Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Isolation Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Assessment of Contaminated Brine Fate and Transport in MB139 at WIPP

Following the radionuclide release event of February 14, 2014 at the Waste Isolation Pilot Plant (WIPP), actinide contamination has been found on the walls and floor in Panel 7 as a result of a release in Room 7 of Panel 7. It has been proposed to decontaminate Panel 7 at the WIPP by washing contaminated surfaces in the underground with fresh water. A cost-effective cleanup of this contamination would allow for a timely return to waste disposal operations at WIPP. It is expected that the fresh water used to decontaminate Panel 7 will flow as contaminated brine down into the porosity of the materials under the floor – the run-of-mine (ROM) salt above Marker Bed 139 (MB139) and MB139 itself – where its fate will be controlled by the hydraulic and transport properties of MB139. Due to the structural dip of MB139, it is unlikely that this brine would migrate northward towards the Waste-Handling Shaft sump. A few strategically placed shallow small-diameter observation boreholes straddling MB139 would allow for monitoring the flow and fate of this brine after decontamination. Additionally, given that flow through the compacted ROM salt floor and in MB139 would occur under unsaturated (or two-phase) conditions, there is a need to measure the unsaturated flow properties of crushed WIPP salt and salt from the disturbed rock zone (DRZ).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt rock mechanics - prediction vs. performance - WIPP Provides Answers

In the years leading up to the Compliance Certification Application in 1996, scientists working on the Waste Isolation Pilot Plant (WIPP) conducted an extensive suite of laboratory and field experiments. Additionally, full-scale experiments in the underground established performance standards and expectations, while the fundamental science of salt deformation was explored in the laboratory. Field experiments included several at elevated temperature to ascertain salt response under conditions anticipated for the operating repository, which at the outset included heat-generating defense waste. Simulations and predictions of the field tests were made using finite element computer models that incorporated sophisticated models for salt deformation. Parameters for the salt model were derived from laboratory experiments on natural salt extracted from the repository horizon. All of these science investigations provided confidence in the predicted behavior of the salt at WIPP. Lastly, on this tenth anniversary of WIPP operations, this paper recounts some of the geomechanics investigations conducted during site characterization, highlights three key geomechanics issues experienced over the decade of operations, and concludes that our basic understanding of salt mechanics portends a promising future for radioactive waste disposal in salt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repository Performance Confirmation - 12119

Repository performance confirmation links the technical bases of repository science and societal acceptance. Among the countless aspects of monitoring, performance confirmation holds a special place, involving distinct activities combining technical and social significance in radioactive waste management. Discussion is divided into four themes: 1. A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives, 2. A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain, 3. A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant, and 4. An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. Experience from two repository programs in the United States sheds light on how performance confirmation has been executed. Lessons learned can help the next generation of performance confirmation. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing Fire Resiliency of Fixatives and Coatings for D and D Activities to Mitigate Potential Release of Radioisotopes during Fire and Extreme Heat Conditions - 16393

In discussions with officials from the Department of Energy's Office of Environmental Management and Savannah River National Laboratory (SRNL), the requirement for enhancing the operational performance of fixatives, coatings, and decontamination gels to better address the unique deactivation and decommissioning (D and D) challenges being faced by the SRS 235-F Project, and other high priority D and D efforts across the DOE Complex such as the Waste Isolation Pilot Plant (WIPP), has been identified as a priority focus area for research and development (R and D). Of particular interest is the immediate operational requirement to enhance a fixative's fire resiliency and survivability under fire and extreme heat conditions in order to mitigate the potential release of radioisotopes into the environment when subjected to these conditions. In support of the DOE-FIU Cooperative Agreement, under the Waste and D and D Engineering and Technology Development Project, Task 2: D and D Support for Technology Innovation, Development, Evaluation and Deployment, the FIU Applied Research Center (ARC), in close collaboration with SRNL, is leading the development, implementation, and execution of a phased effort to improve the operational effectiveness of fixative technologies in the critical areas highlighted above, and specifically focusing on enhancing fire resiliency without degrading fixing capacity or decontamination factor (DF). The research area being explored involves the analysis, laboratory experimentation, and testing of existing products, which through layering/combining with an intumescent coating, could possibly produce a synergistic effect, resulting in a new and improved process / material with characteristics that significantly improve operational performance in this area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final evaluation of characterizing pipe-over-pack containers using high efficiency neutron counters

