Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data requests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Computer systems and methods for the query and visualization of multidimensional databases

In response to a user request, a computer generates a graphical user interface on a computer display. A schema information region of the graphical user interface includes multiple operand names, each operand name associated with one or more fields of a multi-dimensional database. A data visualization region of the graphical user interface includes multiple shelves. Upon detecting a user selection of the operand names and a user request to associate each user-selected operand name with a respective shelf in the data visualization region, the computer generates a visual table in the data visualization region in accordance with the associations between the operand names and the corresponding shelves. The visual table includes a plurality of panes, each pane having at least one axis defined based on data for the fields associated with a respective operand name.

97 MATHEMATICS AND COMPUTING↗

Computer systems and methods for the query and visualization of multidimensional databases

In response to a user request, a computer generates a graphical user interface on a computer display. A schema information region of the graphical user interface includes multiple operand names, each operand name associated with one or more fields of a multi-dimensional database. A data visualization region of the graphical user interface includes multiple shelves. Upon detecting a user selection of the operand names and a user request to associate each user-selected operand name with a respective shelf in the data visualization region, the computer generates a visual table in the data visualization region in accordance with the associations between the operand names and the corresponding shelves. The visual table includes a plurality of panes, each pane having at least one axis defined based on data for the fields associated with a respective operand name.

97 MATHEMATICS AND COMPUTING↗

Computer systems and methods for the query and visualization of multidimensional databases

In response to a user request, a computer generates a graphical user interface on a computer display. A schema information region of the graphical user interface includes multiple operand names, each operand name associated with one or more fields of a multi-dimensional database. A data visualization region of the graphical user interface includes multiple shelves. Upon detecting a user selection of the operand names and a user request to associate each user-selected operand name with a respective shelf in the data visualization region, the computer generates a visual table in the data visualization region in accordance with the associations between the operand names and the corresponding shelves. The visual table includes a plurality of panes, each pane having at least one axis defined based on data for the fields associated with a respective operand name.

97 MATHEMATICS AND COMPUTING↗

libIS: a lightweight library for flexible in transit visualization

As simulations grow in scale, the need for in situ analysis methods to handle the large data produced grows correspondingly. One desirable approach to in situ visualization is in transit visualization. By decoupling the simulation and visualization code, in transit approaches alleviate common difficulties with regard to the scalability of the analysis, ease of integration, usability, and impact on the simulation. We present libIS, a lightweight, flexible library which lowers the bar for using in transit visualization. Our library works on the concept of abstract regions of space containing data, which are transferred from the simulation to the visualization clients upon request, using a client-server model. We also provide a SENSEI analysis adaptor, which allows for transparent deployment of in transit visualization. We demonstrate the flexibility of our approach on batch analysis and interactive visualization use cases on different HPC resources.

