Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical cables”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Shrink-Fit Solderable Inserts Seal Hermetically

Shrink-fit stainless-steel insert in aluminum equipment housing allows electrical connectors to be replaced by soldering, without degrading hermeticity of housing or connector. Welding could destroy electrostatic-sensitive components and harm housing and internal cables. Steel insert avoids problems because connector soldered directly to it rather than welded to housing. Seals between flange and housing, and between connector and flange resistant to leaks, even after mechanical overloading and thermal shocking.

Croucher, William C.↗

Lightweight, Wearable, Metal Rubber Sensor

For autonomous health monitoring. NanoSonic, Inc., has developed comfortable garments with multiple integrated sensors designed to monitor astronaut health throughout long-duration space missions. The combined high electrical conductivity, low mechanical modulus, and environmental robustness of the sensors make them an effective, lightweight, and comfortable alternative to conventional use of metal wiring and cabling.

Hill, Andrea↗

Advanced Diagnosis and Accelerated Testing of Balance of System Components for Utility Scale PV Installations: October 1, 2022-September 30, 2024

A study of the durability of PV Balance of System components was performed. Specifically, wire cable jackets and cable connectors were examined within the direct current (DC) PV Power Transmission Chain (PTC). Degraded and failed samples have been obtained from utility PV installations to provide feedback on the degradation modes and the related damage-enabling considerations in today's PV systems. An industry interface group (including system owners, system inspectors, component manufacturers, and test labs) was used to help identify and obtain field-failed samples, for feedback (including samples and experimental design), and to facilitate the subsequent dissemination of the results of this study. Samples were empirically studied using accelerated stress testing with steady-state conditions (cable jackets) in addition to combined-accelerated stress testing (cable jackets, connectors and uncapped connectors). Steady-state accelerated testing has been performed using at least one applied stressor (e.g. UV light) to aid understanding of jacket durability relative to its application. Component- and material-focused failure analysis was conducted to develop an understanding and advise the PV industry. In-depth characterization will be applied selectively to field- and artificially aged-samples, to gain scientific understanding of the structural, chemical, electrical, mechanical, and thermal properties enabling degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Electrode Arrays for Neuro-Prosthetic Implants

Arrays of electrodes integrated with chip-scale packages and silicon-based integrated circuits have been proposed for use as medical electronic implants, including neuro-prosthetic devices that might be implanted in brains of patients who suffer from strokes, spinal-cord injuries, or amyotrophic lateral sclerosis. The electrodes of such a device would pick up signals from neurons in the cerebral cortex, and the integrated circuit would perform acquisition and preprocessing of signal data. The output of the integrated circuit could be used to generate, for example, commands for a robotic arm. Electrode arrays capable of acquiring electrical signals from neurons already exist, but heretofore, there has been no convenient means to integrate these arrays with integrated-circuit chips. Such integration is needed in order to eliminate the need for the extensive cabling now used to pass neural signals to data-acquisition and -processing equipment outside the body. The proposed integration would enable progress toward neuro-prostheses that would be less restrictive of patients mobility. An array of electrodes would comprise a set of thin wires of suitable length and composition protruding from and supported by a fine-pitch micro-ball grid array or chip-scale package (see figure). The associated integrated circuit would be mounted on the package face opposite the probe face, using the solder bumps (the balls of the ball grid array) to make the electrical connections between the probes and the input terminals of the integrated circuit. The key innovation is the insertion of probe wires of the appropriate length and material into the solder bumps through a reflow process, thereby fixing the probes in place and electrically connecting them with the integrated circuit. The probes could be tailored to any distribution of lengths and made of any suitable metal that could be drawn into fine wires. Furthermore, the wires could be coated with an insulating layer using anodization or other processes, to achieve the correct electrical impedance. The probe wires and the packaging materials must be biocompatible using such materials as lead-free solders. For protection, the chip and package can be coated with parylene.

Brandon, Erik↗

Component design, construction and evaluation for satellites

Components for a high-reliability system such as the Telstar project are obtained by: (a) design of the component for the required environment, (b) careful control of manufacturing processes, (c) elimination of potential early failures by screening tests, and (d) selection of the most stable components. For passive components, these methods could be applied by using design parameters, suppliers and screening techniques established in the earlier submarine cable program, with consideration being given to the additional effects of the satellite launch and orbit environments. Semiconductor component designs were selected by qualification tests using accelerated electrical and environmental stress conditions. Screening tests were applied to eliminate early failures, and resulting components were aged from two to six months before selection for the satellite. The recognition of the effect of ionizing radiation on transistors caused the addition of a radiation qualification test, or a screening to assure selection of the least sensitive devices. Tests have shown this screening to be effective for the radiation intensity expected. Experience with the passive components, and evaluation of the accelerated test results and aging data of the semiconductor devices, indicate that the reliability objective was obtained.

