Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Distribution Cybersecurity: Cybersecurity Considerations of Distributed Resources

This presentation is focused on cybersecurity of the distribution system. It will educate attendees about the evolving cybersecurity threats facing energy infrastructure through exploring relevant cybersecurity incidents. Additionally, Participants will gain an understanding of Distributed Energy Resources and their growing role in grid architecture. Finally, the session will examine critical standards and guidelines, including Cybersecurity Baselines for Electric Distribution Systems and the IEEE 1547.3 standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Reliability and U.S. Coal Fleet Attributes: Considerations for State Regulators

This briefing paper provides state utility regulators with a comprehensive and current understanding of the reliability attributes of coal as a generation resource, potential reliability impacts associated with near-term coal plant retirements, and possible mitigation strategies to ensure a stable and resilient energy system.

01 COAL, LIGNITE, AND PEAT↗

Regulatory Considerations for Domestic Reprocessing Facility Physical Security

U.S. advanced non-light-water reactor vendors may pursue collocated on-site reprocessing activities. Therefore, these facilities are likely to possess formula quantities, or Category I quantities, of special nuclear material (SNM) during normal operations. The U.S. Nuclear Regulatory Commission (U.S. NRC) has yet to formally establish a regulatory framework for commercial reprocessing. While Category I requirements would explicitly not apply in this circumstance under current regulatory requirements, regulatory certainty does not exist. A novel framework should be developed to ensure public health and safety while also risk-informing the physical security requirements. This report reviews the relevant background of related rulemaking activities and proposes risk-informed physical protection requirements to satisfy these objectives. Insights from NRC security-related rulemaking activities provide a substantial technical basis to approach potential establishment of physical security requirements for reprocessing facilities. If a licensee can provide justification that the material satisfies a sufficient self-protecting radiation dose threshold, the material may not be subject to theft or diversion requirements and only potential sabotage requirements would apply. Furthermore, if the material can be justified to be moderately dilute, a set of risk-informed requirements could provide adequate protection of public health and safety. A revised performance objective for prevention of theft of moderately dilute Category I SNM may be detection to allow prompt recovery by a local law enforcement agency. However, a significant caveat to the proposed categorization scheme is the unknown integration of radiological sabotage with requirements for the protection against theft. Future licensees should consult with the NRC regarding treatment of this regulatory topic. Additionally, the self-protecting radiation dose threshold (either the existing or a proposed future threshold) would need to be considered. An integrated approach may apply graded potential requirements for protection against the design basis threat of radiological sabotage currently applicable to commercial nuclear power plants and Category I SNM facilities defined within 10 CFR 73.1(a).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Portal Monitoring Considerations for Treaty Verification Applications

Portal monitoring is one method in a suite of options for treaty verification and can assist in verification of treaty accountable items (TAIs). Portal monitor technology spans a wide range of sensors, including radiation detectors, break-beams, or weight sensors. For radiation-detecting portal monitors, they are able to confirm absence / presence of a radiological signature and to track TAI direction of motion. Portal monitoring uses measurements from strategically placed sensors (e.g., radiation detectors) to record the entry or egress of TAIs. The implementation of portal monitoring relies on three key elements: perimeter definition, portal locations, and sensor technology, and can be implemented in either time-bound or continuous operations depending on what is permitted by the Treaty.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Heavy-Duty Hydrogen Station Equipment Performance Device (HD HyStEP) Specifications and Design Considerations

The original Hydrogen Station Equipment Performance (HyStEP) device was commissioned in 2015 and was critical for the rapid validation of light-duty (LD) hydrogen fueling stations. As applications for hydrogen as a heavy-duty (HD) transportation fuel continue to grow, new heavy-duty stations are being developed to fuel these vehicles that require larger onboard storage tank systems to meet HD transportation demands and drive cycles. The differences in size and geometry from LD vehicles have driven the creation of new hydrogen fueling protocols that will enable safe and economical fueling of HD vehicles. With the new requirements that are set out in HD fueling protocols like SAE J601-5, a new HyStEP-like device is needed to evaluate the capabilities of high-flow hydrogen stations to fuel HD vehicles to the new protocol standard. To create a heavy-duty HyStEP (HD HyStEP) device, an effort has been undertaken to evaluate the requirements that would form the basis for the design of a successful HD HyStEP device. The primary design goal of this HD HyStEP device is its capability of following a test methodology similar to what is outlined in CSA HGV 4.3, which guides the validation of LD fueling dispensers but with adjustments to verify adherence to the HD fueling protocols (SAE J2601-5) for 70 MPa and 35 MPa pressure class vehicles rather than the LD fueling protocols (SAE J2601). The design presented here aims to provide information that enables the creation of an HD HyStEP device that achieves the primary design goal while being informed by the years of experience from the current HyStEP operators.