97 MATHEMATICS AND COMPUTING↗

Final Report for CCS Cross-Layer Reliability Visioning Study

The geometric rate of improvement of transistor size and integrated circuit performance known as Moore's Law has been an engine of growth for our economy, enabling new products and services, creating new value and wealth, increasing safety, and removing menial tasks from our daily lives. Affordable, highly integrated components have enabled both life-saving technologies and rich entertainment applications. Anti-lock brakes, insulin monitors, and GPS-enabled emergency response systems save lives. Cell phones, internet appliances, virtual worlds, realistic video games, and mp3 players enrich our lives and connect us together. Over the past 40 years of silicon scaling, the increasing capabilities of inexpensive computation have transformed our society through automation and ubiquitous communications. Looking forward, increasing unpredictability threatens our ability to continue scaling integrated circuits at Moore's Law rates. As the transistors and wires that make up integrated circuits become smaller, they display both greater differences in behavior among devices designed to be identical and greater vulnerability to transient and permanent faults. Conventional design techniques expend energy to tolerate this unpredictability by adding safety margins to a circuit's operating voltage, clock frequency or charge stored per bit. However, the rising energy costs needed to compensate for increasing unpredictability are rapidly becoming unacceptable in today's environment where power consumption is often the limiting factor on integrated circuit performance and energy efficiency is a national concern. Reliability and energy consumption are both reaching key inflection points that, together, threaten to reduce or end the benefits of feature size reduction. To continue beneficial scaling, we must use a cross-layer, Jull-system-design approach to reliability. Unlike current systems, which charge every device a substantial energy tax in order to guarantee correct operation in spite of rare events, such as one high-threshold transistor in a billion or one erroneous gate evaluation in an hour of computation, cross-layer reliability schemes make reliability management a cooperative effort across the system stack, sharing information across layers so that they only expend energy on reliability when an error actually occurs. Figure 1 illustrates an example of such a system that uses a combination of information from the application and cheap architecture-level techniques to detect errors. When an error occurs, mechanisms at higher levels in the stack correct the error, efficiently delivering correct operation to the user in spite of errors at the device or circuit levels. In the realms of memory and communication, engineers have a long history of success in tolerating unpredictable effects such as fabrication variability, transient upsets, and lifetime wear using information sharing, limited redundancy, and cross-layer approaches that anticipate, accommodate, and suppress errors. Networks use a combination of hardware and software to guarantee end-toend correctness. Error-detection and correction codes use additional information to correct the most common errors, single-bit transmission errors. When errors occur that cannot be corrected by these codes, the network protocol requests re-transmission of one or more packets until the correct data is received. Similarly, computer memory systems exploit a cross-layer division of labor to achieve high performance with modest hardware. Rather than demanding that hardware alone provide the virtual memory abstraction, software page-fault and TLB-miss handlers allow a modest piece of hardware, the TLB, to handle the common-case operations on a cyc1e-by-cycle basis while infrequent misses are handled in system software. Unfortunately, mitigating logic errors is not as simple or as well researched as memory or communication systems. This lack of understanding has led to very expensive solutions. For example, triple-modular redundancy masks errors by triplicating computations in either time or area. This mitigation methods imposes a 200% increase in energy consumption for every operation, not just the uncommon failure cases. At a time when computation is rapidly becoming part of our critical civilian and military infrastructure and decreasing costsfor computation are fueling our economy and our well being, we cannot afford increasingly unreliable electronics or a stagnation in capabilities per dollar, watt, or cubic meter. If researchers are able to develop techniques that tolerate the growing unpredictability of silicon devices, Moore's Law scaling should continue until at least 2022. During this 12-year time period, transistors, which are the building blocks of electronic devices, will scale their dimensions (feature sizes) from 45nm to 4.5nm.

99 GENERAL AND MISCELLANEOUS↗

Characterizing Aerosol Distributions and Optical Properties Using the NASA Langley High Spectral Resolution Lidar

The objective of this project was to provide vertically and horizontally resolved data on aerosol optical properties to assess and ultimately improve how models represent these aerosol properties and their impacts on atmospheric radiation. The approach was to deploy the NASA Langley Airborne High Spectral Resolution Lidar (HSRL) and other synergistic remote sensors on DOE Atmospheric Science Research (ASR) sponsored airborne field campaigns and synergistic field campaigns sponsored by other agencies to remotely measure aerosol backscattering, extinction, and optical thickness profiles. Synergistic sensors included a nadir-viewing digital camera for context imagery, and, later in the project, the NASA Goddard Institute for Space Studies (GISS) Research Scanning Polarimeter (RSP). The information from the remote sensing instruments was used to map the horizontal and vertical distribution of aerosol properties and type. The retrieved lidar parameters include profiles of aerosol extinction, backscatter, depolarization, and optical depth. Products produced in subsequent analyses included aerosol mixed layer height, aerosol type, and the partition of aerosol optical depth by type. The lidar products provided vertical context for in situ and remote sensing measurements from other airborne and ground-based platforms employed in the field campaigns and was used to assess the predictions of transport models. Also, the measurements provide a data base for future evaluation of techniques to combine active (lidar) and passive (polarimeter) measurements in advanced retrieval schemes to remotely characterize aerosol microphysical properties. The project was initiated as a 3-year project starting 1 January 2005. It was later awarded continuation funding for another 3 years (i.e., through 31 December 2010) followed by a 1-year no-cost extension (through 31 December 2011). This project supported logistical and flight costs of the NASA sensors on a dedicated aircraft, the subsequent analysis and archival of the data, and the presentation of results in conferences, workshops, and publications. DOE ASR field campaigns supported under this project included: • MAX-Mex /MILAGRO (2006), • TexAQS 2006/GoMACCS (2006), • CHAPS (2007), • RACORO (2009), and • CARE/CalNex (2010). In addition, data acquired on HSRL airborne field campaigns sponsored by other agencies were used extensively to fulfill the science objectives of this project and the data acquired have been made available to other DOE ASR investigators upon request.

