Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Asteroid Crew Segment Mission Lean Development

Asteroid Retrieval Crewed Mission (ARCM) requires a minimum set of Key Capabilities compared in the context of the baseline EM-1/2 Orion and SLS capabilities. These include: Life Support & Human Systems Capabilities; Mission Kit Capabilities; Minimizing the impact to the Orion and SLS development schedules and funding. Leveraging existing technology development efforts to develop the kits adds functionality to Orion while minimizing cost and mass impact.

Gard, Joseph↗

Space Program Advocacy Can Distort Project Management and Damage Systems Engineering

Over-optimistic project advocacy often causes exaggerated performance claims and underestimated costs and schedules. This can distort project management and damage systems engineering. NASA projects such as the space shuttle and Hubble are extreme examples. NASA's spectacular success in the Apollo moon landings seems to have produced overconfidence and carelessness, but also to have gained tolerance for unrealistic claims and forgiveness when they were proven wrong. Apollo risk analysis predicted many astronaut fatalities. This was believed but was potentially damaging to the Apollo program, so risk analysis was discontinued. The moon landings beat bad odds because Apollo obsessively reduced risk. Its success seemed to confirm that risk analysis was unreasonably pessimistic and that risk could be overcome by good engineering. This understanding caused risk to be increased during space shuttle engineering and led to an unnecessarily dangerous approach. The shuttle design placed a fragile spacecraft next to the fuel tanks and failed to provide crew escape or launch abort. These design decisions directly caused the Challenger and Columbia tragedies. After Challenger, risk analysis was re-established. The current rocket and capsule design does consider risk and the result strongly resembles Apollo. Apollo advocacy led NASA to abandon risk analysis and this was ultimate cause of the Shuttle tragedies. Excessive advocacy that distorts risk, cost, and schedule could be prevented in an ideal organization that used systems engineering to make rational and fair decisions. However, most real organizations accommodate human and group needs using informal methods often described as "the system." Humans have biases, use innate decision making heuristics, instinctively rely on "gut feel," and establish deviant groups through groupthink. Expecting organizations to become totally rational is impractical, but specific problems such as neglecting risk and underestimating cost and schedule can be directly challenged with some hope of success.

Jones, Harry W.↗

STS-96 Flight Crew Press Q & A at KSCNF for TCDT

Live footage shows Commander of STS-96 mission, Kent V. Rominger, introducing the other crewmembers, Pilot Rick D. Husband, and Mission Specialists Tamara E. Jernigan, Ellen Ochoa, Daniel T. Barry, Julie Payette and Valery Ivanovich Tokarev. During the introduction, Rominger describes each crewmember's responsibilities. He also mentions the deployment of STARSHINE, and the scheduled space walk with Jernigan and Barry. Panoramic views of the shuttle on the launch pad are also shown.

Source record↗

Mars exploration study workshop 2

A year-long NASA-wide study effort has led to the development of an innovative strategy for the human exploration of Mars. The latest Mars Exploration Study Workshop 2 advanced a design reference mission (DRM) that significantly reduces the perceived high costs, complex infrastructure, and long schedules associated with previous Mars scenarios. This surface-oriented philosophy emphasizes the development of high-leveraging surface technologies in lieu of concentrating exclusively on space transportation technologies and development strategies. As a result of the DRM's balanced approach to mission and crew risk, element commonality, and technology development, human missions to Mars can be accomplished without the need for complex assembly operations in low-Earth orbit. This report, which summarizes the Mars Exploration Study Workshop held at the Ames Research Center on May 24-25, 1993, provides an overview of the status of the Mars Exploration Study, material presented at the workshop, and discussions of open items being addressed by the study team. The workshop assembled three teams of experts to discuss cost, dual-use technology, and international involvement, and to generate a working group white paper addressing these issues. The three position papers which were generated are included in section three of this publication.

Duke, Michael B.↗

CLV First Stage Design, Development, Test and Evaluation

The Crew Launch Vehicle (CLV) is an integral part of NASA's Exploration architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Currently in the system definition phase, the CLV is planned to replace the Space Shuttle for crew transport in the post 2010 time frame. It is comprised of a solid rocket booster first stage derived from the current Space Shuttle SRB, a LOX/hydrogen liquid fueled second stage utilizing a derivative of the Space Shuttle Main Engine (SSME) for propulsion, and a Crew Exploration Vehicle (GEV) composed of Command and Service Modules. This paper deals with current DDT&E planning for the CLV first stage solid rocket booster. Described are the current overall point-of-departure design and booster subsystems, systems engineering approach, and milestone schedule requirements.

