Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Actuator and Motor Control End-to-End V&V on the Mars 2020 Rover

The Mars 2020 Perseverance rover is the most advanced robotic exploration system ever sent to another planet. To support the complex scientific and mobility needs of the mission, the rover utilizes 33 actuators, three multi-degree-of-freedom force-torque sensors, fifteen single or dual-speed resolvers, two solenoid valves, and twelve contact switches. The control for these actuators and sensors is achieved by several levels of flight software, coordinated between two computers with varying bandwidth control loops. Furthermore, the actuators and sensors were integrated into multiple larger robotic mechanisms that were delivered by different organizations at various points in the Integration and Test (I&T) timeline. All of this created a very complex Verification and Validation (V&V) scenario involving multiple subsystems and teams, several hardware and software testbeds with varying levels of fidelity, and significant systems engineering to ensure the overall I&T schedule could be maintained while ensuring system hardware safety.This paper details the integrated V&V effort across multiple teams and venues to provide full coverage of all necessary functionality, performance, and fault protection. First, it provides an overview of how the V&V campaign was subdivided among teams and venues and provides descriptions of the various hardware configurations used to support the testing. The Mars 2020 implementation of the plan incorporates many of the lessons learned from Mars Science Laboratory’s test campaign, and these value-added modifications are discussed here. Also included in this section is the system-level environmental testing approach used for mechanisms. Second, the paper describes the phased approach used by the teams to support new hardware and software deliveries to testbed and Systems I&T. In this approach the test campaign was built upon higher-level mechanism needs for performance, functionality, and safety at specific times in the campaign. Finally, the paper discusses lessons learned from the V&V campaign that should be applied to future large-scale motion control testing efforts.

Borne, Davis↗

Transient Thermal Analysis of the 12.5 KW HERMeS Hall Thruster

NASA’s Dawn spacecraft entered orbit around the dwarf planet Ceres on March 6, 2015 thereby becoming the first mission to orbit two celestial bodies outside of the Earth-moon system. This feat was made possible due to the use of electric propulsion (EP) to provide the 11 km/s of delta-V that was necessary. This type of propulsion is also enabling for many of NASA’s future missions, such as the proposed Asteroid Redirect Robotic Mission (ARRM). Specifically, the Hall Effect Rocket with Magnetic Shielding (HERMeS) is the propulsive design baseline due to its long operational lifetime and high specific impulse. Extensive modeling is required to verify the thruster's predicted thermal performance and survival during the bounding mission phases. Since the thruster would constrain plasma on the order of tens of thousands of hours, components in the thruster must be able to accommodate much higher sustained temperatures than typical spacecraft hardware. Furthermore, the high temperatures necessitate care in analyzing thermal gradients within the thruster. In this paper, we describe a thermal model of the HERMeS thruster and focus upon the thruster's transient performance under different initial firing conditions. The thruster's transient thermal response is critical to verify margin in the thermal stresses inherent in the thruster and to determine safe start-up procedures to protect the thruster's critical components. This model is used to perform transient thermal analysis of the thruster during startup and shutdown, provide temperature maps for structural analysis, and plan for thermal cycle testing conducted at JPL. The thermal cycle testing includes thruster starts at the cold temperature limits and operation at maximum expected external heat flux. This work will support laboratory environmental testing of the HERMeS thruster, which is being conducted at JPL in 2016.

Reilly, Sean↗

Lessons Learned from the Flight Unit Testing of the Near Earth Asteroid Scout Flight System

The Near Earth Asteroid Scout flight mission is set to launch on the maiden voyage of the Space Launch System as a secondary payload. The spacecraft will be jettisoned in cis-lunar space and embark on an ambitious 2.5 year mission to image an asteroid. The spacecraft is uniquely equipped with an 85m2 solar sail as the main propulsion system. The monolithic sail system is designed to package within a 6U volume for launch and then deploy during flight. The NEA Scout team has presented in the past to the International Symposium on Solar Sailing topics related to the engineering development unit and design efforts to achieve flight hardware build. This paper will focus on the lessons learned from building and testing the NEA Scout flight system. Focus will be on the mechanical, software, and electrical interfaces as well as preparation for subsystem environmental tests, including thermal vacuum. Due to the unique design of the spacecraft, the solar sail subsystem was required to be located in the center of the spacecraft. This requirement lead to design challenges such as designing and accommodating critical cable harnesses to run through the center of the sail subsystem, packaging and deployment design of the sail subsystem, and integrated testing efforts through an avionics test bed to verify and validate a complete system architecture.

