Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Search and Rescue Operations of Aircraft in Africa: Some Compelling Issues

The world aviation community has felt the compelling need for a well-coordinated global programme for search and rescue operations of aircraft ever since commercial aviation was regulated in 1944. Guidelines and plans of action for search and rescue have therefore been considered critical in the event of an aircraft accident. This fact is eminently brought to bear in the continental regions of Africa and South America in particular, where vast expanses of land are still uninhabited or sparsely populated and controlled flight into terrain (CFIT-where an aircraft may crash on land while still under the control of technical crew) is a common occurrence. There are numerous guidelines that have been adopted under the umbrella of the International Civil Aviation Organization which are already in place for the provision of search and rescue operations pertaining to aircraft. However, when an accident occurs in the territory of a State, there are sensitivities involving the State in which the aircraft concerned was registered and issues of sovereignty which have to be considered. Additionally. issues such as the voluntary nature of the search and rescue services offered. confidentiality, timeliness of such operations, fairness and uniformity all play a critical role. This article addresses the issue of search and rescue operations in Africa and examines in some detail where the world aviation community is right now and where it is headed in this important field of human endeavour.

Abeyratne, Ruwantissa I. R.↗

Denver TMA assessment

This report describes the assessment of the Traffic Management Advisor (TMA) conducted at the Denver Center and TRACON, January 11-February 5, 1993. The assessment addressed the effectiveness of TMA for supporting various traffic management activities. At the Center, traffic management coordinators (TMC's) shadowed traffic operations, using TMA to make metering time and internal release decisions. At the TRACON, TMC's accessed TMA in an advisory mode for different planning activities such as staffing, distributing the traffic load, and changing the airport acceptance rate. These different opportunities for assessing TMA provide insight into TMA as a potential communication aid and planning tool. Findings from this assessment indicate that TMA can be used to support traffic management planning and decisions. TMC's at the center were able to use information provided by TMA to determine metering times as well as internal release times. At the TRACON, TMA supported decisions on airport configuration, airport acceptance rate, load distribution, proactive coordination with the center, and staffing. While findings of TMA use are generally positive, it must be kept in mind that this assessment is a snapshot in time. Not all TMA capabilities were assessed, nor were TMC's fully trained and knowledgeable on all features. Feature use will continue to evolve and strategies emerge as the TMC's gain experience with TMA over a variety of traffic situations and their understanding of TMA capabilities broadens with continued training.

Harwood, Kelly↗

Impact of U-10Mo HALEU fuel element tolerances on the Massachusetts Institute of Technology reactor safety and operational performance – Thermal hydraulics

The U.S. is coordinating efforts for the conversion of six U.S. High Performance Research Reactors (USHPRR) including one critical facility from highly enriched uranium (HEU) to low-enriched uranium (LEU). In order to continue the mission of these reactors, including the Massachusetts of Institute of Technology Reactor (MITR), and achieve similar performance, high-assay low-enriched uranium (HALEU) with a high-density metallic alloy of uranium with 10 wt% molybdenum (U-10Mo) is being evaluated. The impact of the fabrication specification and tolerances was assessed following the preliminary design of the MITR LEU fuel elements using the U-10Mo monolithic alloy. This research focuses on the analysis of fabrication specification impact on thermal hydraulics (TH) characteristic of the MITR LEU core as a function of the variation of the relevant fuel specification parameters (e.g., coolant channel gap thickness, fuel plate thickness, etc.). The analyses are performed based on an all-fresh LEU fuel conversion plan identified in a preliminary safety analysis report submitted to the Nuclear Regulatory Commission. The reactor power margin to the onset of nucleate boiling (ONB) is assessed under the limiting safety system settings (LSSS), where a scram occurs, to ensure there is sufficient margin to the reactor safety limit, which is defined by the onset of flow instability that occurs after the ONB. The best estimate plus uncertainty approach is employed to analyze this TH characteristic, which yields realistic results while maintaining adequate conservatism, utilizing a statistical uncertainty propagation method with the STAT7 code. The TH characteristic is analyzed as a function of the variability of the specification parameters resulting from the fabrication process. The main findings of this study show that the MITR core can meet the TH safety and operational requirements at the all-LEU initial core startup (cycle 1), selected transition cycles (most reactive cycle and most limiting cycle: cycle 3 and 5, respectively) and equilibrium (cycle 14) cores under all limiting fabrication parameter combinations considered. In addition, the analyses show that the dependency of the core power margin to ONB on those specification parameters that have the most direct impact on TH performance is non-linear but monotonically decreasing within the specification tolerances. The third order polynomial fit curves are reported in detail for selected limiting cases and can serve as a powerful tool for future MITR fuel management in cases such as when HALEU supply is established that may allow additional cycle length or other operational benefits.

