Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid simulator testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

EchemAMR (electro-chemical microsctructure scale models with adaptive meshing) [SWR-23-111]

A 3D microstructure resolving electrochemical transport and interfacial chemistry solver. Electrode microstructure plays an important role in determining the performance of an electrochemical system, e.g. lithium ion battery. EchemAMR is a microstructure scale model that solves the governing equations for ion transport, electrical current continuity, interfacial chemistry and structural mechanics. Complex microstructure geometries from imaging can be directly imported into EchemAMR. A volume fraction based description of the geometry on Cartesian grid with an immersed interface formulation enables simplified meshing and large-scale simulations with millions of degrees of freedom. EchemAMR has been tested against systems with analytic solutions for numerical convergence and highly resolved lithium ion battery microstructures. EchemAMR demonstrates excellent mass conversation and efficient scaling on heterogenous High-Performance Computing (HPC) with central and graphics processing units.

Sitaraman, Hariswaran↗

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering↗

CFD Modeling for Active Flow Control

This presentation describes current work under UEET Active Flow Control CFD Research Tool Development. The goal of this work is to develop computational tools for inlet active flow control design. This year s objectives were to perform CFD simulations of fully gridded vane vortex generators, micro-vortex genera- tors, and synthetic jets, and to compare flowfield results with wind tunnel tests of simple geometries with flow control devices. Comparisons are shown for a single micro-vortex generator on a flat plate, and for flow over an expansion ramp with sidewall effects. Vortex core location, pressure gradient and oil flow patterns are compared between experiment and computation. This work lays the groundwork for evaluating simplified modeling of arrays of devices, and provides the opportunity to test simple flow control device/sensor/ control loop interaction.

Buning, Pieter G.↗

Flicker Mitigation for a Grid-Connected Tidal and River Power Generator Using the BESS

In the grid-connected tidal and river power generation, the water turbulence and the grid condition can induce the fluctuating output power. This power fluctuation may cause a power quality issue such as flicker, or voltage fluctuations, during the continuous operation. Hence, it is important to assess flicker emission and to mitigate flicker in order to solve this power quality issue. This paper proposes a Battery Energy Storage System (BESS)installed between the power converters of the tidal and river power system in order to mitigate flickers in different grid conditions. The BESS smooths the active power fluctuations and reduces flicker even from the weak grid with the low impedance angle in the distribution network. The feasibility of the proposed BESS system has been tested using a simplified simulation model with interconnected inverters developed in the validated simulation tool of PSCAD/EMTDC, and the obtained results from the case studies are presented.

16 TIDAL AND WAVE POWER↗

A Blockchain Based Co-Simulation Framework for Integrating DERs to Wholesale Electricity Markets

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain interoperability↗

Towards Predictive Reacting Flow LES

Grid dependency and the interaction of numerical errors with those from physical models can negatively impact the predictive capabilities of the traditional large eddy simulation (LES) approach. This paper attempts to address these issues for the simulation of turbulent reacting flows, where the canonical problem of a temporally evolving reacting jet is used as a test case. The impact of implicit and explicit filtering of the governing system of equations, and the impact of removing grid dependency from physical models through application of a constant filter width, is assessed. Four different grid resolutions are employed in the study. Differences are experienced in mean velocity and temperature profiles with grid resolution refinement when using the traditional implicit filtering approach, demonstrating the grid dependency of the obtained solutions. These differences are substantially mitigated by fixing the filter width used in physical models to a constant value, as the grid resolution is refined. Explicit filtering utilizing discrete filters reduces these differences even further, but to a smaller degree. This latter improvement comes at a very substantial computational cost. Higher Reynolds number cases need to be studied, where the LES resolution is far from that of a DNS, in order for a more conclusive assessment of the benefit of the explicit filtering approach to be made. However, even if explicit filtering is found to have a large positive impact on the predictive capabilities of reacting flow LES, its computational cost is likely to prevent it from being routinely applied to large, complex geometries, at least for the case where discrete filters are used.

