Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SUBSTATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Propionitrile in the Two Lowest Excited Vibrational States in the Laboratory and on Titan

The rotational spectrum of propionitrile (ethyl cyanide, C2H5CN) in the two lowest excited vibrational states, ν(sub 13) = 1 and ν(sub 21) = 1, was studied in detail. The compiled experimental data set consisted of published line lists, lines measured from published spectra up to 645 GHz, and new measurements at frequencies from 8 to 331 GHz. The two states are subject to considerable mutual interaction but application of a- and b-axis Coriolis coupling model to the measured A-symmetry internal rotation substate transitions was found to be successful. A total of over 1900 transitions were fitted for J values up to 76 and Ka up to 24, resulting in determined vibrational separation between the two states ΔE = 6:2070246(14) cm(exp -1), and Coriolis coefficients |ζ(sup a)(sub 13,21)| = 0.378, |ζ(sup b) (sub 13,21)| = 0.127, in good agreement with quantum chemistry calculations. The new line catalog was used to model ALMA spectra of Titan’s atmosphere from 2016, fitting many weak lines not previously modeled. By including the vibrationally excited lines of C2H5CN and a new partition function, we derive a disk-averaged volume mixing ratio estimate in 2016 of 7.8 ± 0.2 ppb assumed constant above 300 km.

Analysis of rotational spectrum↗

GAuche-Ethyl Alcohol: Laboratory Assignments and Interstellar Identification

Ethyl alcohol (ethanol) is known to possess a pair of closely-spaced excited torsional substates (gauche +, gauche -) at an energy of approximately 57 K above the ground (trans) torsional substrate. We report an extended analysis of some gauch- - gauch+ Q branch (delta J=0) transitions witha three-substrate fixed frame axis method (FFAM) Hamilton.

ISM↗

Frustration in Fuzzy Protein Complexes Leads to Interaction Versatility

Disordered proteins frequently serve as interaction hubs involving a constrained variety of partners. Complexes with different partners frequently exhibit distinct binding modes, involving regions that remain disordered in the bound state. While the conformational properties of disordered proteins are well-characterized in their free states, less is known about the molecular mechanisms by which specificity can be achieved not with one but with multiple partners. Using the energy landscape theory concept of protein frustration, we demonstrate that complexes of disordered proteins exhibit a high degree of local frustration, especially at the binding interface. These suboptimal interactions lead to the possibility of multiple bound substates, each displaying distinct frustration patterns, which are differently populated in complexes with different partners. These results explain how specificity of disordered proteins can be achieved without a single common bound conformation and how the conflict between different interactions can be used to control the binding to multiple partners.

Chemical specificity↗

Examination of the role of nuclear deterrence in the 21st century: a systems analysis approach

Until very recently, an evaluation of US policy regarding deterrence and the role of its nuclear weapons arsenal as a deterrent has been largely absent in the public debate. With President's Obama embrace of a goal of a future world without nuclear weapons, issues of nuclear policy and deterrence have just recently risen to the forefront of policy discussions. The traditional role of US nuclear weapons-to deter the use of nuclear weapons by other states-endures, but is no longer unique nor even predominant. In an increasingly multi-polar world, the US now faces growing risks of nuclear weapons proliferation; the spread of weapons of mass destruction generally to non-state, substate and transnational actors; cyber, space, economic, environmental and resource threats along with the application of numerous other forms of 'soft power' in ways that are inimical to national security and to global stability. What concept of deterrence should the US seek to maintain in the 21st Century? That question remains fluid and central to the current debate. Recently there has been a renewed focusing of attention on the role of US nuclear weapons and a national discussion about what the underlying policy should be. In this environment, both the United States and Russia have committed to drastic reductions in their nuclear arsenals, while still maintaining forces sufficient to ensure unacceptable consequence in response to acts of aggression. Further, the declared nuclear powers have maintained that a limited nuclear arsenal continues to provide insurance against uncertain developments in a changing world. In this environment of US and Russian stockpile reductions, all declared nuclear states have reiterated the central role which nuclear weapons continue to provide for their supreme national security interests. Given this new environment and the challenges of the next several decades, how might the United States structure its policy and forces with regard to nuclear weapons? Many competing objectives have been stated across the spectrum of political, social, and military thought. These objectives include goals of ratification of the Comprehensive Test Ban Treaty, recommitment to further downsizing of the nuclear arsenal, embracing a long-term goal of the elimination of nuclear weapons, limitations on both the production complex and upgrades to nuclear weapons and delivery systems, and controls and constraints to limit proliferation of nuclear materials and weapons, particularly to rogue states and terrorist groups.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Properly Understanding the Impacts of Distributed Resources on Distribution Systems