Conversion↗

Multi-limbed locomotion systems for space construction and maintenance

A well developed technology of coordination of multi-limbed locomotory systems is now available. Results from a NASA sponsored study of several years ago are presented. This was a simulation study of a three-limbed locomotion/manipulation system. Each limb had six degrees of freedom and could be used either as a locomotory grasping hand-holds, or as a manipulator. The focus of the study was kinematic coordination algorithms. The presentation will also include very recent results from the Adaptive Suspension Vehicle Project. The Adaptive Suspension Vehicle (ASV) is a legged locomotion system designed for terrestrial use which is capable of operating in completely unstructured terrain in either a teleoperated or operator-on-board mode. Future development may include autonomous operation. The ASV features a very advanced coordination and control system which could readily be adapted to operation in space. An inertial package with a vertical gyro, and rate gyros and accelerometers on three orthogonal axes provides body position information at high bandwidth. This is compared to the operator's commands, injected via a joystick to provide a commanded force system on the vehicle's body. This system is, in turn, decomposed by a coordination algorithm into force commands to those legs which are in contact with the ground.

Waldron, K. J.↗

Mishap Investigation Team (MIT) - Barksdale AFB, Louisiana

The Shuttle Program is organized to support a Shuttle mishap using the resources of the MIT. The afternoon of Feb. 1, 2003, the MIT deployed to Barksdale AFB. This location became the investigative center and interim storage location for crewmembers received from the Lufkin Disaster Field Office (DFO). Working under the leadership of the MIT Lead, the medical team executed a short-term plan that included search, recovery, and identification including coordination with the Armed Forces Institute of Pathology Temporary operations was set up at Barksdale Air Force Base for two weeks. During this time, coordination with the DFO field recovery teams, AFIP personnel, and the crew surgeons was on going. In addition, the crewmember families and NASA management were updated daily. The medical team also dealt with public reports and questions concerning biological and chemical hazards, which were coordinated with SPACEHAB, Inc., Kennedy Space Center (KSC) Medical Operations and the Johnson Space Center (JSC) Space Medicine office. After operations at Barksdale were concluded the medical team transitioned back to Houston and a long-term search, recovery and identification plan was developed.

Stepaniak, Philip↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Blue Rock CropSpanPV - Low Cost Racking for Agricultural Solar Photovoltaics

In this work, a total of four solar panel layouts, applied to Agrivoltaics, are investigated. This study presents two hypotheses: 1. Prefabrication - Lower total cost can be achieved by constructing a pre-assembled, pre-wired solar array in a factory, with automation, then rapidly deploying it in the field. 2. Tension Structures - Using tension structures in a way to suspend an overhead solar array also reduces costs when compared to conventional support methods. Designs are presented for frames to hold the panels. Configurations are advanced to connect the frames into arrays. Supports and foundations to hold the arrays in the desired layout are calculated, selected and presented. Cost models are prepared for the four layouts, which include definition of the business enterprise, the manufacturing operation, and the required facility for production at scale. Cost models include, detail material and task/labor take-offs for both manufacturing and installation. Comparisons with conventional system adapted to Agrivoltaics reveal that the two hypotheses do not hold true. A prefabricated array requires additional material that is not needed in the base system and the cost of this additional material is not outweighed by the cost savings of reduced field installation. The cost of wire rope for a tension structure does result in an economy of material, however, the cost of end connections and tensioning devices adds significantly to the cost of the overall tension structure. Foundation loads with tension structures, especially the large wind uplift seen with a fixed tilt solar array, impose significant constraints and high costs. The following conclusions are recommended for further consideration: 1. Best Case Agrivoltaic Configuration - The best value/lowest cost configuration for agrivoltaics is the installation of solar panels mounted on a single axis tracker in either a 2-in-portrait or 2-in landscape arrangement. This is useful for grazing lands and for staple crops which require high light levels. These applications represent the vast majority of the potential agrivoltaic market. Important elements in this configuration are the specific geometric layout coordinated with the various field operations and a control system linked between the farm equipment and single axis tracker. The control system is to monitor location and orientation, then actively tilt the solar panels or brake the field equipment to provide clearance and avoid collisions. 2. Long Span Applications - The use of tension structures for an overhead fixed tilt array is beneficial where long spans are a necessity, especially where the base support in the project location has consolidated rock near the surface or some other solid structure. One application is spanning wide irrigation canals. Another may be as an installation at the top deck of parking structures. 3. Direct Ground Mount Configuration – Having skids at the base of a pre-fabricated array that extend when the array is deployed, could be a successful design. This could be a useful strategy for dense, flat, ground-mount configurations like that employed by a couple of successful commercial operations (5G Maverick and Erthos). Arrays would be orientated north and south, deployed very low on prepared grade. Arrays would be aligned closely next to each other and anchored with small ground screws or simply with ballast. This same product arrangement could be very useful for rapid deployment and set-up of solar arrays for temporary deployments, disaster response and the military operations