Lockett, Tiffany Russell↗

NavCube3-mini Lunar GNSS Receiver

This paper describes development and testing of NASA Goddard Space Flight Center’s new NavCube3-mini (NC3m) spaceborne, weak-signal GNSS receiver, which targets all Earth orbit regimes with special focus on lunar applications. NC3m derives from the ground-breaking Magnetospheric Multiscale (MMS) mission Navigator GPS receiver. The MMS-Navigator (launched 2015) holds a Guinness World Record for highest altitude GPS fix and is currently in a highly elliptic orbit with a 29 Earth radii apogee, nearly half lunar distance. NC3m has reduced size, weight, and power compared to the MMS-Navigator, making it suitable for smallsat applications, and adds multi-frequency and multi-GNSS capabilities, among other improvements. A NC3m engineering test unit was subjected to and successfully completed a comprehensive Technology Readiness Level 6 (system/subsystem model or prototype demonstration in a relevant environment) testing campaign in the second half of 2022. This involved high-fidelity simulations in LEO, GEO, and lunar regimes and full environmental testing, including vibration, thermal vacuum, and electromagnetic compatibility. An overview of the NC3m receiver, the test setup, and a sample of results is presented. The results include predicted performance at high-altitude and in the lunar regime.

NavCube3↗

Contamination control in hybrid microelectronic modules

Thin and thick film test specimens were utilized to study the effects of silicone and epoxy hybrid microcircuit coatings on 0.025 mm diameter aluminum and gold ultrasonic bonds, and 0.051 diameter gold pulsed-thermocompression bonds. Chip-to-substrate and substrate-to-substrate geometries were included. Because sealed packages were utilized, a test pattern design was incorporated that allowed the determination of bond failures by making resistance measurements external to the package after the various environmental tests. All wire bonds were non-destructively pull tested prior to sealing. Tests included the PIN test, temperature cycling, and high temperature storage.

Himmel, R. P.↗

Solar extreme ultraviolet sensor and advanced langmuir probe

For more than two decades, the staff of the Space Physics Research Laboratory (SPRL) has collaborated with the Goddard Space Flight Center (GSFC) in the design and implementation of Langmuir probes (LP). This program of probe development under the direction of Larry Brace of GSFC has evolved methodically with innovations to: improve measurement precision, increase the speed of measurement, and reduce the weight, size, power consumption and data rate of the instrument. Under contract NAG5-419 these improvements were implemented and are what characterize the Advanced Langmuir Probe (ALP). Using data from the Langmuir Probe on the Pioneer Venus Orbiter, Brace and Walter Hoegy of GSFC demonstrated a novel method of monitoring the solar extreme ultraviolet (EUV) flux. This led to the idea of developing a sensor similar to a Langmuir probe specifically designed to measure solar EUV (SEUV) that uses a similar electronics package. Under this contract, a combined instrument package of the ALP and SEUV sensor was to be designed, constructed, and laboratory tested. Finally the instrument was to be flight tested as part of sounding rocket experiment to acquire the necessary data to validate this method for possible use in future earth and planetary aeronomy missions. The primary purpose of this contract was to develop the electronics hardware and software for this instrument, since the actual sensors were suppied by GSFC. Due to budget constraints, only a flight model was constructed. These electronics were tested and calibrated in the laboratory, and then the instrument was integrated into the rocket payload at Wallops Flight Facility where it underwent environmental testing. After instrument recalibration at SPRL, the payload was reintegrated and launched from the Poker Flat Research Range near Fairbanks Alaska. The payload was successfully recovered and after refurbishment underwent further testing and developing to improve its performance for future use.

Voronka, N. R.↗

Rain droplet erosion mechanisms in transparent plastic materials

Tests were conducted to determine the damaging effects of rain erosion on optically transparent materials. The rotating arm test equipment used for the tests is described. Typical transparent materials such as those found in windshields, infrared windows, lasers, and television systems were tested. Nominal velocities of 400, 500, and 600 miles per hour and rainfall conditions of one inch per hour simulated rainfall were used in the tests. It was determined that an 80 percent reduction in laser transmittance can occur in plastics submitted to rain erosion. Significant results of the environmental tests are explained.

Schmitt, G. F., Jr.↗

Design and fabrication of solar cell modules

A program conducted for design, fabrication and evaluation of twelve silicon solar cell modules is described. The purpose of the program was to develop a module design consistent with the requirements and objectives of JPL specification and to also incorporate elements of new technologies under development to meet LSSA Project goals. Module development emphasized preparation of a technically and economically competitive design based upon utilization of ion implanted solar cells and a glass encapsulation system. The modules fabricated, tested and delivered were of nominal 2 X 2 foot dimensions and 20 watt minimum rating. Basic design, design rationale, performance and results of environmental testing are described.

