Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

State of Jet Noise Prediction-NASA Perspective

This presentation covers work primarily done under the Airport Noise Technical Challenge portion of the Supersonics Project in the Fundamental Aeronautics Program. To provide motivation and context, the presentation starts with a brief overview of the Airport Noise Technical Challenge. It then covers the state of NASA s jet noise prediction tools in empirical, RANS-based, and time-resolved categories. The empirical tools, requires seconds to provide a prediction of noise spectral directivity with an accuracy of a few dB, but only for axisymmetric configurations. The RANS-based tools are able to discern the impact of three-dimensional features, but are currently deficient in predicting noise from heated jets and jets with high speed and require hours to produce their prediction. The time-resolved codes are capable of predicting resonances and other time-dependent phenomena, but are very immature, requiring months to deliver predictions without unknown accuracies and dependabilities. In toto, however, when one considers the progress being made it appears that aeroacoustic prediction tools are soon to approach the level of sophistication and accuracy of aerodynamic engineering tools.

Bridges, James E.↗

Mars Opposition Piloted Nuclear Electric Propulsion (NEP)-Chem Vehicle

Many previous studies have examined sending crews to and from Mars. The most economical involved a ‘conjunction’ class whereby the crew spends around 500 days on Mars surface waiting for a ‘cheap’ return. The total mission time results in a mission duration around 3 years. Given the current demonstrated crew maximum of a 1 year stint on ISS, it is interesting to look at reducing that time to only two years, thus reducing risk and minimizing time in the Martian System. In order to meet such a short mission an ‘opposition’ class Mars mission (which includes a Venus flyby) was chosen. The energy required to perform such a mission in only two years (for the 2036 opportunity at least) is about three times that of the 3 year conjunction mission. The rocket equation clearly shows that this mission would then require several times the propellant of the three-year mission unless the Isp of the propulsion system can be increased. Electric propulsion can provide the 3-10x improvement in Isp but even with a nuclear reactor power levels could approach 10 MWe. As an alternative, a smaller reactor (1.5 MWe class) joined together with a chemical stage was found to allow for using each propulsion system to its best advantage: low thrust in interplanetary space and chemical in the gravity wells of Earth and Mars. Indeed, the use of high Isp, low thrust during the interplanetary leg of the journey’s reduced the required capture/departure ∆Vs by 5-10X. Lowering the NEP power also allowed fitting the power system into a single SLS launch – which limited the radiator area to ~ 2500m^2. For the first look a reactor using fuels created by the SP-100 program with a limit of ~1200K was assumed. Starting in the ‘Lunar Gateway’ also allowed for use of commercial tankers to fuel the vehicle in a relative benign place. A top level summary of the mission design, concept of operations, as well as a conceptual point design of the vehicle is described.

Nuclear Electric Propulsion↗

Kodak AMSD Mirror Development Program

The Advanced Mirror System Demonstration Program is developing minor technology for the next generation optical systems. Many of these systems will require extremely lightweight and stable optics due to the overall size of the primary mirror. These segmented, deployable systems require new technology that AMSD is developing. The on-going AMSD program is a critical enabler for Next Generation Space Telescope (NGST) which will start in 2002. The status of Kodak's AMSD mirror and future plans will be discussed with respect to the NGST program.

