Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Telemetry Tracking & Control (TT&C) - First TDRSS, then Commercial GEO & Big LEO and Now Through LEO

The advent of low earth orbit (LEO) commercial communication satellites provides an opportunity to dramatically reduce Telemetry, Tracking and Control (TT&C) costs of launch vehicles, Unpiloted Aerial Vehicles (UAVs), Research Balloons and spacecraft by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center's Wallops Flight Facility (GSFC\WFF) have successfully used commercial Geostationary Earth Orbit (GEO) and Big LEO communications satellites for Long Duration Balloon Flight TT&C. The Flight Modem is a GSFC\WFF Advanced Range Technology initiative (ARTI) designed to streamline TT&C capability in the user community of these scientific data gathering platforms at low cost. Making use of existing LEO satellites and adapting and ruggedized commercially available components; two-way, over the horizon communications may be established with these vehicles at great savings due to reduced infrastructure. Initially planned as a means for permitting GPS data for tracking and recovery of sounding rocket and balloon payloads, expectations are that the bandwidth can soon be expanded to allow more comprehensive data transfer. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem and a single board computer with custom software is described and technical challenges are discussed along with the plan for their resolution. A three-phase testing and development plan is outlined and the current results are reported. Results and status of ongoing flight tests on aircraft and sounding rockets are reported. Future applications on these platforms and the potential for satellite support are discussed along with an analysis of cost effectiveness of this method vs. other tracking and data transmission schemes.

Morgan, Dwayne R.↗

Improving Reliability and Maintainability (R&M) in Space Life Support

This paper considers how to improve the reliability and maintainability (R&M) of future NASA space life support systems. If these systems are procured under an industry contract, defining the R&M requirements would take precedence over providing technical guidance on designing the system. Imposing a specific R&M design could be over constraining. However, the mission may define the overall R&M approach, as the International Space Station (ISS) did by requiring Orbital Replacement Units (ORUs). Before defining the R&M requirements for the next mission, the life support research program should understand and plan the R&M approach. The recent NASA technical standard on R&M has moved away from requiring specific R&M activities during each of the traditional project phases to instead developing and planning to implement the R&M requirements to meet the top level project R&M objectives. The emphasis is on providing the evidence to show that the R&M requirements are met, rather than on conducting specific prescribed R&M activities. The technical standard on R&M defines a comprehensive hierarchy of specific R&M objectives and identifies particular strategies to implement them at each level. That is, the top level R&M objective is defined and then one or more design strategies to implement it are developed immediately, before the next lower objectives are defined and the strategies to achieve those are designed. This step-by-step, top-down approach is similar to the axiomatic design method. The objectives are the R&M requirements, and the strategies are the hardware designs or operations plans developed to meet these requirements. The new R&M process is aligned with the systems design process and helps ensure that the methods to meet the R&M requirements are built into the design.

Jones, Harry W.↗

NASA Langley Systems Analysis & Concepts Directorate Technology Assessment/Portfolio Analysis

Systems analysis develops and documents candidate mission and architectures, associated system concepts, enabling capabilities and investment strategies to achieve NASA s strategic objectives. The technology assessment process connects the mission and architectures to the investment strategies. In order to successfully implement a technology assessment, there is a need to collect, manipulate, analyze, document, and disseminate technology-related information. Information must be collected and organized on the wide variety of potentially applicable technologies, including: previous research results, key technical parameters and characteristics, technology readiness levels, relationships to other technologies, costs, and potential barriers and risks. This information must be manipulated to facilitate planning and documentation. An assessment is included of the programmatic and technical risks associated with each technology task as well as potential risk mitigation plans. Risks are assessed and tracked in terms of likelihood of the risk occurring and consequences of the risk if it does occur. The risk assessments take into account cost, schedule, and technical risk dimensions. Assessment data must be simplified for presentation to decision makers. The Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center has a wealth of experience in performing Technology Assessment and Portfolio Analysis as this has been a business line since 1978.

Cavanaugh, Stephen↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

Rice scene radiation research plan

Data requirements, tasks to be accomplished, and the technical approaches to be used in identifying the characteristics of rice for crop inventories are listed as well as methods for estimating crop development and assessing its conditions.

Heilman, J.↗

A strawman SLR program plan for the 1990s

A series of programmatic and technical goals for the satellite laser ranging (SLR) network are presented. They are: (1) standardize the performance of the global SLR network; (2) improve the geographic distribution of stations; (3) reduce costs of field operations and data processing; (4) expand the 24 hour temporal coverage to better serve the growing constellation of satellites; (5) improve absolute range accuracy to 2 mm at key stations; (6) improve satellite force, radiative propagation, and station motion models and investigate alternative geodetic analysis techniques; (7) support technical intercomparison and the Terrestrial Reference Frame through global collocations; (8) investigate potential synergisms between GPS and SLR.

Degnan, John J.↗

Crew Transportation Technical Management Processes

Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.

