Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Washington”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

An Application of the SSHAC Level 3 Process to the Probabilistic Seismic Hazard Analysis for Nuclear Facilities at the Hanford Site, Eastern Washington, USA

Under the sponsorship of the US Department of Energy (DOE) and the electric utility Energy Northwest, the Pacific Northwest National Laboratory (PNNL) is conducting a probabilistic seismic hazard analysis (PSHA) within the framework of a SSHAC Level 3 procedure (Senior Seismic Hazard Analysis Committee; Budnitz et al., 1997). Specifically, the project is being conducted following the guidelines and requirements specified in NUREG-2117 (USNRC, 2012b) and consistent with approach given in the American Nuclear Standard ANSI/ANS-2.29-2008 Probabilistic Seismic Hazard Analysis. The collaboration between DOE and Energy Northwest is spawned by the needs of both organizations for an accepted PSHA with high levels of regulatory assurance that can be used for the design and safety evaluation of nuclear facilities. DOE committed to this study after performing a ten-year review of the existing PSHA, as required by DOE Order 420.1C. The study will also be used by Energy Northwest as a basis for fulfilling the NRC’s 10CFR50.54(f) requirement that the western US nuclear power plants conduct PSHAs in conformance with SSHAC Level 3 procedures. The study was planned and is being carried out in conjunction with a project Work Plan, which identifies the purpose of the study, the roles and responsibilities of all participants, tasks and their associated schedules, Quality Assurance (QA) requirements, and project deliverables. New data collection and analysis activities are being conducted as a means of reducing the uncertainties in key inputs to the PSHA. It is anticipated that the results of the study will provide inputs to the site response analyses at multiple nuclear facility sites within the Hanford Site and at the Columbia Generating Station.

Nuclear Facilities↗

DOE Zero Energy Ready Home Case Study: Montlake Modern - Seattle, Washington

This case study describes a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 42 without PV and a -1 with PV. This 3,192 ft2 custom home has 6-inch SIP walls, a 12-inch SIP roof, an R-28 ICF-insulated foundation slab edge with R-20 rigid foam under the slab; an air-to-water heat pump plus radiant floor heat; 100% LED lighting; filtered-fan-powered fresh air intake; triple-pane windows, 9.7 kWh PV for electric car charging station.

air-to-water heat pump↗

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Coupeville, Washington

Ted Clifton, founder of Clifton View Homes, achieved an impressive Home Energy Rating System (HERS) score of 34 (without solar panels) on a two-story home completed in July 2011 that also earned him his first Challenge Home certification from the U.S. Department of Energy (DOE). This home also garnered a 2013 Housing Innovation Award in the "systems builder" category.

Challenge Home↗

DOE Zero Energy Ready Home Case Study: Dwell Development, Seattle, Washington

This Challenge Home is one of 42 homes in a micro-community of ultra-modern, energy-efficient homes built by Dwell Development on an urban gray-field site in South Seattle. Every home will achieve a 5-Star Built Green rating from the regional master builders association and meet the criteria of the Northwest ENERGY STAR program, which is more strict than the national ENERGY STAR criteria. Also, the home won a 2013 Housing Innovation Award in the "systems builder" category.

Building America↗

DOE Zero Energy Ready Home Case Study: TC Legend Homes, Seattle, Washington

This house incorporates slab-on-grade, EPS roof, and radiant heating with an air-to-water heat pump that also preheats domestic hot water. Without counting in the solar panels, the home earns a home energy rating system (HERS) score of 37, with projected utility bills of about $740 a year. With the 6.4-kW photovoltaic power system installed on the roof, the home’s HERS scores drops to -1 and utility bills for the all-electric home drop to zero. This home was awarded a 2013 Housing Innovation Award in the affordable builder category.

Building America↗

New Whole-House Solutions Case Study: Technology Solutions for New Manufactured Homes, Idaho, Oregon, and Washington

The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in the manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.

BA-PIRC↗

Existing Whole-House Solutions Case Study: Group Home Energy Efficiency Retrofit for 30% Energy Savings, Washington, D.C.

Energy efficiency retrofits (EERs) face many challenges on the path to scalability. Limited budgets, cost effectiveness, risk factors, and accessibility impact the type and the extent of measures that can be implemented feasibly to achieve energy savings goals. Group home retrofits can face additional challenges than those in single family homes – such as reduced access (occupant-in-place restrictions) and lack of incentives for occupant behavioral change. This project studies the specification, implementation, and energy savings from an EER in a group home, with an energy savings goal of 30%. This short term test report chronicles the retrofit measures specified, their projected cost-effectiveness using building energy simulations, and the short term test results that were used to characterize pre-retrofit and post-retrofit conditions. Additionally, the final report for the project will include analysis of pre- and post-retrofit performance data on whole building energy use, and an assessment of the energy impact of occupant interface with the building (i.e., window operation). Ultimately, the study’s results will be used to identify cost effective EER measures that can be implemented in group homes, given constraints that are characteristic of these buildings. Results will also point towards opportunities for future energy savings.

BA-PIRC↗

A Workshop on the History of Plutonium Processing at Hanford Washington as the Foundation for Modern-day Plutonium Process Science

Numerous national laboratories in the United States have roots related to the Manhattan Project that contributed to the end of World War II. The pioneering science and engineering that took place over the decades that followed continues to influence modern-day actinide-related research at those institutions, leading to unique strengths and cutting-edge ideas and perspectives. These same national laboratories also face a challenge: figuring out how to capture the expertise of a retiring workforce who had first-hand experience in these pioneering nuclear efforts. Recently, at PNNL a “Train-the-Trainer” approach has been piloted where mentors and mentees are paired together to develop and deliver interactive workshops on historical topics that relate to modern-day research, such as Plutonium Processing or Environmental Management of Legacy Nuclear Waste. This approach was used to develop a workshop that beings with the Historic Hanford process plutonium chemistry and engineering, describes its influence on current plutonium separation and process science, and then details the chemistry of plutonium as it progresses from a minor constituent in irradiated fuel to purified solid product. This workshop is targeted to the practitioner of applied science and technology wishing to gain a better understanding of the history and process-related chemistry of element 94 so that they may better direct the tools of their specific craft toward the present and future needs of plutonium science.

Smith, Frances N.↗

Development of a Numerical Wave Tank to Support WETS Activities, 3rd Marine Energy Technology Symposium (METS), Washington, D.C.

This paper outlines a suite of numerical methods developed to aid in the power prediction of Wave Energy Conversion (WEC) devices such as may be tested at the Navy's Wave Energy Test Site (WETS) in Hawaii. The NWT developed with the open-source OpenFOAM CFD solver has been successfully validated with well-known experimental data. Currently, work is in progress to combine drag data from CFD/SPH, WAMIT output and wave climate data at the site into a single time domain framework, to efficiently predict WEC power performance.

16 TIDAL AND WAVE POWER↗