The subject paper discusses important impacts of distributed resources on distribution networks and feeders. These include capacity, line losses, voltage regulation, and central system support (such as volt/var via central generators and substation) as the number, placement and penetration levels of distributed resources are varied. Typically, the impacts of distributed resources on the distribution system are studied by using steady-state rather than dynamic analysis tools. However, the response time and transient impacts of both system equipment (such as substation/feeder capacitors) and distributed resources needs to be taken into account and only dynamic analysis will provide the full impact results. ORNL is wrapping up a study of distributed resources interconnected to a large distribution system considering the above variables. A report of the study and its results will be condensed into a paper for this panel session. The impact of distributed resources will vary as the penetration level reaches the capacity of the distribution feeder/system. The question is how high of a penetration of distributed resource can be accommodated on the distribution feeder/system without any major changes to system operation, design and protection. The impacts most surely will vary depending upon load composition, distribution and level. Also, it is expected that various placement of distributed resources will impact the distribution system differently.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Analysis of a Region-Wide Remotely Controllable Electrical Lock-Out System

Electric utilities have a main responsibility to protect the lives and safety of their workers when they are working on low-, medium-, and high-voltage power lines and distribution circuits. With the anticipated widespread deployment of smart grids, a secure and highly reliable means of maintaining isolation of customer-owned distributed generation (DG) from the affected distribution circuits during maintenance is necessary to provide a fully de-energized work area, ensure utility personnel safety, and prevent hazards that can lead to accidents such as accidental electrocution from unanticipated power sources. Some circuits are serviced while energized (live line work) while others are de-energized for maintenance. For servicing de-energized circuits and equipment, lock-out tag-out (LOTO) programs provide a verifiable procedure for ensuring that circuit breakers are locked in the off state and tagged to indicate that status to operational personnel so that the lines will be checked for voltage to verify they are de-energized. The de-energized area is isolated from any energized sources, which traditionally are the substations. This procedure works well when all power sources and their interconnections are known armed with this knowledge, utility personnel can determine the appropriate circuits to de-energize for isolating the target line or equipment. However, with customer-owned DG tied into the grid, the risk of inadvertently reenergizing a circuit increases because circuit connections may not be adequately documented and are not under the direct control of the local utility. Thus, the active device may not be properly de-energized or isolated from the work area. Further, a remote means of de-energizing and locking out energized devices provides an opportunity for greatly reduced safety risk to utility personnel compared to manual operations. In this paper, we present a remotely controllable LOTO system that allows individual workers to determine the configuration and status of electrical system circuits and permit them to lock out customer-owned DG devices for safety purposes using a highly secure and ultra-reliable radio signal. The system consists of: (1) individual personal lockout devices, (2) lockout communications and logic module at circuit breakers, which are located at all DG devices, and (3) a database and configuration control process located at the utility operations center. The lockout system is a close permissive, i.e., loss of control power or communications will cause the circuit breaker to open. Once the DG device is tripped open, a visual means will provide confirmation of a loss of voltage and current that verifies the disconnected status of the DG. Further the utility personnel will be able to place their own lock electronically on the system to ensure a lockout functionally. The proposed LOTO system provides enhanced worker safety and protection against unintended energized lines when DG is present. The main approaches and challenges encountered through designing the proposed region-wide LOTO system are discussed in this paper. These approaches include: (1) evaluating the reliability of the proposed approach under N-modular redundancy with voter/spares configurations and (2) conducting a system level risk assessment study using the failure modes and effects analysis (FMEA) technique to identify and rank failure modes by probability of occurrence, probability of detection, and severity of consequences. This ranking allows a cost benefits analysis to be conducted such that dollars and efforts will be applied to the failures that provide greatest incremental gains in system capability (resilience, survivability, security, reliability, availability, etc.) per dollar spent whether capital, operations, or investment. Several simulation scenarios and their results are presented to demonstrate the viability of these approaches.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Designing and Operating Through Compromise: Architectural Analysis of CKMS for the Advanced Metering Infrastructure

