Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REPROCESSING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Global recycling services for short and long term risk reduction

New schemes are being developed by AREVA in order to provide global solutions for safe and non-proliferating management of used fuels, thereby significantly contributing to overall risks reduction and sustainable nuclear development. Utilities are thereby provided with a service through which they will be able to send their used fuels and only get returned vitrified and compacted waste, the only waste remaining after reprocessing. This waste is stable, standard and has demonstrated capability for very long term interim storage. They are provided as well with associated facilities and all necessary services for storage in a demonstrated safely manner. Recycled fuels, in particular MOX, would be used either in existing LWRs or in a very limited number of full MOX reactors (like the EPR reactor), located in selected countries, that will recycle MOX so as to downgrade the isotopic quality of the Pu inventories in a significant manner. Reprocessed uranium also can be recycled. These schemes, on top of offering demonstrated operational advantages and a responsible approach, result into optimized economics for all shareholders of the scheme, as part of reactor financing (under Opex or Capex form) will be secured thanks to the value of the recycled flows. It also increases fuel cost predictability as recycled fuel is not subject to market fluctuations as much and allows, in a limited span of time, for clear risk mitigation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An economic analysis of a light and heavy water moderated reactor synergy: burning americium using recycled uranium

An economic analysis is presented for a proposed synergistic system between 2 nuclear utilities, one operating light water reactors (LWR) and another running a fleet of heavy water moderated reactors (HWR). Americium is partitioned from LWR spent nuclear fuel (SNF) to be transmuted in HWRs, with a consequent averted disposal cost to the LWR operator. In return, reprocessed uranium (RU) is supplied to the HWRs in sufficient quantities to support their operation both as power generators and americium burners. Two simplifying assumptions have been made. First, the economic value of RU is a linear function of the cost of fresh natural uranium (NU), and secondly, plutonium recycling for a third utility running a mixed oxide (MOX) fuelled reactor fleet has been already taking place, so that the extra cost of americium recycling is manageable. We conclude that, in order for this scenario to be economically attractive to the LWR operator, the averted disposal cost due to partitioning americium from LWR spent fuel must exceed 214 dollars per kg, comparable to estimates of the permanent disposal cost of the high level waste (HLW) from reprocessing spent LWR fuel. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New approaches for MOX multi-recycling

Due to its low fissile content after irradiation, Pu from used MOX fuel is considered by some as not recyclable in LWR (Light Water Reactors). The point of this paper is hence to go back to those statements and provide a new analysis based on AREVA extended experience in the fields of fissile and fertile material management and optimized waste management. This is done using the current US fuel inventory as a case study. MOX Multi-recycling in LWRs is a closed cycle scenario where U and Pu management through reprocessing and recycling leads to a significant reduction of the used assemblies to be stored. The recycling of Pu in MOX fuel is moreover a way to maintain the self-protection of the Pu-bearing assemblies. With this scenario, Pu content is also reduced repetitively via a multi-recycling of MOX in LWRs. Simultaneously, {sup 238}Pu content decreases. All along this scenario, HLW (High-Level Radioactive Waste) vitrified canisters are produced and planned for deep geological disposal. Contrary to used fuel, HLW vitrified canisters do not contain proliferation materials. Moreover, the reprocessing of used fuel limits the space needed on current interim storage. With MOX multi-recycling in LWR, Pu isotopy needs to be managed carefully all along the scenario. The early introduction of a limited number of SFRs (Sodium Fast Reactors) can therefore be a real asset for the overall system. A few SFRs would be enough to improve the Pu isotopy from used LWR MOX fuel and provide a Pu-isotopy that could be mixed back with multi-recycled Pu from LWRs, hence increasing the Pu multi-recycling potential in LWRs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Start-up fuel and power flattening of sodium-cooled candle core

