Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Development of a Total Energy, Environment and Asset Management (TE2AM tm) Curriculum

The University of Wisconsin Department of Engineering Professional Development (EPD) has completed the sponsored project entitled, Development of a Total Energy, Environment and Asset Management (TE2AM) Curriculum. The project involved the development of a structured professional development program to improve the knowledge, skills, capabilities, and competencies of engineers and operators of commercial buildings. TE2AM advances a radically different approach to commercial building design, operation, maintenance, and end of life disposition. By employing asset management principles to the lifecycle of a commercial building, owners and occupants will realize improved building performance, reduced energy consumption and positive environmental impacts. Through our commercialization plan, we intend to offer TE2AM courses and certificates to the professional community and continuously improve TE2AM course materials. The TE2AM project supports the DOE Strategic Theme 1 Energy Security; and will further advance the DOE Strategic Goal 1.4 Energy Productivity. Through participation in the TE2AM curriculum, engineers and operators of commercial buildings will be eligible for a professional certificate; denoting the completion of a prescribed series of learning activities. The project involved a comprehensive, rigorous approach to curriculum development, and accomplished the following goals: 1. Identify, analyze and prioritize key learning needs of engineers, architects and technical professionals as operators of commercial buildings. 2. Design and develop TE2AM curricula and instructional strategies to meet learning needs of the target learning community. 3. Establish partnerships with the sponsor and key stakeholders to enhance the development and delivery of learning programs. 4. Successfully commercialize and sustain the training and certificate programs for a substantial time following the term of the award. The project team was successful in achieving the goals and deliverables set forth in the original proposal. Though attempts were made to adhere to the original project timeline, the team requested, and was granted a 6 month project extension, during which time the project was completed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Commissioning Agent/Auditor Online Training Program

The original objective of this project was to create a comprehensive training and deployment program - suitable for in-person delivery in the New York metro region – focused on educating building commissioning authorities and energy auditors. The NJIT Center for Building Knowledge was to have sole responsibility for this curriculum development and deployment plan effort. Very early in the project timeline, however, the scope of the project evolved – with DOE and NETL approval - to become a collaborative effort between NJIT and Portland Energy Conservation, Inc. (PECI). The structure of this collaboration involved PECI taking the lead on developing a comprehensive curriculum program suitable for in-person delivery, and NJIT taking the lead on turning this curriculum into a comprehensive online training program that would complement – and extend the reach of – the in-person curriculum.

Evans, Deane↗

Quick Start User’s Guide for the PATH/AWARE Decision Support System

The Prioritization Analysis Tool for All-Hazards/Analyzer for Wide Area Restoration Effectiveness (PATH/AWARE) software system, developed by Sandia National Laboratories, is a comprehensive decision support tool designed to analyze situational awareness, as well as response and recovery actions, following a wide-area release of chemical, biological or radiological materials. The system provides capability to prioritize critical infrastructure assets and services for restoration. It also provides a capability to assess resource needs (e.g., number of sampling teams, laboratory capacity, decontamination units, etc.), timelines for consequence management activities, and costs. PATH/AWARE is a very comprehensive tool set with a considerable amount of database information managed through a Microsoft SQL (Structured Query Language) database engine, a Geographical Information System (GIS) engine that provides comprehensive mapping capabilities, as well as comprehensive decision logic to carry out the functional aspects of the tool set. This document covers the basic installation and operation of the PATH/AWARE tool in order to give the user enough information to start using the tool. A companion user's manual is under development with greater specificity of the PATH/AWARE functionality.

Knowlton, Robert G.↗

Beyond Renewable Portfolio Standards: An Assessment of Regional Supply and Demand Conditions Affecting the Future of Renewable Energy in the West; Report and Executive Summary

This study assesses the outlook for utility-scale renewable energy development in the West once states have met their renewable portfolio standard (RPS) requirements. In the West, the last state RPS culminates in 2025, so the analysis uses 2025 as a transition point on the timeline of RE development. Most western states appear to be on track to meet their final requirements, relying primarily on renewable resources located relatively close to the customers being served. What happens next depends on several factors including trends in the supply and price of natural gas, greenhouse gas and other environmental regulations, consumer preferences, technological breakthroughs, and future public policies and regulations. Changes in any one of these factors could make future renewable energy options more or less attractive.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recovery Act: Innovative CO 2 Sequestration from Flue Gas Using Industrial Sources and Innovative Concept for Beneficial CO 2 Use