Nondestructive assay (NDA) measurements of Transuranic (TRU) waste at Los Alamos National Laboratory (LANL) packed in Pipe-over-Pack Containers (POC) contain a number of complexities. The POC is highly attenuating to both gamma rays and neutrons which presents a difficult waste matrix for correct quantification of material in the container. Currently there are a number ofPOC containers at LANL that require evaluation for shipment to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, NM. Updated data has been evaluated that finalizes the evaluation of characterizing Pipe-Over-Pack Containers. Currently at LANL, a single instrument has been used to explore the appropriateness of both passive neutron and quantitative gamma ray methods for measuring POC's. The passive neutron approach uses the Reals coincidence count rate to establish plutonium mass and other parameters of interest for TRU waste. The quantitative gamma ray method assumes a homogeneous distribution of radioactive source material with the surrounding material throughout the drum volume. Drums are assayed with a calibration based on the known density of the matrix. Both methods are supplemented by a simultaneous isotopic measurement using Multi-Group Analysis (MGA) to determine the plutonium isotopic composition. If MGA fails to provide a viable isotopic result Fixed Energy Response function Analysis with Multiple efficiencies (FRAM) has been used to replace the MGA results. Acceptable Knowledge (AK) may also be used in certain instances. This report will discuss the two methods in detail. Included in the discussion will be descriptions of the setup parameters and calibration techniques for the instrument. A number of test measurements have been performed to compare HENC data with certified historical data. Empty POCs loaded with known sources have also been measured to determine the viability of the technique. A comparison between calorimetry data, historical measurements and HENC data will also be performed. The conclusion will show that the current calibration on the HENC units is viable for analysis of POCs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experiments and Modeling to Support Field Test Design

Disposition of heat-generating nuclear waste (HGNW) remains a continuing technical and sociopolitical challenge. We define HGNW as the combination of both heat generating defense high level waste (DHLW) and civilian spent nuclear fuel (SNF). Numerous concepts for HGNW management have been proposed and examined internationally, including an extensive focus on geologic disposal (c.f. Brunnengräber et al., 2013). One type of proposed geologic material is salt, so chosen because of its viscoplastic deformation that causes self-repair of damage or deformation induced in the salt by waste emplacement activities (Hansen and Leigh, 2011). Salt as a repository material has been tested at several sites around the world, notably the Morsleben facility in Germany (c.f. Fahland and Heusermann, 2013; Wollrath et al., 2014; Fahland et al., 2015) and at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, NM. Evaluating the technical feasibility of a HGNW repository in salt is an ongoing process involving experiments and numerical modeling of many processes at many facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mixed-layered bismuth-oxygen-iodine materials for capture and waste disposal of radioactive iodine

Materials and methods of synthesizing mixed-layered bismuth oxy-iodine materials, which can be synthesized in the presence of aqueous radioactive iodine species found in caustic solutions (e.g. NaOH or KOH). This technology provides a one-step process for both iodine sequestration and storage from nuclear fuel cycles. It results in materials that will be durable for repository conditions much like those found in Waste Isolation Pilot Plant (WIPP) and estimated for Yucca Mountain (YMP). By controlled reactant concentrations, optimized compositions of these mixed-layered bismuth oxy-iodine inorganic materials are produced that have both a high iodine weight percentage and a low solubility in groundwater environments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mixed-layered bismuth--oxygen--iodine materials for capture and waste disposal of radioactive iodine

