Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WIND POWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Aero-MINE (Motionless INtegrated Energy) for Distributed Scalable Wind Power.

The proposed Aero-MINE technology will extract energy from wind without any exterior moving parts. Aero-MINEs can be integrated into buildings or function stand-alone, and are scalable. This gives them advantages similar to solar panels, but with the added benefit of operation in cloudy or dark conditions. Furthermore, compared to solar panels, Aero-MINEs can be manufactured at lower cost and with less environmental impact. Power generation is isolated internally by the pneumatic transmission of air and the outlet air-jet nozzles amplify the effectiveness. Multiple units can be connected to one centrally located electric generator. Aero-MINEs are ideal for the built-environment, with numerous possible configurations ranging from architectural integration to modular bolt-on products. Traditional wind turbines suffer from many fundamental challenges. The fast-moving blades produce significant aero-acoustic noise, visual disturbances, light-induced flickering and impose wildlife mortality risks. The conversion of massive mechanical torque to electricity is a challenge for gears, generators and power conversion electronics. In addition, the installation, operation and maintenance of wind turbines is required at significant height. Furthermore, wind farms are often in remote locations far from dense regions of electricity customers. These technical and logistical challenges add significantly to the cost of the electricity produced by utility-scale wind farms. In contrast, distributed wind energy eliminates many of the logistical challenges. However, solutions such as micro-turbines produce relatively small amounts of energy due to the reduction in swept area and still suffer from the motion-related disadvantages of utility-scale turbines. Aero-MINEs combine the best features of distributed generation, while eliminating the disadvantages.

17 WIND ENERGY↗

Wind Power Myths Debunked

Explore the source record for details and available documents.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

17 WIND ENERGY↗

Feed-in Tariffs and Offshore Wind Power Development

This paper will briefly review the evolution and status of various feed‐in‐tariff programs (FITs) throughout Europe and North America. This paper will first outline feed-in tariffs in more detail and provide a summary of their design features, discuss how costs are calculated, address differences and adjustments to prices, highlight legal issues associated with FITs, and highlight some problems that FITs can face. The second part of the paper will give details of a number of FIT programs that have been established with a particular emphasis on those that relate to offshore wind. FITs have enjoyed widespread success in Europe, and by providing a reliable price and thereby leveling the playing field for renewable energy generators, FITs have fostered under‐developed renewable industries. Several European countries have experienced unprecedented growth in generation and industry after the adoption of feed-in tariffs, yet growth in the United States renewable energy sector has been markedly slow. An order by the Federal Energy Regulatory Commission (FERC) in July 2010 appeared to significantly hinder a state’s ability to develop flexible and fairly priced tariffs; however, a subsequent FERC clarification provided a platform for state tariff development based on practical price considerations. Continued federal leadership will be imperative to squarely address the needs of the renewable industry. By providing continued clarity and establishing state autonomy, FERC’s role can evolve to promote growth in this critical market segment. Absent direct guidance from Congress and federal regulatory agencies, this critical energy sector may languish as international markets capitalize on these flexible policies.

17 WIND ENERGY↗

Stochastic economic dispatch of wind power under uncertainty using clustering-based extreme scenarios

Operation of power systems with high penetrations of renewable energy sources requires tools for robust decision making under uncertainty. Stochastic economic dispatch and stochastic unit commitment are effective techniques for planning and operation under uncertainty, whose effectiveness depends on the cardinality and quality of the scenario set. Here, this article proposes a machine learning method using -means clustering for capturing relevant physical information from a large population of analog scenarios. Extreme scenario samples drawn from the clusters are used in a two-stage stochastic economic dispatch computation. The effectiveness of the proposed approach is assessed on a synthetic 200-bus system with a geographic footprint over Illinois, USA for four months from each season of WIND Toolkit data. The combination of -means clustering with importance sampling is shown to reduce the total operational cost by over 43% compared to sampling from populations based on heuristic clustering-based methods. Additionally, the variability in the mean cost is about 56% lower than the variability using Monte Carlo sampling. Moreover, the operational cost with the presented approach is shown to be close to the cost calculated based on a hindsight exact wind profile, signifying a highly accurate quantification of wind uncertainty by the presented -means clustering based sampling method.