The overall goal of this DOE Phase 2 project was to further develop and conduct pilot-scale and field testing of a biomimetic in-duct scrubbing system for the capture of gaseous CO 2 coupled with sequestration of captured carbon by carbonation of alkaline industrial wastes. The Phase 2 project, reported on here, combined efforts in enzyme development, scrubber optimization, and sequestrant evaluations to perform an economic feasibility study of technology deployment. The optimization of carbonic anhydrase (CA) enzyme reactivity and stability are critical steps in deployment of this technology. A variety of CA enzyme variants were evaluated for reactivity and stability in both bench scale and in laboratory pilot scale testing to determine current limits in enzyme performance. Optimization of scrubber design allowed for improved process economics while maintaining desired capture efficiencies. A range of configurations, materials, and operating conditions were examined at the Alcoa Technical Center on a pilot scale scrubber. This work indicated that a cross current flow utilizing a specialized gas-liquid contactor offered the lowest system operating energy. Various industrial waste materials were evaluated as sources of alkalinity for the scrubber feed solution and as sources of calcium for precipitation of carbonate. Solids were mixed with a simulated sodium bicarbonate scrubber blowdown to comparatively examine reactivity. Supernatant solutions and post-test solids were analyzed to quantify and model the sequestration reactions. The best performing solids were found to sequester between 2.3 and 2.9 moles of CO 2 per kg of dry solid in 1-4 hours of reaction time. These best performing solids were cement kiln dust, circulating dry scrubber ash, and spray dryer absorber ash. A techno-economic analysis was performed to evaluate the commercial viability of the proposed carbon capture and sequestration process in full-scale at an aluminum smelter and a refinery location. For both cases the in-duct scrubber technology was compared to traditional amine- based capture. Incorporation of the laboratory results showed that for the application at the aluminum smelter, the in-duct scrubber system is more economical than traditional methods. However, the reverse is true for the refinery case, where the bauxite residue is not effective enough as a sequestrant, combined with challenges related to contaminants in the bauxite residue accumulating in and fouling the scrubber absorbent. Sensitivity analyses showed that the critical variables by which process economics could be improved are enzyme concentration, efficiency, and half-life. At the end of the first part of the Phase 2 project, a gate review (DOE Decision Zero Gate Point) was conducted to decide on the next stages of the project. The original plan was to follow the pre-testing phase with a detailed design for the field testing. Unfavorable process economics, however, resulted in a decision to conclude the project before moving to field testing. It is noted that CO 2 Solutions proposed an initial solution to reduce process costs through more advanced enzyme management, however, DOE program requirements restricting any technology development extending beyond 2014 as commercial deployment timeline did not allow this solution to be undertaken.

Dando, Neal↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 First Quarterly Report

The CRADA between PNNL, Autodesk, Toyota and Magna has been effective since October 28th, 2013. The whole team including CRADA and subcontract partners kicked off the project technically on November 1st, 2013. This report describes work performed during the first quarter of FY 2014. The following technical progresses have been made toward project milestones: 1) The project kickoff meeting was organized at PlastiComp, Inc. in Winona on November 13th, 2013 involving all the project partners. During this meeting the research plan and Gantt chart were discussed and refined. The coordination of the research activities among the partners was also discussed to ensure that the deliverables and timeline will be met. 2) Autodesk delivered a research version of ASMI to PNNL for process modeling using this tool under the project. PNNL installed this research version on a PNNL computer and tested it. Currently, PNNL is using ASMI to prepare the models for PlastiComp plaques. 3) PlastiComp has compounded long carbon-fiber reinforced polypropylene and polyamide 6,6 compounds for rheological and thermal characterization tests by the Autodesk laboratories in Melbourne, Australia. 4) Initial mold flow analysis was carried out by PlastiComp to confirm that the 3D complex part selected by Toyota as a representative automotive part is moldable. 5) Toyota, Magna, PlastiComp and PNNL finalized the planning for molding the Toyota 3D complex part. 6) Purdue University worked with PNNL to update and specify the test matrix for characterization of fiber length/orientation. 7) Purdue University developed tools to automate the data collection and analysis of fiber length and orientation measurements. 8) Purdue University designed and specified equipment to replace the need for equipment using the technology established by the University of Leeds at General Motors.