The hard neutron spectrum and unique power shape of CANDLE enable its distinctive performances such as achieving high burnup more than 30% and exempting necessity of both enrichment and reprocessing. On the other hand, they also cause several challenging problems. One is how the initial fuel can be prepared to start up the first CANDLE reactor because the equilibrium fuel composition that enables stable CANDLE burning is complex both in axial and radial directions. Another prominent problem is high radial power peaking factor that worsens averaged burnup, namely resource utilization factor in once-through mode and shorten the life time of structure materials. The purposes of this study are to solve these two problems. Several ideas for core configurations and startup fuel using single enrichment uranium and iron as a substitute of fission products are studied. As a result, it is found that low enriched uranium is applicable to ignite the core but all concepts examined here exceeded heat limits. Adjustment in enrichment and height of active and burnt zone is opened for future work. Sodium duct assemblies and thorium fuel assemblies loaded in the center region are studied as measures to reduce radial power peaking factor. Replacing 37 fuels by thorium fuel assemblies in the zeroth to third row provides well-balanced performance with flattened radial power distribution. The CANDLE core loaded with natural uranium in the outer and thorium in the center region achieved 35.6% of averaged burnup and 7.0 years of cladding life time owing to mitigated local fast neutron irradiation at the center. Using thorium with natural or depleted uranium in CANDLE reactor is also beneficial to diversifying fission resource and extending available term of fission energy without expansion of needs for enrichment and reprocessing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Current status of fluoride volatility method development

The Fluoride Volatility Method is based on a separation process, which comes out from the specific property of uranium, neptunium and plutonium to form volatile hexafluorides whereas most of fission products (mainly lanthanides) and higher transplutonium elements (americium, curium) present in irradiated fuel form nonvolatile tri-fluorides. Fluoride Volatility Method itself is based on direct fluorination of the spent fuel, but before the fluorination step, the removal of cladding material and subsequent transformation of the fuel into a powdered form with a suitable grain size have to be done. The fluorination is made with fluorine gas in a flame fluorination reactor, where the volatile fluorides (mostly UF{sub 6}) are separated from the non-volatile ones (trivalent minor actinides and majority of fission products). The subsequent operations necessary for partitioning of volatile fluorides are the condensation and evaporation of volatile fluorides, the thermal decomposition of PuF{sub 6} and the finally distillation and sorption used for the purification of uranium product. The Fluoride Volatility Method is considered to be a promising advanced pyrochemical reprocessing technology, which can mainly be used for the reprocessing of oxide spent fuels coming from future GEN IV fast reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technical basis for extending storage of the UK's advanced gas-cooled reactor fuel

The UK Nuclear Decommissioning Agency has recently declared a date for cessation of reprocessing of oxide fuel from the UK's Advanced Gas-cooled Reactors (AGRs). This will fundamentally change the management of AGR fuel: from short term storage followed by reprocessing to long term fuel storage followed, in all likelihood, by geological disposal. In terms of infrastructure, the UK has an existing, modern wet storage asset that can be adapted for centralised long term storage of dismantled AGR fuel under the required pond water chemistry. No AGR dry stores exist, although small quantities of fuel have been stored dry as part of experimental programmes in the past. These experimental programmes have shown concerns about corrosion rates.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aging and iodine loading of silver-functionalized aerogels

Engineered silver-functionalized silica aerogels are being investigated for their potential application in off-gas treatment at a used nuclear fuel reprocessing facility. Reprocessing will release several key volatile radionuclides, including iodine-129. To achieve regulatory compliance, iodine-129 must be removed from any off-gas stream prior to environmental discharge. Ag{sup 0}-functionalized aerogels have been demonstrated to have high iodine-capture capacity, high porosity, and potential for conversion into a waste form. Capture materials used in off-gas treatment may be exposed to a heated, high-humidity, acidic gas stream for months. Extended exposure to this stream could affect sorbent performance. It was the aim of this study to evaluate what impacts might be observed when Ag{sup 0}-functionalized aerogels prepared at Pacific Northwest National Laboratory were contacted with a dry air stream for up to 6 months and then used to adsorb iodine from a synthetic off-gas stream. Results demonstrate that there is some loss of iodine-capture capacity caused by aging, but that this loss is not as marked as for aging of more traditional iodine sorbents, such as silver-impregnated mordenite. Specifically, aging silver-functionalized aerogel under a dry air stream for up to 6 months can decrease its iodine capacity from 41 wt% to 32 wt%. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safeguards and security modeling for electrochemical plants

