Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Fatigue Management in Spaceflight Operations

Sleep loss and fatigue remain an issue for crewmembers working on the International Space Station, and the ground crews who support them. Schedule shifts on the ISS are required for conducting mission operations. These shifts lead to tasks being performed during the biological night, and sleep scheduled during the biological day, for flight crews and the ground teams who support them. Other stressors have been recognized as hindering sleep in space; these include workload, thinking about upcoming tasks, environmental factors, and inadequate day/night cues. It is unknown if and how other factors such as microgravity, carbon dioxide levels, or increased radiation, may also play a part. Efforts are underway to standardize and provide care for crewmembers, ground controllers and other support personnel. Through collaborations between research and operations, evidenced-based clinical practice guidelines are being developed to equip flight surgeons with the tools and processes needed for treating circadian desynchrony (and subsequent sleep loss) caused by jet lag and shift work. The proper implementation of countermeasures such as schedules, lighting protocols, and cognitive behavioral education can hasten phase shifting, enhance sleep and optimize performance. This panel will focus on Fatigue Management in Spaceflight Operations. Speakers will present on research-based recommendations and technologies aimed at mitigating sleep loss, circadian desynchronization and fatigue on-orbit. Gaps in current mitigations and future recommendations will also be discussed.

Whitmire, Alexandra↗

Retracted Article: Distributed energy management for networked microgrids in a three-phase unbalanced distribution network

Owing to increased penetration of three-phase and single-phase microgrids, distributed energy resources (DERs), and responsive loads, the maintenance of a three-phase balance by distribution networks is a significant challenge. Existing literature on distributed energy management for networked microgrids generally neglects the distribution network or employs a simplified phase balanced distribution network; thus, these evaluations are not applicable. Further, the underlying mutual coupling between the different phases of distribution feeders results in a more challenging situation. Here, to solve this issue, this study sought to propose distributed energy management based on a three-phase unbalanced distribution network. Various three-phase or single-phase microgrids, utility-owned DERs, and responsive loads were coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) updated the schedules of the DERs and responsive loads under their jurisdiction separately. The price signals were then updated according to the generation-load mismatch at each node and distributed to the corresponding MCs and DMS for the next iteration. The iteration continued until a sufficiently small generation-load mismatch was achieved at all nodes, that is, a balanced generation and load at all nodes under the agreed price signals. Considering a three-phase unbalanced distribution network, the price signals were determined per phase per node. Overall, the proposed distributed energy management coordinates microgrids, utility-owned DERs, responsive loads with guaranteed network constraints, and preserves the privacy of microgrid customers. This distributed energy management method was further demonstrated through various case studies on a three-phase networked microgrid test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Radionuclide Inventory Threshold for Trench 31 and 34 Located Within the 200 West Area Low-Level Burial Grounds

Trenches 31 and 34 located in the 200 West Area Low-Level Burial Ground (LLBG) are authorized for disposal of low-level and mixed low-level radioactive waste under DOE Order 435.1, Radioactive Waste Management. A revised Disposal Authorization Statement was issued in October 2023 following approval of the performance assessment (PA) and supporting technical basis documents. To be consistent with approved PA calculations, the waste acceptance criteria (WAC) needs to be updated to include concentration limits for Category 1 (CAT1) and Category 3 (CAT3) waste along with the inventory limits. This environmental calculation file (ECF) provides the inventory limits for Category 1 and Category 3 waste disposal of radionuclides at Trench 31 and 34 based on the PA calculations. The concentration limits are not calculated as they are provided in the PA itself. The inventory thresholds (or limits) are calculated for only those radionuclides that are identified in the PA as the primary dose contributors. The primary dose contributors for the groundwater pathway are technetium-99, iodine-129, niobium-94, chlorine-36, molybdenum-93, and niobium-93m while those for the air pathway are tritium and carbon-14.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management: A continuing literature survey with indexes, March 1976

Management is a compilation of references to selected reports, journal articles, and other documents on the subject of management. This publication lists 368 documents originally announced in the 1975 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). It includes references on the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. It also includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.

Source record↗

Data management for support of the Oregon Transect Ecosystem Research (OTTER) project

Management of data collected during projects that involve large numbers of scientists is an often overlooked aspect of the experimental plan. Ecosystem science projects like the Oregon Transect Ecosystem Research (OTTER) Project that involve many investigators from many institutions and that run for multiple years, collect and archive large amounts of data. These data range in size from a few kilobytes of information for such measurements as canopy chemistry and meteorological variables, to hundreds of megabytes of information for such items as views from multi-band spectrometers flown on aircraft and scenes from imaging radiometers aboard satellites. Organizing and storing data from the OTTER Project, certifying those data, correcting errors in data sets, validating the data, and distributing those data to other OTTER investigators is a major undertaking. Using the National Aeronautics and Space Administration's (NASA) Pilot Land Data System (PLDS), a Support mechanism was established for the OTTER Project which accomplished all of the above. At the onset of the interaction between PLDS and OTTER, it was not certain that PLDS could accomplish these tasks in a manner that would aid researchers in the OTTER Project. This paper documents the data types that were collected under the auspices of the OTTER Project and the procedures implemented to store, catalog, validate, and certify those data. The issues of the compliance of investigators with data-management requirements, data use and certification, and the ease of retrieving data are discussed. We advance the hypothesis that formal data management is necessary in ecological investigations involving multiple investigators using many data gathering instruments and experimental procedures. The issues and experience gained in this exercise give an indication of the needs for data management systems that must be addressed in the coming decades when other large data-gathering endeavors are undertaken by the ecological science community.