99 GENERAL AND MISCELLANEOUS↗

Innovative Patient Room Lighting System with Integrated Spectrally Adaptive Control

In December of 2013, the U.S. Department of Energy’s SSL R&D Program released a Funding Opportunity Announcement (FOA), that for the first time, contained opportunities for comprehensive application-specific system development. The FOA included opportunities for two applications, one of which was a Patient Room. Philips Lighting Research North America, submitted a proposal for the Patient Room application, and was selected for the complete project award. The award amount was for $497,127, with a Philips Research co-funding commitment 165,709 dollars. The total project value was 662,836 dollars. This project sought to redefine lighting for the patient room application. The goal was to deliver an innovative LED patient suite (patient room and bathroom) lighting system solution that was 40% more energy-efficient than traditional fluorescent incumbent technologies, and would meet all the visual and non-visual needs of patients, caregivers and visitors, and improve the patient experience. State-of-the-art multichannel LED platforms and control technologies that would provide spectral tuning and become part of an intelligent, connected lighting system drove the solution. The project was scoped into four main task areas that included a) System Concept Creation, b) Identification of the Luminaire Portfolio, c) Development of the Connected Lighting Infrastructure, and d) System Performance Validation. Each of the four main tasks were completed and validated extensively over the course the 2 ½ year project. The system concept was created by first developing a lighting design that demonstrated best practices for patient room lighting – illuminance and uniformity for task performance, reduced glare, and convenient controls, in addition to giving patients control over the lighting in their environment. A framework was defined to deliver circadian support via software behaviors. Through that process luminaires were identified from the Philips portfolio that were adaptable – by their form, dimensions, and optical materials – to mix multicolor LED platforms uniformly and deliver target design lumen levels. The Blue Sky luminaire was selected for the patient bed area to give the illusion of skylight while providing white light on the patient bed. Luminaires used existing 2-channel tunable white LED boards, and newly developed 4-channel LED boards. Red-Orange, Blue, Green, and Blue-shifted Yellow LED chips were selected based on spectral characteristics and their ability to produce high quality white light. 4-channel Power over Ethernet (PoE) drivers were developed and firmware written so they would communicate with both 2- and 4-channel boards. These components formed the backbone of the connected lighting infrastructure. Software, flexible and nuanced in its complexity, was written to set behaviors for myriad lighting scenes in the room throughout the 24 hour day – and all could be overridden by manual controls. This included a dynamic tunable white program, three color changing automatic programs that simulated degrees of sunrise to sunset palettes, and an amber night lighting system that offered visual cues for postural stability to minimize the risk of falls. All programs were carefully designed to provide visual comfort for all occupants, support critical task performance for staff, and to support the patient’s 24hr rhythms. A full scale mockup room was constructed in the Philips Cambridge Lab. The lighting system was installed, tested and functionality demonstrated to ensure smooth operation of system components – luminaires, drivers, PoE switches, wall controls, patient remote, and daylight and occupancy sensors. How did the system perform? It met visual criteria, confirmed by calculations, simulations and measurements in the field. It met non-visual criteria, confirmed by setting circadian stimulus (CS) targets and performing calculations using the calculator developed by the Lighting Research Center. Finally, human factors validation studies were conducted to gain insight from real end users in the healthcare profession; surveys were administered, data analyzed, and audio comments captured. The general consensus was positive, with requests to pilot the system in their hospitals. The importance of the research completed under this grant is that it allowed the exploration and development of a unique lighting system, one that would deliver a blend of visual and non-visual criteria in patient room design for today’s healthcare environment. The research investigated the area of multichannel LED technology, multichannel Power over Ethernet (PoE) drivers and their integration with automatic and manual controls as a system – uncovering and meeting challenges along the way. It married visual needs of patients and staff with support for 24 hour rhythms, placing value on the wellbeing of the patient – while successfully saving energy over incumbent technologies. Indications are that the market is ready and willing to invest – multiple healthcare facilities are in line to pilot this system, recognizing its value beyond energy to patient and staff well-being. Its value to the public can best be expressed by a patient support coordinator who, after spending several hours in the room being immersed in the lighting, analyzing all its features, commented: “This re-writes lighting for healthcare”.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical Gaps in Hanford High-Level Waste Solids Settling Behavior and Settling Time Evaluation for Direct Feed High-Level Waste (DFHLW) Operations