Burt, Richard K.↗

Deploying a Route Optimization EFB Application for Commercial Airline Operational Trials

The Traffic Aware Planner (TAP), developed for NASA Langley Research Center to support the Traffic Aware Strategic Aircrew Requests (TASAR) project, is a flight-efficiency software application developed for an Electronic Flight Bag (EFB). Tested in two flight trials and planned for operational testing by two commercial airlines, TAP is a real-time trajectory optimization application that leverages connectivity with onboard avionics and broadband Internet sources to compute and recommend route modifications to flight crews to improve fuel and time performance. The application utilizes a wide range of data, including Automatic Dependent Surveillance Broadcast (ADS-B) traffic, Flight Management System (FMS) guidance and intent, on-board sensors, published winds and weather, and Special Use Airspace (SUA) schedules. This paper discusses the challenges of developing and deploying TAP to various EFB platforms, our solutions to some of these challenges, and lessons learned, to assist commercial software developers and hardware manufacturers in their efforts to implement and extend TAP functionality in their environments. EFB applications (such as TAP) typically access avionics data via an ARINC 834 Simple Text Avionics Protocol (STAP) server hosted by an Aircraft Interface Device (AID) or other installed hardware. While the protocol is standardized, the data sources, content, and transmission rates can vary from aircraft to aircraft. Additionally, the method of communicating with the AID may vary depending on EFB hardware and/or the availability of onboard networking services, such as Ethernet, WIFI, Bluetooth, or other mechanisms. EFBs with portable and installed components can be implemented using a variety of operating systems, and cockpits are increasingly incorporating tablet-based technologies, further expanding the number of platforms the application may need to support. Supporting multiple EFB platforms, AIDs, avionics datasets, and user interfaces presents a challenge for software developers and the management of their code baselines. Maintaining multiple baselines to support all deployment targets can be extremely cumbersome and expensive. Certification also needs to be considered when developing the application. Regardless of whether the software is itself destined to be certified, data requirements in support of the application and user interface elements may introduce certification requirements for EFB manufacturers and the airlines. The example of TAP, the challenges faced, solutions implemented, and lessons learned will give EFB application and hardware developers insight into future potential requirements in deploying TAP or similar flight-deck EFB applications.

Roscoe, David A.↗

Crew interface specifications preparation for in-flight maintenance and stowage functions

The findings and data products developed during the Phase 2 crew interface specification study are presented. Five new NASA general specifications were prepared: operations location coding system for crew interfaces; loose equipment and stowage management requirements; loose equipment and stowage data base information requirements; spacecraft loose equipment stowage drawing requirements; and inflight stowage management data requirements. Additional data was developed defining inflight maintenance processes and related data concepts for inflight troubleshooting, remove/repair/replace and scheduled maintenance activities. The process of maintenance task and equipment definition during spacecraft design and development was also defined and related data concepts were identified for futher development into formal NASA specifications during future follow-on study phases of the contract.

Parker, F. W.↗

High speed research system study. Advanced flight deck configuration effects

In mid-1991 NASA contracted with industry to study the high-speed civil transport (HSCT) flight deck challenges and assess the benefits, prior to initiating their High Speed Research Program (HSRP) Phase 2 efforts, then scheduled for FY-93. The results of this nine-month effort are presented, and a number of the most significant findings for the specified advanced concepts are highlighted: (1) a no nose-droop configuration; (2) a far forward cockpit location; and (3) advanced crew monitoring and control of complex systems. The results indicate that the no nose-droop configuration is critically dependent upon the design and development of a safe, reliable, and certifiable Synthetic Vision System (SVS). The droop-nose configuration would cause significant weight, performance, and cost penalties. The far forward cockpit location, with the conventional side-by-side seating provides little economic advantage; however, a configuration with a tandem seating arrangement provides a substantial increase in either additional payload (i.e., passengers) or potential downsizing of the vehicle with resulting increases in performance efficiencies and associated reductions in emissions. Without a droop nose, forward external visibility is negated and takeoff/landing guidance and control must rely on the use of the SVS. The technologies enabling such capabilities, which de facto provides for Category 3 all-weather operations on every flight independent of weather, represent a dramatic benefits multiplier in a 2005 global ATM network: both in terms of enhanced economic viability and environmental acceptability.

Swink, Jay R.↗

Apollo 14 - Press Kit

Apollo 14, the sixth United States manned flight to the Moon and fourth Apollo mission with an objective of landing men on the Moon, is scheduled for launch Jan. 31 at 3:23 p.m. EST from Kennedy Space Center, Fla. The Apollo 14 lunar module is to land in the hilly upland region north of the Fra Mauro crater for a stay of about 33 hours, during which the landing crew will leave the spacecraft twice to set up scientific experiments on the lunar surface and to continue geological explorations. The two earlier Apollo lunar landings were Apollo 11 at Tranquility Base and Apollo 12 at Surveyor 3 crater in the Ocean of Storms.