Compromises attributable to the Advanced Persistent Threat (APT) highlight the necessity for constant vigilance. The APT provides a new perspective on security metrics (e.g., statistics based cyber security) and quantitative risk assessments. We consider design principals and models/tools that provide high assurance for energy delivery systems (EDS) operations regardless of the state of compromise. Cryptographic keys must be securely exchanged, then held and protected on either end of a communications link. This is challenging for a utility with numerous substations that must secure the intelligent electronic devices (IEDs) that may comprise complex control system of systems. For example, distribution and management of keys among the millions of intelligent meters within the Advanced Metering Infrastructure (AMI) is being implemented as part of the National Smart Grid initiative. Without a means for a secure cryptographic key management system (CKMS) no cryptographic solution can be widely deployed to protect the EDS infrastructure from cyber-attack. We consider 1) how security modeling is applied to key management and cyber security concerns on a continuous basis from design through operation, 2) how trusted models and key management architectures greatly impact failure scenarios, and 3) how hardware-enabled trust is a critical element to detecting, surviving, and recovering from attack.

Cryptographic Key Management System (CKMS)↗

Southwestern Power Administration Annual Report 2012

Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

2012, annual report, southwestern, Arkansas, Kansa↗

Southwestern Power Administration Annual Report 2011

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

Arkansas, Kansas, Louisiana, Missouri, Oklahoma, T↗

Southwestern Power Administration Annual Report 2010

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

Arkansas, Kansas, Louisiana, Missouri, Texas, Okla↗

Southwestern Power Administration Annual Report 2008

Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

Financial statement, operating data, Southwestern ↗

Harnessing Hydropower: The Earth's Natural Resource

This document is a layman's overview of hydroelectric power. It includes information on: History of Hydropower; Nature’s Water Cycle; Hydropower Plants; Turbines and Generators; Transmission Systems; power dispatching centers; and Substations. It goes on to discuss The Power Grid, Hydropower in the 21st Century; Energy and the Environment; and how hydropower is useful for Meeting Peak Demands. It briefly addresses how Western Area Power Administration is Responding to Environmental Concerns.

13 HYDRO ENERGY↗

Method for estimating power outages and restoration during natural and man-made events

A method of modeling electric supply and demand with a data processor in combination with a recordable medium, and for estimating spatial distribution of electric power outages and affected populations. A geographic area is divided into cells to form a matrix. Within the matrix, supply cells are identified as containing electric substations and demand cells are identified as including electricity customers. Demand cells of the matrix are associated with the supply cells as a function of the capacity of each of the supply cells and the proximity and/or electricity demand of each of the demand cells. The method includes estimating a power outage by applying disaster event prediction information to the matrix, and estimating power restoration using the supply and demand cell information of the matrix and standardized and historical restoration information.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FINAL REPORT: SUNSHINE STATE SOLAR GRID INITIATIVE (SUNGRIN) PHASE 1 (Critical Milestone Review Version)

This report provides details on the activities and accomplishments of Phase 1 of the Sunshine State Solar Grid Initiative (SUNGRIN) Project for the period beginning 4/28/2010 and ending 12/31/2011. SUNGRIN is a five-phase high-penetration solar PV project within the Systems Integration (SI) area of the Solar Energy Technologies (SETP) Program, under the SunShot Initiative. SUNGRIN is focused on understanding and enabling high-penetration grid-connected solar PV through simulation assisted studies of actual Florida utility high-penetration distribution circuits as well as substations and, to a limited extent, the bulk power system. Each phase builds and expands upon the efforts of the previous phase, leading to a comprehensive examination and understanding of high-penetration solar PV issues, from the solar resource to the conversion and integration technologies to the electric power system, with Florida and it’s utility partners providing the broad range of conditions and system integration scenarios necessary to develop useful insight and solutions. This phase, Phase 1, was funded with American Recovery and Reinvestment Act (ARRA) funds. This version of the final report is organized to align with statement of project objectives (SOPO) critical milestones.

