Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Return Air Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Weather Research and Forecasting Model Sensitivity Comparisons for Warm Season Convective Initiation

Mesoscale weather conditions can significantly affect the space launch and landing operations at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). During the summer months, land-sea interactions that occur across KSC and CCAFS lead to the formation of a sea breeze, which can then spawn deep convection. These convective processes often last 60 minutes or less and pose a significant challenge to the forecasters at the National Weather Service (NWS) Spaceflight Meteorology Group (SMG). The main challenge is that a "GO" forecast for thunderstorms and precipitation at the Shuttle Landing Facility is required at the 90 minute deorbit decision for End Of Mission (EOM) and at the 30 minute Return To Launch Site (RTLS) decision. Convective initiation, timing, and mode also present a forecast challenge for the NWS in Melbourne, FL (MLB). The NWS MLB issues such tactical forecast information as Terminal Aerodrome Forecasts (TAF5), Spot Forecasts for fire weather and hazardous materials incident support, and severe/hazardous weather Watches, Warnings, and Advisories. Lastly, these forecasting challenges can also affect the 45th Weather Squadron (45 WS), which provides comprehensive weather forecasts for shuttle launch, as well as ground operations, at KSC and CCAFS. The need for accurate mesoscale model forecasts to aid in their decision making is crucial. This study specifically addresses the skill of different model configurations in forecasting warm season convective initiation. Numerous factors influence the development of convection over the Florida peninsula. These factors include sea breezes, river and lake breezes, the prevailing low-level flow, and convergent flow due to convex coastlines that enhance the sea breeze. The interaction of these processes produces the warm season convective patterns seen over the Florida peninsula. However, warm season convection remains one of the most poorly forecast meteorological parameters. To determine which configuration options are best to address this specific forecast concern, the Weather Research and Forecasting (WRF) model, which has two dynamical cores - the Advanced Research WRF (ARW) and the Non-hydrostatic Mesoscale Model (NMM) was employed. In addition to the two dynamical cores, there are also two options for a "hot-start" initialization of the WRF model - the Local Analysis and Prediction System (LAPS; McGinley 1995) and the Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS; Brewster 1996). Both LAPS and ADAS are 3- dimensional weather analysis systems that integrate multiple meteorological data sources into one consistent analysis over the user's domain of interest. This allows mesoscale models to benefit from the addition of highresolution data sources. Having a series of initialization options and WRF cores, as well as many options within each core, provides SMG and MLB with considerable flexibility as well as challenges. It is the goal of this study to assess the different configurations available and to determine which configuration will best predict warm season convective initiation.

Watson, Leela R.↗

Portable 4.6 Micrometers Laser Absorption Spectrometer for Carbon Monoxide Monitoring and Fire Detection

The air quality aboard manned spacecraft must be continuously monitored to ensure crew safety and identify equipment malfunctions. In particular, accurate real-time monitoring of carbon monoxide (CO) levels helps to prevent chronic exposure and can also provide early detection of combustion-related hazards. For long-duration missions, environmental monitoring grows in importance, but the mass and volume of monitoring instruments must be minimized. Furthermore, environmental analysis beyond low-Earth orbit must be performed in-situ, as sample return becomes impractical. Due to their small size, low power draw, and performance reliability, semiconductor-laser-based absorption spectrometers are viable candidates for this purpose. To reduce instrument form factor and complexity, the emission wavelength of the laser source should coincide with strong fundamental absorption lines of the target gases, which occur in the 3 to 5 micrometers wavelength range for most combustion products of interest, thereby reducing the absorption path length required for low-level concentration measurements. To address the needs of current and future NASA missions, we have developed a prototype absorption spectrometer using a semiconductor quantum cascade laser source operating near 4.6 micrometers that can be used to detect low concentrations of CO with a compact single-pass absorption cell. In this study, we present the design of the prototype instrument and report on measurements of CO emissions from the combustion of a variety of aerospace plastics.

Tunable Environmental Laser Spectrometer (TELS)↗

Feasibility of Operating a Heavy-Duty Battery Electric Truck Fleet for Drayage Applications

