Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Hydrogen arcjet technology

During the 1960's, a substantial research effort was centered on the development of arcjets for space propulsion applications. The majority of the work was at the 30 kW power level with some work at 1-2 kW. At the end of the research effort, the hydrogen arcjet had demonstrated over 700 hours of life in a continuous endurance test at 30 kW, at a specific impulse over 1000 s, and at an efficiency of 0.41. Another high power design demonstrated 500 h life with an efficiency of over 0.50 at the same specific impulse and power levels. At lower power levels, a life of 150 hours was demonstrated at 2 kW with an efficiency of 0.31 and a specific impulse of 935 s. Lack of a space power source hindered arcjet acceptance and research ceased. Over three decades after the first research began, renewed interest exists for hydrogen arcjets. The new approach includes concurrent development of the power processing technology with the arcjet thruster. Performance data were recently obtained over a power range of 0.3-30 kW. The 2 kW performance has been repeated; however, the present high power performance is lower than that obtained in the 1960's at 30 kW, and lifetimes of present thrusters have not yet been demonstrated. Laboratory power processing units have been developed and operated with hydrogen arcjets for the 0.1 kW to 5 kW power range. A 10 kW power processing unit is under development and has been operated at design power into a resistive load.

Sankovic, John M.↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Space Power Free-Piston Stirling Engine Scaling Study

The design feasibility study is documented of a single cylinder, free piston Stirling engine/linear alternator (FPSE/LA) power module generating 150 kW-electric (kW sub e), and the determination of the module's maximum feasible power level. The power module configuration was specified to be a single cylinder (single piston, single displacer) FPSE/LA, with tuning capacitors if required. The design requirements were as follows: (1) Maximum electrical power output; (2) Power module thermal efficiency equal to or greater than 20 percent at a specific mass of 5 to 8 kg/kW(sub e); (3) Heater wall temperature/cooler wall temperature = 1050 K/525 K; (4) Sodium heat-pipe heat transport system, pumped loop NaK (sodium-potassium eutectic mixture) rejection system; (5) Maximum power module vibration amplitude = 0.0038 cm; and (6) Design life = 7 years (60,000 hr). The results show that a single cylinder FPSE/LA is capable of meeting program goals and has attractive scaling attributes over the power range from 25 to 150 kW(sub e). Scaling beyond the 150 kW(sub e) power level, the power module efficiency falls and the power module specific mass reaches 10 kg/kW(sub e) at a power output of 500 kW(sub e). A discussion of scaling rules for the engine, alternator, and heat transport systems is presented, along with a detailed description of the conceptual design of a 150 kW(sub e) power module that meets the requirements. Included is a discussion of the design of a dynamic balance system. A parametric study of power module performance conducted over the power output range of 25 to 150 kW(sub e) for temperature ratios of 1.7, 2.0, 2.5, and 3.0 is presented and discussed. The results show that as the temperature ratio decreases, the efficiency falls and specific mass increases. At a temperature ratio of 1.7, the 150 kW(sub e) power module cannot satisfy both efficiency and specific mass goals. As the power level increases from 25 to 150 kW(sub e) at a fixed temperature ratio, power module efficiency is seen to increase slightly, but at the expense of increased specific mass. An empirical equation relating power module thermal efficiency as a function of power module specific mass, power output, and temperature ratio is developed. Alternative configurations to the single cylinder, direct coupled linear alternator approach are also evaluated, but are shown to have technical drawbacks that lessen their attractiveness. The dynamic balance assembly mass (moving mass and structure) represents 20 to 30 percent of the total single cylinder power module mass. Joining two modules in a balanced opposed configuration eliminates the need for the balancer, and a hot end junction can be made without significant addition of structural mass. Recommendations are made for evaluation of advanced heat pipe concepts, tests of radial flow heat exchangers, and evaluation of high temperature alternator materials.