Cocks, Peter A.↗

Full wave modeling of radio-frequency beams in tokamaks in the electron cyclotron frequency range

Simulation of full wave, without paraxial approximation, high-resolution solution of wave equations in frequency domain in the electron cyclotron resonance (ECR) frequency range for realistic Tokamak plasma parameters became possible by using recently formulated hybrid iterative algorithm [Svidzinski et al., Phys. Plasmas 25, 082509 (2018)] for numerically solving discretized wave equations. This approach combines time evolution and iterative relaxation techniques into iteration cycles. This algorithm is implemented in 2D code FullWave, solving wave equations in Tokamaks in cold and hot plasma models, and it has been tested in 3D full wave iterative RF beams simulation tool, which is presently being developed to model 3D ECRH RF beams in fusion devices using dynamic grid adaptation. The results of 2D full wave modeling, assuming specified toroidal mode number, of ECRH RF beams in DIII-D plasma, performed in the cold and hot plasma models for outboard and top launch scenarios using FullWave are presented. Nonlocal hot plasma response model, based on accurate numerical solution of linearized Vlasov equation, is used to model beam propagation and absorption in the 2nd electron cyclotron harmonic region. Demonstration of capability of the hybrid iterative algorithm to model ECRH RF beams in 3D is made by simulating a substantial part of realistic beam in DIII-D, launched from outboard side of the machine. All relevant physics of RF beam propagation, most of which is not captured in paraxial approximation, such as beam's divergence, interference between the X and O modes in the beam, X-O mode conversion, beam splitting into the X and O mode beams, transformation of beam's cross section, and absorption at the 2nd electron cyclotron harmonic, is captured in the simulations. A numerical technique to find an optimal beam polarization at the launcher to launch a nearly pure X or O mode beam in plasma is developed and tested.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

On Distribution Grid Optimal Power Flow Development and Integration

Due to changes in electric distribution grid operation, new operation regimes have been recommended. Distribution grid optimal power flow (DOPF) has received tremendous attention in the research community, yet it has not been fully adopted across the utility industry. Our paper recognizes this problem and suggests a development and integration procedure for DOPF. We propose development of DOPF as a three step procedure of 1) processing the grid, 2) obtaining a tractable solution, and 3) implementing multiple solution algorithms and benchmarking them to improve application reliability. For the integration of DOPF, we demonstrate how a DOPF federate may be developed that can be integrated in a co-simulation environment to mimic the real-world conditions and hence improve its practicality to be deployed in the field. To demonstrate the efficacy of the proposed methods, tests on IEEE 123 bus system are performed where the usage of tractable formulation in DOPF algorithm development and its comparison to the benchmark solution are demonstrated.

Hanif, Sarmad↗

Radiation Coupling with the FUN3D Unstructured-Grid CFD Code

The HARA radiation code is fully-coupled to the FUN3D unstructured-grid CFD code for the purpose of simulating high-energy hypersonic flows. The radiation energy source terms and surface heat transfer, under the tangent slab approximation, are included within the fluid dynamic ow solver. The Fire II flight test, at the Mach-31 1643-second trajectory point, is used as a demonstration case. Comparisons are made with an existing structured-grid capability, the LAURA/HARA coupling. The radiative surface heat transfer rates from the present approach match the benchmark values within 6%. Although radiation coupling is the focus of the present work, convective surface heat transfer rates are also reported, and are seen to vary depending upon the choice of mesh connectivity and FUN3D ux reconstruction algorithm. On a tetrahedral-element mesh the convective heating matches the benchmark at the stagnation point, but under-predicts by 15% on the Fire II shoulder. Conversely, on a mixed-element mesh the convective heating over-predicts at the stagnation point by 20%, but matches the benchmark away from the stagnation region.

Wood, William A.↗

Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters: Preprint

This paper examines state-of-the-art microgrid (MG) black-start technologies with high IBR penetrations and proposes black-start and interconnection methods for 100% grid-forming (GFM) inverter-based MGs. A multiple-microgrid approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units called "synchrobreakers," which enable the synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters with ideal voltage sources. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and DSOs for the next-generation GFM inverter-based multi-MG black-start procedures.

black start↗

Angle Droop Design for Grid-Forming Inverters Considering Impacts of Virtual Impedance Control

Grid-forming inverters (GFMs) based on active power-frequency droop control and reactive power-voltage droop control have been developed in recent years, which can generate voltage and frequency references for islanded power systems or microgrids to improve system-wide synchronization and power-sharing capability. It is known that the control delays in GFMs may cause system harmonic instability. To eliminate this issue, virtual impedance techniques are normally adopted. This paper gives a comprehensive examination of the impacts of virtual impedance control block Z v in GFMs on system stability. It is revealed that although Z v is effective in eliminating system harmonic stability, it may ruin system synchronization stability as a side effect. To compensate for the negative impacts caused by Z v , an active power-angle control block is added into the conventional droop control. Design criteria are also proposed accordingly to ensure system stability over the entire frequency range. Simulations and experimental testing are conducted to validate the analysis and the proposed design guidelines. It can be concluded that the Z v control-caused grid-synchronization instability issues can be eliminated with an appropriate active power-angle droop design.