Vehicle fleet electrification is regarded as one major pathway toward achieving energy independence and reducing air pollution and greenhouse gas emissions. Compared to light-duty and medium-duty vehicles, electrification of heavy-duty vehicles, especially Class 8 trucks, is more challenging owing to the battery size required to attain the driving range necessary for their operating goals. As drayage trucks generally have a limited daily mileage, return to a home base every night, and spend a large amount of time creeping and idling, drayage operation has been the first targeted application for Class 8 electric trucks. The feasibility of operating battery electric drayage trucks at the individual vehicle level has recently been demonstrated. However, questions remain as to whether these trucks are capable of meeting the needs of typical drayage operation at the fleet level. Here we present a feasibility analysis of operating an electric truck fleet based on real-world operation data of a diesel drayage operator in Southern California. Second-by-second activity data collected from 20 trucks in the fleet were used to estimate the corresponding electric energy consumption and the state of charge of the battery using a microscopic electric energy consumption model. An algorithm for generating tours of drayage activity from the collected data was developed and implemented. Multiple scenarios with different battery charging and truck scheduling assumptions were analyzed. The results show that 85% of the tours could be served by electric trucks if there is opportunity for charging at the home base during the time gap between consecutive tours.

33 ADVANCED PROPULSION SYSTEMS↗

Direct FuelCell/Turbine Power Plant

This report summarizes the progress made in development of Direct FuelCell/Turbine (DFC/T{reg_sign}) power plants for generation of clean power at very high efficiencies. The DFC/T system employs an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell's byproduct heat in a Brayton cycle. Features of the DFC/T system include: electrical efficiencies of up to 75% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design, direct reforming internal to the fuel cell, and potential cost competitiveness with existing combined cycle power plants. Proof-of-concept tests using a sub-MW-class DFC/T power plant at FuelCell Energy's (FCE) Danbury facility were conducted to validate the feasibility of the concept and to measure its potential for electric power production. A 400 kW-class power plant test facility was designed and retrofitted to conduct the tests. The initial series of tests involved integration of a full-size (250 kW) Direct FuelCell stack with a 30 kW Capstone microturbine. The operational aspects of the hybrid system in relation to the integration of the microturbine with the fuel cell, process flow and thermal balances, and control strategies for power cycling of the system, were investigated. A subsequent series of tests included operation of the sub-MW Direct FuelCell/Turbine power plant with a Capstone C60 microturbine. The C60 microturbine extended the range of operation of the hybrid power plant to higher current densities (higher power) than achieved in initial tests using the 30kW microturbine. The proof-of-concept test results confirmed the stability and controllability of operating a fullsize (250 kW) fuel cell stack in combination with a microturbine. Thermal management of the system was confirmed and power plant operation, using the microturbine as the only source of fresh air supply to the system, was demonstrated. System analyses of 40 MW DFC/T hybrid systems, approaching 75% efficiency on natural gas, were carried out using CHEMCAD simulation software. The analyses included systems for near-term and long-term deployment. A new concept was developed that was based on clusters of one-MW fuel cell modules as the building blocks. The preliminary design of a 40 MW power plant, including the key equipment layout and the site plan, was completed. The process information and operational data from the proof-of-concept tests were used in the design of 40 MW high efficiency DFC/T power plants. A preliminary cost estimate for the 40 MW DFC/T plant was also prepared. Pilot-scale tests of the cascaded fuel cell concept for achieving high fuel utilizations were conducted. The tests demonstrated that the concept has the potential to offer higher power plant efficiency. Alternate stack flow geometries for increased power output and fuel utilization capabilities were also evaluated. Detailed design of the packaged sub-MW DFC/T Alpha Unit was completed, including equipment and piping layouts, instrumentation, electrical, and structural drawings. The lessons learned from the proof-of-concept tests were incorporated in the design of the Alpha Unit. The sub-MW packaged unit was fabricated, including integration of the Direct FuelCell{reg_sign} (DFC{reg_sign}) stack module with the mechanical balance-of-plant and electrical balance-of-plant. Factory acceptance tests of the Alpha DFC/T power plant were conducted at Danbury, CT. The Alpha Unit achieved an unsurpassed electrical efficiency of 58% (LHV natural gas) during the factory tests. The resulting high efficiency in conversion of chemical energy to electricity far exceeded any sub-MW class power generation equipment presently in the market. After successful completion of the factory tests, the unit was shipped to the Billings Clinic in Billings, MT, for field demonstration tests. The DFC/T unit accomplished a major achievement by successfully completing 8000 hours of operation at the Billings site. The Alpha sub-MW DFC/T power plant unit was returned to the factory for post-operation inspection and analysis. The success of the Alpha Unit operation in the field and achievement of the ultra-high efficiency of 58%, triggered the establishment of a MW-scale commercial product design and development program. Design of a 3 MW (nominal rating) DFC/T Power Plant was completed with an electrical efficiency approaching 60+% LHV of natural gas depending on the design and performance of the gas turbine. Development efforts incorporated lessons learned from the Alpha sub-MW DFC/T power plant demonstration, as well as design features from FCE's commercial product offerings, the DFC1500 and DFC3000 MW-class simple cycle power plants. The 3 MW DFC/T power plant is anticipated to be a superb alternative for large distributed generation applications in locations with high cost-of-electricity.