Jones, D.↗

Development Efforts Expanded in Ion Propulsion: Ion Thrusters Developed With Higher Power Levels

The NASA Glenn Research Center was the major contributor of 2-kW-class ion thruster technology to the Deep Space 1 mission, which was successfully completed in early 2002. Recently, NASA s Office of Space Science awarded approximately $21 million to Glenn to develop higher power xenon ion propulsion systems for large flagship missions such as outer planet explorers and sample return missions. The project, referred to as NASA's Evolutionary Xenon Thruster (NEXT), is a logical follow-on to the ion propulsion system demonstrated on Deep Space 1. The propulsion system power level for NEXT is expected to be as high as 25 kW, incorporating multiple ion thrusters, each capable of being throttled over a 1- to 6-kW power range. To date, engineering model thrusters have been developed, and performance and plume diagnostics are now being documented. The project team-Glenn, the Jet Propulsion Laboratory, General Dynamics, Boeing Electron Dynamic Devices, the Applied Physics Laboratory, the University of Michigan, and Colorado State University-is in the process of developing hardware for a ground demonstration of the NEXT propulsion system, which comprises a xenon feed system, controllers, multiple thrusters, and power processors. The development program also will include life assessments by tests and analyses, single-string tests of ion thrusters and power systems, and finally, multistring thruster system tests in calendar year 2005. In addition, NASA's Office of Space Science selected Glenn to lead the development of a 25-kW xenon thruster to enable NASA to conduct future missions to the outer planets of Jupiter and beyond, under the High Power Electric Propulsion (HiPEP) program. The development of a 100-kW-class ion propulsion system and power conversion systems are critical components to enable future nuclear-electric propulsion systems. In fiscal year 2003, a team composed of Glenn, the Boeing Company, General Dynamics, the Applied Physics Laboratory, the Naval Research Laboratory, the University of Wisconsin, the University of Michigan, and Colorado State University will perform a 6-month study that will result in the design of a 25-kW ion thruster, a propellant feed system, and a power processing architecture. The following 2 years will involve hardware development, wear tests, single-string tests of the thruster-power circuits and the xenon feed system, and subsystem service life analyses. The 2-kW-class ion propulsion technology developed for the Deep Space 1 mission will be used for NASA's discovery mission Dawn, which involves maneuvering a spacecraft to survey the asteroids Ceres and Vesta. The 6-kW-class ion thruster subsystem technology under NEXT is scheduled to be flight ready by calendar year 2006. The less mature 25- kW ion thruster system under HiPEP is expected to be ready for a flight advanced development program in calendar year 2006.

Patterson, Michael J.↗

Multi-Objective Boundary Analysis of Discrete and Integrated SiC FET Modular Non-inverting Buck and Boost Converters for Fuel Cell EVs

This paper presents a multi-objective analysis of discrete and integrated SiC FET-based non-inverting buck-boost converter modules for modular fuel cell electric vehicle (EV) systems. Two converter ratings, 60 kW and 90 kW, are evaluated for both implementations, scalable up to 420 kW and 450 kW, respectively. Performance is assessed across efficiency, volumetric and gravimetric power density, cost, thermal stress, and estimated lifetime, where lifetime is derived from SiC FET B10 power-cycling data and junction temperature variations at rated power. A normalized overall performance index combined with a Pareto-boundary framework is used to identify configurations that optimally balance competing objectives. Results show that most configurations lie on the Pareto front, providing balanced trade-offs, while certain high-power discrete (90 kW at 450 kW) and integrated (60 kW at 180−420 kW) configurations are dominated. In general, discrete modules are more favorable for lower-power modular systems due to higher power density and lower cost, whereas integrated modules become more advantageous at higher power levels due to improved thermal behavior and longer lifetime. These findings provide practical design guidance for scalable fuel cell converter architectures and highlight the importance of system-level trade-offs in modular power electronics design.

Asa, Erdem [ORNL] (ORCID:0000000190884812)↗

A Summary of Closed Brayton Cycle Development Activities at NASA

NASA has been involved in the development of Closed Brayton Cycle (CBC) power conversion technology since the 1960's. CBC systems can be coupled to reactor, isotope, or solar heat sources and offer the potential for high efficiency, long life, and scalability to high power. In the 1960's and 1970's, NASA and industry developed the 10 kW Brayton Rotating Unit (BRU) and the 2 kW mini-BRU demonstrating technical feasibility and performance, In the 1980's, a 25 kW CBC Solar Dynamic (SD) power system option was developed for Space Station Freedom and the technology was demonstrated in the 1990's as part of the 2 kW SO Ground Test Demonstration (GTD). Since the early 2000's, NASA has been pursuing CBC technology for space reactor applications. Before it was cancelled, the Jupiter Icy Moons Orbiter (HMO) mission was considering a 100 kWclass CBC system coupled to a gas-cooled fission reactor. Currently, CBC technology is being explored for Fission Surface Power (FSP) systems to provide base power on the moon and Mars. These recent activities have resulted in several CBC-related technology development projects including a 50 kW Alternator Test Unit, a 20 kW Dual Brayton Test Loop, a 2 kW Direct Drive Gas Brayton Test Loop, and a 12 kW FSP Power Conversion Unit design.