Kong, Le↗

Wave Energy Power Take-off Validation with a Hydraulicly Actuated Rotary Dynamometer and a Bi-Directional High-Power DC Supply

There are many organizations working towards the commercialization of wave energy converter technologies and are advancing their designs through the technology readiness levels (TRLs). A critical step before the field deployment of prototype wave energy converters is the validation of the subsystems and components that are contained in the wave energy converter through laboratory testing and performance characterization. In 2021, the National Renewable Energy Laboratory (NREL) developed and demonstrated a system for testing power takeoffs (PTO) with a low-speed, high-torque dynamometer and a grid-tied high-power DC power source and sink before field deployment. The hydraulic dynamometer allows for the simulation of PTO actuation from wave motion and is capable of a wide range of wave periods and heights which are represented as various speeds and torques from the dynamometer. The high-power bidirectional power supply allows for hardware in the loop and controller in the loop testing to be conducted on WEC power electronics. This presentation was made to describe the methods used by NREL research staff to test all components and sub-systems in the PTO of a novel wave energy converter before field deployment.

dynamometer↗

Wave Energy Power Take-Off Validation with a Hydraulicly Actuated Rotary Dynamometer and a Bidirectional High-Power DC Supply: Preprint

There are many organizations working towards the commercialization of wave energy converter technologies and are advancing their designs through the technology readiness levels (TRLs). A critical step before the field deployment of prototype wave energy converters is the validation of the subsystems and components that are contained in the wave energy converter through laboratory testing and performance characterization. In 2021, the National Renewable Energy Laboratory (NREL) developed and demonstrated a system for testing power takeoffs (PTO) with a low-speed, high-torque dynamometer and a grid-tied high-power DC power source and sink before field deployment. The hydraulic dynamometer allows for the simulation of PTO actuation from wave motion and is capable of a wide range of wave periods and heights which are represented as various speeds and torques from the dynamometer. The high-power bidirectional power supply allows for hardware in the loop and controller in the loop testing to be conducted on WEC power electronics. This presentation was made to describe the methods used by NREL research staff to test all components and sub-systems in the PTO of a novel wave energy converter before field deployment.

dynamometer↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a networked hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAr regulation technologies as an example to illustrate system setups, communication requirements among different HIL simulation systems, and system connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

Xie, Fuhong↗

Real-time Simulation Framework for Hardware-in-the-Loop Testing of Multi-port Autonomous Reconfigurable Solar Power Plant (MARS)

Multiport autonomous reconfigurable solar power plant (MARS) has been proposed for integrated development of photovoltaic (PV) and energy storage system (ESS) that can connect to high-voltage direct current (HVdc) and alternating current (ac) transmission grid. To de-risk the development of this complex integrated system that consists of hundreds to thousands of power electronics modules, a controller hardware-in-the-loop (cHIL) test setup will be extremely beneficial. The cHIL testing can be used for evaluation of modules as well as the hierarchical control system in MARS. With the unique configuration of power electronics modules in MARS, it becomes necessary to develop custom-designed real-time simulation models in the cHIL setup in absence of off-the-shelf models. In this paper, high-fidelity dynamic model of MARS, control algorithms at the lower level, and required communication algorithms are developed and optimized for real-time performance in the cHIL setup. Real-time experimental results from the cHIL are provided.