Safeguards and security design for reprocessing plants can lead to excessive costs if not incorporated early in the design process. The design for electrochemical plants is somewhat uncertain since these plants have not been built at a commercial scale in the past. The Separation and Safeguards Performance Model (SSPM), developed at Sandia National Laboratories, has been used for safeguards design and evaluation for multiple reprocessing plant types. The SSPM includes the following capabilities: -) spent fuel source term library, -) mass tracking of elements 1-99 and bulk solid/liquids, -) tracking of heat load and activity, -) customisable measurement points, -) automated calculation of ID and error propagation, -) alarm conditions and statistical tests, and -) user-defined diversion scenarios. Materials accountancy and process monitoring data can provide more timely detection of material loss specifically to protect against the insider threat. While the SSPM is capable of determining detection probabilities and examining detection times for material loss scenarios, it does not model the operations or spatial effects for a plant design. The STAGE software was chosen to model the physical protection system. STAGE provides a framework to create end-to-end scalable force-on-force combat simulations. It allows for a complete 3D model of a facility to be designed along with the design of physical protection elements. This software, then, can be used to model operations and response for various material loss scenarios. The future integration of the SSPM model data with the STAGE software will provide a more complete analysis of diversion scenarios to assist plant designers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

The paper aims at presenting the new information showroom called 'Escom G2' (for 'Espace Communication') inaugurated by the French Atomic Energy and Alternative Energies Commission (CEA) in spring 2011. This showroom is settled directly inside the main building of the G2 nuclear reactor: a facility formerly dedicated to weapon-grade plutonium production since the late 1950's at the Marcoule nuclear centre, in south of France. After its shutdown, and reprocessing of the last spent fuels, a first dismantling step was successfully completed from 1986 to 1996. Unique in France and in Europe, Escom G2 is focused on France dismantling expertise and its action for disarmament. This showroom comprises of a 300-square meters permanent exhibition, organized around four themes: France strategy for disarmament, decommissioning and dismantling technical aspects, uranium and plutonium production cycles. Each of these topics is illustrated with posters, photos, models and technical pieces from the dismantled plants. It is now used to present France's action in disarmament to highly ranked audiences such as: state representatives, diplomats, journalists... The paper explains the background story of this original project. As a matter of fact, in 1996 France was the first nuclear state to decide to shut down and dismantle its fissile material production facilities for nuclear weapons. First, the paper presents the history of the G2 reactor in the early ages of Marcoule site, its operating highlights as well as its main dismantling operations, are presented. In Marcoule, where the three industrial-scale reactors G1, G2 and G3 used to be operated for plutonium production (to be then reprocessed in the nearby UP1 plant), the initial dismantling phase has now been completed (in 1980's for G1 and in 1996 for G2 and G3). The second phase, aimed at completely dismantling these three reactors, will restart in 2020, and is directly linked to the opening of a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remotely-Controlled Shear for Dismantling Highly Radioactive Tools In Rokkasho Vitrification Facility - 12204

A high-level liquid waste vitrification facility in the Japanese Rokkasho Reprocessing Plant (RRP) is right in the middle of hot commissioning tests toward starting operation in fall of 2012. In these tests, various tools were applied to address issues occurring in the vitrification cell. Because of these tools' unplanned placement in the cell it has been necessary to dismantle and dispose of them promptly. One of the tools requiring removal is a rod used in the glass melter to improve glass pouring. It is composed of a long rod made of Inconel 601 or 625 and has been highly contaminated. In order to dismantle these tools and to remotely put them in a designated waste basket, a custom electric shear machine was developed. It was installed in a dismantling area of the vitrification cell by remote cranes and manipulators and has been successfully operated. It can be remotely dismantled and placed in a waste basket for interim storage. This is a very good example of a successful deployment of a specialty remote tool in a hot cell environment. This paper also highlights how commissioning and operations are done in the Japanese Rokkasho Reprocessing Plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

