Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “human landers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Space Exploration Applications for Development of High Capacity Cryocoolers

Long term storage of cryogens is necessary to enable NASAs long duration crewed missions to both the lunar and Martian surfaces. Such missions require in-space transport systems such as Nuclear Thermal Propulsion (NTP), and descent/ascent vehicles for transportation to and from the lunar and Martian surfaces. NTP systems and Lunar/Martian landers utilize cryogenic fluids to minimize architectural volume and mass. To further enhance the capability of these cryogenic systems, the Agency is putting emphasis on reusability, which requires the NTP and ascent/descent elements be replenished on-orbit via tankers or propellant depots, or on the lunar or Martian surface using liquefied in-situ produced propellants. NTP is one of the leading propulsion option for human Mars missions and requires liquid hydrogen to be stored on-orbit for over four years. For such a long duration mission, near “Zero Boil-Off” (ZBO) must be achieved which requires an optimized suite of passive Cryogenic Fluid Management technologies and active cooling (cryocoolers). Tens of Watts of 20K cooling is required to achieve ZBO conditions for NTP, however two-stage cooling using both 20K and 90K systems can lead to a significant reduction in both active cooling mass and power. The use of in-situ resources for lunar and Martian missions will require 150 Watts of 90K cooling for oxygen liquefaction and 300 Watts of 20K cooling for hydrogen liquefaction (lunar only). Descent/Ascent vehicles, propellant depots, and tankers will also require the use of cryocoolers to achieve ZBO conditions. To support these programs, NASA is developing high capacity 20K and 90K reverse turbo-Brayton cycle cryocoolers which offer a scalable, high efficiency, low vibration solution.

cryocooler↗

Robotic lunar surface operations: Engineering analysis for the design, emplacement, checkout and performance of robotic lunar surface systems

The assembly, emplacement, checkout, operation, and maintenance of equipment on planetary surfaces are all part of expanding human presence out into the solar system. A single point design, a reference scenario, is presented for lunar base operations. An initial base, barely more than an output, which starts from nothing but then quickly grows to sustain people and produce rocket propellant. The study blended three efforts: conceptual design of all required surface systems; assessments of contemporary developments in robotics; and quantitative analyses of machine and human tasks, delivery and work schedules, and equipment reliability. What emerged was a new, integrated understanding of hot to make a lunar base happen. The overall goal of the concept developed was to maximize return, while minimizing cost and risk. The base concept uses solar power. Its primary industry is the production of liquid oxygen for propellant, which it extracts from native lunar regolith. Production supports four lander flights per year, and shuts down during the lunar nighttime while maintenance is performed.

Woodcock, Gordon R.↗

Constellation Architecture and System Margins Strategy

NASA's Constellation Program (CxP) is responsible for the definition, design, development, and operations of the flight, ground, and mission operations elements being developed by the United States for the human exploration of the Moon, Mars, and beyond. This paper provides an overview of the latest CxP technical architecture baseline, driving requirements, and reference missions for initial capability to fly to the International Space Station (ISS) and to the Moon. The results of the most recent design decisions and analyses supporting the architecture, including the Ares I, Ares V, Orion crew exploration vehicle, and the Altair lunar lander will be presented.