42 ENGINEERING↗

nuSTORM Costing document

Detailed costing of the nuSTORM conventional facilities has been done by the Fermilab Facilities Engineering Services Section (FESS) and is reported on in the nuSTORM Project Definition Report (PDR) 6-13-1. Estimates for outfitting the primary proton beam line, the target station, the pion capture/transport line and decay ring are based on either experience from existing Fermilab infrastructure (NuMI) or is based on the detailed costing exercises for DOE CD-1 approval for future experiments (mu2e and LBNE). The detector costing utilized the Euronu costing for the Neutrino Factory Magnetized Iron Neutrino Detector (MIND), extrapolations from MINOS as-built costs and from recent vendor quotes. Costs included all manpower and are fully burdened (FY2013 dollars). The costs are not escalated, however, beyond the 5-year project timeline, since a project start for nuSTORM is unknown. Escalation can be estimated from various models (see Figure 1). LBNE has used the Jacob’s model to determine their cost escalation.

Bross, Alan D.↗

Annual Report: Innovative Process Technologies (30 September 2013)

Innovative Process Technologies is concerned with the development of innovative cost-effective technologies that promote efficiency, environmental performance, availability of advanced energy systems, and the development of computational tools that shorten development timelines of advanced energy systems. The project is focused on five distinct research tasks: (1) Sensors and Controls, (2) Power Electronics and Energetic Materials, (3) Innovative Energy Concepts (IEC), (4) Computational Materials, and (5) Multiphase Flow.

20 FOSSIL-FUELED POWER PLANTS↗

The Trinity System

This paper describes the Trinity system, the first ASC Advanced Technology System (ATS-1). We describe the Trinity procurement timeline, the ASC computing strategy, the Trinity specific mission needs, and the Trinity system specifications.

97 MATHEMATICS AND COMPUTING↗

Insider Threat Case Studies at Radiological and Nuclear Facilities

Seven case studies are presented. The cases include thefts of various materials and sabotage. For each case there is an overview of the incident, a timeline, a profile of the perpetrator, and a discussion of the security system failures which allowed the incident to take place.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Office of Electricity Delivery and Energy Reliability (OE) National Energy Technology Laboratory (NETL) American Recovery and Reinvestment Act 2009 United States Department of Energy

The purpose of this project was for Seeo to deliver the first ever large-scale or grid-scale prototype of a new class of advanced lithium-ion rechargeable batteries. The technology combines unprecedented energy density, lifetime, safety, and cost. The goal was to demonstrate Seeo’s entirely new class of lithium-based batteries based on Seeo’s proprietary nanostructured polymer electrolyte. This technology can enable the widespread deployment in Smart Grid applications and was demonstrated through the development and testing of a 10 kilowatt-hour (kWh) prototype battery system. This development effort, supported by the United States Department of Energy (DOE) enabled Seeo to pursue and validate the transformational performance advantages of its technology for use in grid-tied energy storage applications. The focus of this project and Seeo’s goal as demonstrated through the efforts made under this project is to address the utility market needs for energy storage systems applications, especially for residential and commercial customers tied to solar photovoltaic installations. In addition to grid energy storage opportunities Seeo’s technology has been tested with automotive drive cycles and is seen as equally applicable for battery packs for electric vehicles. The goals of the project were outlined and achieved through a series of specific tasks, which encompassed materials development, scaling up of cells, demonstrating the performance of the cells, designing, building and demonstrating a pack prototype, and providing an economic and environmental assessment. Nearly all of the tasks were achieved over the duration of the program, with only the full demonstration of the battery system and a complete economic and environmental analysis not able to be fully completed. A timeline over the duration of the program is shown in figure 1.

25 ENERGY STORAGE↗

Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag, seismic, and gravity data sets are in good agreement, illustrating two or more major range-bounding faults and buried northwest trending faults. The intersections of these fault systems provide the primary targets for drilling.

15 GEOTHERMAL ENERGY↗

Next Generation Solar Collectors for CSP

The intent of “Next Generation Solar Collectors for CSP” program was to develop key technology elements for collectors in Phase 1 (Budget Period 1), design these elements in Phase 2 (Budget Period 2) and to deploy and test the final collector in Phase 3 (Budget Period 3). 3M and DOE mutually agreed to terminate the program at the end of Budget Period 1, primarily due to timeline issues. However, significant advancements were achieved in developing a next generation reflective material and panel that has the potential to significantly improve the efficiency of CSP systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electronic Production Control System News Note