Shaughnessy, T. P.↗

TQM in a test environment

In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

Chambers, Gary D.↗

NASA's Advanced Solar Sail Propulsion System for Low-Cost Deep Space Exploration and Science Missions that Use High Performance Rollable Composite Booms

Several low-cost solar sail technology demonstrator missions are under development in the United States. However, the mass saving derived benefits that composites can offer to such a mass critical spacecraft architecture have not been realized yet. This is due to the lack of suitable composite booms that can fit inside CubeSat platforms and ultimately be readily scalable to much larger sizes, where they can fully optimize their use. With this aim, a new effort focused at developing scalable rollable composite booms for solar sails and other deployable structures has begun. Seven meter booms used to deploy a 90 m2 class solar sail that can fit inside a 6U CubeSat have already been developed. The NASA road map to low-cost solar sail capability demonstration envisioned, consists of increasing the size of these composite booms to enable sailcrafts with a reflective area of up to 2000 m2 housed aboard small satellite platforms. This paper presents a solar sail system initially conceived to serve as a risk reduction alternative to Near Earth Asteroid (NEA) Scout's baseline design but that has recently been slightly redesigned and proposed for follow-on missions. The features of the booms and various deployment mechanisms for the booms and sail, as well as ground support equipment used during testing, are introduced. The results of structural analyses predict the performance of the system under microgravity conditions. Finally, the results of the functional and environmental testing campaign carried out are shown.

Fernandez, Juan M.↗

The standardized functional support sectional for the Small Astronomy Satellite (SAS)

The standardized functional support section for the improved Small Astronomy Satellite (SAS) spacecraft, which can be used virtually without change for a wide variety of experimental packages and missions, is described. This functional support section makes the spacecraft remarkably flexible for a small satellite. Able to point its thrust axis to any direction in space, it can also spin or slow its outer body rotation to zero for star- or earth-locked pointing of side-viewing experiments. It features a reprogrammable telemetry system, a delayed command system, and an improved control system. Experiments can be built independently and attached to the SAS spacecraft just prior to final acceptance testing and launch. The spacecraft subsystems are described in detail. Included are a summary of the spacecraft characteristics, special design considerations, project reliability requirements, and environmental test conditions. It is intended that this new functional support section afford virtual off-the-shelf availability of the SAS spacecraft to independently built experiments, thus providing quick response time and minimum cost in meeting a wide variety of experimenter needs.

Townsend, M. R.↗

RST Optical Telescope Integration and Test Preparation

The OTA for the Nancy Grace Roman Space Telescope includes the primary mirror, secondary mirror, and aft optics for guiding light into the Wide Field Instrument and the Coronagraph Instrument. The telescope is taking shape as the tested optical mirror assemblies are integrated. The assemblies have been thermal cycled to the cold temperatures for infrared operation, load tested to launch loads, vibration tested, and optically tested. Testing included launch-level vibration testing of the 2.4-meter light-weighted primary mirror assembly. In addition, the telescope control electronics (TCE) box has been fully assembled and the environmental testing of the TCE is progressing. Pictures and descriptions of the integration and test progress are provided, along with performance results measured at these levels of assemblies. Planning and test equipment preparation for the telescope thermal vacuum testing continues including plans to take advantage of the large dynamic range available with focus diversity phase retrieval and a Shack-Hartmann wavefront sensor for the gravity-sagged primary mirror.

Tony L Whitman↗

Optical Modem Enabling Broadband Datacom Links for Crewed Cis-Lunar Missions

We report on the design, development, and testing of our high-power broadband optical modem supporting NASA’s crewed Artemis-2 mission. The O2O modem will be mounted in the crewed Orion module and provide a broadband 505,000 km bi-directional optical link back to earth while en route to the moon. The full-duplex modem consists of a high-power optical transmitter and receiver optimized for serially-concatenated pulse-position modulation (SCPPM). The transmitter is a master-oscillator power-amplifier optical architecture using efficient cladding-pumped amplification in erbium-ytterbium co-doped fiber. The transmitter outputs up to 1 W at ≈1550 nm (limited for eye safety) and supports 6 different user-rates ranging from 20.39 Mb/s to 260.95 Mb/s using PPM16 and PPM32 modulation formats. The optical receiver supports two user-rates: 10.19 Mb/s and 20.39 Mb/s with both rates employing PPM32. The narrowband receiver filtering is optimized to simultaneously accept four separate wavelength channels to mitigate atmospherics through spatial diversity. A configurable interleaver provides additional protection against atmospherics-based signal fading and a powerful soft-decision error correction scheme enables highly sensitive detection. The measured sensitivities at the two bit-rates are -73.8 and -71.8dBm, respectively. The architecture was designed for reliable operation in space, featuring automatic hardware interlocks, pump sparing for the amplifiers, and autonomous operation of all internal hardware and software control loops. The protoflight unit (PFU) was put through rigorous environmental testing which included pyroshock, vibration, electromagnetic interference/compatibility, and thermal-vacuum testing. The modem successfully passed all the environmental screening and has been declared at Technology Readiness Level (TRL) 6.