TELSTAR SATELLITE↗

Observing and modeling the effects of production infrastructure in electromagnetic surveys

Electromagnetic (EM) methods are among the original techniques for subsurface characterization in exploration geophysics because of their particular sensitivity to the earth electrical conductivity, a physical property of rocks distinct yet complementary to density, magnetization, and strength. However, this unique ability also makes them sensitive to metallic artifacts — infrastructure such as pipes, cables, and other forms of cultural clutter — the EM footprint of which often far exceeds their diminutive stature when compared to that of bulk rock itself. In the hunt for buried treasure or unexploded ordnance, this is an advantage; in the long-term monitoring of mature oil fields after decades of production, it is quite troublesome indeed. In this study we consider the latter through the lens of an evolving energy industry landscape in which the traditional methods of EM characterization for the exploration geophysicist are applied toward emergent problems in well-casing integrity, carbon capture and storage, and overall situational awareness in the oil field. We introduce case studies from these exemplars, showing how signals from metallic artifacts can dominate those from the target itself and impose significant burdens on the requisite simulation complexity. Furthermore, we show how recent advances in numerical methods mitigate the computational explosivity of infrastructure modeling, providing feasible and real-time analysis tools for the desktop geophysicist. Lastly, we demonstrate through comparison of field data and simulation results that incorporation of infrastructure into the analysis of such geophysical data is, in a growing number of cases, a requisite but now manageable step.

58 GEOSCIENCES↗

Hanging Windmills From Cables

Relatively inexpensive structure enables raising and lowering of windmills. Windmills supported, according to new concept, by hanging from cables. Possible to raise and lower windmills easily for maintenance and to lower them to avoid excessive windspeeds. Airframe consists of fuselage and empennage. Windmill turns shaft driving electrical generator. Device aerodynamically stable so it will rotate in yaw to maintain windmill in downwind position as wind direction changes.

Farmer, Moses G.↗

The Ames Power Monitoring System

The Ames Power Monitoring System (APMS) is a centralized system of power meters, computer hardware, and specialpurpose software that collects and stores electrical power data by various facilities at Ames Research Center (ARC). This system is needed because of the large and varying nature of the overall ARC power demand, which has been observed to range from 20 to 200 MW. Large portions of peak demand can be attributed to only three wind tunnels (60, 180, and 100 MW, respectively). The APMS helps ARC avoid or minimize costly demand charges by enabling wind-tunnel operators, test engineers, and the power manager to monitor total demand for center in real time. These persons receive the information they need to manage and schedule energy-intensive research in advance and to adjust loads in real time to ensure that the overall maximum allowable demand is not exceeded. The APMS (see figure) includes a server computer running the Windows NT operating system and can, in principle, include an unlimited number of power meters and client computers. As configured at the time of reporting the information for this article, the APMS includes more than 40 power meters monitoring all the major research facilities, plus 15 Windows-based client personal computers that display real-time and historical data to users via graphical user interfaces (GUIs). The power meters and client computers communicate with the server using Transmission Control Protocol/Internet Protocol (TCP/IP) on Ethernet networks, variously, through dedicated fiber-optic cables or through the pre-existing ARC local-area network (ARCLAN). The APMS has enabled ARC to achieve significant savings ($1.2 million in 2001) in the cost of power and electric energy by helping personnel to maintain total demand below monthly allowable levels, to manage the overall power factor to avoid low power factor penalties, and to use historical system data to identify opportunities for additional energy savings. The APMS also provides power engineers and electricians with the information they need to plan modifications in advance and perform day-to-day maintenance of the ARC electric-power distribution system.

Osetinsky, Leonid↗

The new Section 23 of DO160C/ED14C lightning testing of externally mounted electrical equipment

The new Section 23 is introduced which has only very recently been fully approved by the RTCA for incorporation into the first revision of DO160C/ED14C. Full threat lightning direct effects testing of equipment is entirely new to DO160, the only existing lightning testing is transient testing for LRU's (Line Replaceable Units) by pin or cable bundle injection methods, for equipment entirely contained within the airframe and assumed to be unaffected by direct effects. This testing required transients of very low amplitude compared with lightning itself, whereas the tests now to be described involve full threat lightning testing, that is using the previously established severe parameters of lightning appropriate to the Zone, such as 200 kA for Zone 1A as in AC20-136. Direct effects (i.e., damage) testing involves normally the lightning current arc attaching to the object under test (or very near to it) so submitting it to full potential for the electric, mechanical, thermal and shock damage which is caused by high current arcing. Since equipment for any part of the airframe require qualification, tests to demonstrate safety of equipment in fuel vapor regions of the airframe are also included.