The CMD subprogram develops and deploys multi-application weapon component manufacturing capabilities needed to replace sunset technologies, upgrade existing technologies, and introduce new technologies that support the nuclear weapons stockpile. Sandia National Laboratories (SNL) is currently developing an Electronic Production Control System (EPCS) for ASIC production in the back end of line (BEOL) flow. A pre-production version of EPCS has been released and is operating as intended. We are currently processing all ASIC products, including CVV validation ASICs. The BEOL flow includes wafer probe, packaging, quality inspection, initial electrical test, dynamic burn-in, final electrical test, quality inspection, final visual inspection, radiation testing, SNL acceptance, DOE SSO acceptance, and qualification testing steps. EPCS will execute this production workflow (initiate, control, and electronically track each product); it will implement defect prevention strategies; it will create an electronic inventory control system that is accountable for all ASIC material from inception to delivery; it will electronically collect and store any and all required quality evidence and most of the electronic BEOL data; and it will create a management reporting module with production statistics and timelines. The defect prevention strategies include the use of 2D marks on our ASICs with 2D scanners so that there will be no manual entry of part numbers (scanners), will not allow testing the wrong parts in Test and Burn-in. Other defect prevention strategies will negate the possibility of neither using the wrong test or burn-in program for any part nor the use of BEOL machines or boards that are out of calibration. In summary, EPCS is being implemented and it will greatly improve the product acceptance through full electronic data collection and quality control and defect prevention through bar codes, scanners, tracking training of personnel, and tracking tool availability.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Multiyear Research, Development and Demonstration Plan

The Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration (MYRD&D) Plan describes the goals, objectives, technical targets, tasks, and schedules for all activities within the Fuel Cell Technologies (FCT) Office, which is part of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. The MYRD&D Plan is a living document, which is revised periodically to reflect progress in the technologies, revisions to developmental timelines and targets, updates based on external reviews, and changes in the scope of the FCT Office. The document was first published in 2003, and revised in 2005. The document was significantly revised in 2012 to reflect scientific advancements and the changing technological landscape. Any revisions made to the MYRD&D Plan are conducted through a rigorous Change Control process as documented in the Systems Integration section of this report. The hydrogen and fuel cell activities within DOE continue to receive extensive review by stakeholders in the hydrogen and fuel cell community, including panels of the National Research Council and the National Academy of Engineering.

research development demonstration hydrogen fuel c↗

Communication of Energy Efficiency Information to Remodelers: Lessons From Current Practice

The effective communication of energy efficiency and building science information to remodeling contractors is achieved through varying formats, timelines, and modes depending on who is delivering the information, who is intended to receive it, and what technical, intellectual, and time resources the recipients have at their disposal. This report reviews communications that are deemed effective, and selects a group to be further analyzed to determine why they are effective and how less successful formats or strategies can be revised for greater effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transportation Energy Futures Series: Vehicle Technology Deployment Pathways: An Examination of Timing and Investment Constraints

Scenarios of new vehicle technology deployment serve various purposes; some will seek to establish plausibility. This report proposes two reality checks for scenarios: (1) implications of manufacturing constraints on timing of vehicle deployment and (2) investment decisions required to bring new vehicle technologies to market. An estimated timeline of 12 to more than 22 years from initial market introduction to saturation is supported by historical examples and based on the product development process. Researchers also consider the series of investment decisions to develop and build the vehicles and their associated fueling infrastructure. A proposed decision tree analysis structure could be used to systematically examine investors' decisions and the potential outcomes, including consideration of cash flow and return on investment. This method requires data or assumptions about capital cost, variable cost, revenue, timing, and probability of success/failure, and would result in a detailed consideration of the value proposition of large investments and long lead times. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

33 ADVANCED PROPULSION SYSTEMS↗

The Use of Underground Research Laboratories to Support Repository Development Programs. A Roadmap for the Underground Research Facilities Network.

Under the auspices of the International Atomic Energy Agency (IAEA), nationally developed underground research laboratories (URLs) and associated research institutions are being offered for use by other nations. These facilities form an Underground Research Facilities (URF) Network for training in and demonstration of waste disposal technologies and the sharing of knowledge and experience related to geologic repository development, research, and engineering. In order to achieve its objectives, the URF Network regularly sponsors workshops and training events related to the knowledge base that is transferable between existing URL programs and to nations with an interest in developing a new URL. This report describes the role of URLs in the context of a general timeline for repository development. This description includes identification of key phases and activities that contribute to repository development as a repository program evolves from an early research and development phase to later phases such as construction, operations, and closure. This information is cast in the form of a matrix with the entries in this matrix forming the basis of the URF Network roadmap that will be used to identify and plan future workshops and training events.

MacKinnon, Robert J.↗