Muirhead, Brian↗

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

In 2011, NASA released a report assessing the market for commercial crew and cargo services to low Earth orbit (LEO). The report stated that NASA had spent a few hundred million dollars in the Commercial Orbital Transportation Services (COTS) program on the portion related to the development of the Falcon 9 launch vehicle. Yet a NASA cost model predicted the cost would have been significantly more with a non-commercial cost-plus contracting approach. By 2016 a NASA request for information stated it must "maximize the efficiency and sustainability of the Exploration Systems development programs", as "critical to free resources for reinvestment...such as other required deep space exploration capabilities." This work joins the previous two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for "...other required deep space exploration capabilities." These other capabilities include landers, stages and more. We mature the concept of "costed baseball cards", adding cost estimates to NASA's space systems "baseball cards." We show some potential costs, including analysis, the basis of estimates, data sources and caveats to address a critical question - based on initial assessment, are significant agency resources justified for more detailed analysis and due diligence to understand and invest in public private partnerships for human deep space exploration systems? The cost analysis spans commercial to cost-plus contracting approaches, for smaller elements vs. larger, with some variation for lunar or Mars. By extension, we delve briefly into the potentially much broader significance of the individual cost estimates if taken together as a NASA investment portfolio where public private partnership are stitched together for deep space exploration. How might multiple improvements in individual systems add up to NASA human deep space exploration achievements, realistically, affordably, sustainably, in a relevant timeframe?

cost modeling estimation↗

Analysis of Shroud Options in Support of the Human Exploration of Mars

In support of the Mars Design Reference Architecture (DRA) 5.0, the NASA study team analyzed several shroud options for use on the Ares V launch vehicle.1,2 These shroud options included conventional "large encapsulation" shrouds with outer diameters ranging from 8.4 to 12.9 meters (m) and overall lengths of 22.0 to 54.3 meters, along with a "nosecone-only" shroud option used for Mars transfer vehicle component delivery. Also examined was a "multi-use" aerodynamic encapsulation shroud used for launch, Mars aerocapture, and entry, descent, and landing of the cargo and habitat landers. All conventional shroud options assessed for use on the Mars launch vehicles were the standard biconic design derived from the reference shroud utilized in the Constellation Program s lunar campaign. It is the purpose of this paper to discuss the technical details of each of these shroud options including material properties, structural mass, etc., while also discussing both the volume and mass of the various space transportation and surface system payload elements required to support a "minimum launch" Mars mission strategy, as well as the synergy, potential differences and upgrade paths that may be required between the Lunar and Mars mission shrouds.

Feldman, Stuart↗

Flow Simulations for Martian and Lunar Lander Plume-Surface Interaction Prediction

Landing vehicle propulsive systems introduce several risks associated with plume/surface interactions (PSI) during the final stages of descent. For example, view obscuration during descent due to the liberation of dust driven by the rocket plume’s interaction with the lunar surface was reported on several Apollo missions. Plume-driven debris impacts on vehicle and nearby assets as well as landing instabilities due to crater formation are also potential risks associated with plume/surface interactions. The importance of studying these plume/surface interactions has been elevated due to NASA’s mission to land humans on the Moon by 2024. Existing and under-development predictive simulation tools are currently being brought to application readiness under a project awarded by the NASA Space Technology Mission Directorate (STMD) Game Changing Development (GCD) program. This tool development is divided into four tasks: (1) simulating plume structure in low-pressure environments, (2) simulating crater development and ejecta, (3) regolith particle phase modeling, and (4) gas-particle interaction modeling. Recent efforts under task 1 include demonstrating existing computational fluid dynamics (CFD) tools for simulating plume structure in low pressure environments similar to those found on Mars. The results of these demonstrative simulations are compared to available experimental data. Emerging capability being developed under task 2 is also presented, demonstrating simulations of crater formation in Lunar conditions.

Thomas P Shurtz↗

A search for life on earth at 100 meter resolution

A study of several thousand photos indicated approximately 1% of Gemini and Apollo photographs of the earth at 100 m resolution revealed signs of life; rectangular arrays due to human agricultural and urban territoriality, roads, canals, jet contrails, and industrial pollution. Potential false positives such as dunes, sand bars, and jet stream clouds abound. A curve was derived for the detectivity of contemporary life on earth, in a plot of ground resolution versus global coverage. A comparable biology on Mars would not have been detected by all observations of Mars through Mariner 7. Forthcoming Mars orbiter and lander imaging experiments hold significant promise of detecting life on Mars of contemporary terrestrial extent and advancement, should such life exist.

