS and C70-2RS.

Kaufman, A.↗