03 NATURAL GAS↗

Sabatier Methanation Reactor for Space Exploration

The Sabatier Methanation Reactor technology is of vital importance to the success of the human and robotic exploration program. In order to achieve an affordable program, the logistics supply to support the mission must be minimized to the fullest extent possible. One area of potential reduction with high return on investment is the closure of life support loops, particularly oxygen and water. The Sabatier system accomplishes this by utilizing hydrogen and carbon dioxide, waste products from the life support system, to produce water and methane. The recovered water is then recycled back into the life support system to provide oxygen; while the methane can be used for propulsion, or can be broken down further to recover the hydrogen. This technology is applicable not only to transit phases of exploration, but surface habitats as well as in-situ propellant production. The Sabatier Reactor system has been developed for ground based demonstration experiments extensively over the past 30 years. Over the past three years, NASA has funded development of the Sabatier Carbon Dioxide Reduction Assembly (CRA) for use on the ISS. Currently this system is at TRL 5 and it is expected that the system will be flown on the ISS as a flight experiment, The purpose of the flight experiment is to integrate the Sabatier CRA into a synchronized system with the oxygen generation system and the carbon dioxide concentrator. The flight experiment will verify the integration of the different systems working together plus it will verify the capability of the system to operate, and effectively separate its products in a micro-gravity environment. Subsequent to design validation, the flight experiment can remain onboard the ISS providing valuable water to offset logistics re-supply requirements. Some of the challenges facing the development of the Sabatier system include handling vibration induced particulates, microgravity phase separation and containment of hazardous gases. Plans for adequately addressing these issues will be presented. The Sabatier carbon dioxide reduction process will greatly benefit any of the extended duration human exploration missions because of the tremendous savings of consumables realized. Any of these mission scenarios, be they transit or surface based, must consider closing the life support loops in order to make the mission achievable, let alone affordable. Carbon dioxide reduction technology will be necessary for future outpost habitats, and the technology needs to be proven viable in a space application. The Sabatier methanation reaction is also a desirable method for producing propellant from the Mars atmosphere. The common system could be designed to accept carbon dioxide from an indoor air revitalization loop concentrator, or from an outdoor atmosphere compressor. Carbon dioxide reduction validation is but one step in the spiral development of the in-situ propellant production system desired for future planetary exploration.

Murdoch, Karen↗

TASK 2.5.4 DEVELOPMENT OF AN ENERGY SAVINGS CALCULATOR

California s major energy utilities and the California Energy Commission (CEC) are seeking to allocate capital that yields the greatest return on investment for energy infrastructure that meets any part of the need for reliable supplies of energy. The utilities are keenly interested in knowing the amount of electrical energy savings that would occur if cool roof color materials are adopted in the building market. To meet this need the Oak Ridge National Laboratory and the Lawrence Berkeley National Laboratory (LBNL) have been collaborating on a Public Interest Energy Research (PIER) project to develop an industry-consensus energy-savings calculator. The task was coordinated with an ongoing effort supported by the DOE to develop one calculator to achieve both the DOE and the EPA objectives for deployment of cool roof products. Recent emphasis on domestic building energy use has made the work a top priority by the Department of Energy s (DOE) Building Technologies Program. The Roof Savings Calculator (RSC) tool is designed to help building owners, manufacturers, distributors, contractors and practitioners easily run complex simulations. The latest web technologies and usability design were employed to provide an easy input interface to an annual simulation of hour-by-hour, whole-building performance using the world-class simulation tools DOE-2.1E and AtticSim. Building defaults were assigned based on the best available statistical evidence and can provide energy and cost savings after the user selects nothing more than the building location. A key goal for the tool is to promote the energy benefits of cool color tile, metal and asphalt shingle roof products and other energy saving systems. The RSC tool focuses on applications for the roof and attic; however, the code conducts a whole building simulation that puts the energy and heat flows of the roof and attic into the perspective of the whole house. An annual simulation runs in about 30 sec. In addition to cool reflective roofs, the RSC tool will simulate high- medium- and low-slope roofs, and has a custom selection for the user whose house has a unique inclination. There is an option for above sheathing ventilation, which is prevalent in tile and stone-coated metal roof assemblies. The tool also accommodates the effects of radiant barriers and low-emittance surfaces in the inclined air space above the sheathing. The practitioner can select to have air-conditioning ducts either in the conditioned space or in the attic. If in the attic, the user can select one of three air leakage options. Option 1 is an inspected duct having 4% leakage and code level of duct insulation; option 2 is a poorly insulated duct having 14% air leakage; and option 3 is a custom leakage rate specified by the user. The practitioner can setup multiple layers of ceiling insulation. AtticSim is benchmarked against the field data acquired for Ft. Irwin located near Barstow, CA, first as a standalone simulation program and then again integrated within the DOE-2.1E program. The standalone benchmark was very useful to determining how well AtticSim replicates the building physics of an attic. The coupled benchmark was useful to verify that the DOE-2.1E/AtticSim code is modeling correctly the dynamic relationship between the attic and the occupied space below, as well as the interactions between the attic and the HVAC system, in particular when the ducts are located in the attic.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SU-CD-PinS Room/Hall E-00: HAZMAT Training for the Medical Physicist - Part I