Summary of the technical management process↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

54 ENVIRONMENTAL SCIENCES↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of a NASA Human Research Program’s (HRP) Space Radiation Element-sponsored Mini-Technical Interchange Meeting/workshop on Cardiovascular Disease Risk from Space Radiation

The NASA HRP’s Space Radiation Element funds research to characterize and mitigate adverse health outcomes from space radiation including cardiovascular risks to astronauts to enable deep space exploration and sustained human presence in space. Non-cancer effects such as damage to the cardiovascular system have been observed at clinically relevant high doses of ionizing radiation. However, an association between lower doses and risk of cardiovascular disease (CVD) remains somewhat controversial, especially in relation to the existence of low dose thresholds, radiation quality, and dose-rate effects, as well as gaps in characterizing the mechanisms and major pathways of disease. To facilitate, accelerate, and incubate new ideas to characterize and mitigate this risk, the Element is planning to organize a series of miniature technical interchange meetings (Tiny-TIMs) to provide a venue for HRP-funded investigators and thought leaders to present ongoing work and engage in open discussion on presented results, limitations of current approaches, incorporating better experimental strategies, model systems, etc. The initial Tiny-TIM held during the NASA HRP Investigators’ Workshop earlier this year – Upping the ante on characterizing and mitigating cardiovascular disease risk from space radiation exposure – aimed to stimulate discussion on the current state of scientific knowledge of CVD risk from space-like radiation exposure. The Tiny-TIM consisted of two 90-minute sessions; the first session concentrated on current knowledge of CVD risk from space radiation and the second session focused on innovative ideas, newer approaches, and techniques to accelerate research. The second session was followed by an open spirited discussion amongst peers on the current issues impeding the characterization of CVD risk from space radiation. The Element facilitated the discussion using a set of pressing open questions/gaps in knowledge that need to be addressed by the scientific community. The outcomes of the Tiny-TIM will be presented along with a plan of proposed future workshops and other initiatives of the Space Radiation Element.

Janapriya Saha↗

Resilient Energy Transition Planning for Ouzinkie, Alaska

This report documents an energy system planning study for the village of Ouzinkie, Alaska, conducted by the U.S. Department of Energy's (DOE) Energy Transitions Initiative Partnership Project (ETIPP). Ouzinkie is a small remote community located on Spruce Island, Alaska, in the Kodiak Archipelago. The Ouzinkie community is served by a local electrical system powered by a combination of diesel generators and a hydroelectric turbine. Due to aging assets, however, the power system reliability has declined in recent years, while the cost of operating the diesel generators has increased significantly. To address these problems, Ouzinkie asked ETIPP to provide technical assistance to develop an updated integrated plan for improvements to the Ouzinkie power system, in order to transition to a more reliable and resilient system powered by renewable energy resources.

13 HYDRO ENERGY↗

Yes, there was a moon race

Examination of newly disclosed evidence confirms that the Soviets were indeed striving to reach the moon before the U.S. in 1969. It is noted that a Soviet unmanned lunar probe crashed on the moon's surface only hours before the U.S. Apollo landing. Now confirmed openly are moon-exploration schedules that were competitive with Apollo plans, the names and histories of Soviet lunar boosters and landers, identities of the lunar cosmonauts; and even photos of manned lunar craft are available. Additional details on the troubled moon-probe program are presented: technical problems, continuous changes in goals, schedules, and planning, vehicle and personnel disasters, transfer of authority between ministries, and political power struggles in the scientific community.

Oberg, James E.↗

Invertible Design Manifolds for Heat Transfer Surfaces (INVERT) (Final Technical Report)

This final report briefly reviews the main technical accomplishments of the INVERT award, summarizes existing or planned publications or transitions from the effort, and lastly reviews T2M strategies resulting from the program. Specifically, under the award, our team studied three main technical areas and performed one preliminary T2M study on the cost-benefit analysis of Inverse Design Methods and one major software release (the Maryland Inverse Design Benchmark Suite).

97 MATHEMATICS AND COMPUTING↗

Advanced Transmission Technologies –GETs and HPCs Session 3: HPCs and Building Actions Plans to Digital Assurance Risks

The third session of the Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program, held on November 11, 2025, centered on High Performance Conductors (HPCs) and the formulation of action plans to address digital assurance risks associated with Grid-Enhancing Technologies (GETs). This session convened experts from utilities, vendors, and government agencies to examine the technical, operational, and cybersecurity aspects of HPC deployment. Discussions highlighted the benefits of HPCs, such as their ability to rapidly increase transmission capacity using existing corridors, improve grid resilience, reduce system losses, and align with FERC Orders 2023 and 1920. Participants evaluated supply chain and digital assurance risks, including reliance on imported materials, limited domestic manufacturing capacity, workforce shortages, and traceability issues. The session also emphasized the importance of digital trust, integration-layer cybersecurity, and unified risk frameworks, introducing tools like intrusion detection systems, encryption, zero trust networking, and firmware integrity. Recaps of earlier workshops on Dynamic Line Ratings (DLRs), Advanced Power Flow Control (APFC), and Transmission Topology Optimization (TTO) underscored institutional barriers and integration challenges. Action plans were proposed to mitigate issues such as inconsistent cybersecurity practices, SBOM usage, supply chain visibility, operator trust, and misaligned incentives. Additionally, INL presented its supply chain risk management tools and Cyber-Informed Engineering (CIE) principles to support secure procurement and system design. The session concluded with a commitment to share key takeaways, incorporate cohort feedback into future policy development, and continue collaborative engagement through upcoming pilot activities. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