Source record↗

Humanoids for lunar and planetary surface operations

This paper presents a vision of humanoid robots as human's key partners in future space exploration, in particular for construction, maintenance/repair and operation of lunar/planetary habitats, bases and settlements. It integrates this vision with the recent plans, for human and robotic exploration, aligning a set of milestones for operational capability of humanoids with the schedule for the next decades and development spirals in the Project Constellation. These milestones relate to a set of incremental challenges, for the solving of which new humanoid technologies are needed. A system of systems integrative approach that would lead to readiness of cooperating humanoid crews is sketched. Robot fostering, training/education techniques, and improved cognitive/sensory/motor development techniques are considered essential elements for achieving intelligent humanoids. A pilot project in this direction is outlined.

information fusion↗

Ares 1 First Stage Design, Development, Test, and Evaluation

The Ares I Crew Launch Vehicle (CLV) is an integral part of NASA s exploration architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Currently in the system definition phase, the CLV is planned to replace the Space Shuttle for crew transport in the post 2010 time frame. It is comprised of a solid rocket booster (SRB) first stage derived from the current Space Shuttle SRB, a liquid oxygen/hydrogen fueled second stage utilizing a derivative of the Apollo upper stage engine for propulsion, and a Crew Exploration Vehicle (CEV) composed of command and service modules. This paper deals with current design, development, test, and evaluation planning for the CLV first stage SRB. Described are the current overall point-of-departure design and booster subsystems, systems engineering approach, and milestone schedule requirements.

Williams, Tom↗

Analysis and Down Select of Flow Passages for Thermal Hydraulic Testing of a SNAP Derived Reactor

As past of the Vision for Space Exploration, man will return to the moon. To enable safe and productive time on the lunar surface will require adequate power resources. To provide the needed power and to give mission planners all landing site possibilities, including a permanently dark crater, a nuclear reactor provides the most options. Designed to be l00kWt providing approx. 25kWe this power plants would be very effective in delivering dependable, site non-specific power to crews or robotic missions on the lunar surface. An affordable reference reactor based upon the successful SNAP program of the 1960's and early 1970's has been designed by Los Alamos National Laboratory that will meet such a requirement. Considering current funding, environmental, and schedule limitations this lunar surface power reactor will be tested using non-nuclear simulators to simulate the heat from fission reactions. Currently a 25kWe surface power SNAP derivative reactor is in the early process of design and testing with collaboration between Los Alamos National Laboratory, Idaho National Laboratory, Glenn Research Center, Marshall Space Flight Center, and Sandia National Laboratory to ensure that this new design is affordable and can be tested using non-nuclear methods as have proven so effective in the past. This paper will discuss the study and down selection of a flow passage concept for a approx. 25kWe lunar surface power reactor. Several different flow passages designs were evaluated using computational fluid dynamics to determine pressure drop and a structural assessment to consider thermal and stress of the passage walls. The reactor design basis conditions are discussed followed by passage problem setup and results for each concept. A recommendation for passage design is made with rationale for selection.

Godfroy, T. J.↗

Humanoids in Support of Lunar and Planetary Surface Operations

This paper presents a vision of humanoid robots as human's key partners in future space exploration, in particular for construction, maintenance/repair and operation of lunar/planetary habitats, bases and settlements. It integrates this vision with the recent plans for human and robotic exploration, aligning a set of milestones for operational capability of humanoids with the schedule for the next decades and development spirals in the Project Constellation. These milestones relate to a set of incremental challenges, for the solving of which new humanoid technologies are needed. A system of systems integrative approach that would lead to readiness of cooperating humanoid crews is sketched. Robot fostering, training/education techniques, and improved cognitive/sensory/motor development techniques are considered essential elements for achieving intelligent humanoids. A pilot project using small-scale Fujitsu HOAP-2 humanoid is outlined.

imitation↗

Using Virtual Reality and Motion Capture as Tools for Human Factors Engineering at Nasa Marshall Space Flight Center

MSFC’s Human Factors Engineering (HFE) team is responsible for all worksite analyses performed for the SLS pre-launch integration activities at Kennedy Space Center (KSC). There is a wide variety of tasks associated with pre-launch integration activities and it is important to verify that vehicle integration will be successful early in the design process. The VR work performed by the HFE team at MSFC has allowed fast changing layouts to be analyzed by various departments with minimal impact to cost or schedule. Implementing these methods for SLS allows for VR use in early design cycles, saving time and budget. Utilizing the resulting HFE analyses improves usability and safety. Ultimately, the goal is to provide a safe environment for the technicians assembling the vehicle and the astronaut crew at launch.