Sagan, C.↗

The Walkback Test: A Study to Evaluate Suit and Life Support System Performance Requirements for a 10 Kilometer Traverse in a Planetary Suit

As planetary suit and planetary life support systems develop, specific design inputs for each system relate to a presently unanswered question concerning operational concepts: What distance can be considered a safe walking distance for a suited EVA crew member exploring the surface of the Moon to "walk-back" to the habitat in the event of a rover breakdown, taking into consideration the planned EVA tasks as well as the possible traverse back to the habitat? It has been assumed, based on Apollo program experience, that 10 kilometers (6.2 mi) will be the maximum EVA excursion distance from the lander or habitat to ensure the crew member s safe return to the habitat in the event of a rover failure. To investigate the feasibility of performing a suited 10 km Walkback, NASA-JSC assembled a multi-disciplinary team to design and implement the Lunar Walkback Test . The test was designed not only to determine the feasibility of a 10 km excursion, but also to collect human performance, biomedical, and biomechanical data relevant to optimizing space suit design and life support system sizing. These data will also be used to develop follow-on studies to understand interrelationships of such key parameters as suit mass, inertia, suit pressure, and center of gravity (CG), and the respective influences of each on human performance.

Vos, Jessica R.↗

NASA's Ares I and Ares V Launch Vehicles--Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) is charting a renewed course for lunar exploration, with the fielding of a new human-rated space transportation system to replace the venerable Space Shuttle, which will be retired after it completes its missions of building the International Space Station (ISS) and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Altair Lunar Lander, which will be delivered by the Ares V Cargo Launch Vehicle (fig. 1). This configuration will empower rekindled investigation of Earth's natural satellite in the not too distant future. This new exploration infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit (LEO) for extended lunar missions and preparation for the first long-distance journeys to Mars. All space-based operations - to LEO and beyond - are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective architecture solutions to sustain this multi-billion-dollar program across several decades. Leveraging SO years of lessons learned, NASA is partnering with private industry and academia, while building on proven hardware experience. This paper outlines a few ways that the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Constellation Program and its project offices to streamline ground operations concepts by designing for operability, which reduces lifecycle costs and promotes sustainable space exploration.

Singer, Christopher E.↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

Integrated Network Architecture for NASA's Orion Missions

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. The series of missions will begin with a new crew exploration vehicle (called Orion) that will initially provide crew exchange and cargo supply support to the International Space Station (ISS) and then become a human conveyance for travel to the Moon. The Orion vehicle will be mounted atop the Ares I launch vehicle for a series of pre-launch tests and then launched and inserted into low Earth orbit (LEO) for crew exchange missions to the ISS. The Orion and Ares I comprise the initial vehicles in the Constellation system of systems that later includes Ares V, Earth departure stage, lunar lander, and other lunar surface systems for the lunar exploration missions. These key systems will enable the lunar surface exploration missions to be initiated in 2018. The complexity of the Constellation system of systems and missions will require a communication and navigation infrastructure to provide low and high rate forward and return communication services, tracking services, and ground network services. The infrastructure must provide robust, reliable, safe, sustainable, and autonomous operations at minimum cost while maximizing the exploration capabilities and science return. The infrastructure will be based on a network of networks architecture that will integrate NASA legacy communication, modified elements, and navigation systems. New networks will be added to extend communication, navigation, and timing services for the Moon missions. Internet protocol (IP) and network management systems within the networks will enable interoperability throughout the Constellation system of systems. An integrated network architecture has developed based on the emerging Constellation requirements for Orion missions. The architecture, as presented in this paper, addresses the early Orion missions to the ISS with communication, navigation, and network services over five phases of a mission: pre-launch, launch from T0 to T+6.5 min, launch from T+6.5 min to 12 min, in LEO for rendezvous and docking with ISS, and return to Earth. The network of networks that supports the mission during each of these phases and the concepts of operations during those phases are developed as a high level operational concepts graphic called OV-1, an architecture diagram type described in the Department of Defense Architecture Framework (DoDAF). Additional operational views on organizational relationships (OV-4), operational activities (OV-5), and operational node connectivity (OV-2) are also discussed. The system interfaces view (SV-1) that provides the communication and navigation services to Orion is also included and described. The challenges of architecting integrated network architecture for the NASA Orion missions are highlighted.