Materials and methods of synthesizing mixed-layered bismuth oxy-iodine materials, which can be synthesized in the presence of aqueous radioactive iodine species found in caustic solutions (e.g. NaOH or KOH). This technology provides a one-step process for both iodine sequestration and storage from nuclear fuel cycles. It results in materials that will be durable for repository conditions much like those found in Waste Isolation Pilot Plant (WIPP) and estimated for Yucca Mountain (YMP). By controlled reactant concentrations, optimized compositions of these mixed-layered bismuth oxy-iodine inorganic materials are produced that have both a high iodine weight percentage and a low solubility in groundwater environments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sampling Report for Parent Drum S855793

This report outlines the sampling of the empty parent drum of the breached drum identified in Panel 7 of the Waste Isolation Pilot Plant (WIPP). The 55-gal parent drum identification number is S855793 and it was contained in the 85-gal overpack drum 69120. Armando Alcaraz, of Lawrence Livermore National Laboratory (LLNL), was present to support and observe sampling operations conducted at Los Alamos National Laboratory (LANL) by LANL personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Borate and Organics on U(VI) Solubility in WIPP Brine

This report provides an update to a previously issued report on the solubility of uranium (VI) at different borate concentrations and in the presence of organics. The solubility of uranium (VI) in the Waste Isolation Pilot Plant (WIPP)-relevant brine was determined to support ongoing WIPP recertification activities (CRA-2026). This research was performed by the Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) Actinide Chemistry and Repository Science Program (ACRSP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Lessons Learned - 17406

Following a negative occurrence or event, putting corrective actions into place to address an organisation's systemic and administrative weaknesses is paramount to that organisation's future success. At Los Alamos National Laboratory (LANL, or the Laboratory), recent experiences emphasize this critical point. On February 14, 2014, transuranic (TRU) waste management at DOE facilities changed significantly when a drum of mixed hazardous and TRU (MTRU) waste from LANL breached after its disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Shortly following the LANL-WIPP event, several internal and external investigations and analyses were conducted by LANL, the U.S. Department of Energy (DOE) and others, including the DOE Inspector General and an Office of Environmental Management Accident Investigation Board (AIB), to determine the cause of the LANL drum breach at WIPP. Internal investigations led LANL to self-disclose non-compliancies including treatment without a permit and improper waste characterization to the New Mexico Environment Department (NMED), leading to a Settlement Agreement in January 2016. The Settlement Agreement, together with the other investigations, led LANL to identify and implement many corrective actions related to its waste management practices. The Laboratory recognized the need to revisit implementation of some fundamental concepts, and noted the following 'Lessons Learned': - Communicating requirements more clearly, - Using technical expertise more effectively, and - Improving implementation of policies and procedures. This paper presents the actions LANL has taken to prevent recurrence and demonstrate the Laboratory's commitment to compliant waste management requirements. They have focused on promoting a better understanding of the regulatory requirements in order to address the key root causes and the resulting Lessons Learned, as follows: - Ensure that all levels of a Project Team understand the regulatory requirements related to performing the work;- Engage RCRA subject matter experts in planning (for both initial project plans and subsequent modifications to plans); - Validate that Project Teams' plans and procedures will be effective in meeting regulatory requirements; and - Verify implementation. We believe the corrective actions taken since the drum event at WIPP will fundamentally improve our way of doing business throughout the Laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of a Portable HPGe for Field Contamination Assay

In this work, using MCNP to construct a detector model based initially on x-ray images of a portable high purity germanium (HPGe) detector followed by normalizing covering material values to also agree with check source responses, a validation of the model was attained. By calibrating the detector parameters using large count spectra, rigorous reproducibility is attained for high activity measurements but does not prevent deviations from normality in error distributions at the very low count events where spectral peaks are not always identifiable. The resulting model was created to allow operational assay of contamination over large areal distributions that could not otherwise be measured, such as the exhaust shaft at the Waste Isolation Pilot Plant (WIPP). Results indicate that contamination levels of activity in the exhaust shaft can be assayed to within a factor of 2. Lastly, detection limits are evaluated to be well below the contamination levels, which would constitute a legal environmental release if unfiltered ventilation of the underground facility were used.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biologically Influenced Transport of the +3 Actinide Oxidation State from the WIPP Environment, Using Neodymium as an Analog