Matthews, Gary↗

A Physical Validation Program for the GPM Mission

The GPM mission is currently planned for start in the late 2007 - early 2008 time frame. Its main scientific goal is to help answer pressing scientific problems arising within the context of global and regional water cycling. These problems cut across a hierarchy of scales and include climate-water cycle interactions, techniques for improving weather and climate predictions, and better methods for combining observed precipitation with hydrometeorological prediction models for applications to hazardous flood-producing storms, seasonal flood draught conditions, and fresh water resource assessments. The GPM mission will expand the scope of precipitation measurement through the use of a constellation of some 9 satellites, one of which will be an advanced TRMM-like core satellite carrying a dual-frequency Ku-Ka band precipitation radar and an advanced, multifrequency passive microwave radiometer with vertical-horizontal polarization discrimination. The other constellation members will include new dedicated satellites and co-existing operational/research satellites carrying similar (but not identical) passive microwave radiometers. The goal of the constellation is to achieve approximately 3-hour sampling at any spot on the globe -- continuously. The constellation's orbit architecture will consist of a mix of sun-synchronous and non-sun-synchronous satellites with the core satellite providing measurements of cloud-precipitation microphysical processes plus calibration-quality rainrate retrievals to be used with the other retrieval information to ensure bias-free constellation coverage. A major requirement before the retrieved rainfall information generated by the GPM mission can be used effectively by prognostic models to improve weather forecasts, hydrometeorological forecasts, and climate model reanalysis simulations is a capability to quantify the error characteristics of the retrievals. A solution for this problem has been upheld in past precipitation missions because of the lack of suitable error modeling systems incorporated into the validation programs and data distribution systems. An overview of how NASA intends to overcome this problem for the GPM mission using a physically-based error modeling approach within a multi-faceted validation program is described. The solution is to first identify specific user requirements and then determine the most stringent of these requirements that embodies all essential error characterization information needed by the entire user community. In the context of NASA s scientific agenda for the GPM mission, the most stringent user requirement is found within the data assimilation community. The fundamental theory of data assimilation vis-a-vis ingesting satellite precipitation information into the pre-forecast initializations is based on quantifying the conditional bias and precision errors of individual rain retrievals, and the space-time structure of the precision error (i.e., the spatial-temporal error covariance). By generating the hardware and software capability to produce this information in a near real-time fashion, and to couple the derived quantitative error properties to the actual retrieved rainrates, all key validation users can be satisfied. The talk will describe the essential components of the hardware and software systems needed to generate such near real-time error properties, as well as the various paradigm shifts needed within the validation community to produce a validation program relevant to the precipitation user community.

Smith, Eric A.↗

Developments in low-gravity cryogenic propellant acquisition and thermal control systems

Development programs are described for two low-gravity cryogenic propellant acquisition systems: a full-screen liner system, and a refillable start-tank. First, based on experimental LH2 screen flow data, the fluid-dynamic characteristics of an integrated screen/thermodynamic vent system were analyzed for a design compared to 17.5 cu fg supercritical life-support systems, and for a Tug orbital LH2/LQ2 resupply system. Second, the analysis, design, fabrication, and test of a 10 cu ft, annular-screen start-tank with a wall-mounted thermodynamic vent was performed. The test program demonstrated that the system expelled LH2 against 1-g and performed properly over a range of conditions.

Cady, E. C.↗

NASA Langley/CNU Distance Learning Programs

NASA Langley Research Center and Christopher Newport University (CNU) provide, free to the public, distance learning programs that focus on math, science, and/or technology over a spectrum of education levels from K-adult. The effort started in 1997, and we currently have a suite of five distance-learning programs. We have around 450,000 registered educators and 12.5 million registered students in 60 countries. Partners and affiliates include the American Institute of Aeronautics and Astronautics (AIAA), the Aerospace Education Coordinating Committee (AECC), the Alliance for Community Media, the National Educational Telecommunications Association, Public Broadcasting System (PBS) affiliates, the NASA Learning Technologies Channel, the National Council of Teachers of Mathematics (NCTM), the Council of the Great City Schools, Hampton City Public Schools, Sea World Adventure Parks, Busch Gardens, ePALS.com, and Riverdeep. Our mission is based on the "Horizon of Learning," a vision for inspiring learning across a continuum of educational experiences. The programs form a continuum of educational experiences for elementary youth through adult learners. The strategic plan for the programs will evolve to reflect evolving national educational needs, changes within NASA, and emerging system initiatives. Plans for each program component include goals, objectives, learning outcomes, and rely on sound business models. It is well documented that if technology is used properly it can be a powerful partner in education. Our programs employ both advances in information technology and in effective pedagogy to produce a broad range of materials to complement and enhance other educational efforts. Collectively, the goals of the five programs are to increase educational excellence; enhance and enrich the teaching of mathematics, science, and technology; increase scientific and technological literacy; and communicate the results of NASA discovery, exploration, innovation and research. All pre-college distance learning programs support the national mathematics, science, and technology standards; support K-12 systemic change; involve educators in their development, implementation, and evaluation; and are based on alliances and partnerships. In addition the programs seek to invoke a sense of geographic, ethnic and cultural diversity by featuring schools from all over the U.S.; schools from urban, suburban, and rural areas; public, private, and religious schools; and schools with large populations of African-American, Asian and Hispanic students.