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two-year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

60 APPLIED LIFE SCIENCES↗

SU-CD-PinS Room/Hall E-01

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two-year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-G-PinS Room/Hall E-00: HAZMAT Training for the Medical Physicist - Part II

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

60 APPLIED LIFE SCIENCES↗

SU-G-PinS Room/Hall E-01

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

60 APPLIED LIFE SCIENCES↗

STS-77 Space Shuttle Mission Report

The STS-77 Space Shuttle Program Mission Report summarizes the Payload activities as well as the: Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME) systems performance during the seventy-seventh flight of the Space Shuttle Program, the fifty-second flight since the return-to-flight, and the eleventh flight of the Orbiter Endeavour (OV-105). STS-77 was also the last flight of OV-105 prior to the vehicle being placed in the Orbiter Maintenance Down Period (OMDP). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-78; three SSME's that were designated as serial numbers 2037, 2040, and 2038 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-080. The RSRM's, designated RSRM-47, were installed in each SRB and the individual RSRM's were designated as 360TO47A for the left SRB, and 360TO47B for the right SRB. The STS-77 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume VII, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objectives of this flight were to successfully perform the operations necessary to fulfill the requirements of Spacehab-4, the SPARTAN 207/inflatable Antenna Experiment (IAE), and the Technology Experiments Advancing Missions in Space (TEAMS) payload. Secondary objectives of this flight were to perform the experiments of the Aquatic Research Facility (ARF), Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE), Biological Research in Canisters (BRIC), Get-Away-Special (GAS), and GAS Bridge Assembly (GBA). The STS-77 mission was planned as a 9-day flight plus 1 day, plus 2 contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-77 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 11. The Government Fumished Equipment/Flight Crew Equipment (GFE/FCE) Problem Tracking List is shown in Table II. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET). The six-person crew for STS-77 consisted of John H. Casper, Col., U. S. Air Force, Commander; Curtis L. Brown, Jr., Lt. Col., U. S. Air Force, Pilot; Andrew S. W. Thomas, Civilian, Ph.D., Mission Specialist 1; Daniel W. Bursch, CDR., U. S. Navy, Mission Specialist 2; Mario Runco, Jr., Civilian, Mission Specialist 3; and Marc Gameau, Civilian, PhD, Mission Specialist 4.

Fricke, Robert W., Jr.↗

Broadband Via-Less Microwave Crossover Using Microstrip-CPW Transitions

The front-to-back interface between microstrip and CPW (coplanar waveguide) typically requires complex fabrication or has high radiation loss. The microwave crossover typically requires a complex fabrication step. The prior art in microstrip-CPW transition requires a physical vias connection between the microstrip and CPW line on a separate layer. The via-less version of this transition was designed empirically and does not have a close form solution. The prior art of the micro wave crossover requires either additional substrate or wire bond as an air bridge to isolate two microwave lines at the crossing junction. The disadvantages are high radiation loss, no analytical solution to the problem, lengthy simulation time, and complex fabrication procedures to generate air bridges or via. The disadvantage of the prior crossover is a complex fabrication procedure, which also affects the device reliability and yield. This microstrip-CPW transition is visualized as two microstrip-slotline transitions combined in a way that the radiation from two slotlines cancels each other out. The invention is designed based on analytical methods; thus, it significantly reduces the development time. The crossover requires no extra layer to cross two microwave signals and has low radiation loss. The invention is simple to fabricate and design. It produces low radiation loss and can be designed with low insertion loss, with some tradeoff with signal isolation. The microstrip-CPW transition is used as an interface to connect between the device and the circuit outside the package. The via-less microwave crossover is used to allow two signals to cross without using an extra layer or fabrication processing step to enable this function. This design allows the solution to be determined entirely though analytical techniques. In addition, a planar via-less microwave crossover using this technique was proposed. The experimental results show that the proposed crossover at 5 GHz has a minimum isolation of 32 dB. It also has low in-band insertion loss and return loss of 1.2 dB and 18 dB, respectively, over more than 44 percent of bandwidth at room temperature. This microstrip-CPW transition requires the microstrip line to be split into two sections. Each section is connected to a microstrip quarter-wavelength openended stub. A slotline is also placed perpendicular to the microstrip section. The slot is connected to a grounded-end quarter-wavelength slotline and generates a microstrip-slotline transition. When two of these sections are placed in parallel and with the microstrip section combined at transition, a microstrip- CPW transition is formed. The slotline radiation is suppressed as two slots are excited with the electric field in an opposite direction, which cancels the radiation in far field. The invention on the crossover consists of the invented microstrip-CPW transitions combined back-to-back and a microstrip low-pass filter. One signal is crossed through to the microstrip layer, while the other signal is crossed through the CPW line located on the ground plane of the microstrip line. The microstrip low-pass filter produces a narrow line at the crossing point to enhance the system isolation. It also produces broadband response in the operating frequency band. The microstrip-CPW transition allows a microwave signal to travel from microstrip line to CPW line with low radiation loss. The crossover allows two microwave signals to cross with minimal parasitic coupling.