Andrews, Tanya↗

"Making Safety Happen" Through Probabilistic Risk Assessment at NASA

NASA is using Probabilistic Risk Assessment (PRA) as one of the tools in its Safety & Mission Assurance (S&MA) tool belt to identify and quantify risks associated with human spaceflight. This paper discusses some of the challenges and benefits associated with developing and using PRA for NASA human space programs. Some programs have entered operation prior to developing a PRA, while some have implemented PRA from the start of the program. It has been observed that the earlier a design change is made in the concept or design phase, the less impact it has on cost and schedule. Not finding risks until the operation phase yields much costlier design changes and major delays, which can result in discussions of just accepting the risk. Risk contributors identified by PRA are not just associated with hardware failures. They include but are not limited to crew fatality due to medical causes, the environment the vehicle and crew are exposed to, the software being used, and the reliability of the crew performing required actions. Some programs have entered operation prior to developing a PRA, and while PRA can still provide a benefit for operations and future design trades, the benefit of implementing PRA from the start of the program provides the added benefit of informing design and reducing risk early in program development. Currently, NASA’s International Space Station (ISS) program is in its 20th year of on-orbit operations around the Earth and has several new programs in the design phase preparing to enter the operation phase all of which have active (or living) PRAs. These programs incorporate PRA as part of their Risk-Informed, Decision-Making (RIDM) process. For new NASA human spaceflight programs discussion begins with mission concept, establishing requirements, forming the PRA team, and continues through the design cycles into the operational phase. Several examples of PRA related applications and observed lessons are included.

Applications↗

TPSAS-NF1676L-12168-DND

The Federal Aviation Administration’s Surveillance and Broadcast Services Program Office considers Interval Management (IM) to be one of the three key, near-term applications to make use of ADS-B-In, the receiving and processing of Automatic Dependent Surveillance – Broadcast data on-board an aircraft. Interval Management is used to describe a wide range of operational applications and uses of airborne spacing technology. Interval Management makes use of improved scheduling and sequencing capabilities for the air traffic controllers (ATC) and precise, relative spacing of aircraft, to improve airport throughput, increase the use of Optimized Profile Descents (OPD), and reduce tactical controller workload. The IM applications are subdivided into two categories: one where the flight crew is authorized to manage their speed to achieve the IM goal while the controller retains separation responsibility and a second where the flight crew takes responsibility for both managing speed but also for separation from the specified target aircraft. The former is referred to as Interval Management-Spacing (IM-S) and the latter as Interval Management-Delegated Separation (IM-DS). For the past 10 years NASA has been working on a specific IM application called Airborne Precision Spacing (APS). This concept has focused on increasing runway throughput while enabling OPDs. It is seen as a specific application within the IM class of applications. This talk will present the current state of the APS concept including support for dependent parallel runway operations and how NASA is working to have APS support the broader IM activities. Planned development and testing of APS, including extensions to support IM-DS and FAA-planned flight trials will be presented along with several up-coming simulations.

Bryan E Barmore↗

TPSAS-NF1676L-12329-DND

The Federal Aviation Administration’s Surveillance and Broadcast Services Program Office considers Interval Management (IM) to be one of the three key, near-term applications to make use of ADS-B-In, the receiving and processing of Automatic Dependent Surveillance – Broadcast data on-board an aircraft. Interval Management is used to describe a wide range of operational applications and uses of airborne spacing technology. Interval Management makes use of improved scheduling and sequencing capabilities for the air traffic controllers (ATC) and precise, relative spacing of aircraft, to improve airport throughput, increase the use of Optimized Profile Descents (OPD), and reduce tactical controller workload. The IM applications are subdivided into two categories: one where the flight crew is authorized to manage their speed to achieve the IM goal while the controller retains separation responsibility and a second where the flight crew takes responsibility for both managing speed but also for separation from the specified target aircraft. The former is referred to as Interval Management-Spacing (IM-S) and the latter as Interval Management-Delegated Separation (IM-DS). For the past 10 years NASA has been working on a specific IM application called Airborne Precision Spacing (APS). This concept has focused on increasing runway throughput while enabling OPDs. It is seen as a specific application within the IM class of applications. This talk will present the current state of the APS concept including support for dependent parallel runway operations and how NASA is working to have APS support the broader IM activities. Planned development and testing of APS, including extensions to support IM-DS and FAA-planned flight trials will be presented along with several up-coming simulations.

Brian T Baxley↗

Top-End Installation for DESI Project at Mayall Telescope

In this time-lapse video, crews at the Mayall Telescope near Tucson, Arizona, lift and install the top-end components for the Dark Energy Spectroscopic Instrument, or DESI. The components, which include a stack of six lenses and other structures for positioning and support, weigh about 12 tons. DESI, scheduled to begin its sky survey next year, is designed to produce the largest 3-D map of the universe and produce new clues about the nature of dark energy.

3-D MAP↗