Burrows, B. J. C.↗

A continuously pulsed copper halide laser with a cable-capacitor Blumlein discharge circuit

Experimental characteristics of a continuously pulsed copper halide laser with a cable-capacitor Blumlein discharge circuit are reported. Quartz laser tubes 1 m in length and 1.5 and 2.5 cm in diameter were employed to study the effects of the electrical circuit, lasant, and buffer gas on laser performance. Measured properties of the Blumlein circuit are compared with an analytic solution for an idealized circuit. Both CuCl and CuBr with neon and helium buffer gas were studied. A maximum average power of 12.5 W was obtained with a 1.5 nF capacitor charged to 8 kV and discharged at 31 kHz with CuCl and neon buffer gas at 0.7 kPa in a 2.5-cm-diam tube. A maximum efficiency of 0.72 percent was obtained at 9 W average power. Measurements of the radial distribution of the power in the laser beam and the variation of laser power at 510.6 and 578.2 nm with halide vapor density are also reported. Double and continuously pulsed laser characteristics are compared, and the role of copper metastable level atoms in limiting the laser pulse energy density is discussed.

Nerheim, N. M.↗

Arbitrarily shaped dual-stacked patch antennas: A hybrid FEM simulation

A dual-stacked patch antenna is analyzed using a hybrid finite element - boundary integral (FE-BI) method. The metallic patches of the antenna are modeled as perfectly electric conducting (PEC) plates stacked on top of two different dielectric layers. The antenna patches may be of any shape and the lower patch is fed by a coaxial cable from underneath the ground plane or by an aperture coupled microstrip line. The ability of the hybrid FEM technique for the stacked patch antenna characterization will be stressed, and the EM coupling mechanism is also discussed with the aid of the computed near field patterns around the patches.

Gong, Jian↗

The Typical General Aviation Aircraft

The reliability of General Aviation aircraft is unknown. In order to "assist the development of future GA reliability and safety requirements", a reliability study needs to be performed. Before any studies on General Aviation aircraft reliability begins, a definition of a typical aircraft that encompasses most of the general aviation characteristics needs to be defined. In this report, not only is the typical general aviation aircraft defined for the purpose of the follow-on reliability study, but it is also separated, or "sifted" into several different categories where individual analysis can be performed on the reasonably independent systems. In this study, the typical General Aviation aircraft is a four-place, single engine piston, all aluminum fixed-wing certified aircraft with a fixed tricycle landing gear and a cable operated flight control system. The system breakdown of a GA aircraft "sifts" the aircraft systems and components into five categories: Powerplant, Airframe, Aircraft Control Systems, Cockpit Instrumentation Systems, and the Electrical Systems. This breakdown was performed along the lines of a failure of the system. Any component that caused a system to fail was considered a part of that system.

Turnbull, Andrew↗

Boeing's High Voltage Solar Tile Test Results

Real concerns of spacecraft charging and experience with solar array augmented electrostatic discharge arcs on spacecraft have minimized the use of high voltages on large solar arrays despite numerous vehicle system mass and efficiency advantages. Boeing's solar tile (patent pending) allows high voltage to be generated at the array without the mass and efficiency losses of electronic conversion. Direct drive electric propulsion and higher power payloads (lower spacecraft weight) will benefit from this design. As future power demand grows, spacecraft designers must use higher voltage to minimize transmission loss and power cable mass for very large area arrays. This paper will describe the design and discuss the successful test of Boeing's 500-Volt Solar Tile in NASA Glenn's Tenney chamber in the Space Plasma Interaction Facility. The work was sponsored by NASA's Space Solar Power Exploratory Research and Technology (SERT) Program and will result in updated high voltage solar array design guidelines being published.

Reed, Brian J.↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

Conceptual design of HTS magnets for fusion nuclear science facility

Second-generation high temperature superconductors (HTS) are available for producing >20 T at the magnet bore compared to 13–16 T for lower temperature superconducting (LTS) toroidal field magnets proposed in recent fusion energy systems studies (FESS) of Fusion Nuclear Science Facility (FNSF). HTS may enable higher fusion power density and smaller device size. High current density cables of multi-layered REBCO tapes have achieved >10 kA at 4–20 K operation in short sample tests for fusion. High current density cables are required for engineering design of FNSF to allow space for interior plasma components. High current density HTS magnets are particularly attractive in reducing the size of a fusion device, beneficial for compact tokamaks, due to their space constraints. Successful HTS magnet development may enable the design of smaller and cheaper fusion pilot plants with a mission of demonstrating net electricity. It may also offer significant cost and performance advantages in non-fusion applicants such as nuclear magnetic resonance (NMR) and magnetic resonance imaging (MRI). Furthermore, we developed HTS magnet design concepts for a compact FNSF radial build in order to define the coil size, winding pack mechanical loading and engineering requirements. Partnering with vendors in the US, PPPL is also testing high current cable prototypes aiming at enabling low cost cable technology toward 100 A/mm 2 engineering current density over the winding pack desired in high field model coil development for compact fusion pilot plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