Stevenson, Thomas↗

X-Ray Computed Tomography of Apollo Drive Tube 73001 as Part of the Apollo Next Generation Sample Analysis Program

Introduction: Starting in 2019, the Apollo Next Generation Sample Analysis (ANGSA) Program has enabled consortium studies of specially curated Apollo samples that were previously unstudied (or under studied). This program was intended as a participating scientist program for these Apollo samples, as well as a preparation for upcoming lunar sample return missions (e.g., Artemis). The work began with studies of unsealed core tube 73002 [1,2] that is the upper ~35 cm of an Apollo 17 double drive tube (~70 cm total depth) collected on the landslide deposit near Lara Crater at Station 3 in the Taurus Littrow Valley. More recently the program extended to the study of a variety of frozen Apollo 17 samples [3], as well as the gas extraction [4] and dissection [5] of 73001, the lower half of the station 3 double drive tube. Sample 73001 was sealed under vacuum on the Moon in a Core Sample Vacuum Container (CSVC). In this abstract we will examine the role of X-ray Computed Tomography (XCT) during the preliminary examination process for sealed core 73001, including: (1) engineering scans to aid in understanding the gas extraction process, (2) whole-core scanning prior to opening to inform extrusion and dissection work, and (3) individual particle scanning to characterize rock fragment lithologies for follow on studies. Methodology: Sample 73001 is a 33 cm long, 4 cm diameter regolith sample collected inside a lunar drive tube (~1 mm aluminum walls). That drive tube was sealed inside a 0.5 mm thick stainless steel (SS) CSVC. XCT scans for engineering purposes were done on the Nikon XTH 320 system at Johnson Space Center using the 225 kV multi-metal reflection source at 215 kV, 179 A, and a 38.49 m voxel size. Individual >4 mm particles separated from the core during processing (then triply sealed in Teflon bags) were also scanned at JSC using the 180 kV source at 90 kV, 33 A, and a 2.98 – 10.65 m voxel size. Whole-core scans were done at the University of Texas High-Resolution X-ray Computed Tomography Facility (UTCT) on the 225 kV reflection source on the North Star Imaging cabinet XCT system. These scans included: (1) a series of 9 overlapping super-resolution scans each covering a ~4 cm length of the tube at 190 kV, 180 µA, and a 12.9 µm voxel size and (2) a lower resolution continuous helical scan of the entire core at 190 kV, 180 µA, and a 51.8 µm voxel size. Progress and Results: Before piercing and extracting the gas from sample 73001, an XCT scan of the bottom portion of the CSVC was used to confirm the location of the Teflon cap on the inner drive tube and whether there was an “air” gap between the Teflon cap and the CSVC. This was to ensure the Teflon cap (which immobilized the soil inside the drive tube) was not accidentally pierced during gas extraction. Similarly, after piercing, the bottom and top portions of the CSVC were scanned in order to capture engineering knowledge about the results of the piercing process, as well as the metal knife edge vacuum seal (SS into an In-Ag alloy). Both scans will provide constraints on future work of this type, both for the design of tools used on the lunar surface during Artemis, as well as how we open future samples of this type. An unexpected finding from these engineering scans was that the device in the drive tube that immobilizes the regolith (the keeper) was not seated in the tube properly. This meant that (1) the drive tube could not be removed from the CSVC for the trip to UTCT, and (2) the procedure for opening and extruding the drive tube had to be modified. Had either of these things not been known prior to opening the CSVC, it could have led to an inability to XCT scan the whole core at high resolution and/or potential disruption of the core stratigraphy during extrusion. At UTCT, the entire length of the core was scanned at high resolution (12.9 microns per voxel). This scan serves multiple purposes: (1) A lower resolution (and uncorrected) version of these scans stitched together was used to help inform the processors of potential pitfalls during extrusion and dissection (voids, angular fragments at the edges of the sample, etc.); and (2) the full resolution corrected data will serve as the permanent in situ record of the stratigraphy of the sample and will enable future researchers to perform a variety of analyses. All 121 >4 mm particles separated during dissection pass 1 of sample 73001 have been individually scanned. These scans clearly show the lithology of each particle while keeping the particles in pristine condition (they are individually triply bagged in Teflon within our N2 purged processing cabinets). Because of the dust adhering to particle exteriors, it would otherwise be impossible to determine lithologies in a non-contaminating way. Thus far the types of lithologies seen in sample 73001 (e.g., regolith breccias, impact-melt breccias, agglutinates, and bas-alts) are similar to those previously identified in sample 73002 [2]. By the time of the meeting, all particles from all 3 dissection passes will have been scanned and statistics on the different lithologies in 73001 compiled. References: [1] Shearer et al. (2020) 51st LPSC, abstract 1181. [2] Zeigler et al. (2020) 51st LPSC, abstract 3023. [3] Kent et al. (2022) This Volume. [4] McDonald et al. (2022) European Lunar Symposium. [5] Gross et al (2022) This volume.