Settling of high-level waste (HLW) solids in process vessels is a key conceptual process step in providing HLW feed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) HLW Vitrification Facility. Direct Feed High-Level Waste (DFHLW) is a potential approach to initiating HLW vitrification prior to completing of the WTP Pretreatment Facility. Settling would be used with subsequent supernatant decant to concentrate HLW feed. To support planning for DFHLW, Washington River Protection Solutions (WRPS) requested support from the Pacific Northwest National Laboratory to evaluate the current data set available to predict the time needed for HLW solids to settle, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling time. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers including: Gap 1: In-Tank Settling Rates Faster than Settling of Laboratory Samples, Gap 2: Effect of Sludge Leaching/Washing on Predicted Settling Times, Gap 3: Predicting Waste Settling from Waste Chemistry (Waste Type), Gap 4: Predicting Waste Settling from Particle Size and Density Distributions (PSDDs), Gap 5: Insufficient Laboratory and In-Tank Settling Data to Represent Hanford Waste, Gap 6: Methods for Real-Time, In-Tank Tracking of Settling, Gap 7: Prediction of Sediment Erosion Resistance as a Function of Settling Time, and Gap 8: Prediction of Sediment Solids Content as a Function of Settling Time. In addition to the data gaps, an overarching observation of the settling rate and settled layer data is the significant variation in behavior. At similar solids concentrations, settling rates can vary by as much as 3 orders of magnitude depending on the source waste tank, and significantly different settling rates are noted between laboratory and in situ tests for the same waste tank. The range of average solids concentration in existing HLW sediment, which may have been quiescent for decades, can vary from less than 7 wt% to greater than 74 wt% solids. The shear strengths (or yield stresses) measured on laboratory samples range from less than 27 Pa to greater than 6400 Pa. These variations can challenge process planning for the application of a settle/decant process for DFHLW. This report describes the significance of the gaps to the settle/decant process and presents uncertainties by way of examples. Potential technical approaches for resolving these gaps are described and the estimated difficulty in resolving these gaps is evaluated. Based on the significance of the gap and the difficulty of resolution, recommendations are made to address specific gaps. Scoping estimates of the potential settling times for DFHLW solids have been made based on the existing data set with its associated gaps. Depending on the process vessel depth and final sediment concentration, substantial fractions of the scoping estimate results for settling times for characterized HLW exceed the 2-week period that has been previously assumed for process planning. There is also significant disparity, potentially greater than a factor of 5000 difference, in the estimated settling times depending on process vessel depth and final sediment solid concentration. This variation in results underscores the significance of the identified gaps and uncertainties with respect to process planning for utilizing settle/decant operations for DFHLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of fuel consumption potential of medium and heavy duty vehicles through modeling and simulation.