Caton, Randall↗

Analytic investigation of efficiency and performance limits in klystron amplifiers using multidimensional computer programs; multi-stage depressed collectors; and thermionic cathode life studies

Due to complexity of the program which used a hydrodynamic, axially and radially deformable disk-ring model and the resulting long computing time only the output gap was investigated. Results from independent studies were used to initiate the starting conditions for the electrons and the RF voltage using our program. Although this method of computation is less exact than processing the entire klystron interaction in 3-Dimensions it is shown that, for a confined flow focused throughout the penultimate cavity, radial velocities remain very small and the beam is highly laminar. It is concluded that possible errors resulting from treating only the output cavity in 3-D would remain small.

Kosmahl, H. G.↗

Modal analysis and dynamic stresses for acoustically excited shuttle insulation tiles

Improvements and extensions to the RESIST computer program developed for determining the normalized modal stress response of shuttle insulation tiles are described. The new version of RESIST can accommodate primary structure panels with closed-cell stringers, in addition to the capability for treating open-cell stringers. In addition, the present version of RESIST numerically solves vibration problems several times faster than its predecessor. A new digital computer program, titled ARREST (Acoustic Response of Reusable Shuttle Tiles) is also described. Starting with modal information contained on output tapes from RESIST computer runs, ARREST determines RMS stresses, deflections and accelerations of shuttle panels with reusable surface insulation tiles. Both programs are applicable to stringer stiffened structural panels with or without reusable surface insulation titles.

Ojalvo, I. U.↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

Mixed Integer Programming↗

High-Flux, High-Temperature Thermal Vacuum Qualification Testing of a Solar Receiver Aperture Shield

As part of the International Space Station (ISS) Phase 1 program, NASA Lewis Research Center (LERC) and the Russian Space Agency (RSA) teamed together to design, build and flight test the world's first orbital Solar Dynamic Power System (SDPS) on the Russian space station Mir. The Solar Dynamic Flight Demonstration (SDFD) program was to operate a nominal 2 kWe SDPS on Mir for a period up to 1-year starting in late 1997. Unfortunately, the SDFD mission was demanifested from the ISS phase 1 shuttle program in early 1996. However, substantial flight hardware and prototypical flight hardware was built including a heat receiver and aperture shield. The aperture shield comprises the front face of the cylindrical cavity heat receiver and is located at the focal plane of the solar concentrator. It is constructed of a stainless steel plate with a 1-m outside diameter, a 0.24-m inside diameter and covered with high-temperature, refractory metal Multi-Foil Insulation (MFI). The aperture shield must minimize heat loss from the receiver cavity, provide a stiff, high strength structure to accommodate shuttle launch loads and protect receiver structures from highly concentrated solar fluxes during concentrator off-pointing events. To satisfy Mir operational safety protocols, the aperture shield was required to accommodate direct impingement of the intensely concentrated solar image for a 1-hour period. To verify thermal-structural durability under the anticipated high-flux, high-temperature loading, an aperture shield test article was constructed and underwent a series of two tests in a large thermal vacuum chamber configured with a reflective, point-focus solar concentrator and a solar simulator. The test article was positioned near the focal plane and exposed to concentrated solar flux for a period of 1-hour. In the first test, a near equilibrium temperature of 1862 K was attained in the center of the shield hot spot. In the second test, with increased incident flux, a near equilibrium temperature of 2072 K was achieved. The aperture shield sustained no visible damage as a result of the exposures. This paper describes the aperture shield thermal-vacuum qualification test program including the test article, test facility, procedures, data collection, test success criteria, results and conclusions.

Kerslake, Thomas W.↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

Catena, John J.↗

The Robotic Lunar Exploration Program (RLEP): An Introduction to the Goals, Approach, and Architecture

The Vision for Space Exploration calls for undertaking lunar exploration activities to enable sustained human and robotic exploration of Mars and beyond, including more distant destinations in the solar system. In support of this vision, the Robotic Lunar Exploration Program (RLEP) is expected to execute a series of robotic missions to the Moon, starting in 2008, in order to pave the way for further human space exploration. This paper will give an introduction to the RLEP program office, its role and its goals, and the approach it is taking to executing the charter of the program. The paper will also discuss candidate architectures that are being studied as a framework for defining the RLEP missions and the context in which they will evolve.