Moon↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Delay Banking for Managing Air Traffic

Delay banking has been invented to enhance air-traffic management in a way that would increase the degree of fairness in assigning arrival, departure, and en-route delays and trajectory deviations to aircraft impacted by congestion in the national airspace system. In delay banking, an aircraft operator (airline, military, general aviation, etc.) would be assigned a numerical credit when any of their flights are delayed because of an air-traffic flow restriction. The operator could subsequently bid against other operators competing for access to congested airspace to utilize part or all of its accumulated credit. Operators utilize credits to obtain higher priority for the same flight, or other flights operating at the same time, or later, in the same airspace, or elsewhere. Operators could also trade delay credits, according to market rules that would be determined by stakeholders in the national airspace system. Delay banking would be administered by an independent third party who would use delay banking automation to continually monitor flights, allocate delay credits, maintain accounts of delay credits for participating airlines, mediate bidding and the consumption of credits of winning bidders, analyze potential transfers of credits within and between operators, implement accepted transfers, and ensure fair treatment of all participating operators. A flow restriction can manifest itself in the form of a delay in assigned takeoff time, a reduction in assigned airspeed, a change in the position for the aircraft in a queue of all aircraft in a common stream of traffic (e.g., similar route), a change in the planned altitude profile for an aircraft, or change in the planned route for the aircraft. Flow restrictions are typically imposed to mitigate traffic congestion at an airport or in a region of airspace, particularly congestion due to inclement weather, or the unavailability of a runway or region of airspace. A delay credit would be allocated to an operator of a flight that has accepted, or upon which was imposed, a flow restriction. The amount of the credit would increase with the amount of delay caused by the flow restriction, the exact amount depending on which of several candidate formulas is eventually chosen. For example, according to one formula, there would be no credit for a delay smaller than some threshold value (e.g., 30 seconds) and the amount of the credit for a longer delay would be set at the amount of the delay minus the threshold value. Optionally, the value of a delay credit could be made to decay with time according to a suitable formula (e.g., an exponential decay). Also, optionally, a transaction charge could be assessed against the value of a delay credit that an operator used on a flight different from the one for which the delay originated or that was traded with a different operator. The delay credits accumulated by a given airline could be utilized in various ways. For example, an operator could enter a bid for priority handling in a new flow restriction that impacts one or more of the operator s flights; if the bid were unsuccessful, all or a portion of the credit would be returned to the bidder. If the bid pertained to a single aircraft that was in a queue, delay credits could be consumed in moving the aircraft to an earlier position within the queue. In the case of a flow restriction involving a choice of alternate routes, planned altitude profile, aircraft spacing, or other non-queue flow restrictions, delay credits could be used to bid for an alternative assignment.