This report provides an update to a previously issued report on the bioassociation of the +3 actinide analog, neodymium, with Waste Isolation Pilot Plant (WIPP) microbial isolates (LCO ACP-32, Biologically Influenced Transport of the +3 Actinide Oxidation State from the WIPP Environment, Using Neodymium as an Analog ). Results contribute to updates for the biocolloid parameters for the 2026 Compliance Recertification Application (CRA-2026).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Status and Plans - 2013 - 13379

An up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository is presented in this paper. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize defense transuranic waste for final shipment and emplacement in WIPP. The Waste Isolation Pilot Plant (WIPP) is completing its 14. year of operations. Five of the ten planned disposal panels have been filled and sealed from ventilation, with about half of the legislated volume capacity consumed. About 11,000 shipments have been made successfully, traveling more than 40 million kilometers across the nation's highways. A fleet of new Type B shipping packages, the TRUPACT-III, has been added to the transportation capability, with an ongoing campaign to de-inventory large waste items from the Savannah River Site, while minimizing size reduction and repackaging. A new shipping and emplacement method for remote handled waste in shielded containers has been approved for disposal, and will significantly improve operational efficiency. Remote handled waste packaged in these shielded containers will be shipped, handled and emplaced as contact handled waste. Also described is a new criticality control over-pack container, which will improve efficiency when shipping high fissile-content waste streams consisting of Special Nuclear Material declared as waste from nuclear weapons sites. The paper describes the importance of the infrastructure at WIPP to ensure disposal site availability for defense transuranic waste sites across the weapons complex. With the facility reaching its original design lifetime, there are many infrastructure maintenance and improvements being planned and performed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Direct Path To WIPP - 12471

Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant (WIPP) will be discussed. Lessons learned from the RH campaigns are: - Some containers that were originally identified as HC-3 have been re-evaluated and became < HC-3 due to the conservative estimates made by the original generators - Operators at the AHCF were not accustomed to the detail required by the VE operators. However, they worked well together and the repackaging was completed ahead of schedule. - The AK was not always accurate as was demonstrated by the solid waste found in the drum during the first visit by EPA. That waste has since been determined to be low-level. - Two drums originally thought to be RH turned out to be CH and arrangement for RTR had to be made quickly. - Six of the original RH repacked drums became low level. - Lessons learned from the CH campaigns were helpful in avoiding many issues. The RH repackaging effort has been a success due to the expertise of the AHCF operators, supervisor, and manager, the conscientious attention to detail of the CCP VE operators, the experience of the CCP DTC and headspace gas sampling staff, and the guidance and support from CCP and CBFO. Sometimes schedules had to be adjusted, processes updated, and issues discussed, but the communication between CCP and SNL/NM was good. SNL/NM hopes to have the legacy RH TRU waste shipped off-site by early 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SELECTION OF SURPLUS PLUTONIUM MATERIALS FOR DISPOSITION TO WIPP

The U.S. Department of Energy (DOE) is preparing a Surplus Plutonium Disposition (SPD) Supplemental Environmental Impact Statement (SEIS). Included in the evaluation are up to 6 metric tons (MT) of plutonium in the form of impure oxides and metals for which a disposition plan has not been decided, among options that include preparation as feed for the Mixed Oxide Fuel Fabrication Facility; disposing to high-level waste through the Savannah River Site (SRS) HB Line and H Canyon; can-in-canister disposal using the SRS Defense Waste Processing Facility; and preparation for disposal at the Waste Isolation Pilot Plant (WIPP). DOE and SRS have identified at least 0.5 MT of plutonium that, because of high levels of chemical and isotopic impurities, is impractical for disposition by methods other than the WIPP pathway. Characteristics of these items and the disposition strategy are discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Materials Identification System for 200 liter/55 gallon Waste Drums using Computer Tomographic Techniques - 17162