Dong, Zerui↗

Advanced Techniques for Power System Identification from Measured Data

Time-synchronized measurements provide rich information for estimating a power-system's electromechanical modal properties via advanced signal processing. This information is becoming critical for the improved operational reliability of interconnected grids. A given mode's properties are described by its frequency, damping, and shape. Modal frequencies and damping are useful indicators of power-system stress, usually declining with increased load or reduced grid capacity. Mode shape provides critical information for operational control actions. This project investigated many advanced techniques for power system identification from measured data focusing on mode frequency and damping ratio estimation. Investigators from the three universities coordinated their effort with Pacific Northwest National Laboratory (PNNL). Significant progress was made on developing appropriate techniques for system identification with confidence intervals and testing those techniques on field measured data and through simulation. Experimental data from the western area power system was provided by PNNL and Bonneville Power Administration (BPA) for both ambient conditions and for signal injection tests. Three large-scale tests were conducted for the western area in 2005 and 2006. Measured field PMU (Phasor Measurement Unit) data was provided to the three universities. A 19-machine simulation model was enhanced for testing the system identification algorithms. Extensive simulations were run with this model to test the performance of the algorithms. University of Wyoming researchers participated in four primary activities: (1) Block and adaptive processing techniques for mode estimation from ambient signals and probing signals, (2) confidence interval estimation, (3) probing signal design and injection method analysis, and (4) performance assessment and validation from simulated and field measured data. Subspace based methods have been use to improve previous results from block processing techniques. Bootstrap techniques have been developed to estimate confidence intervals for the electromechanical modes from field measured data. Results were obtained using injected signal data provided by BPA. A new probing signal was designed that puts more strength into the signal for a given maximum peak to peak swing. Further simulations were conducted on a model based on measured data and with the modifications of the 19-machine simulation model. Montana Tech researchers participated in two primary activities: (1) continued development of the 19-machine simulation test system to include a DC line; and (2) extensive simulation analysis of the various system identification algorithms and bootstrap techniques using the 19 machine model. Researchers at the University of Alaska-Fairbanks focused on the development and testing of adaptive filter algorithms for mode estimation using data generated from simulation models and on data provided in collaboration with BPA and PNNL. There efforts consist of pre-processing field data, testing and refining adaptive filter techniques (specifically the Least Mean Squares (LMS), the Adaptive Step-size LMS (ASLMS), and Error Tracking (ET) algorithms). They also improved convergence of the adaptive algorithms by using an initial estimate from block processing AR method to initialize the weight vector for LMS. Extensive testing was performed on simulated data from the 19 machine model. This project was also extensively involved in the WECC (Western Electricity Coordinating Council) system wide tests carried out in 2005 and 2006. These tests involved injecting known probing signals into the western power grid. One of the primary goals of these tests was the reliable estimation of electromechanical mode properties from measured PMU data. Applied to the system were three types of probing inputs: (1) activation of the Chief Joseph Dynamic Brake, (2) mid-level probing at the Pacific DC Intertie (PDCI), and (3) low-level probing on the PDCI. The Chief Joseph Dynamic Brake is a 1400 MW disturbance to the system and is injected for a half of a second. For the mid and low-level probing, the Celilo terminal of the PDCI is modulated with a known probing signal. Similar but less extensive tests were conducted in June of 2000. The low-level probing signals were designed at the University of Wyoming. A number of important design factors are considered. The designed low-level probing signal used in the tests is a multi-sine signal. Its frequency content is focused in the range of the inter-area electromechanical modes. The most frequently used of these low-level multi-sine signals had a period of over two minutes, a root-mean-square (rms) value of 14 MW, and a peak magnitude of 20 MW. Up to 15 cycles of this probing signal were injected into the system resulting in a processing gain of 15. The resulting measured response at points throughout the system was not much larger than the ambient noise present in the measurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Subsurface Grain Morphology Reconstruction by Differential Aperture X-ray Microscopy

A multistep, non-destructive grain morphology reconstruction methodology that is applicable to near-surface volumes is developed and tested on synthetic grain structures. This approach probes the subsurface crystal orientation using differential aperture x-ray microscopy on a sparse grid across the microstructure volume of interest. Resulting orientation data are clustered according to proximity in physical and orientation space and used as seed points for an initial Voronoi tessellation to (crudely) approximate the grain morphology. Curvature-driven grain boundary relaxation, simulated by means of the Voronoi implicit interface method, progressively improves the reconstruction accuracy. The similarity between bulk and readily accessible surface reconstruction error provides an objective termination criterion for boundary relaxation.

36 MATERIALS SCIENCE↗

Impact of Blockchain Delay on Grid-Tied Solar Inverter Performance

This paper investigates the impact of the delay resulting from a blockchain, a promising security measure, for a hierarchical control system of inverters connected to the grid. The blockchain communication network is designed at the secondary control layer for resilience against cyberattacks. To represent the latency in the communication channel, a model is developed based on the complexity of the blockchain framework. Taking this model into account, this work evaluates the plant’s performance subject to communication delays, introduced by the blockchain, among the hierarchical control agents. In addition, this article considers an optimal model-based control strategy that performs the system’s internal control loop. The work shows that the blockchain’s delay size influences the convergence of the power supplied by the inverter to the reference at the point of common coupling. In the results section, real-time simulations on OPAL-RT are performed to test the resilience of two parallel inverters with increasing blockchain complexity.

41 EE - Solar Energy Technologies Office (EE-4S)↗