Green, Steve↗

Nitrile/Buna N Material Failure Assessment for an O-Ring used on the Gaseous Hydrogen Flow Control Valve (FCV) of the Space Shuttle Main Engine

After the rollout of Space Shuttle Discovery in April 2005 in preparation for return-to-flight, there was a failure of the Orbiter (OV-103) helium signature leak test in the gaseous hydrogen (GH2) system. Leakage was attributed to the Flow Control Valve (FCV) in Main Engine 3. The FCV determined to be the source of the leak for OV-103 is designated as LV-58. The nitrile/Buna N rubber O-ring seal was removed from LV-58, and failure analysis indicated radial cracks providing leak paths in one quadrant. Cracks were eventually found in 6 of 9 FCV O-rings among the three Shuttle Orbiters, though none were as severe as those for LV-58, OV-103. Testing by EM10 at MSFC on all 9 FCV O- rings included: laser dimensional, Shore A hardness and properties from a dynamic mechanical analyzer (DMA) and an Instron tensile machine. The following test data was obtained on the cracked quadrant of the LV-58, OV-103 O-ring: (1) the estimated compression set was only 9.5%, compared to none for the rest of the O-ring; (2) Shore A hardness for the O.D. was higher by almost 4 durometer points than for the rest of the O-ring; and (3) DMA data showed that the storage/elastic modulus E was almost 25% lower than for the rest of the O-ring. Of the 8 FCV O-rings tested on an Instron, 4 yielded tensile strengths that were below the MIL spec requirement of 1350 psi-a likely influence of rubber cracking. Comparisons were made between values of modulus determined by DNA (elastic) and Instron (Young s). Each nitrile/Buna N O-ring used in the FCV conforms to the MIL-P-25732C specification. A number of such O-rings taken from shelf storage at MSFC and Kennedy Space Center (KSC) were used to generate a reference curve of DMA glass transition temperature (Tg) vs. shelf storage time ranging from 8 to 26 years. A similar reference curve of TGA onset temperature (of rubber weight loss) vs. shelf storage time was also generated. The DMA and TGA data for the used FCV O-rings were compared to the reference curves. Correlations were also made between the DMA modulus (at 22 C) and Shore A hardness for all 9 of the FCV O-rings used among the three Shuttle Orbiters. The radial cracking in the FCV O-rings was determined to be due to ozone attack, as nitrile/Buna N rubber is susceptible to such attack. Nitrile/Buna N material under MIL-P25732C should be used in a hydraulic fluid environment to help protect it from cracking. However, the FCV O-rings were used in an air only environment. The FCV design has as much as a 9-mil gap that allows the O.D. of the O-ring to be directly exposed to ozone, pressurized air and some elevated temperatures, accelerating the weathering process that leads to O-ring cracking. Space Shuttle flights will likely not continue past 2010. Therefore, Shuttle management decided to continue using the nitrile/Buna N material for the FCVs, but have each O-ring replaced after 3 years to minimize any chances for crack initiation.

Wingard, Doug↗

Work Term Assignment Spring 2017

My tour in the Engineering Robotics directorate exceeded my expectations. I learned lessons about Creo, manufacturing and assembly, collaboration, and troubleshooting. During my first tour, last spring, I used Creo on a smaller project, but had limited experience with it before starting in the Dynamic Systems Test branch this spring. I gained valuable experience learning assembly design, sheet metal design and designing with intent for manufacturing and assembly. These skills came from working both on the hatch and the floor. I also learned to understand the intent of other designers on models I worked with. While redesigning the floor, I was modifying an existing part and worked to understand what the previous designer had done to make it fit with the new model. Through working with the machine shop and in the mock-up, I learned much more about manufacturing and assembly. I used a Dremel, rivet gun, belt sander, and countersink for the first time. Through taking multiple safety training for different machine shops, I learned new machine shop safety skills specific to each one. This semester also gave me new collaborative opportunities. I collaborated with engineers within my branch as well as with Human Factors and the building 10 machine shop. This experience helped me learn how to design for functionality and assembly, not only for what would be easiest in my designs. In addition to these experiences, I learned many lessons in troubleshooting. I was the first person in my office to use a Windows 10 computer. This caused unexpected issues with NASA services and programs, such as the Digital Data Management Server (DDMS). Because of this, I gained experience finding solutions to lockout and freeze issues as well as Creo specific settings. These will be useful skills to have in the future and will be implemented in future rotations. This co-op tour has motivated me more to finish my degree and pursue my academic goals. I intend to take a machining Career Gateway Elective in the Fall to improve my skills in building as well as designing with manufacturing intent. I am also inspired to take more mechatronics CGE courses before I graduate to learn more about the crossover between mechanical and electrical engineering. This semester, I worked on multiple projects and had the opportunity to learn from engineers of different disciplines. I became proficient in Creo 2.0, a program I had not used significantly before. I finished modifying the hatch for 3D print and made sizeable modifications to the nose floor support design. I also gained hands-on experience that will be useful in my engineering career in the future. I would consider all of these major achievements from this spring semester. Lastly, I learned to ask more questions and to search for the right people to find answers which I know will be a valuable skill in the future. This summer, I will be completing my last rotation in the Flight Operations Directorate at Ellington Air Field. After this last tour, I will be returning to school for the Fall, Spring and Summer. I will graduate in August of 2018. I am looking forward to learning more about the different jobs available to engineers. This division works directly with many different types of aircrafts and I am excited to learn more about this focus of engineering. The Aircraft Operations Division values team work greatly and I intend to improve my interpersonal skills by working with them this summer.