The main objective of this report is to provide quantitative data to support the Committee in its task of establishing a report to support rulemaking on medium- and heavy-duty fuel efficiency improvement. In particular, it is of paramount importance for the Committee to base or illustrate their conclusions on established models and actual state-of-the art data. The simulations studies presented in the report have been defined and requested by the members of the National Academy committee to provide quantitative inputs to support their recommendations. As such, various technologies and usage scenarios were considered for several applications. One of the objective is to provide the results along with their associated assumptions (both vehicle and drive cycles), information generally missing from public discussions on literature search. Finally, the advantages and limitations of using simulation will be summarized. The study addresses several of the committee tasks, including: (1) Discussion of the implication of metric selection; (2) Assessing the impact of existing technologies on fuel consumption through energy balance analysis (both steady-state and standard cycles) as well as real world drive cycles; and (3) Impact of future technologies, both individually and collectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The gate-keepers in a changing world: integrating microbial diversity and dynamics with global change biology

Microorganisms (Bacteria, Archaea and Fungi) are the gate-keepers of many ecosystem-scale biogeochemical cycles. Although there have been measurable changes in ecosystem function due to human activities such as greenhouse gas production, nutrient loading, land-use change, and water consumption, few studies have connected microbial community dynamics with these changes in ecosystem function. Specifically, very little is known about how global changes will induce important functional changes in microbial biodiversity. Even less is known about how microbial functional changes could alter rates of nutrient cycling or whether microbial communities have enough functional redundancy that changes will have little impact on overall process rates. The proposed symposium will provide an overview of this emerging research area, with emphasis on linking the microorganisms directly to important ecological functions under the influence of global change dynamics. The session will include both broad overviews as well as specific case-studies by researchers who examine microbial communities from a variety of taxonomic levels and from various environments. The session will begin broadly, with speakers discussing how microbial communities may inform ecosystem-scale global change studies, and help to make microbial ecological knowledge more tangible for a broad range of ecologists. The session will continue with case studies of microbial community information informing process in global change experiments. Finally, the session will close with speakers discussing how microbial community information might fit into global change models, and what types of information are useful for future studies. We have requested that speakers particularly incorporate their views on what types of microbial data is useful and informative in the context of larger ecosystem processes. We foresee that this session could serve as a focal point for global change microbial ecologists to meet and discuss their field at the ESA 2010 General Meeting. However, more importantly, the session will provide for a broad range of interests for ecosystem ecologists, theoretical ecologists, and global change biologists, and will foster communication between these groups to generate informative microbial community data in the future.

54 ENVIRONMENTAL SCIENCES↗

LambdaStation: Exploiting Advance Networks In Data Intensive High Energy Physics Applications

Lambda Station software implements selective, dynamic, secure path control between local storage & analysis facilities, and high bandwidth, wide-area networks (WANs). It is intended to facilitate use of desirable, alternate wide area network paths which may only be intermittently available, or subject to policies that restrict usage to specified traffic. Lambda Station clients gain awareness of potential alternate network paths via Clarens-based web services, including path characteristics such as bandwidth and availability. If alternate path setup is requested and granted, Lambda Station will configure the local network infrastructure to properly forward designated data flows via the alternate path. A fully functional implementation of Lambda Station, capable of dynamic alternate WAN path setup and teardown, has been successfully developed. A limited Lambda Station-awareness capability within the Storage Resource Manager (SRM) product has been developed. Lambda Station has been successfully tested in a number of venues, including Super Computing 2008. LambdaStation software, developed by the Fermilab team, enables dynamic allocation of alternate network paths for high impact traffic and to forward designated flows across LAN. It negotiates with reservation and provisioning systems of WAN control planes, be it based on SONET channels, demand tunnels, or dynamic circuit networks. It creates End-To-End circuit between single hosts, computer farms or networks with predictable performance characteristics, preserving QoS if supported in LAN and WAN and tied security policy allowing only specific traffic to be forwarded or received through created path. Lambda Station project also explores Network Awareness capabilities.