08 HYDROGEN↗

Considerations for Distributed Edge Data Centers and Use of Building Loads to Support Large Interconnections

The rapid expansion of artificial intelligence (AI) and machine learning is driving unprecedented electricity demand from data centers. It is predicted that by 2030, 90% of AI workloads will be inference-based, requiring interconnection of multiple low-latency edge data centers (<20 MW) sited closer to end users - often on already constrained distribution feeders. Although individually small, these loads can aggregate to large loads per feeder, straining infrastructure, creating multi-year interconnection delays, and driving up customer costs. This paper proposes a data center-focused grid-integration framework that combines feeder hosting capacity analysis with building energy efficiency, building load flexibility, and waste heat reuse to expand effective feeder and substation headroom. Such approaches can reduce interconnection delays, lower costs for ratepayers, and accelerate AI-ready infrastructure deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Financing Storage as a Transmission Asset: Initial Considerations for an Emerging Use Case

Deploying energy storage as an electric transmission system asset is a unique use case that, despite a body of policy and regulatory support, has received little attention or investment in the United States. The benefits of using storage on the transmission system—and the remaining barriers to that use—have been explored elsewhere. This paper complements that body of research by exploring the finance implications of using energy storage as a transmission asset (SATA). Because transmission infrastructure in the U.S. is generally subject to rate-of-return regulation, in which asset owners receive both a return of their invested capital and a return on that capital, storage assets deployed for that use are not subject to market volatility and have a much lower risk profile overall. That lower risk profile would, in theory, correspond to lower interest rates and other more favorable financing terms relative to a storage project deployed in a market setting. This paper draws from corollaries in other markets to estimate the expected finance impacts of SATA projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Consideration of REBCO Rapid-Cycling Diple Magnet for Staged Muon Acceleration

A possible application of the HTS (ReBCO) rapid-cycling dipole magnet [1] in the first stages of muon acceleration consisting of Recirculating Linear Accelerator (RLA) and followed-up first Rapid Cycling Synchrotron (RCS-1) is presented. The projected ReBCO magnet hysteresis loss is discussed in terms of the liquid helium coolant choice and the option with the striated ReBCO conductor for the further significant reduction of the hysteresis power loss.

Piekarz, Henryk [Fermilab] (ORCID:0000000194225662↗

Considerations and Mitigations for Liquid Metal Target Campaigns in the Material Plasma Exposure eXperiment

This document reports a detailed initial risk assessment associated with the exposure of liquid metal (LM) targets to plasma flux in the Material Plasma Exposure eXperiment (MPEX) at ORNL. This document, while preliminary, does give a comprehensive mitigation plan to the risks along with justification and recommendations before potentially proceeding to LM exposures. At the date of issuance of this report, the MPEX Project has completed Final Design, and the MPEX device is in the Fabrication stage. Remaining project stages include Commissioning of the device with plasma and transitioning to routine Operations for research. As will be described in this document, since the MPEX device is currently being fabricated and the existing design does not include sufficient engineering provisions for most LM targets, no LM exposures will be conducted in MPEX until further assessment can be conducted and the necessary engineering changes incorporated (during MPEX Operations.)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Future Generation High Performance Computing Center (FG-HPCC): RFI Technical Considerations

Lawrence Livermore National Security, LLC (LLNS) is interested in receiving information about technologies that could be available in the 2029-2030 timeframe that may serve to enable the vision for a Future Generation High Performance Computing (HPC) Center (FG-HPCC) described in this document. The future HPC Center vision has been conceived to meet the future mission needs of the Advanced Simulation and Computing (ASC) Program within the National Nuclear Security Administration (NNSA). LLNS envisions a center composed not of many independent clusters, but of heterogeneous elements accessible to users as a single system. The capabilities will be integrated to create a scalable, flexible, yet tightly coupled computing center capable of integrated HPC, AI, and cloud-like workloads.

97 MATHEMATICS AND COMPUTING↗

Economic Analysis of the NIF Optics Recycle Loop Systems Investment Options: SAE 560 - Economic Considerations for Systems Engineering at University of Southern California

The National Ignition Facility (NIF) relies on large-scale precision optics to deliver high-energy laser pulses for fusion and high-energy-density physics research; however, the NIF routinely operates above the damage threshold for those optics, decreasing their effectiveness with every experiment. A production line composed of several dozen highly specialized processing systems, collectively referred to as the ‘optics recycle loop’, was established to support refurbishment and re-use of these critical components to reduce reliance on high-cost and high-risk optic replacement strategies. This analysis aims to identify the most cost-effective investment options for improving recycle loop throughput by maximizing availability and production flexibility while minimizing the engineering and infrastructure efforts and cost.