Bhasin, Kul B.↗

NASA's Space Launch System (SLS) Program: Mars Program Utilization

NASA's Space Launch System is being designed for safe, affordable, and sustainable human and scientific exploration missions beyond Earth's orbit (BEO), as directed by the NASA Authorization Act of 2010 and NASA's 2011 Strategic Plan. This paper describes how the SLS can dramatically change the Mars program's science and human exploration capabilities and objectives. Specifically, through its high-velocity change (delta V) and payload capabilities, SLS enables Mars science missions of unprecedented size and scope. By providing direct trajectories to Mars, SLS eliminates the need for complicated gravity-assist missions around other bodies in the solar system, reducing mission time, complexity, and cost. SLS's large payload capacity also allows for larger, more capable spacecraft or landers with more instruments, which can eliminate the need for complex packaging or "folding" mechanisms. By offering this capability, SLS can enable more science to be done more quickly than would be possible through other delivery mechanisms using longer mission times.

May, Todd A.↗

Advanced Spacecraft Designs in Support of Human Missions to Earth's Neighborhood

NASA's strategic planning for technology investment draws on engineering studies of potential future missions. A number of hypothetical mission architectures have been studied. A recent study completed by The NASA/JSC Advanced Design Team addresses one such possible architecture strategy for missions to the moon. This conceptual study presents an overview of each of the spacecraft elements that would enable such missions. These elements include an orbiting lunar outpost at lunar L1 called the Gateway, a lunar transfer vehicle (LTV) which ferries a crew of four from the ISS to the Gateway, a lunar lander which ferries the crew from the Gateway to the lunar surface, and a one-way lunar habitat lander capable of supporting the crew for 30 days. Other supporting elements of this architecture discussed below include the LTV kickstage, a solar-electric propulsion (SEP) stage, and a logistics lander capable of re-supplying the 30-day habitat lander and bringing other payloads totaling 10.3 mt in support of surface mission activities. Launch vehicle infrastructure to low-earth orbit includes the Space Shuttle, which brings up the LTV and crew, and the Delta-IV Heavy expendable launch vehicle which launches the landers, kickstage, and SEP.