14 SOLAR ENERGY↗

Orbital operations studies

Nautical units being developed for coordinating the space-time positions of things throughout the earth's atmosphere and the earth-centered region of space are considered. Three aspects of the problem are briefly summarized.

Bellamy, J. C.↗

Constellation Coordination System (CCS) Status

This presentation will be given at the Mission Operations Working Group meeting June 13-15, 2017 to discuss the Constellation Coordination System status.

Constellation coordination system↗

Methods of satellite oceanography

The theoretical basis for remote sensing measurements of climate and ocean dynamics is examined. Consideration is given to: the absorption of electromagnetic radiation in the atmosphere; scattering in the atmosphere; and satellite observations using visible light. Consideration is also given to: the theory of radio scatter from the sea; scatter of centimeter waves from the sea; and the theory of operation of synthetic aperture radars. Additional topics include: the coordinate systems of satellite orbits for oceanographic remote sensing applications; the operating features of the major U.S. satellite systems for viewing the ocean; and satellite altimetry.

Stewart, R. H.↗

Adaptive Reinforcement Learning (ARL) Control of a Multi-port Resonant Converter in UAV Systems

This study presents an adaptive reinforcement learning (ARL) control framework for a multi-port resonant converter used in hybrid unmanned aerial vehicle (UAV) power systems. The converter integrates high-frequency half-bridge input ports connected to a rectified engine–generator set and a battery energy storage system, along with a semi-bridgeless active rectifier supplying the propulsion load. A deep RL agent is trained to dynamically regulate inter-port phase-shift commands in real time based on flight conditions and load power demand. The ARL controller autonomously identifies phase-shift combinations that maximize conversion efficiency while maintaining stable and coordinated power flow, even under rapidly varying operating scenarios. This data-driven approach eliminates the need for explicit system modeling or extensive manual tuning and enables coordinated control among multiple power ports without inter-port communication. Experimental results validate that the ARL based strategy achieves reliable power sharing and consistently high-efficiency operation across diverse UAV operating conditions.

Asa, Erdem [ORNL] (ORCID:0000000190884812)↗

Intrinsic operators for the translationally-invariant many-body problem

Abstract The need to enforce fermionic antisymmetry in the nuclear many-body problem commonly requires use of single-particle coordinates, defined relative to some fixed origin. To obtain physical operators which nonetheless act on the nuclear many-body system in a Galilean-invariant fashion, thereby avoiding spurious center-of-mass contributions to observables, it is necessary to express these operators with respect to the translational intrinsic frame. Several commonly-encountered operators in nuclear many-body calculations, including the magnetic dipole and electric quadrupole operators (in the impulse approximation) and generators of U(3) and Sp ( 3 , R ) symmetry groups, are bilinear in the coordinates and momenta of the nucleons and, when expressed in intrinsic form, become two-body operators. To work with such operators in a second-quantized many-body calculation, it is necessary to relate three distinct forms: the defining intrinsic-frame expression, an explicitly two-body expression in terms of two-particle relative coordinates, and a decomposition into one-body and separable two-body parts. We establish the relations between these forms, for general (non-scalar and non-isoscalar) operators bilinear in coordinates and momenta.

Physics↗

Regularization prescription for the mixing between nonlocal gluon and quark operators

It is well known that in the study of mixing between nonlocal gluon and quark bilinear operators there exists an ambiguity when relating coordinate space and momentum space results. In this work, we show that this ambiguity is due to the lack of a proper regularization prescription of the singularity that arises when the separation between the gluon/quark fields approaches zero. We then demonstrate that dimensional regularization resolves this issue and yields consistent results in both coordinate and momentum space. This prescription is also compatible with lattice extractions of parton distributions from nonlocal operators.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Communication-Constrained Robust Control and Learning of Grid-Connected