Skiles, J. W.↗

The WISE Satellite Development: Managing the Risks and the Opportunities

NASA's Wide-field Infrared Survey Explorer (WISE) MIDEX mission is surveying the entire sky in four infrared bands from 3.4 to 22 micrometers. The WISE instrument consists of a 40 cm telescope, a solid hydrogen cryostat, a scan mirror mechanism, and four 1K x1K infrared detectors. The WISE spacecraft bus provides communication, data handling, and avionics including instrument pointing. A Delta 7920 successfully launched WISE into a Sun-synchronous polar orbit on December 14, 2009. WISE was competitively selected by NASA as a Medium cost Explorer mission (MIDEX) in 2002. MIDEX missions are led by the Principal Investigator who delegates day-to-day management to the Project Manager. Given the tight cost cap and relatively short development schedule, NASA chose to extend the development period one year with an option to cancel the mission if certain criteria were not met. To meet this and other challenges, the WISE management team had to learn to work seamlessly across institutional lines and to recognize risks and opportunities in order to develop the flight hardware within the project resources. In spite of significant technical issues, the WISE satellite was delivered on budget and on schedule. This paper describes our management approach and risk posture, technical issues, and critical decisions made.

Risk Management↗

Selection of Components for the Remote, Canister-Monitoring System

This report documents the selection of components as part of the efforts initiated to develop a remote, canister-monitoring system (RCMS) for determining and monitoring environmental conditions within dry fuel storage canisters containing aluminum clad spent nuclear fuel (ASNF) at the Idaho National Laboratory (INL). These efforts are in support of Department of Energy Office of Environmental Management (DOE-EM) investigations into technical issues associated with extended dry storage (50+ years) of ASNF. The capability to establish and monitor the performance of ASNF in situ provides the opportunity to (1) evaluate the appropriate technologies for monitoring, (2) collect canister environment conditions as soon as possible, (3) verify and validate current laboratory-based study results and analytic modeling approaches, and (4) potentially identify additional dry storage options for ASNF at the INL site. The improved understanding of ASNF behavior gained by performing this work would also contribute to the safety basis for extended dry storage in current and future configurations as well as to provide information for future transportation, conditioning, and disposal of ASNF. The parameters to be monitored by the RCMS include temperature, relative humidity, hydrogen gas concentration and radiation environment (dose). Components are selected based on the expected environmental conditions within the canister and fuel storage area, and the desired performance of the RCMS. Several of these components have been purchased and received. Future activities include component testing and calibration, software development for operation of the integrated sensor module and fabrication of a representative test volume. The results of these tests and changes to desired performance characteristics will inform subsequent activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hubble Space Telescope: SRM/QA observations and lessons learned

The Hubble Space Telescope (HST) Optical Systems Board of Investigation was established on July 2, 1990 to review, analyze, and evaluate the facts and circumstances regarding the manufacture, development, and testing of the HST Optical Telescope Assembly (OTA). Specifically, the board was tasked to ascertain what caused the spherical aberration and how it escaped notice until on-orbit operation. The error that caused the on-orbit spherical aberration in the primary mirror was traced to the assembly process of the Reflective Null Corrector, one of the three Null Correctors developed as special test equipment (STE) to measure and test the primary mirror. Therefore, the safety, reliability, maintainability, and quality assurance (SRM&QA) investigation covers the events and the overall product assurance environment during the manufacturing phase of the primary mirror and Null Correctors (from 1978 through 1981). The SRM&QA issues that were identified during the HST investigation are summarized. The crucial product assurance requirements (including nonconformance processing) for the HST are examined. The history of Quality Assurance (QA) practices at Perkin-Elmer (P-E) for the period under investigation are reviewed. The importance of the information management function is discussed relative to data retention/control issues. Metrology and other critical technical issues also are discussed. The SRM&QA lessons learned from the investigation are presented along with specific recommendations. Appendix A provides the MSFC SRM&QA report. Appendix B provides supplemental reference materials. Appendix C presents the findings of the independent optical consultants, Optical Research Associates (ORA). Appendix D provides further details of the fault-tree analysis portion of the investigation process.

