Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engineered systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Assessing Alternatives in the Systems Engineering Process: Case Study of an Earth Observing Satellite Concept

Defining design alternatives constitutes one of the critical initial steps of the systems engineering process. Once these design alternatives have been identified, assessing which alternatives best satisfy the project’s objectives can prove to be challenging when dealing with complex decision frameworks. Complex systems often involve the participation of different interest groups, who have different value systems and are focused on distinct aspects of the project. For example, design alternatives might be assessed predominantly for their technical merit by one group of stakeholders, while a different group might be more inclined to assess the design alternatives primarily based on programmatic values. MESCAL (Monitoring the Evolving State of Clouds and Aerosol Layers) is an ongoing NASA / CNES (Centre National d’Etudes Spatiales) joint study for an active remote sensing Earth observing satellite. Several design alternatives have been identified and the assessment of these alternatives requires consideration of a variety of factors. This paper presents the approach that was used to support a global assessment of the MESCAL design alternatives. A mapping of the interactions between mission, instrument, and science requirements was modeled to support the assessment of the trade space. In addition, a set of metrics was developed to structure the assessment that was conducted. Finally, this paper also discusses the general applicability of these metrics to other science mission concepts in the formulation phase.

Ivanco, Marie L.↗

A new systems engineering approach to streamlined science and mission operations for the Far Ultraviolet Spectroscopic Explorer (FUSE)

The Mission Operations and Data Systems Directorate (MO&DSD, Code 500), the Space Sciences Directorate (Code 600), and the Flight Projects Directorate (Code 400) have developed a new approach to combine the science and mission operations for the FUSE mission. FUSE, the last of the Delta-class Explorer missions, will obtain high resolution far ultraviolet spectra (910 - 1220 A) of stellar and extragalactic sources to study the evolution of galaxies and conditions in the early universe. FUSE will be launched in 2000 into a 24-hour highly eccentric orbit. Science operations will be conducted in real time for 16-18 hours per day, in a manner similar to the operations performed today for the International Ultraviolet Explorer. In a radical departure from previous missions, the operations concept combines spacecraft and science operations and data processing functions in a single facility to be housed in the Laboratory for Astronomy and Solar Physics (Code 680). A small missions operations team will provide the spacecraft control, telescope operations and data handling functions in a facility designated as the Science and Mission Operations Center (SMOC). This approach will utilize the Transportable Payload Operations Control Center (TPOCC) architecture for both spacecraft and instrument commanding. Other concepts of integrated operations being developed by the Code 500 Renaissance Project will also be employed for the FUSE SMOC. The primary objective of this approach is to reduce development and mission operations costs. The operations concept, integration of mission and science operations, and extensive use of existing hardware and software tools will decrease both development and operations costs extensively. This paper describes the FUSE operations concept, discusses the systems engineering approach used for its development, and the software, hardware and management tools that will make its implementation feasible.

Butler, Madeline J.↗

Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)

The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.

Vipavetz, Kevin↗

Tailoring Systems Engineering Projects for Small Satellite Missions

NASA maintains excellence in its spaceflight systems by utilizing rigorous engineering processes based on over 50 years of experience. The NASA systems engineering process for flight projects described in NPR 7120.5E was initially developed for major flight projects. The design and development of low-cost small satellite systems does not entail the financial and risk consequences traditionally associated with spaceflight projects. Consequently, an approach is offered to tailoring of the processes such that the small satellite missions will benefit from the engineering rigor without overly burdensome overhead. In this paper we will outline the approaches to tailoring the standard processes for these small missions and describe how it will be applied in a proposed small satellite mission.

Horan, Stephen↗

Characterization Test of the 12.5-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the detailed characterization testof the 12.5 kW Advanced Electric Propulsion System Engineering Test Unit 2 (AEPS ETU-2) thruster produced by Aerojet Rocketdyne. This test campaign had two major goals: to assessthe risk of design compliance with thruster requirements and providea comparison to the previously-tested NASA Hall Effect Rocket with Magnet Shielding Technology Demonstration Units (HERMeS TDUs) from which the AEPS ETU design was derived.