Watzin, James G.↗

A Study into Validating a Coupled Method of Characteristics and Direct Simulation Monte Carlo Method Against Empirical Data

The following will outline the methodology and results of validating a coupled Method of Characteristics (MOC) and Direct Simulation Monte Carlo (DSMC) method. This research focused specifically on modeling plume impingement, induced by Reaction Control System (RCS) thrusters that flew on the National Aeronautics and Space Administration’s (NASA’s) space shuttle Discovery. For each simulation, the continuum portion of the RCS thruster was simulated using MOC for solving hyperbolic Partial Differential Equations (PDEs) and computed with the NASA code, Reacting and Multi-phase Program (RAMP). The solution was then implemented as a starting condition into the NASA DSMC code, Direct Simulation and Monte Carlo Analysis Code (DAC). Typically, DSMC models rely on code-to-code validation for fidelity. The significance of this research is in its ability to validate its models against empirical data. Prior to computing solutions for these simulations, the mesh size and structure were optimized and many variants of DSMC input parameters were iterated on in order to acquire a reliable, mesh-independent, fully optimized numerical solution. This research will discuss the mathematical formulation of MOC for nozzle flow and DSMC for rarefied gases. Additionally, it will provide an explanation of how to implement these mathematical concepts into the two solvers: RAMP and DAC. Ultimately, this research will demonstrate that the overall process illustrated produces results in good agreement with empirical data. As a consequence, the methodology presented is granted an increased level of confidence and will greatly contribute to the aerospace industry and its effort in understanding and predicting rarefied flow fields.

Direct Simulation Monte Carlo Analysis Code↗

A Decade of Friction Stir Welding R and D at NASA's Marshall Space Flight Center and a Glance into the Future

Welding at NASA's Marshall Space Flight Center (MSFC), Huntsville, Alabama, has taken a new direction through the last 10 years. Fusion welding processes, namely variable polarity plasma arc (VPPA) and tungsten inert gas (TIG) were once the corner stone of welding development in the Space Flight Center's welding laboratories, located in the part of MSFC know as National Center for Advanced Manufacturing (NCM). Developed specifically to support the Shuttle Program's External Tank and later International Space Station manufacturing programs, was viewed as the paragon of welding processes for joining aluminum alloys. Much has changed since 1994, however, when NASA's Jeff Ding brought the FSW process to the NASA agency. Although, at that time, FSW was little more than a "lab curiosity", NASA researchers started investigating where the FSW process would best fit NASA manufacturing programs. A laboratory FSW system was procured and the first welds were made in fall of 1995. The small initial investment NASA made into the first FSW system has certainly paid off for the NASA agency in terms of cost savings, hardware quality and notoriety. FSW is now a part of Shuttle External Tank (ET) production and the preferred weld process for the manufacturing of components for the new Crew Launch Vehicle (CLV) and Heavy Lift Launch Vehicle (HLLV) that will take this country back to the moon. It is one of the solid state welding processes being considered for on-orbit space welding and repair, and is of considerable interest for Department of Defense @OD) manufacturing programs. MSFC involvement in these and other programs makes NASA a driving force in this country's development of FSW and other solid state welding technologies. Now, a decade later, almost the entire on-going welding R&D at MSFC now focuses on FSW and other more advanced solid state welding processes.

Ding, Jeff↗

Large Deployable Reflector (LDR) system concept and technology definition study. Volume 2: Technology assessment and technology development plan

A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.

Agnew, Donald L.↗

Improving the Advancement of Women in Computer and Computational Science Research with the CRA-W Career Mentoring Workshops (Final Report)

The mission of the Computing Research Association’s Committee on Widening Participation in Computing Research (CRA-WP) is to widen the participation and improve the access, opportunities, and positive experiences of individuals from groups underrepresented in computing research and education. CRA-WP programs serve this overarching goal at all career stages; in addition, CRA-WP, through the formation of the CRA Center for Evaluating the Research Pipeline (CERP), has developed a methodology for thoroughly evaluating the success of its programs by comparing a nationwide sample of students, researchers, and faculty (non-participants) to program participants. Achieving these objectives requires that an increasing number of individuals from populations underrepresented in computing start and progress to the next stage while understanding and supporting the myriad computing pathways. CRA-WP offers programs for participants from undergraduate to senior professional levels. Different career stages need different types of interventions, and the goal of all Alliance program activities can be described within the unifying framework of Social Cognitive Career Theory, which finds that interest in and choice of a particular career path will be increased by interventions that improve one or more of the following: (1) outcome expectations (understanding and valuing the rewards of a particular outcome), (2) self-efficacy (a belief that one can successfully achieve an outcome), and (3) social supports that help one persist and overcome obstacles.

97 MATHEMATICS AND COMPUTING↗