Mason, Lee S.↗

Towers: Critical Initial Infrastructure for the Moon, Such as a Power Module Support

Towers are an efficient structure commonly used to elevate systems against a gravity field, such as above the surface of a planet or the Moon. Towers can be used to elevate antennas, transmitters and sensors for communication, navigation, and observation infrastructure in support of surface operations. Near the Lunar poles, elevation of rotating solar panels enables nearly continuous panel illumination for solar power production despite the Sun remaining near the horizon year-round. Further, once technology is developed for tower assembly, this same technology can be extended to the assembly of a variety of structures including rocket blast containment shields, bridges, shelters, and habitats from either Earth-sourced or Lunar-sourced structural members. Environmental factors on the Lunar surface are vastly different than those found on Earth and have significant impact on the design of towers. Towers designed for the Lunar surface have no heritage nor Earth analog. The designs discussed herein are therefore breaking new ground creating a fundamentally new class of structures outside of current experience and intuition. The purpose of this paper is to: a) describe the unique environmental factors affecting tower design on the Lunar surface compared to Earth-based systems, b) evaluate two structural forms for the tower; telescoping tubes and an assembled truss, as well as c)provide recommendations on when each structural form is most suitable. A major contribution presented in the current paper is to provide parametric plots and supporting equations of mass and volume versus module power level and blanket height above the Lunar surface for the solar array application, to enable system level studies of optimum power module distribution and size. A secondary contribution are plots of the mass and volume of aluminum or structural glass required for assembled truss towers formed from Lunar derived structural members. An objective of achieving 1 MW of total power has been used to enable comparison of structural forms, because the total mass of solar arrays is consistent. It will be shown that for moderate module sizes, up to ~50 kW power modules, based on a telescoping tube tower have advantages, but for power modules from 50 kW to 200 kW an assembled truss tower can be created with half to one third of the tube tower mass. More significantly, when shipped from Earth, an assembled truss tower can be packed into 1/14th to 1/25th of the tube tower volume. Truss designs in the 100 kW to 200 kW range will be shown to be a favorable when assembled from either graphite-epoxy angles shipped from Earth or aluminum angles fabricated from Lunar materials. 50 kW towers are an attractive choice for both a telescoping or assembled tower with the solar arrays elevated 10 m above the Lunar surface, while increased solar array elevation favors 100 kW to 200 kW power modules.

assembly↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

Ion Thruster Power Levels Extended by a Factor of 10

In response to two NASA Office of Space Science initiatives, the NASA Glenn Research Center is now developing a 7-kW-class xenon ion thruster system for near-term solar-powered spacecraft and a 25-kW ion engine for nuclear-electric spacecraft. The 7-kW ion thruster and power processor can be throttled down to 1 kW and are applicable to 25-kW flagship missions to the outer planets, asteroids, and comets. This propulsion system was scaled up from the 2.5-kW ion thruster and power processor that was developed successfully by Glenn, Boeing, the Jet Propulsion Laboratory (JPL), and Spectrum Astro for the Deep Space 1 spacecraft. The 7-kW ion thruster system is being developed under NASA's Evolutionary Xenon Thruster (NEXT) project, which includes partners from JPL, Aerojet, Boeing, the University of Michigan, and Colorado State University.