Sico, Mallory↗

A Study of a Diesel Engine Based Micro-CHP System

This project, funded by New York State Energy Research and Development Agency (NYSERDA), investigated the potential for an oil-fired combined heat and power system (micro-CHP system) for potential use in residences that use oil to heat their homes. Obviously, this requires the power source to be one that uses heating oil (diesel). The work consisted of an experimental study using a diesel engine and an analytical study that examined potential energy savings and benefits of micro-CHP systems for 'typical' locations in New York State. A search for a small diesel engine disclosed that no such engines were manufactured in the U.S. A single cylinder engine manufactured in Germany driving an electric generator was purchased for the experimental work. The engine was tested using on-road diesel fuel (15 ppm sulfur), and biodiesel blends. One of the main objectives was to demonstrate the possibility of operation in the so-called HCCI (Homogeneous Charge Compression Ignition) mode. The HCCI mode of operation of engines is being explored as a way to reduce the emission of smoke, and NOx significantly without exhaust treatment. This is being done primarily in the context of engines used in transportation applications. However, it is felt that in a micro-CHP application using a single cylinder engine, such an approach would confer those emission benefits and would be much easier to implement. This was demonstrated successfully by injecting the fuel into the engine air intake using a heated atomizer made by Econox Technologies LLC to promote significant vaporization before entering the cylinder. Efficiency and emission measurements were made under different electrical loads provided by two space heaters connected to the generator in normal and HCCI modes of operation. The goals of the analytical work were to characterize, from the published literature, the prime-movers for micro-CHP applications, quantify parametrically the expected energy savings of using micro-CHP systems instead of the conventional heating system, and analyze system approaches for interaction with the local electric utility. The primary energy savings between the space heating provided by a conventional space heating system with all the required electrical energy supplied by the grid and the micro-CHP system supplemented when needed by a conventional space heating and the grid supplied electricity. were calculated for two locations namely Long Island and Albany. The key results from the experimental work are summarized first and the results from the analytical work next. Experimental results: (1) The engine could be operated successfully in the normal and HCCI modes using both diesel and biodiesel blends. (2) The smoke levels are lower with biodiesel than with diesel in both modes of operation. (3) The NOx levels are lower with the HCCI mode of operation than with the normal mode for both fuels. (4) The engine efficiency in these tests is lower in the HCCI mode of operation. However, the system parameters were not optimized for such operation within the scope of this project. However, for an engine designed with such operation in mind, the efficiency would possibly be not lower. Analytical results: (1) The internal combustion engine (diesel engine in this case) is the only proven technology as a prime mover at present. However, as noted above, no U.S. engine is available at present. (2) For both locations, the use of a micro-CHP system results in primary energy savings. This is true whether the CHP system is used only to supply domestic hot water or to supply both hot water and space heat and even for a low efficiency system especially for the latter case. The size of the thermal storage (as long as it above a certain minimum) did not affect this. (3) For example, for a 2 kW CHP electrical efficiency of 25%, a typical house on Long Island will save about 30MBtu of energy per year for a combined space heat and domestic hot water system. This corresponds to annual energy savings of about 210 gallons oil equivalent per (4) The savings increased initially with the power capacity of the prime-mover, but flattened out at around 2 kW power output suggesting that a low power engine like the one tested is a good choice. (5) Reverse metering, that is, power returned to the electric grid when produced in excess of the local load, increased the primary energy savings significantly when using a 3kW to 5kW system with high fuel-to-electric efficiency. (6) In view of the current interest in plug-in electric or hybrid vehicles, the impact of night-time recharging on the micro-CHP operation was considered. Obviously, it will reduce the amount reverse metered and without reverse-metering, the primary energy savings were increased significantly. (7) The micro-CHP systems can contribute to the decrease of the carbon emissions of the local utility even with the use of diesel fuel and much more so with biodiesel use.

02 PETROLEUM↗