Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Testing.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Analysis of Respirator Cartridge Performance Testing on the 702-AZ Primary Exhauster for the Hanford AY/AZ Tank Farms during a Waste-Disturbing Event

Washington River Protection Solutions (WRPS) conducted tests using two types of chemical cartridges for use in air-purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance1 for APRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from vapors exiting the 702-AZ Primary Exhauster for the Hanford AY-AZ tank farms. Unlike prior cartridge testing on the 702-AZ Primary Exhauster, the recent tests were performed during a waste-disturbing event. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules. Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate the cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from February 10–11, 2017, on a slipstream from the 702-AZ exhauster fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina), were assessed on separate days. Sample media (sorbent tubes) and canisters (e.g., Summa) sampling were used to collect samples of the vapor stream entering and exiting the respirator cartridge and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Solids Performance Testing in a Scaled TSCR System

The Tank Side Cesium Removal (TSCR) project is a technology demonstration that will pretreat Hanford tank waste supernatant in support of the Direct Feed Low-Activity Waste (DFLAW) mission. The TSCR system employs two key separation technologies: dead-end filtration (DEF) and ion exchange (IX) using crystalline silicotitanate (CST) media. DEF will be used to remove undissolved solids from tank waste to protect the functionality of the IX columns and the IX system will remove Cs-137 from tank waste. The separation technologies (DEF and IX) used in TSCR are technically mature and have also been successfully deployed at the Savannah River site in a similar facility known as the Tank Closure Cesium Removal (TCCR) system. While testing with simulants and real waste has been successfully performed under conditions expected during the initial operation of TSCR, test data is absent for assessing off normal high solids loading that may be in the TSCR waste feed. Normal TSCR treatment operations are expected to handle wastes with solids content on the order of 200 ppm, and off normal solids loading could be much larger than the nominal level. The testing program described in this report was conducted to understand the consequence of operating the TSCR system at elevated solids loadings up to the high-solids limit of 15,000 ppm [i.e., 1.5-wt%] identified in the TSCR design basis. Although the system is not required to make throughput above the nominal solids loading, the testing was intended to provide important information related to potential off normal operations. At off normal levels near the high-solids limit, there are potential implications for TSCR performance in the areas of throughput, DEF pressure drop, filter backflush frequency, and IX column pressure drop. In addition, intrusion of solids into the IX column was postulated to impact the Cs-137 loading behavior by promoting channeling or flow maldistribution in the column; since the magnitude of the postulated effect was unknown, assessing it was also of interest. The testing was performed using representative waste simulants and a prototypic, integrated TSCR system designed and assembled specifically to conduct the high solids performance assessment. Overall, the scaled TSCR testing demonstrated that full-scale unit operations can succeed in fulfilling their processing objectives in the presence of solids up to 3,000 ppm, but there are potential performance challenges to filtration operations at solids loadings as low as ~500 ppm. The severity of the challenge is likely to be dependent on the type and size distribution of solids, of which the current testing only examined a single type and size distribution. To provide some flexibility for future full-scale operations, the results of the testing suggest two possible risk reduction strategies that can be implemented without any changes in TSCR design or configuration. One option would be to enact an administrative limit on the solids loading to protect TSCR from feeds that are likely to require a high DEF swap frequency. Another option is to permit operation of the DEFs at differential pressures greater than 2 psid before swapping filters. The selection of a higher differential pressure target is not anticipated to adversely impact DEF backflushing efficacy and would reduce both swap frequency and the amount of waste sent to AP-108.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification Testing of Body Forces due to a Prescribed Angular Velocity in DYNA3D/Paradyn

This report documents the verification testing and regression testing done on a new feature in DYNA3D/Paradyn, which allows users to prescribe body force loads based upon an angular velocity. This feature is unique in that the direction of the angular velocity vector follows the unit vector formed by two coordinate points associated with two nodes or the average coordinates of two separate small collection of nodes. The angular velocity direction will follow the directional vector defined by these nodes while the angular velocity magnitude is defined by a load curve. A simple single element verification test was performed to determine the correct implementation of this feature, and two separate regression tests were added to the DYNA3D Software Quality Assur ance test suite. The nodal positions, velocities, and accelerations from the solution of the single element verification test compare well to analytically derived values of those nodal quantities. The regression tests serve as good examples of this new feature’s use case and were consequently added to the SQA test suite to ensure that further modifications of the DYNA3D source code do not unintentionally change the generated baseline answers.