In 2014 a thermal runaway event within a drum in-situ at the Waste Isolation Pilot Plant (WIPP) facility near Carlsbad, NM, resulted in the drum being breached and activity released. This emphasized the need for a better determination of drum contents and identification of material combinations and in-drum conditions. Enhanced characterization is required to identify and quantify the presence of absorbent materials, determine whether they are organic or inorganic, locate their position in the drum with respect to other materials, and quantify how much liquid is being held in the absorbent material. As part of the waste characterization process to ensure compliance with the WIPP waste acceptance criteria, drums are currently inspected by Real Time Radioscopic (RTR) x-ray to identify prohibited items such as free liquids and un-punctured aerosol cans, but that technique cannot satisfy these newly identified requirements, and a new approach to non-destructive examination was required. This approach complements the current RTR inspection with Cone-Beam Area Detector Computed Tomography (CT) scanning of the whole drum, followed by more-quantitative CT scanning of specific areas of concern, using a highly collimated Linear Detector Array. The density of representative waste drums required x-ray energies of up to 9 MeV, which meant that sorting of materials by their photo-electric absorption is not viable as this occurs in the 80 - 180 keV range. However, a notable characteristic of higher energy imaging in this context is the general correspondence between material density and total attenuation in the 1.5-4.0 MeV range due to Compton Scatter. Development of the imaging chain, comprising the x-ray source and the detectors was critical to achieving the required system performance. Theoretical analysis of the energy spectra of the 9 MeV beam, and filtration of the beam to remove the lower energies which cause beam hardening artifacts in the image was required. Theoretical evaluation of the required efficiency and image acquisition performance of area detectors and linear array detectors, was carried out to complete the selection of equipment. A system of density calibration rods was designed and, together with the selected equipment, was configured and used to acquire cone-beam CT data and line-scan CT data by scanning a 55 gallon drum containing surrogate waste. From the acquired data, CT reconstruction was performed and the basis of algorithms to identify materials were developed. Following this, a series of blind tests were done using a range of surrogate materials the contents of which were unknown to the system operators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Handled TRU Storage Challenges at Sandia National Laboratories/ New Mexico - 16071

The events at the Waste Isolation Pilot Plant (WIPP) in February 2014 had a significant impact on the packaging, storage, and disposal options at Sandia National Laboratories/New Mexico (Sandia) as with other transuranic generator sites. In 2012, Sandia had identified accountable material for disposal, fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}), which had been used in experiments conducted in the 1970's and 1980's. During the 2012/2013 timeframe, discussions with WIPP determined the samples and experimental vessels qualified as remote-handled (RH) transuranic (TRU) waste for disposal at WIPP. Sandia began discussions with WIPP to determine the process to repackage and characterize the material for disposal at WIPP in addition to obtain funding to complete the project. By January 2014, Sandia had contracted with Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) certified visual examination (VE) and dose-to-curie (DTC) support to package and certify the accountable material/waste. Work began on February 3, 2014 with the arrival of two VE operators. On February 5, 2014, a salt truck caught fire in the underground and on February 14, 2014, the radiological release occurred at WIPP initiating a suspension of shipments. The length of the suspension was not known at the time. Sandia was only a couple of days into this long-term project, had signed a contract with NWP for support, and was still responsible for meeting earlier negotiated milestones. There were 37 parent containers which included experimental vessels from 3 to 10 feet long and unused material pieces. The original plan was to package each of the 37 parent containers separately, but several issues, including the suspension of shipments, made it imperative that a new path forward be developed. Because space is limited in the Auxiliary Hot Cell Facility (AHCF), the storage configuration for criticality safety and material-at-risk was of the highest importance. Therefore, packaging in the fewest number of containers without exceeding WIPP limits, keeping the accountable items together, and not violating any safety basis requirements was Sandia's goal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