space communications↗

Testing of Candidate Batteries for Global Positioning System

Three lithium batteries proposed as candidates for use in the Global Positioning System are studied. The batteries are discharged at several rates and temperatures both before and after environmental testing. Batteries are heated inside a closed chamber until they vent. Samples of the vented gases are analyzed for components which might be toxic. The test results raise concerns about each of the proposed batteries.

Barnes, J. A.↗

Thermal Infrared Sensor (TIRS) Instrument Thermal Subsystem Design and Lessons Learned

The Thermal Infrared Sensor (TIRS) is one of two instruments on the Landsat Data Continuity Mission (LDCM), which is scheduled to launch in February of 2013. The TIRS instrument was officially added to the mission later in the flow, which led to a highly aggressive schedule that became one of the main drivers during instrument development. The thermal subsystem design of the TIRS Sensor Unit is comprised of five thermal zones which range in temperature from less than 43 Kelvin to 330 Kelvin. Most zones are proportional heater controlled, and all are within a volume of 35 cu.ft. A two-stage cryocooler is used to cool the "cold stage" including three QWIP detectors to less than 43 Kelvin, and cool the "warm stage" to 105 Kelvin. The excess power dissipation from the cryocooler is rejected via ammonia transport heat pipes to a dedicated Cryocooler Radiator with embedded ammonia heat pipes. The cryogenic subsystem includes a series of shells used to radiatively and conductively isolate the cold stage from the warmer surroundings. The Optical System (telescope) is passively cooled to 180-190 Kelvin using a "thermal link" (comprised of a Flexible Conductive Thermal Strap and an APG Bar) which couples the telescope stage to a dedicated radiator with embedded ethane heat pipes. The Scene Select Mechanism, which is responsible for moving the Scene Select Mirror to three distinct positions (including Nadir, Space, and On-board Black Body Calibrator pointing), runs nominally at 278 Kelvin and is thermally isolated from the cryogenic thermal zones. The On-board Black Body Calibrator requires a dedicated radiator which allows for a temperature range of 260-330 Kelvin at the Source. The detectors are powered by the FPE Box, which is mounted to the nadir external surface of the composite honeycomb structure. There are two additional electronics boxes which are wet-mounted directly to the spacecraft shear panel, the Main Electronics Box and Cryocooler Electronics Box; thermal control of these boxes is the responsibility of Orbital Sciences Corporation, the spacecraft developer. The TIRS thermal subsystem design was successfully verified during months of testing campaign, from component & subsystem level to two instrument-level thermal vacuum tests. The Instrument, despite an aggressive schedule, was delivered to the spacecraft vendor in February of 2012 and is currently undergoing the final stages of spacecraft environmental testing in preparation for launch.

Otero, Veronica↗

JWST Optical Telescope Element Center of Curvature Test

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) completed element level integration and test programs and were integrated to the next level of assembly called OTE/ISIM (OTIS) at Goddard Space Flight Center (GSFC) in Greenbelt, Maryland in 2016. Before shipping the OTIS to Johnson Space Center (JSC) for optical test at cryogenic temperature a series of vibration and acoustic tests were performed. To help ensure that the OTIS was ready to be shipped to JSC an optical center of curvature (CoC) test was performed to measure changes in the mirror's optical performance to verify that the telescope's primary mirror was not adversely impacted by the environmental testing and help us in understanding potential anomalies identified during the JSC tests. The primary is a 6.5 meter diameter mirror consisting of 18 individual hexagonal segments. Each segment is an off-axis asphere. There are a total of three prescriptions repeated six times each. As part of the CoC test each segment was individually measured using a high-speed interferometer (HSI) designed and built specifically for this test. This interferometer is capable of characterizing both static and dynamic characteristics of the mirrors. The latter capability was used, with the aid of a vibration stinger applying a low-level input force, to measure the dynamic characteristic changes of the PM backplane structure. This paper describes the CoC test setup and both static and dynamic test results.

interferometer↗