42 ENGINEERING↗

High-Burnup Spent Fuel Data Project: Sister Rod Final Phase II Test Plan

The Sibling Pin test campaign is a Department of Energy (DOE) research activity within the Spent Fuel and Waste Science and Technology (SFWST) program that is tasked with characterization of high burnup (HBU) fuel in support of the High Burnup Spent Fuel Data Project. Of the 25 fuel rods in the Sibling Pin inventory, approximately 9 rod lengths have been consumed during the first phase (Phase I) of the test campaign leaving approximately 16 rod lengths for the second phase (Phase II) of testing. This plan outlines the Phase II testing and the motivations for performing these tests. Priorities for Phase II testing are based on previously identified knowledge gaps, lessons-learned from Phase I work, the original objectives of the High Burnup Spent Fuel Data Project and the Sibling Pin test campaign, and input from external stakeholders. The priorities for Phase II testing are to obtain data to characterize the effects of annealing on cladding mechanical properties and fuel rod performance, to quantify the creep behavior of cladding materials and fuel rods and the effects of creep deformations on the performance of cladding and fuel rods, and to gather data to support the final closure of the hydride reorientation and radial hydride induced embrittlement gap for HBU fuel rods.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ultimate FY23 Vacuum Creep Testing Facility Operation Report

This facility operation report covers the refurbishment and initial testing of a vacuum creep frame used to conduct 1300°C tensile and creep tests on Mo- and Nb-based alloys. The report details the refurbishment of the frame and initial operation including 100 h creep experiments compared to similar tests in argon. Unlike the 25 mm dogbone specimens tested in argon, the vacuum load train requires 76 mm dog bone specimens. Testing in vacuum has eliminated concern of O embrittlement in argon and Nb alloy CB103 showed >120% tensile elongation at 1300°C and 1450°C. Also, a window in the vacuum chamber allows the use of digital image correlation (DIC) to measure strain rather than the load train displacement used in the argon frames. Comparison of the displacement and DIC results in the vacuum frame showed significant variation in primary creep deformation, likely due to the machine compliance, but similar secondary creep rates. Recently, ULTIMATE teams have submitted specimens for testing in vacuum. With the relatively low volume of creep testing, the facility performance metric of testing within 4 weeks of receiving specimens has been met.

36 MATERIALS SCIENCE↗

Excerpt from Oxygen Monitor Clean Testing Report Performed in 2010

The Rosemount X-STREAM Series X2GP is a paramagnetic oxygen analyzer with a 0-25% oxygen measurement range. It claims a drift less than 2% of span (0.10% volume oxygen) per week, and a response time of less than 5 seconds (for the analyzer to report 90% of a step change). Our test equipment was set-up such that the same gas was running through each oxygen analyzer at the same time. This allowed Calibration Error, Calibration Drift, and Loss of Power Testing to be run on all monitors at the same time, eliminating any variability between the analyzers from tolerances in the gas cylinder, ambient temperature, ambient pressure, test duration, etc. An APTech pressure regulator was placed on the gas cylinder manifold and a 23 psia Paroscientific pressure transducer measured the regulator’s outlet pressure. This did not give the inlet pressure on any one analyzer but outlet pressure from the manifold before the stream was split. The APTech pressure regulator was used to keep operating conditions consistent. A DWYER rotameter was installed on each oxygen monitor’s outlet piping. With the exception of Variation of Flow Rate Testing, the rotameter was left fully open for all testing. The flow rate through each oxygen monitor was controlled by a Swagelok needle valve that was installed on each analyzer’s inlet piping. Additionally, a filter was installed in the each monitor’s inlet piping to keep particles from the measurement cells and a Swagelok ball valve was installed on each monitor’s outlet piping to isolate each monitor between tests. No pumps were installed. Each of the cylinders used was at a pressure greater than ambient room barometric pressure. This pressure differential was used to move gas through the testing equipment. The flow rate through each analyzer was controlled by the Swagelok needle valve installed on each analyzer’s inlet piping. Finally, for all tests, a Paroscientific Digiquartz Barometer was used to measure ambient room barometric pressure and a Fluke Thermo-hygrometer was used to measure ambient room temperature.