De-nitration Process in Glass Melter Off-Gas Treatment System - 17092

Vitrification technology has been generally applied to stabilize High-Level Radioactive Wastes (HLW) generated from spent fuel reprocessing for safe interim storage and final geological disposal. High temperature operation of the glass melter system generates substantial amounts of NOx with various hazardous radioactive elements, due to HLW containing a lot of nitrate. Hence the off-gas treatment system (OGTS) is one of the essential systems for the removal of hazardous radioactive elements including NOx, to ensure the stable and safe operation of the glass melter system. In general, the wet scrubbing process (e.g. Sub-merged Bed Scrubber: SBS) is installed in the upstream of the OGTS for HLW vitrification in order to remove volatile ruthenium, cesium and other radioactive mists and dusts. NOx together with ruthenium, iodine and submicron particles are removed in the wet absorber equipment to below the regulated limit by law. In the Rokkasho Vitrification Laboratory (RVL) constructed recently for inactive full scale mock-up tests, we have adopted the de-nitration process using reduction catalyst in addition to together with the wet scrubbing process considering the future scenarios that are compliant to the even stricter Air Pollution Control Law. By introducing this new system, we have successfully demonstrated a good de-nitration performance in the full scale mock-up test of the glass melter system. On the other hand, by using the wet scrubbing process, nitric acid would be generated by the absorption of NOx on this recovery process and should be reworked or disposed of as secondary liquid wastes. This is one of the deciding factors for enlarging the facility and increasing construction cost. That is the reason why IHI has developed the OGTS omitting the wet scrubbing process. In this paper, we have summarized the results on the de-nitration process of the OGTS in RVL and the progress of the optimizing denitration process for future reprocessing system applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ruthenium Volatilisation in Nuclear Waste Systems -Comparison of Ru(III)Cl{sub 3} and Ru(III)NO(NO{sub 3}){sub 3} - 17113

Ruthenium is a fission product possessed of two relatively long lived isotopes; {sup 103}Ru and {sup 106}Ru, both of which form part of the Highly Active (HA) waste raffinate during spent nuclear fuel reprocessing. During reprocessing, ruthenium, which may be in the form of the RuNO{sub 3}+ complex, encounters temperatures conducive to volatilisation. Due to ruthenium's high specific radioactivity it is important to understand the mechanism by which volatilisation occurs. Here we use combined cyclic voltammetry (CV) and electrochemical micro-gravimetry experiments in a study of both NO free Ru (III), in the form of a RuCl{sub 3} solution and NO complexed Ru (III), in the form of RuNO{sub 3}+ solutions. We do this in order to establish baseline behaviour of NO free Ru (III) and compare it to NO complexed Ru (III) to determine the effect of complexation on the system. We have observed discrete oxidations in both systems from solution phase Ru (III) to solid phase RuO{sub 2} and volatile RuO{sub 4}. Two key differences emerged between the two systems, the first being the mass changes associated with deposition and stripping of RuO{sub 2} are significantly smaller in the RuNO{sub 3}+ solutions than those for solutions of RuCl{sub 3}. The second difference is the difference in onset of volatile RuO{sub 4} generation, in the RuNO{sub 3}+ solution, RuO{sub 4} generation is 100 mV positive than that for the RuCl{sub 3} solution. This suggests NO complexation protects Ru (III) against oxidation and, to a certain extent, volatilisation as RuO{sub 4}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Liquid Wastes Calcination: The High-Level French Experience - 17184

Calcination is an efficient process for volume reduction and stabilization of nuclear liquid wastes. It is often the first step of waste containment processes such as vitrification or grouting. The CEA (French Alternative Energies and Atomic Energy Commission) and AREVA have acquired a high-level experience in the field of calcination through more than forty years of R and D and industrial operation. During this period, a broad range of liquid wastes have been studied and treated. R and D work and associated engineering studies allowed defining the design and sizing of the equipment and the process control parameters to be applied for the calcination of all kinds of solutions. The calcination process has been qualified for the following effluents amongst others: - Liquid waste from UOx fuel reprocessing; - Liquid waste from UMo fuel reprocessing (high molybdenum and phosphorus contents); - Hanford HLW; - Liquid waste from D and D operation (sodium bearing waste). This paper presents several studies led by the Joint Vitrification Laboratory (L.C.V), a common research laboratory between CEA and AREVA in charge of qualifying new processes and matrices for waste containment. These studies allowed defining the calcination rules, in particular for very hard to process solutions such as effluents with high boron, molybdenum and sodium contents. The feedback from industrial operation of the calcination process with fission products and effluents from D and D operations, highly loaded with sodium, is also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effectiveness of actinide management in fast reactors over a finite recycling period - 15123