42 ENGINEERING↗

Proposed Classifications of Remote Operations for Nuclear Reactors Based on Physical and Cybersecurity Considerations

The incorporation of remote operations into reactor operations is a topic of high interest among advanced and small modular reactor (A/SMR) vendors, with some considering it essential to the success of their business models. However, remote operations are a concept novel to the nuclear industry. While various technical aspects of remote operations have been explored, a significant gap remains in understanding the security implications of integrating remote operations into reactor designs, particularly concerning the security requirements for remote-operations facilities and infrastructure. This report aims to address this gap by first defining classes of remote operation based on the extent of remote access to reactor control systems and grounded in the existing regulatory framework with compatible terminology. Secondly, the report outlines the physical and cybersecurity requirements applicable to remote-operations facilities and infrastructure at each defined class. These requirements are based on existing licensing frameworks provided by 10 Code of Federal Regulations (CFR) Part 50 and 10 CFR Part 52, as well as the upcoming A/SMR licensing framework in the proposed Part 53. The assessment focuses specifically on security regulations, such as 10 CFR Part 73, which includes provisions for both cybersecurity (§ 73.54) and physical security (§ 73.55). This report proposes five classes of remote reactor operations. Class 1 involves remote monitoring only, with no control over reactor systems. Class 2 allows for the remote issuance of allowlisted commands to the reactor facility. Class 3 extends control to non-safety-significant, non-safety-related, or not important to safety systems and equipment. Class 4 permits remote control of safety-significant systems. Finally, Class 5 allows remote control of safety-related systems. It is important to note that these classes were defined purely with functionality in mind, without considering the practicality or feasibility of implementation for each class under current or upcoming regulatory guidance. The intention behind this approach is to enable an assessment of which security requirements apply to each class, allowing readers to evaluate the implementation possibilities for their specific use cases. Following the definition of remote-operation classes, the report assesses the specific physical and cybersecurity requirements applicable to the remote-operations facility and infrastructure within each defined class. This includes defining the types and locations of operators that are possible at each class of operation and, based on operator type and location, as well as functionality within each class, outlining the physical and cybersecurity requirements. By detailing the security requirements by class, the report provides readers with the information needed to determine the type of security program they may need to implement for their desired concept of operation. The next contribution of this report was to assess the practicality of implementing each proposed class of remote operations based upon the security requirement assessment. In short, three of the five proposed remote-operation classes were found to possibly have a practical path forward to implementation under the U.S. regulatory framework. Class 1 remote operations are currently in use in the U.S. while Class 2 and 3 remote operations may be logistically possible to implement under the U.S. regulatory framework. The final two Classes, 4 and 5, would likely be logistically difficult, if not infeasible to implement within the current U.S. physical- and cybersecurity regulatory framework. Given the results of the feasibility assessment, an example architecture is proposed for both Class 2, remote allowlisted commands, and Class 3, remote control of non-safety systems as well as security implication assessments of each architecture. These example implementations are not meant to be prescriptive in terms of how Class 2 or Class 3 remote operations should be deployed; instead, they are intended to be informative to stakeholders on how Class 2 or Class 3 could potentially be applied in order to inform their system design. An example architecture for Class 1 remote monitoring was not provided as Class 1 in already in use in U.S. nuclear operations. Example architectures for Class 4 and Class 5 were not provided due to their assessment of being likely infeasible to implement. The final contribution is an assessment of the physical- and cybersecurity implications of introducing autonomous operations into an A/SMR. What was found was that the security implications can be separated into two cases. Autonomous operations supported by SSCs located only at the reactor site, and autonomous operations supported by SSCs outside of the reactor site. For the first case, the introduction of autonomous systems will likely not change the facility’s requirement to comply with existing cyber and physical security regulation

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors Considerations for Hydrogen Rail Refueling and Maintenance

The Federal Railroad Administration (FRA) contracted Sandia National Laboratories to review the risks introduced specifically through human interactions within hydrogen rail refueling and maintenance activities and present recommendations for future system development and implementation. Due to the lack of domestic hydrogen-powered trains at the time of review, observational data was collected on analogous existing systems to consider various ways hydrogen might be implemented within future designs. The team developed 50 human factors design guidelines through analysis of human risk factors. Because hydrogen rail systems are still in the early design stage, the resulting human factors guidelines represent general best practices and do not include specific design features. The research team recommends design and regulatory agencies include a Human Factors Engineer in the design and review process to ensure the guidelines are appropriately implemented and verified.

08 HYDROGEN↗

Data Center Power Systems: Architectures, Impact on Grid Reliability, Modeling Considerations, and Megawatt-Scale Hardware Testing [Slides]

This slide deck describes typical power systems of large datacenters along with reliability problems to bulk power systems from large-scale integration of datacenters. The slide deck covers the architecture of datacenter power systems, different power electronic converters used inside datacenters, their operation modes, and R&Dopportunities in maintaining grid stability.

24 POWER TRANSMISSION AND DISTRIBUTION↗