47 OTHER INSTRUMENTATION↗

Load Test of Alum-a-Lift Serial No. 33053261

An Alum-A-Lift A800CSPD-60 (Lift) was procured to support mechanical testing of programmatic equipment. This testing will take place within the Bldg. 131 Hi Bay. The design of the Lift procured for the purposes at LLNL was a modification of a machine that had previously been engineered and sold by Alum-a-Lift, see Fig. 1. The modification was to shorten the boom from a 56 in. length to a 28 in. length. The modified design is illustrated in Fig. 2. The Lift was fabricated and shipped to LLNL, received ~ June 2022. Upon arrival, it was successfully evaluated for “no-load” performance capability. Upon inspection of the documentation provided by Alum-a-Lift, it was noted that the load test was performed to qualify the machine for a lifting capacity of 200 lb. The LLNL requirement was that the capacity of the machine be 400 lb. Conversations with the vendor, Alum-A-Lift, followed this discovery. Rather than send the machine back to the vendor for load testing, discussions concurred that LLNL would load test the machine and Alum-A-Lift would provide the relevant load test placard to be placed on the machine subsequent to the successful load test. This MESN provides documentation of the load test to qualify the Alum-a-Lift to its’ rated capacity of 400 lb.

42 ENGINEERING↗

Water-based Ria Testing in TREAT: Commissioning and Early Results

We have completed a series of reactivity-initiated accident commissioning tests with the static water capsule in the Transient Reactor Test Facility and completed some visual and non-destructive post-irradiation examinations on the fuel rods. The test campaign included a calibration test followed by five tests in the Static Environment Rodlet Transient Test Apparatus capsule. The conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO2. The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope C2 Feed in Support of the LAW Pilot Melter (Final Report)

One of the principal objectives of the DM100 melter tests was to demonstrate that the LAW Sub-Envelope C2 feeds with ± 15% variations in the amounts of waste simulant are suitable for large-scale tests on the LAW Pilot melter. The other principle objective for the DM100 tests was to determine the relative effects of sugar versus waste organics on glass redox state, NOx emissions, sulfur emissions, sulfur retention in the glass, secondary sulfate layer formation, and glass-melt foaming. Additional objectives included measurement of the feed rheological properties and collection of melter emissions data. Screening tests are conducted at the DM100 scale in order to identify and correct potential problems before testing at the larger scale LAW Pilot melter. Testing goals were met in that the results of the DM100 melter test resulted in selection of LAW Sub-Envelope C2 feed suitable for Pilot Melter testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Additively Manufactured Carbon Fiber and Fused Deposition Modeling PLA Interlaminar Shear Testing Report

This test report summarizes the torsional test setup, procedure, and results for interlaminar shear (ILS) failure of additively manufactured carbon fiber (CFAM) material developed at LLNL. In addition, the report also includes testing of fused deposition modeled (FDM) polylactic acid (PLA), including ILS test standard D7078 and the same torsional test mentioned above. The test hopes to characterize ILS properties of CFAM, however substantial further testing and improvements still need to be done to induce a proper failure mode. This testing was performed by Sundi Win as part of her summer internship project in Kinetic Technologies.