17 WIND ENERGY↗

Role of Wind Power in Primary Frequency Response of an Interconnection: Preprint

The electrical frequency of an interconnection must be maintained very close to its nominal level at all times. Large frequency deviations can lead to unintended consequences such as load shedding, instability, and machine damage, among others. Turbine governors of conventional generating units provide primary frequency response (PFR) to ensure that frequency deviations are not significant duringlarge transient events. Increasing penetrations of variable renewable generation, such as wind and solar power, and planned retirements of conventional thermal plants - and thus a reduction in the amount of suppliers with PFR capabilities - causes concerns about a decline of PFR and system inertia in North America. The capability of inverter-coupled wind generation technologies to contribute toPFR and inertia, if appropriately equipped with the necessary control features, can help alleviate concerns. However, these responses differ from those supplied by conventional generation and inertia, and it is not entirely understood how variable renewable generation will affect the system response at different penetration levels. This paper evaluates the impact of wind generation providing PFRand synthetic inertial response on a large interconnection.

17 WIND ENERGY↗

DOE: Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The DOE-funded project 'Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets' aims to evaluate the benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of different balancing approaches with increasing levels of inter-regional cooperation. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. The primary analysis of the project is based on unit commitment (UC) and economic dispatch (ED) simulations of the SPP-SERC regions as modeled for the year 2022. The UC/ED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as accurately as possible realizing that all such future scenario models are quite uncertain. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy. The analysis aspects of the project comprised 4 primary tasks: (1) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with only 7 GW of installed wind capacity in SPP for internal SPP consumption with no intended wind exports to SERC. This model is referred to as the 'Non-RES' model as it does not reflect the need for the SPP or SERC BAs to meet a federal Renewable Energy Standard (RES). (2) Analysis of hourly-resolution simulation results of the Non-RES model for the year 2022 to provide project stakeholders with confidence in the model and analytical framework for a scenario that is similar to the existing system and more easily evaluated than the high-wind transfer scenarios that are analyzed subsequently. (3) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with sufficient installed wind capacity in SPP (approximately 48 GW) for both SPP and the participating SERC BAs to meet an RES of 20% energy. This model is referred to as the 'High-Wind Transfer' model with several different scenarios represented. The development of the High-Wind Transfer model not only included identification and allocation of SPP wind to individual SERC BAs, but also included the evaluation of various methods to allow the model to export the SPP wind to SERC without developing an actual transmission plan to support the transfers. (4) Analysis of hourly-resolution simulation results of several different High-Wind Transfer model scenarios for the year 2022 to determine balancing costs and potential benefits of collaboration among SPP and SERC BAs to provide the required balancing.

17 WIND ENERGY↗

Estimated Economic Impacts of Utility Scale Wind Power in Iowa

This analysis examines the first 1 ,000 MW of wind energy deployment in Iowa and associated economic impacts. We find that this deployment supported 2,300 FTE jobs over the 1999-2008 period, and 270 ongoing, annual jobs to-date. It also supported nearly $290 million in gross economic activity for Iowa during the construction period and approximately $38 million per year during the operatingperiod.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Enabling Legislation for Commercial-Scale Wind Power Siting and the Local Government Role

Siting of commercial-scale wind facilities (>5MW) is determined primarily by state laws. State laws either leave siting regulation to local governments, prescribe and constrain the role for local governments, establish state standards, or preempt local governance by having state institutions govern siting. Siting regulation is extremely important to the advancement of wind generation in the United States. Major siting decisions lie ahead for state and local governments as the nation diversifies its energy portfolio. An increase in the number of new wind facilities, siting in more locations and in more heavily populated areas, will require attention to the laws and regulations that govern siting. Local governments exercise some authority over commercial-scale wind facility siting in 48 of the 50 states. In 34 states, local governments have substantial autonomy to regulate the siting of most or all commercial-scale wind facilities. A few states authorize local governments to regulate wind facility siting, but make the scope of local regulation subject to limitations defined by state law. Eleven states set size thresholds for state regulatory involvement – with local governments in these states regulating smaller facilities and state boards regulating larger ones (either exclusively or concurrently with local governments). In just under a third of the states, siting of most or all commercial-scale wind facilities requires approval by both state and local government bodies. Only a few states reserve the regulation of siting of all or virtually all commercial-scale wind facilities to state boards and commissions. The content of the applicable regulations is more important, in general, than the level of government responsible for the decision. Several states that assign siting responsibilities to local governments have specified some of the content and the limits of local regulation. About 1/5 of the states have directed boards and commissions to develop statewide regulations to deal with wind facility siting issues subject to state approval. These requirements most often specify standards for setbacks, wildlife, noise, decommissioning, and other issues.

17 WIND ENERGY↗