Fletcher, David↗

Lander Lighting Solution to Reduce Pilot & Autonomous Approach Errors

The south pole lighting environment will have harsh low inclination sunlight, making overhead judgement of surface features difficult. Autonomous solutions are great, however, the need for visual monitoring and independent go/no-go decisions remain. Our project proposes that lunar landing systems will be better served by including a powerful landing light system that improves visibility of surfaces from overhead by illuminating the ground at critical distances for the crew to make last minute decisions regarding an approach. The project utilized computer-based optical modeling software to predict requirements for a potential landing light system. The analysis based the lamp prediction from commercially available LED chip sets and lamp optics. The goal was to illustrate a method to raise the surface contrast of a landing site within an acceptable contrast threshold for most camera systems and human observers to recognize hazards that would not be noticed with low inclination sunlight alone. The Apollo lunar landings benefitted from overhead sun or dark conditions. The surface lighting at the Lunar South Pole is a harsh environment where surfaces are lit from a low inclination angle by the sun (from the side). This change in lighting condition precipitates a need for updated lunar landing systems that facilitate improved recognition of landing sites, and thereby increase pilot awareness of landing hazards. The reliance on LIDAR and other autonomous mechanisms alone is risky given the known usage of visual monitoring for operator concurrence on current spacecraft programs and present-day autonomous land-based vehicles. Visual monitoring via cameras or windows requires the surface contrast to be within 3 orders of magnitude for reasonable recognition of objects. Artificial overhead illumination, when sufficiently sized, provides a means to even out contrast problems created by low inclination sunlight, potentially reducing piloting errors. Current vehicle requirements do not specify this type of guidance for the purpose of increasing mission success. An optical ray-trace simulation model was developed in Zemax Optics Studio to predict the best combination of LED power, LED optics, lamp quantity, and lamp location to raise the surface contrast to within 2 orders of magnitude from 3 orders required to further increased visibility and reduce risk. The project considered the following design constraints: potential base diameter of lander, approach distance(s) for a go-no-go decision point (200 meter), solar inclination angle (2-7), lunar surface reflectance (10%), LED chip sets, LED focusing optics, LED power, lamp quantity, lamp locations, and illumination diameter of lunar surface landing zone. The results can be used to establish minimum design constraints for vehicle landing light systems. With a solar inclination angle ranging from 2-7 degrees, the horizontal illumination of the lunar surface is attenuated by about 10% when compared to overhead illumination from the Sun. This modifies the sun's maximum of 130,000 lux to 13,000 lux horizontal illuminance. The artificial lighting system was designed to provide an 18-meter-wide illumination zone, to create viewing clearances around a 6-meter-wide lander. The system provides an average illuminance of 300 lux, meeting the 2 orders of magnitude criteria. The solution utilized modern Chip On Board LEDs, that each utilized 17 watts, with focusing Total Internal Reflection (TIR) lenses. A lighting system of 300 LEDs was arrayed along the "bottom" of a “lander”. With 17 watts per LED, the system is estimated to require 5100 watts. This is a large amount of power, but it would only be needed during critical phases during the landing. LED lighting systems can be dimmed, and it is assumed that as the lander arrives closer to the landing site, the lighting system power can be adjusted as needed to produce the necessary surface illuminance. The designed reduction of contrast improves reliability of safety assessments using real time visible light camera systems and out the window viewing by the crew.

T A Clark↗

Designing the Ares I Crew Launch Vehicle Upper Stage Element and Integrating the Stack at NASA's Marshall Space Flight Center

Fielding an integrated launch vehicle system entails many challenges, not the least of which is the fact that it has been over 30 years since the United States has developed a human-rated vehicle - the venerable Space Shuttle. Over time, whole generations of rocket scientists have passed through the aerospace community without the opportunity to perform such exacting, demanding, and rewarding work. However, with almost 50 years of experience leading the design, development, and end-to-end systems engineering and integration of complex launch vehicles, the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center offers the in-house talent - both junior- and senior-level personnel - to shape a new national asset to meet the requirements for safe, reliable, and affordable space exploration solutions. The technical personnel are housed primarily in Marshall's Engineering Directorate and are matrixed into the programs and projects that reside at the rocket center. Fortunately, many Apollo-era and Shuttle engineers, as well as those who gained valuable hands-on experience in the 1990s by conducting technology demonstrator projects such as the Delta-Clipper Experimental Advanced, X-33, X-34, and X-37, as well as the short-lived Orbital Space Plane, work closely with industry partners to advance the nation's strategic capability for human access to space. The Ares Projects Office, resident at Marshall, is managing the design and development of America's new space fleet, including the Ares I, which will loft the Orion crew capsule for its first test flight in the 2013 timeframe, as well as the heavy-lift Ares V, which will round out the capability to leave low-Earth orbit once again, when it delivers the Altair lunar lander to orbit late next decade. This paper provides information about the approach to integrating the Ares I stack and designing the upper stage in house, using unique facilities and an expert workforce to revitalize the nation's space exploration resources.