36 MATERIALS SCIENCE↗

Low Purge and Mercury Recovery Testing with Sludge Batch 10 Tank 40 Simulant

Researchers at the Savannah River National Laboratory (SRNL) have completed testing as requested by Savannah River Mission Completion (SRMC) to perform experiments to determine the impact of using a lower or inert purge in Sludge Batch (SB) 10 processing under the Nitric-Glycolic Acid (NGA) flowsheet. A key objective of this testing was also to determine the mercury speciation and recovery during each experiment. The testing was performed as part of the SB10 Technical Task Request (TTR) and Task Technical and Quality Assurance Plan (TTQAP). Two sets of tests were performed, and a Run Plan was approved prior to each set of experiments to document the planned testing. Three initial experiments were completed to determine whether a low air purge would be beneficial to CPC processing at higher acid stoichiometry (110%) based on the Koopman minimum acid (KMA) equation (116% Hsu). One of the tests, an inert nitrogen purge experiment, was also completed to demonstrate that excluding oxygen did not introduce any new hazards. The experiments were designed to be identical except for the change in purge gas and purge flowrate from run to run. After reviewing the results from the initial three experiments, six additional tests were proposed by SRNL to support the lower purge study and to look for processing alternatives for improving mercury recovery. These additional six tests were all completed at a very low acid stoichiometry to mimic the pH experienced during processing in DWPF (~7). DWPF is processing SB10 sludge at an acid stoichiometry of 90% based on the Hsu equation. The additional SRNL experiments were performed at an acid stoichiometry of 62.5% KMA stoichiometry (66.3% Hsu) to produce a Sludge Receipt and Adjustment Tank (SRAT) product with a pH of about 7. All experiments used simulants of both SWPF streams, although no entrained solvent was added during any of the experiments

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proposed New STELLA-2 Tests

In 2025, KAERI and Argonne initiated a collaboration based on software validation using data from tests performed at KAERI’s STELLA-2 facility. STELLA-2 is a large-scale sodium thermal-hydraulic test facility that was originally developed to support KAERI’s development of the PGSFR design concept. KAERI has performed a large number of tests at STELLA-2, providing valuable data to support sodium fast reactor code validation. KAERI will be conducting new tests in 2026, targeting system conditions that were not achieved during previous test campaigns. KAERI has requested from Argonne proposed tests that could be performed during the upcoming test campaign. This report documents Argonne’s proposed tests in fulfillment of KAERI’s request.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solvari SR, Simplifying Residential Solar to 1 SKU, with Extended Testing

Accelerated weathering and material compatibility testing for polymeric and asphaltic materials. NLR will be testing the durability of the polymeric materials proposed for use in the supporting structures designed by TESCI solar. This will include the bare materials and coupons attached to asphalt shingles. The exposure will be in damp heat and separately heat, humidity and UV light, all followed by mechanical evaluation. Modification 1 is an extension of the first round of testing with both a continuation of some of the same testing and addition of new testing methods and materials. The testing of materials in the condition of A3 looking at mechanical durability will be continued looking at the materials used in the mounting brackets. We will be adding in testing of the silicone adhesive to the module and of the module itself. For the mounting brackets, testing will also be conducted at multiple temperatures and humidity levels to allow for extrapolation to the field.

14 SOLAR ENERGY↗

Validation of a Custom Ball-on-Ring Apparatus and Consideration of Common Issues for Use in Further Testing (SULI Deliverables)

Ceramic materials are well-known for their high hardness and strength but are limited in their application due to low toughness and sudden failure. As a potential solution, inspiration can be taken from dental enamel nanostructure, where undulating rods cause cracks to branch or deflect, increasing the energy needed to cause total fracture of a ceramic part. Following the dental enamel structure, a novel ceramic which uses 3D printed Yttria stabilized Zirconia rods in an alumina matrix was developed. To test this bio-inspired ceramic material, a proper testing apparatus needed to be created and tested to verify its accuracy. For this project, a bespoke ball on ring testing apparatus was created and tested using both conventionally sintered alumina disks and purchased alumina disks to validate its accuracy. By comparing the Weibull distribution of rupture strengths measured by the tests to literature values, it was shown that the testing frame had a wide distribution of strength which did not align with literature values on the lower end. Through fractography, it was found that some samples fractured from the contact stress induced by the ball indenter, which could not be used to calculate rupture strength. This fracture was often linked to low stress to failure, which was initiated by a flaw on the surface near the indenter which acted as a stress concentrator. Removal of these samples from the data set increased the accuracy of the reported rupture strength values for the ceramic. Considering the equations for the magnitude of contact and flexural strength, along with observations of initiating flaws, several measures can be taken for testing the bio-inspired composite. These measures include proper polishing of both sides of the sample, reducing sample thickness, and potentially using a softer indenter material.