Patterson, Michael J.↗

Techno-economic analysis of renewable energy generation at the South Pole

Transitioning from fossil-fuel power generation to renewable energy generation and energy storage in remote locations has the potential to reduce both carbon emissions and cost. Here, this study presents a techno-economic analysis for implementation of a hybrid renewable energy system at the South Pole in Antarctica, which currently hosts several high-energy physics experiments with nontrivial power needs. A tailored model of resource availability and economics for solar photovoltaics, wind turbine generators, lithium-ion energy storage, and long-duration energy storage at this site is explored in different combinations with and without existing diesel energy generation. The Renewable Energy Integration and Optimization (REopt) platform is used to determine the optimal system component sizing and the associated system economics and environmental benefit. We find that the least-cost system includes all three energy generation sources and lithium-ion energy storage. For an example steady-state load of 170 kW, this hybrid system includes 180 kW-DC of photovoltaic panels, 570 kW of wind turbines, and a 3.4 MWh lithium-ion battery energy storage system. This system reduces diesel consumption by 95% compared to an all -diesel configuration, resulting in approximately 1200 metric tons of carbon footprint avoided annually. Over the course of a 15-year analysis period the reduced diesel usage leads to a net savings of 57 million United States dollars, with a time to payback of approximately two years. All the scenarios modeled show that the transition to renewables is highly cost effective under the unique economics and constraints of this extremely remote site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GSE Yearly Load Profiles for Each Airport Under Six Charging Scenarios

This dataset contains GSE yearly load profiles for each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse_load_profile_sample_day.png) GSE load profile of a sample day across different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Charger Requirements for GSE at Each Airport

This dataset contains the required number of chargers for GSE at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fleet Size Requirements for Each GSE Type at Each Airport

This dataset contains the required number of vehicles for each GSE type at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse-vehicles-chargers.png) Number of GSE vehicles per GSE type and chargers required for different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lightweight diesel engine designs for commuter type aircraft

Conceptual designs and performance of advanced technology lightweight diesel engines, suitable for commuter type aircraft power plants are defined. Two engines are discussed, a 1491 kW (2000 SHP) eight-cylinder engine and a 895 kW (1200 SHP) six-cylinder engine. High performance and related advanced technologies are proposed such as insulated cylinders, very high injection pressures and high compressor and turbine efficiencies. The description of each engine includes concept drawings, a performance analysis, and weight data. Fuel flow data are given for full and partial power up to 7620m altitude. The performance data are also extrapolated over a power range from 671 kW(900SHP) to 1864 kW (2500 SHP). The specific fuel consumption of the 1491 kW (2000 SHP) engine is 182 g/hWh (.299 lb/HPh) at cruise altitude, its weight 620 kg (1365 lb.) and specific weight .415 kg/kW (.683 lb/HP). The specific fuel consumption of the 895 kW (1200 SHP) engine is 187 g/hWh (.308 lb/HPh) at cruise altitude, its weight 465 kg (1025 lb.) and specific weight .520 kg/kW (.854 lb/HP).

Brouwers, A. P.↗

Operating characteristics of the Russian D-55 thruster with anode layer

Performance measurements of a Russian engineering-model Thruster with Anode Layer (TAL) were obtained as part of a program to evaluate the operating characteristics of Russian Hall-thruster technology. The TAL model D-55 was designed to operate in the 1-2 kW power range on xenon. When received, the thruster had undergone only a few hours of acceptance testing by the manufacturer. Direct thrust measurements were obtained at a background pressure of 0.0003 Pa (2 x 10(exp -6) torr) at power levels ranging from 0.3 kW to 2.1 kW. At the nominal power level of 1.3 kW, a specific impulse level of 1600 s with a corresponding efficiency of 0.48 was attained. At all flow rates tested, the efficiency increased linearly with specific impulse until a maximum was reached, and then the efficiency leveled off. Increasing the anode flow rate shifted the efficiency upward, reaching 0.50 at 1850 s specific impulse. The thruster was equipped with inner and outer electromagnets which were isolated from the discharge and from each other. Variation of the magnetic field, obtained by changing the currents through the magnets, had little effect on performance, except at current levels below 70 percent of nominal. For a given operating condition, the performance was slightly affected by facility pressure. As the pressure was increased by a factor of thirty to 0.008 Pa (6 x 10(exp -5) torr), the current steadily increased by 4 percent, and the thrust increased by 2 percent. Performance comparisons were made with the Stationary Plasma Thruster, and the efficiency and specific impulse values were similar at power levels ranging from 0.9 kW to 1.5 kW. Endurance testing was not performed, and comparisons of lifetime were not made.

Sankovic, John M.↗