97 MATHEMATICS AND COMPUTING↗

Considerations for Corridor and Community DC Fast Charging Complex System Design

The Idaho National Laboratory (INL), a U.S. Department of Energy (DOE) national laboratory located in Idaho Falls, Idaho, has been DOE’s lead laboratory for the field testing of light-duty plug-in electric vehicles (PEVs), charging infrastructure, and other alternative vehicle technologies for 25 years. INL has tested and collected data from more than 17,000 charging stations, documenting efficiencies, charge profiles, and PEV drivers’ behaviors when using charging infrastructure. Based on the experience of INL staff and support personnel, DOE requested that INL perform three tasks: • Identify pertinent lessons learned from previous direct current (DC) fast charger (DCFC) deployment and data collection activities in order to perform an analysis of the experience to date with DC fast charging systems • Establish the criteria for siting DC fast charging systems, including access to current or future sizeable penetrations of PEVs and existing power, the potential to be used by local (intracity) as well as pass-through (intercity) PEV drivers, expandability, and accessible to the federal highway system • Develop a draft system specification that lists the components that will be incorporated in a DC fast charging complexes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ride Pingo to Transit

In this project, we developed an on-demand microtransit first- and last-mile service. To integrate the service with fixed-route transit, we developed a feature called Transit Connect that prioritized riders’ on-time arrival at the transit station over other service requirements. We first prototyped service and related algorithms in a simulated environment, and then piloted the service in the city of Kent, Washington. Our algorithm incorporates request-specific hard drop-off deadlines to ensure timely arrivals for transit transfers. In the pilot, these constraints were obtained from GTFS Realtime data to accurately determine the schedule of the transit and the location of the stations. This approach introduced the ability to accept or decline new requests based on the timing of transit connections for these new requests and connection status of onboarding customers. The pilot (called “Ride Pingo to Transit”) deployed a fleet of three 14-person vans, ran from September 2021 to March 2023, and served a total of 21,329 trips. Transit Connect was offered for drop-offs at both Kent Station and the Kent Valley hub. In total, 2,844 such trips were completed. This dataset was collected from our pilot, which includes the following: - Requests: List of all trip requests, including those that were actually served and those not materialized. - Fleet: Daily vehicle service logs. - Service details: Daily vehicle stop logs (boarding and alighting). - Trip types: First mile, last mile, or point-to-point. ![pingo to transit](pingo-to-transit.jpg)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Standardized Procedure Content And Data Structure Based On Human Factors Requirements For Computer-Based Procedures

Most activities that involve human interaction with systems in a nuclear power plant are guided by procedures. Traditionally, the use of procedures has been a paper-based process that supports safe operation of the nuclear power industry. However, the nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. Advances in digital technology make computer-based procedures (CBPs) a valid option that provides further enhancement of safety by improving human performance related to procedure use. The transition from paper-based procedures (PBPs) to CBPs creates a need for a computer-based procedure system (CBPS). A CBPS needs to have the ability to perform logical operations in order to adjust to the inputs received from either users or real time data from plant status databases. Without the ability for logical operations the procedure is just an electronic copy of the paper-based procedure. In order to provide the CBPS with the information it needs to display the procedure steps to the user, special care is needed in the format used to deliver all data and instructions to create the steps. The procedure should be broken down into basic elements and formatted in a standard method for the CBPS. One way to build the underlying data architecture is to use an Extensible Markup Language (XML) schema, which utilizes basic elements to build each step in the smart procedure. The attributes of each step will determine the type of functionality that the system will generate for that step. The CBPS will provide the context for the step to deliver referential information, request a decision, or accept input from the user. The XML schema needs to provide all data necessary for the system to accurately perform each step without the need for the procedure writer to reprogram the CBPS. The research team at the Idaho National Laboratory has developed a prototype CBPS for field workers as well as the underlying data structure for such CBPS. The objective of the research effort is to develop guidance on how to design both the user interface and the underlying schema. This paper will describe the result and insights gained from the research activities conducted to date.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Data Sheets for A = 84