36 - MATERIALS SCIENCE↗

Enhanced climate reproducibility testing with false discovery rate correction

Simulating the Earth's climate is an important and complex problem, thus climate models are similarly complex, comprised of millions of lines of code. In order to appropriately utilize the latest computational and software infrastructure advancements in Earth system models running on modern hybrid computing architectures to improve their performance, precision, accuracy, or all three; it is important to ensure that model simulations are repeatable and robust. This introduces the need for establishing statistical or non-bit-for-bit reproducibility, since bit-for-bit reproducibility may not always be achievable. Here, we propose a short-simulation ensemble-based test for an atmosphere model to evaluate the null hypothesis that modified model results are statistically equivalent to that of the original model. We implement this test in version 2 of the US Department of Energy's Energy Exascale Earth System Model (E3SM). The test evaluates a standard set of output variables across the two simulation ensembles and uses a false discovery rate correction to account for multiple testing. The false positive rates of the test are examined using re-sampling techniques on large simulation ensembles and are found to be lower than the currently implemented bootstrapping-based testing approach in E3SM. We also evaluate the statistical power of the test using perturbed simulation ensemble suites, each with a progressively larger magnitude of change to a tuning parameter. The new test is generally found to exhibit more statistical power than the current approach, being able to detect smaller changes in parameter values with higher confidence.

Kelleher, Michael E. [Oak Ridge National Laborator↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR) 5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of the development and qualification of tri-structural isotropic (TRISO) low enriched fuel for use in high-temperature gas-cooled reactors (HTGR). The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR 5/6/7 experiment were to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel, beyond normal operating conditions. 3. Provide irradiated-fuel performance data and irradiated-fuel samples for post irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective is to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast (NE) flux trap of the ATR with a planned duration of 500 effective full-power days (EFPDs). The NE flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B?168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 EFPDs. Final burnup values, on a per-compact basis, ranged from 5.66% to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples (TC) had failed (the bottom three capsules lost all TCs). During the first five cycles (162B ? 165A), fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8?10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to the maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particle failures in Capsule 3, which was considered possible at the start of the irradiation, since the experiment was designed to operate beyond the high-temperature gas-cooled reactor (HTGR) normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

POST-TEST EXAMINATIONS OF A LOCA SAMPLE FROM AN IRRADIATED HIGH-BURNUP PWR M5 FUEL ROD

A LOCA integral test with high burnup PWR M5 fuel rod was conducted in the Irradiated Fuel Examination Laboratory through the complete LOCA sequence: heating the LOCA sample to 300ºC and pressurizing the internal pressure to 8.27 MPa, heating at 5ºC/s from 300 to 1200ºC, holding in steam for 90s at 1200ºC, cooling at 3ºC/s to 800ºC, followed by water quench and rapid cooling to 100ºC. After LOCA testing, examinations, such as the fuel fragmentation analysis, burst and ballooning characterization, axial strain measurement, and microstructural examinations were performed. Metallographic examinations of an as-irradiated high burnup sample adjacent to the LOCA test sample revealed a bonding layer between the fuel and cladding. The posttest LOCA examinations indicates the corrosion layer formed during normal operations in the commercial reactor might provide a protection against the steam oxidation at high temperatures for test times performed in this work. The microstructure of the as-irradiated fuel is compared to the microstructure of the post-LOCA test fuel. Posttest LOCA examination on unirradiated post-tests Zr cladding samples was conducted, which served as baseline data for in cell testing with irradiated samples. The results obtained with irradiated PWR high burnup M5 fuel rad were compared to the LOCA test data obtained with irradiated BWR high burnup Zircaloy-2 fuel rod at Argonne national Laboratory.

Yan, Yong↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