Long-lived nuclear waste primarily consists of transuranic (TRU) isotopes. Full recycling of TRU isotopes can, in theory, lead to a reduction in repository radiotoxicity to reference levels in as little as ∼500 years provided reprocessing and fuel fabrication losses are limited. However, over a limited time frame, the radiotoxicity of the 'final' core can dominate over reprocessing losses, leading to a much lower reduction in radiotoxicity compared to that achievable at equilibrium. In this paper, the fuel cycle code ORION is used to model the recycle of light water reactor (LWR)-produced TRUs in sodium-cooled fast reactors (SFRs). With full actinide recycling, at least 6 generations of SFRs are required in a gradual phase-out of nuclear power to achieve transmutation performance approaching the theoretical equilibrium performance. Break-even SFRs are much less effective from a point of view of reducing waste radiotoxicity. Thorium (Th)-burner fuel cycles are found to result in slightly lower radiotoxicity than U-burner fuel cycles for the same number of generations. Closed break-even Th fuel cycles require ∼3 generations of operation before their waste radiotoxicity benefits result in decay to the reference level in ∼1000 years, provided that Pa is recycled. While this is a very long time frame, it is substantially better than the time frame required by other strategies. The integrated decay heat over the scenario time frame is substantially higher for break-even Th-SFRs than break-even U-SFRs as a result of much higher {sup 90}Sr production. As decay heat affects repository sizing, this weakens the argument for the Th cycle. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Progress in Defining the UK Highly Active Storage Tanks POCO Strategy - 16134

In the UK Highly Active (HA) waste is stored in stainless steel tanks prior to encapsulation in glass in one of three operating vitrification plants. Significant progress has been made in recent years towards the reduction in the volume of HA Liquor (HAL) stored in these tanks and a number of the tanks are now operating at heel levels. As a result, a strategy is being developed to carry out Post Operational Clean Out (POCO) of some tanks while reprocessing operations continue, thus enabling accelerated and more cost effective clean-up of these HA facilities. This paper, and subsequent conference presentation, will highlight some of the key aspects of this strategy, including a description of the challenges and progress made so far to help facilitate the clean-up mission without having a detrimental effect on ongoing reprocessing operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Highly Active Cells in Preparation for Post Operational Clean Out at Sellafield - 18139

The Highly Active Liquor Evaporation and Storage (HALES) Plant at Sellafield receives highly active (HA) raffinate liquors from the Magnox and Thermal Oxide (THoRP) Reprocessing Plants. These liquors are concentrated through evaporation into Highly Active Liquor (HAL), conditioned and stored in HALES before immobilisation in glass in the Waste Vitrification Plant (WVP). Reprocessing operations at Sellafield are nearing completion and hence these liquor feeds will soon cease. Therefore, HALES is starting its planning and preparation phases for Post Operational Clean Out (POCO) and decommissioning. POCO is a transitional phase between operations and decommissioning and encompasses activities undertaken to remove residual inventory and activity from the facility. Key drivers for POCO include risk and hazard reduction and facilitating subsequent decommissioning activities (including potential surveillance and maintenance or care and maintenance regimes). Characterization is a critical enabler for development and implementation of effective POCO. In addition to the key drivers above characterization within HALES will be used to: - Define the start and end points of POCO (radiological condition, inventory sources and location, configuration, etc.); - Develop and technically underpin the wash out strategy (volumes, rates, reagent types, etc.; - Monitor the effectiveness of POCO activities (reduction in inventory/activity, points of diminishing return, confirmation of end points for POCO). There are a number of significant challenges that present to characterization of the HALES facilities. Perhaps the most significant of these is the radiological status of the facility. HALES is an HA facility meaning that the high dose rates limit not only the technology selection for characterization (i.e. those with a very high radiation tolerance) but also place constraints on the access and deployment for the selected technology. Additionally, parts of the facility are circa 60 years old which brings its own challenges such as poor quality construction drawings and limited operational knowledge. Finally, limited sampling capability and minimal data regarding historic operations has resulted in uncertainties that will need to be addressed in order to undertake POCO as efficiently and effectively as possible. The solution to this challenge requires a novel and innovative approach and an example of this is the technique which is described in this paper. This is a radiometric characterization technique which utilizes remotely deployed dosimetry to determine the activity distribution within the vessels of interest to POCO. The results to date have been extremely promising, and the ability to produce concise visual representation of these results has already begun to facilitate better informed discussions around the POCO of the facility. It is expected that in the future this technique will be applicable to other areas of Sellafield which face similar characterization challenges. This paper presents a summary of the development and implementation of the solution along with the results obtained so far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radionuclide Inventory Calculations for the Calcined Solid Storage Facility Performance Assessment - 19292