The evaluated spectroscopic data are presented for 12 known nuclides of mass 84 (Ga, Ge, As, Se, Br, Kr, Rb, Sr, Y, Zr, Nb, Mo). Except for the stable nuclides {sup 84}Sr and {sup 84}Kr, extensive new data are available for all the other nuclides since the 1997 evaluation by J.K. Tuli (1997Tu02) of A = 84 nuclides. Many precise Penning-trap mass measurements since AME-2003 for A = 84 nuclides (2009Re03,2008Ha23,2008We10,2007Ke09,2006Ka48,2006De36,2006Ri15) have resulted in improved Q values and separation energies. However, many deficiencies still remain. Some examples are given below. Excited-state data for {sup 84}Ga and {sup 84}As are nonexistent, and those for {sup 84}Ge are scarce. The radioactive decay schemes of {sup 84}Ga, {sup 84}Ge, {sup 84}Se, {sup 84}Y (39.5 min), {sup 84}Y (4.6 s), {sup 84}Zr and {sup 84}Nb suffer from incompleteness and that for {sup 84}Mo decay is not known at all. The energy ordering of the two activities (39.5 min and and 4.6 s) of {sup 84}Y is not well established, although, high-spin with tentative spin-parity of (6+) is adopted here as the ground state of {sup 84}Y based on weak arguments. From a conference report published in 2000, it is clear that extensive experiments were done to investigate decays of {sup 84}Zr and {sup 84}Y, but details of these studies never appeared in literature and none were made available to the evaluators when requested from original authors. This evaluation was carried out as part of ENSDF workshop for Nuclear Structure and Decay Data Evaluators, organized and hosted by the 'Horia Hulubei' National Institute for Physics and Nuclear Engineering, Bucharest, Romania during March 30, 2009 - April 3, 2009. Names of the evaluators principally responsible for evaluation of individual nuclides are given under the respective Adopted data sets.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

BioPortal: an open community resource for sharing, searching, and utilizing biomedical ontologies

Abstract BioPortal (https://bioportal.bioontology.org) is the world’s most comprehensive repository of biomedical ontologies. It provides infrastructure for finding, sharing, searching, and utilizing biomedical ontologies. Launched in 2005, BioPortal now includes 1549 ontologies (1182 of them public). Its open, freely accessible website enables anyone (i) to browse the ontology library, (ii) to search for terms across ontologies, (iii) to browse mappings between terms, (iv) to see popularity ratings and recommendations on which ontologies are most relevant to their use cases, (v) to annotate text with ontology terms, (vi) to submit an ontology, and (vii) to request ontology changes. The library of ontologies can be accessed programmatically via a REST application programming interface (API). Recent enhancements include a BioPortal knowledge graph that integrates knowledge from multiple ontologies; a unified data model for interoperability with other knowledge sources; ontology popularity ratings and recommendations for relevant ontologies; and the ability to request ontology changes via a simple user interface that automatically converts user change requests to GitHub Pull Requests that specify the edits that will be made to the ontology upon approval.

Vendetti, Jennifer↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period April 1, 2007 - March 31, 2008. Table 2 shows the summary of cumulative users for the period April 1, 2007 - March 31, 2007. For the second quarter of FY 2008, the overall number of users was nearly as high as the last reporting period, in which a new record high for number of users was established. This quarter, a new record high was established for the number of user days, particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany, as well as major field campaigns at the NSA and SGP sites. This quarter, 37% of the Archive users are ARM science-funded principal investigators and 23% of all other facility users are either ARM science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period January 1 - March 31, 2008. There were no incidents this reporting period.

54 ENVIRONMENTAL SCIENCES↗