The electric grid of things (EGoT) promises great potential for innovative grid services by tapping into vast load flexibility. However, the unique characteristics of EGoT, being a part of the cyber-physical electric power system, present both opportunities and challenges, especially concerning supply-demand balancing, stability, and communication constraints. Traditionally, centralized control was employed to ensure balance and stability in power systems. However, with the massive influx of EGoT devices, new strategies are needed to efficiently coordinate and control these distributed devices for optimal grid operations. While some studies have explored efficiency and economic models, there remains a gap in ensuring reliability under everyday operations and resilience during extreme conditions. Addressing this gap, this project develops the technology for an Energy Service Interface (ESI) that includes novel pricing, control, learning, and distributed optimization algorithms, which will enable utilities to recruit EGoT assets for crucial grid services such as load flexibility, voltage regulation, and situation-awareness. The key novelty of the proposed technology is the careful distribution of learning and control functions across utility and EGoT asset owners such that provably efficient and resilient grid operations are attained while respecting communication and information-exchange constraints. Specifically, the project team develops machine-learning enhanced load modeling methods to allow EGoT asset owners to learn their load capability and flexibility, and develops pricing-based and decentralized learning-based control so that asset owners can coordinate to meet system-wide demand-supply balance and reliability goals. For extreme situations involving high-impact, low-probability catastrophic events (termed the “black-sky” events), the team also develops (1) a “Feeder-Operating Center-on-a-Laptop” (FOCAL) software that can assist utility personnel in leveraging EGoT assets to accelerate the service recovery of damaged feeders, and (2) distributed optimization algorithms that can coordinate the operation points of EGoT devices under severe communication constraints. The proposed technology has been extensively tested and evaluated through simulations and on a testbed. In summary, as we transition into a more interconnected and digital power grid era, our project’s findings and developments offer a pivotal step toward guaranteeing both efficiency and resilience in the face of both everyday operations and rare “black-sky” events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An assembly to provide a time reference for the JPL Network Operations Control Center, Real-Time

A device is described which provides the value of date coordinated universal time (date UTC) to the JPL Network Operations Control Center, Real Time (NOCC-RT) facility. The NOCC-RT is the real time portion of the NOCC upgrade task. The time scale is generated in the NOCC-RT clock processor; however, there is a continuous reference to UTC, as realized by the National Institute of Standards and Technology and transmitted by Earth orbiting satellites. An important functional design requirement is the 99.9 pct. availability.

Clements, P. A.↗

Simultaneous Improvements in Efficiency and Stability of Organic Solar Cells via a Symmetric‐Asymmetric Dual‐Acceptor Strategy

Abstract Simultaneously achieving improvements in power conversion efficiency (PCE) and stability is the main task of the current development stage of organic solar cells (OSCs). This work reports a symmetry–asymmetry dual‐acceptor (SADA) strategy to construct ternary devices, which is found to be feasible for increasing both the PCE and the operational lifetime of OSCs. In this contribution, the symmetric acceptor L8‐BO and the asymmetric acceptor BTP‐S9 are blended in equal proportions with polymer donor PM6 for the consideration of absorption spectrum complementarity and cascade energetic alignment. In addition, the features of crystallinity and miscibility of the dual‐acceptor deliver optimized morphology lead to a high PCE of 18.84%. In addition, the asymmetric acceptor BTP‐S9 with a larger dipole moment shows tighter molecular stacking and longer crystal correlation length, which favor intrinsic molecular photostability, and further consolidate the operational lifetime of OSCs when coordinated with L8‐BO. This work demonstrates the efficacy of the SADA strategy for constructing efficient and stable OSCs.

Chemistry↗

Multilayered Network Models for Security: Enhancing System Security Engineering with Orchestration

Security engineering approaches can often focus on a particular domain—physical security, cyber security, or personnel security, for example. Yet, security systems engineering consistently faces challenges requiring socio-technical solutions to address evolving and dynamic complexity. While some drivers of this complexity stem from complex risk environments, innovative adversaries, and disruptive technologies, other drivers are endogenous and emerge from the interactions across security engineering approaches. In response, INCOSE's Systems Security Working Group identified the need to better coordinate “disparate security solutions [that] operate independently” as one of eleven key concepts in their IS21 FuSE Security Roadmap. From this perspective, this need for “security orchestration” aligns with the perspective that security is a property that emerges from interactions within complex systems. Current efforts at Sandia National Laboratories are developing a systems security engineering approach that describes high consequence facility (HCF) security as a multidomain set of interacting layers. The result is a multilayered network (MLN)-based approach that captures the interactions between infrastructure, physical components, digital components, and humans in nuclear security systems. This article will summarize the MLN-based approach to HCF security and describe two preliminary results demonstrating potential benefits from incorporating interactions across disparate security solutions. Here, leveraging the logical structure of networks, this MLN model-based approach provides an example of how security orchestration provides enhanced systems security engineering solutions.

42 ENGINEERING↗