Rodney, George A.↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗

Compound flood simulations indicate rising public exposure to sewage-contaminated waters in Waikīkī, Hawai‘i

Waikīkī, Hawai‘i serves as a valuable case study for flood vulnerability due to its low elevation, present-day exposure to multiple flood sources, and role as the state’s economic engine. This study applies the high-resolution, open-source WRF-Hydro-CUFA (Coastal Urban Flood Application) model to simulate compound flood interactions among pluvial, fluvial, coastal, storm drain-driven, and subsurface processes, and to evaluate how flood characteristics in Waikīkī evolve under projected sea-level rise (SLR). Simulated water levels in an estuarine drainage canal, serving as the primary outlet for gravity-flow drainage from Waikīkī, show strong agreement with observations (r ≥ 0.935, R 2 ≥ 0.874), accurately reproducing flooding observed during recent 5-year and 50-year storm events. Simulations incorporating SLR demonstrate a shift in dominant flood drivers as sea levels rise. In addition, results identify critical thresholds at which elevated estuarine tailwater conditions cause widespread drainage backflow, eventually occurring in the absence of rainfall. These findings suggest that tidally driven flooding will progressively dominate over rainfall-driven events, increasing public exposure to highly contaminated canal and groundwater sources. The results underscore the urgent need to integrate water quality issues and drainage failure into coastal flood management strategies for low-lying urban environments, particularly those reliant on polluted estuarine waterways for stormwater management.

Compound flooding↗

Considerations for Department of Defense Implementation of Zero-Emission Vehicles and Charging Infrastructure

This guide provides a roadmap to comply with Executive Order (EO) 14057 requirements and transition to a zero-emission vehicle (ZEV) fleet efficiently and quickly. EO 14057 on Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability requires the Department of Defense (DoD) to transition its non-tactical vehicles to a 100% ZEV fleet, including 100% of light-duty acquisitions by 2027 and 100% of medium- and heavy-duty acquisitions by 2035. The report covers planning for ZEVs and electric vehicle supply equipment (EVSE), roles and responsibilities of key stakeholders in designing EVSE, and execution issues including acquisition, installation, and ongoing fleet management.

33 ADVANCED PROPULSION SYSTEMS↗

A Comprehensive Survey of Coal Ash Law and Commercialization: Its Environmental Risks, Disposal Regulation, and Beneficial Use Markets

This white paper was commissioned by the National Association of Regulatory Utility Commissioners (NARUC) under a grant from the U.S. Department of Energy (DOE), in response to a major rule, Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities; Final Rule (Final Rule) issued by the U.S. Environmental Protection Agency (EPA) on April 17, 2015, on coal ash disposal and remediation of disposal sites, which has significant implications to states. It subjects state environmental agencies and public utility commissions to regulatory responsibilities to implement federal regulations under the Final Rule and oversee the cost implications on electric customers. To better evaluate the regulatory issues underlying the choices facing utilities and independent power producers (IPPs) regarding coal ash management options under the Final Rule, an overview of coal ash production and disposal practices is helpful. This comprehensive survey provides background information on the following topics: (a) coal ash production by a coal combustion generation plant, (b) the historical practices of utility waste management practices, (c) coal ash toxicity and related constituents, (d) further understanding of potential impacts to groundwater, and (e) the aging structures and outdated designs of coal ash surface impoundments and landfills.

01 COAL, LIGNITE, AND PEAT↗

NASA technology transfer in the southwest states - Arizona, Colorado, Nevada and Utah

Features of the NASA Regional Application Program for providing state and local land management agencies an opportunity to assess the usefulness of emerging remote sensing technology are described. The Program guidelines necessitated configuring software for local facilities, assuring that the aggncy involved furnished manpower, and applying the technology to local needs. The study focused on the southwestern U.S., particularly for purposes of water management, federal/state ownership/policy, energy development, environmental impact issues, timber and range inventory, fire control, and urban expansion. Demonstration projects were conducted in various topics, according to the state surveyed, with the success of the projects determined by the willingness of the agencies to continue with the technology, which happened in several cases.

Norman, S. D.↗

System software for the finite element machine

The Finite Element Machine is an experimental parallel computer developed at Langley Research Center to investigate the application of concurrent processing to structural engineering analysis. This report describes system-level software which has been developed to facilitate use of the machine by applications researchers. The overall software design is outlined, and several important parallel processing issues are discussed in detail, including processor management, communication, synchronization, and input/output. Based on experience using the system, the hardware architecture and software design are critiqued, and areas for further work are suggested.

Crockett, T. W.↗

Design of an advanced flight planning system

The demand for both fuel conservation and four-dimensional traffic management require that the preflight planning process be designed to account for advances in airborne flight management and weather forecasting. The steps and issues in designing such an advanced flight planning system are presented. Focus is placed on the different optimization options for generating the three-dimensional reference path. For the cruise phase, one can use predefined jet routes, direct routes based on a network of evenly spaced grid points, or a network where the grid points are existing navaid locations. Each choice has its own problem in determining an optimum solution. Finding the reference path is further complicated by choice of cruise altitude levels, use of a time-varying weather field, and requiring a fixed time-of-arrival (four-dimensional problem).

Sorensen, J. A.↗

Blazing the trailway - Nuclear electric propulsion and its technology program plans

An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for outer space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.

Doherty, Michael P.↗

Blazing the trailway: Nuclear electric propulsion and its technology program plans

An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.

Doherty, Michael P.↗