AEPS↗

Model-Based Systems Engineering Pilot Program at NASA Langley

NASA Langley Research Center conducted a pilot program to evaluate the benefits of using a Model-Based Systems Engineering (MBSE) approach during the early phase of the Materials International Space Station Experiment-X (MISSE-X) project. The goal of the pilot was to leverage MBSE tools and methods, including the Systems Modeling Language (SysML), to understand the net gain of utilizing this approach on a moderate size flight project. The System Requirements Review (SRR) success criteria were used to guide the work products desired from the pilot. This paper discusses the pilot project implementation, provides SysML model examples, identifies lessons learned, and describes plans for further use on MBSE on MISSE-X.

Vipavetz, Kevin G.↗

2.0 AEDL Systems Engineering

Some engineering topics: Some Initial Thoughts. Capability Description. Capability State-of-the-Art. Capability Requirements. Systems Engineering. Capability Roadmap. Capability Maturity. Candidate Technologies. Metrics.

Graves, Claude↗

A Systems Engineering Analysis of National Ignition Facility Industrial Controls Systems and Safety Interlock Systems Remote Input/Output Networking Migration from ControlNet to EtherNet/IP

The ControlNet industrial communications protocol and modules used in the Industrial Control System (ICS) and Safety Interlock System (SIS) at the National Ignition Facility (NIF) are no longer necessary and the ICS and SIS would be better served by migrating the communications structure to use EtherNet/Industrial Protocol (IP) and EtherNet bridge modules instead. By the admission of the vendor of ControlNet hardware, Rockwell Automation, in literature by Bill Petro [1], “Moving forward, customers will be able to optimize their asset utilization better using EtherNet/IP protocol than with ControlNet.” The NIF is one of the key elements of the Inertial Confinement Fusion (ICF) program at Lawrence Livermore National Laboratory (LLNL), a federally funded research and development center (FFRDC). The NIF contains the systems and provides the operational capacity to perform ICF, high energy density (HED), and discovery science experiments utilizing 192 individual beamlines, a host of diagnostics, and all the industrial systems required to facilitate these beamlines and diagnostics. The industrial systems are governed by the ICS and SIS, with the ICS providing control and the SIS providing monitoring and permissives. Construction on the NIF began in 1997 and was certified complete in 2009 and, as a result, the ICS and SIS were developed during this time using the tools that were available then. This includes the communications structure and protocols for these systems, much of which was, and still is, ControlNet. ControlNet, particularly during the time that the ICS and SIS were being built, has several attractive features. ControlNet hardware is exclusive to Rockwell Automation, which was the automation hardware chosen for the ICS and SIS. One feature that could be considered an advantage or a disadvantage depending on the communication needs of the system is that ControlNet also utilizes no active network components, excluding repeaters which are not always necessary. According to the architect of the ICS system at the NIF, Gordon Lau, one of the most attractive features of the ControlNet protocol during development of the ICS and SIS was that it is deterministic, providing timing of data transfer that is executed exactly as it is defined by the developer.

42 ENGINEERING↗

National Research Council Dialogue to Assess Progress on NASA's Systems Engineering Cost/Risk Analysis Capability Roadmap Development: General Background and Introduction

Contents include the following: General Background and Introduction of Capability. Roadmaps for Systems Engineering Cost/Risk Analysis. Agency Objectives. Strategic Planning Transformation. Review Capability Roadmaps and Schedule. Review Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

Regenie, Victoria↗

Wear Test of the 12.5-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12.5 kW Advanced Electric Propulsion System Engineering Test Unit 2 (AEPS ETU-2) thruster produced by Aerojet Rocketdyne. The ETU-2 Wear Test accumulated approximately 730 hours of operation split between the nominal 600 V/12.5 kW condition and the 300 V/6.25 kW condition previously identified as the worst-case erosion condition.