14 SOLAR ENERGY↗

Protective barriers and related methods

Protective barriers for protecting assets (e.g., electrical power transformers and other substation components). The protective barrier may include a lower portion and an upper portion. The lower portion may include first and second laterally spaced A-frame structures having a first protective member assembly extending between aligned legs of the respective A-frame structures on one side thereof. The first protective member assembly may include a first plurality of substantially horizontally extending protective members oriented at an angle relative to a horizontal plane. The first and second A-frame structures may have a second protective member assembly extending between aligned legs of the respective A-frame structures on an opposing side thereof. The upper portion may comprise a third protective member assembly. Methods of making a protective barrier are also disclosed.

42 ENGINEERING↗

Protective Relaying for Distribution and Microgrids Evolving from Radial to Bi-Directional Power Flow

As distributed energy resources (DER) achieve higher penetration levels in distribution systems, the normal flow of power (and fault current) is no longer unidirectional, from substation source to load (or fault). The increased importance of DER has also led to pending revisions in the DER interconnection standards, particularly voltage regulation and ride-through, with publication of a new IEEE Standard 1547 expected in early 2018. These changes have complicated normal distribution system operation, and they will also complicate distribution system protection. The U. S. Department of Energy undertook a review of protection state-of-the-art for this new environment in order to identify gaps and propose near-term solutions.

McDermott, Tom↗

Data-Driven Load Diversity and Variability Modeling for Quasi-Static Time-Series Simulation on Distribution Feeders: Preprint

This paper presents a data-driven load modeling methodology for distribution system quasi-static time-series (QSTS) simulation considering both diversity and variability characteristics of distribution loads. Based on our previous work in [1]-[2], a variability library and diversity library have been established based on the realistic high-resolution data collected from actual utility feeders. Given the load profile for the start-of-circuit load of a feeder, the loads on the feeder nodes can be modeled with both diversity and variability instead of being directly scaled from the substation load profile according to the distribution allocation factors. With diversified load models, the load-induced impact on the feeder operation characteristics, such as voltage ramp and regulator operations, can be better considered in QSTS simulation. The proposed modeling methodology has been tested on both the IEEE 123-bus feeder and an actual utility feeder model, and the simulation results have demonstrated the merits of deploying the proposed load modeling methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nailing the Peak: City-Scale, Building-Specific Load Factor and Contribution to a Utility’s Hour of Critical Generation

Maintaining electrical generation assets to meet peak demand increases the cost of providing electricity to a country’s buildings and insufficient assets can result in power outages. In order to keep reliable electricity costs low for consumers and demand charges low for utilities, there exist markets and financial incentives for limiting consumption during peak demand.The team has partnered with an electrical distributor servicing a 1,390 km2 area and 178,368 buildings with the aim of using urban-scale building energy modelling to inform business decisions necessary for the operation of their electric grid. A suite of software has been developed that allows the scalable creation of a “digital twin” for all buildings in the utility’s service area. This virtual utility area is analysed for targeted deployment of new technologies or policies to assess building-specific savings, effects on critically-loaded grid infrastructure (e.g. feeders, substations), and aggregated impact to utility-scale operations.This work leverages 15-minute data from each building to compare actual and simulated monthly peak-hour demand and assessment of the load factor for each building. Findings include market characterization via clustering of relative energy use profiles for ~180,000 buildings as well as simulation-informed savings opportunities indicating residential load factors of 0.17, commercial load factors of 0.2-0.4 depending on year of construction, and general load factors of 0.16-0.5 depending on building type.

New, Joshua↗