Originally named the Idaho Chemical Processing Plant when it was constructed in the early 1950's, the Idaho Nuclear Technology and Engineering Center reprocessed SNF to recover highly enriched uranium and other nuclear-related products for the U.S. DOE. Reprocessing SNF generated millions of gallons of aqueous radioactive waste. Calcination was a process developed at the INL Site to convert liquid waste into a solid, granular form from 1963 to 2000. The calcination process produced a safer product for storage while reducing the volume of stored liquid waste by an average factor of seven. Calcine is currently stored in the Calcined Solids Storage Facility (CSSF). The CSSFs are often called 'bin sets' because each CSSF (CSSFs 1 through 6) contains several stainless-steel storage bins housed in a concrete vault. The CSSF is an interim waste storage facility. In the future, calcine will be retrieved, treated (if necessary), and sent to an off-Site facility for storage or disposal. To close the CSSF, the bulk of the calcine will be removed and stored or disposed of elsewhere. The bins and vaults will then be placed in a configuration that is protective of human health and the environment. For purposes of the performance assessment, the depth of the residual calcine at closure was assumed to be 5-cm in each bin. The 5-cm of residual calcine in each bin is assumed to be mixed in grout during closure. The activities of the residual radionuclides are the inventory used for the dose assessment calculations for the CSSF performance assessment. The objective of this analysis was to calculate the radionuclide activity in the residual calcine remaining in the CSSF after closure. The purpose of this paper is to present the approach used to calculate the radionuclide inventory of the calcine currently stored in CSSF and the residual calcine in the CSSF after closure using data from the calcined waste Historical Processing Model (HPM). Limited sampling and analysis of the calcine in the CSSF bins was conducted in the past. Future similar calcine sampling and analysis efforts would be costly, generate additional mixed waste, and may not provide the desired detailed calcine composition data. However, during the later years of calcining, an alternative to calcine sampling and analysis was developed and the information was captured in the HPM. The HPM uses multiple sources to provide definitive calcine volume, mass, and composition, including: compositions and volumes of the liquid wastes that were calcined, ORIGEN2 - and ORIGEN-ARP-based radioactivity calculations, calciner and CSSF operating data, and process knowledge of INTEC fuel and waste-processing systems. HPM calcine composition was used to develop an inventory of radionuclides for use in the performance assessment evaluation for closure of CSSF. There are 43 bins that contain calcine, with six to twelve segments in each bin for a total of 337 bin segments for which the HPM calculates the average calcine composition. The HPM calculates the composition of each of the nearly 7,000 batches of material (startup bed, nonradioactive material, and radioactive waste) charged to the calciners. The calculations use the CSSF dimensions, including the CSSF number of bins, heights, outside diameters, annular air space diameter (if necessary), and volume of calcine currently in the bins. For each of the CSSFs, for a 5-cm residual, the percent of total calcine was calculated along with the residual activity for the radionuclides. Residual activity was estimated for 148 different radionuclides. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