Jason D. Frieman↗

Air cargo: An Integrated Systems View. 1978 Summer Faculty Fellowship Program in Engineering Systems Design

The national air cargo system is analyzed and how it should be in 1990 is prescribed in order to operate successfully through 2015; that is through one equipment cycle. Elements of the system which are largely under control of the airlines and the aircraft manufacturers are discussed. The discussion deals with aircraft, networks, facilities, and procedures. The regulations which govern the movement of air freight are considered. The larger public policy interests which must be served by the kind of system proposed, the air cargo integrated system (ACIS), are addressed. The possible social, economical, political, and environment impacts of the system are considered. Recommendations are also given.

Keaton, A.↗

Engine System Loads Development for the Fastrac 60K Flight Engine

Early implementation of structural dynamics finite element analyses for calculation of design loads is considered common design practice for high volume manufacturing industries such as automotive and aeronautical industries. However, with the rarity of rocket engine development programs starts, these tools are relatively new to the design of rocket engines. In the new Fastrac engine program, the focus has been to reduce the cost to weight ratio; current structural dynamics analysis practices were tailored in order to meet both production and structural design goals. Perturbation of rocket engine design parameters resulted in a number of Fastrac load cycles necessary to characterize the impact due to mass and stiffness changes. Evolution of loads and load extraction methodologies, parametric considerations and a discussion of load path sensitivities are discussed.

Frady, Greg↗

The Montana ALE (Autonomous Lunar Excavator) Systems Engineering Report

On May 2 1-26, 20 12, the third annual NASA Lunabotics Mining Competition will be held at the Kennedy Space Center in Florida. This event brings together student teams from universities around the world to compete in an engineering challenge. Each team must design, build and operate a robotic excavator that can collect artificial lunar soil and deposit it at a target location. Montana State University, Bozeman, is one of the institutions selected to field a team this year. This paper will summarize the goals of MSU's lunar excavator project, known as the Autonomous Lunar Explorer (ALE), along with the engineering process that the MSU team is using to fulfill these goals, according to NASA's systems engineering guidelines.

Lars Osborne↗

Radiation Belt Remediation: A Complex Engineered System (RBR-ACES) (Institutional Computing Report)

We have performed the simulation campaigns in support of LDRD-DR project Radiation Belt Remediation: A Complex Engineered System (RBR-ACES). This project involves modeling wave generation and wave propagation in plasma environment and studying the effect of waves on the distribution of high energy electrons with the focus on electrons appeared after a high-altitude nuclear explosion (HANE). One of the major goal of this research is strong validation of the numerical models with laboratory experiments and space-based experiments and observations.

42 ENGINEERING↗

Medical Systems Engineering to Support Mars Mission Crew Autonomy

Human spaceflight missions to Mars face exceptionally challenging resource limitations that far exceed those faced before. Increasing transit times, decreasing opportunity for resupply, communications challenges, and extended time to evacuate a crew to definitive medical care dictate a level of crew autonomy in medical care that is beyond the current medical model. To approach this challenge, a medical systems engineering approach is proposed that relies on a clearly articulated Concept of Operations and risk analysis tools that are in development at NASA. This paper proposes an operational clinical model with key terminology and concepts translated to a controls theory paradigm to frame a common language between clinical and engineering teams. This common language will be used for design and validation of an exploration medical system that is fully integrated into a Mars transit vehicle. This approach merges medical simulation, human factors evaluation techniques, and human-in-the-loop testing in ground based analogs to tie medical hardware and software subsystem performance and overall medical system functionality to metrics of operational medical autonomy. Merging increases in operational clinical autonomy with a more restricted vehicle system resource scenario in interplanetary spaceflight will require an unprecedented level of medical and engineering integration. Full integration of medical capabilities into a Mars vehicle system may require a new approach to integrating medical system design and operations into the vehicle Program structure. Prior to the standing-up of a Mars Mission Program, proof of concept is proposed through the Human Research Program.

Antonsen, Erik↗