Otte, Neil E.↗

Ares V: A National Launch Asset for the 21st Century

NASA is designing the Ares V as the cargo launch vehicle to carry NASA's exploration plans into the 21st century. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study, NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V also represents a national asset offering opportunities for new science, national security, and commercial missions of unmatched size and scope. Using the dual-launch Earth Orbit Rendezvous approach, the Ares I and Ares V together will be able to inject roughly 57percent more mass to the Moon than the Apollo-era Saturn V. Ares V alone will be able to send nearly 414,000 pounds into low Earth orbit (LEO) or more than 138,000 pounds directly to the Moon, compared with 262,000 pounds and 99,000 pounds, respectively for the Saturn V. Significant progress has been made on the Ares V to support a planned fiscal 2011 authority-to-proceed (ATP) milestone. This paper discusses recent progress on the Ares V and planned future activities.

Sumrall, Phil↗

The MECA Payload as an Exobiology Laboratory on the MSP 2001 Lander

The "Mars Environmental Compatibility Assessment" (MECA) payload for Mars Surveyor Project 2001 (MSP 2001) is comprised of a multifunctional laboratory equipped to assess martian soil properties with wet chemistry, camera imagery, optical microscopy (potentially with UV fluorescence capability), atomic force microscopy (AFM; potentially with mineral-discrimination capabilities), electrometry, active & passive external materials-test panels, mineral hardness testing, and electrostatic and magnetic materials testing. Additionally, evaluation of soil chemical and physical properties as a function of depth down to -50 cm will be facilitated by the Lander/MECA robot arm on which the camera (RAC) and electrometer are mounted. MECA was designed as a NASA Human Exploration and Development of Space (HEDS) payload for determining the properties of martian soil that may be detrimental to human exploration. It is, however, well equipped to address exobiology questions in the following areas: (1)Geochemical clues to Aqueous Mineralogy and Oxidant formation; (2) Soil structures and microfabrics as indicators of water-volatiles migration; (3) Minerals and rocks as clues to ancient hydrology; (4) Grain textures as indicators of aqueous activity and weathering. Additional information is contained in the original.

Marshall, J.↗

A Distributed Simulation Framework Applied to Artemis Analysis, Studies, Integration, and Test

The National Aeronautics and Space Administration (NASA) established the Artemis Program, a series of missions to return humans to the Moon and explore further than before. To execute the Artemis missions, NASA is collaborating with commercial and international partners to create the necessary infrastructure and logistics plan that will establish a long term presence on the Moon ahead of exploring Mars. NASA and its partners are developing a collection of space and surface systems to support crewed missions to the lunar surface that will provide the mobility, habitation, logistics, and exploration support necessary for Artemis mission successes which includes robust scientific investigations. This paper details the design, capabilities, and uses of the Artemis Distributed Simulation (ADS) being developed by the NASA Exploration Systems Simulations (NExSyS) Team to support Artemis architecture studies. ADS utilizes international interoperability standards to connect a collection of independent vehicle and service simulations; these include but are not limited to elements such as rovers, landers, and habitation elements along with services like communications, environment, visualization, and data logging. ADS’s distributed nature allows for the complex aggregation of constituent Artemis elements; this includes efficient scenario modification with the addition or removal of individual simulations representing Artemis elements or services. This capability provides support for the rapid performance of various Artemis mission trade studies exploring alternate configurations. Currently, ADS uses NASA developed simulations for development and testing; however, through the use of international simulation interoperability standards, ADS provides an integration framework to incorporate dissimilar authoritative vendor simulations as Artemis systems mature and vendor simulations become available. Vendor simulations will be able to join ADS and interact with other Artemis elements and vehicles while limiting the exposure of proprietary data. This paper describes the expansion of an existing distributed simulation infrastructure to accommodate a collaborative and dynamic framework for the Artemis Program. This work includes updated federation designs, integration into existing NASA facilities, advancements in visualizations, and advancements in human driven inputs. This paper will also outline recently completed and ongoing support and collaboration with NASA studies and testing, namely results from energetics and Human-In-The-Loop (HITL) studies. The paper concludes with a plan for future developments and facility integration to enable enhanced studies in preparation for a return of humans to the lunar surface.

Artemis↗