Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MPC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

DECENTRALIZED APPROACH TO MULTI-ZONE GREY-BOX MODELING FOR MODEL-BASED PREDICTIVE CONTROL

This study aims to improve the easiness of utilizing the grey-box model (i.e., Resistance-Capacitance circuit) for Model-based Predictive Control (MPC). The primary barrier of implementing the MPC is estimating the control-oriented building model that needs to be computationally inexpensive and quick but reasonably precise in predicting building load and indoor conditions. The estimating of the model parameters becomes more complicated when the building scale is larger; e.g., multi-zone building. In this study, a decentralized approach is introduced; each zone is split and individually estimated with measured boundary temperature from adjacent zones integrated into one single system model. The proposed decentralized method is demonstrated with experimental data from a full-scale multi-zone test cell compared with the centralized reference case.

Joe, Jaewan↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning: Preprint

Distributed energy resources (DER) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline MPC controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning

Distributed energy resources (DER) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline MPC controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Model Predictive Control of Dual-Mode Energy-Stored Quasi-Z-Source Photovoltaic System

The energy-stored quasi-Z-source inverter (ES-qZSI) has attracted much attention for photovoltaic (PV) power generations, due to its capability to stabilize the PV power fluctuations and other advantages of Z-source inverter. Traditional ES-qZSI suffers from poor operation at night or cloudy days when PV power is extremely low. In order to overcome that, this paper proposes a model predictive control (MPC) strategy for an improved dual-mode ES-qZSI, which is designed to support all-weather operation of PV power generation system. The system predictive models in both day and night operating modes are derived. And the control strategy based on MPC is disclosed to ensure the high-performance operation of the system. Simulation is carried out on PV power fluctuation in daytime and switching between the two modes, to verify the effectiveness of proposed control strategy.

Xue, Yaosuo↗

Model predictive control for matrix converter operating in current control mode with load current estimation

A matrix converter system operating in current control mode is provided. The matrix converter includes a switching matrix coupled between a low voltage side and a high voltage side, wherein the matrix converter is coupled at its low voltage side to a generator for receiving an input power including an input current and transforming the input power into an output power at its high voltage side, wherein a load is coupled to the high voltage side. The control system includes a load observer and a model predictive controller (MPC). The load observer is configured to estimate a load current that flows to the load from the high voltage side of the matrix converter as a function of a switching state of the switching matrix, an output voltage output at the high voltage side of the matrix converter, and the input current. The MPC is configured to select the switching state of the switching matrix to meet one or more control objectives defined by minimization of a multi-objective function that tracks the output voltage and the input current using the estimated load current.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Multi-Fidelity Modeling and Control for Building Temperature Control

The ability to control energy loads such as a building's heating, ventilation, and air conditioning (HVAC) system can help facilitate increased penetration of variable renewable energy sources into the electric grid. To be able to control these HVAC systems more effectively, detailed simulations of the corresponding building physics is becoming increasingly important. These detailed simulations can be complex, nonlinear, and can require immense computational power when used in an advanced control method such as model predictive control (MPC), prompting the need to explore less computationally intensive strategies. In this work, a multi-fidelity approach is proposed to combine samples from a complex, high-fidelity model with a simple, low-fidelity model within the MPC control loop. More specifically, the parameters of a reduced-order, linear building model are periodically updated with knowledge from its high-fidelity counterpart - an EnergyPlus model - in an online fashion using a Gaussian Process surrogate model. Hence, highly accurate predictions of current and future conditions in a building are maintained with a substantially reduced computational burden compared to using the high-fidelity models alone. In other words, this linear parameter varying model preserves the low computational requirements of a low-order linear model while accurately modeling a building's dynamics. This allows a building controller to take highly informed actions without requiring a large computational budget.

building modeling↗

Reinforcement Learning to Enhance Optimal Operation of Resilient Community Energy Systems

This paper presents a novel model-free multi-agent Reinforcement Learning (RL) control method to enhance the resilience of community energy systems in island mode, which coordinates multiple objectives without the necessity of identifying system models that require expert knowledge. Specifically, a community-level coordinator agent is designed to allocate renewable energy resources among different buildings, and multiple building-level agents are developed to optimize load schedules based on limited energy resources and requirements of building loads and occupants’ comfort. In a two-day evaluation, our RL approach demonstrated a similar performance against MPC without requiring system models and formulation of optimization problems as required in MPC.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

FLAW STABILITY ANALYSIS OF SURFACE CRACKS IN DOE STANDARD CANISTERS UNDER OPERATION LOADS AND WELDING RESIDUAL STRESSES

There are over 3000 commercial spent nuclear fuel (SNF) storage canisters that are made of stainless steel and planned for multi-purpose functions of SNF handling: interim storage, transportation, and ultimate disposal at a future SNF disposition location. To date, many multi-purpose canisters (MPC) are located in coastal regions for long-term storage. The canisters are fabricated by welding, and post-welding heat treatment is not required for relieving welding residual stresses (WRS). As a result, these canisters may be susceptible to chloride induced stress corrosion cracking (CISCC) due to the chloride-bearing marine salts. The flaw stability analysis of MPC canisters was performed at SRNL (i.e., PVP2016-4935 and PVP2016-63887) for through-wall flaws and for surface flaws respectively, where WRS was considered, and the failure assessment diagram (FAD)-based fracture mechanics method codified by API 579-1/ASME FFS-1-2007 Edition was adopted.

DOE standard canister↗

DESI DR1 Ly$α$ forest: 3D full-shape analysis and cosmological constraints

We perform an analysis of the full shapes of Lyman-$α$ (Ly$α$) forest correlation functions measured from the first data release (DR1) of the Dark Energy Spectroscopic Instrument (DESI). Our analysis focuses on measuring the Alcock-Paczynski (AP) effect and the cosmic growth rate times the amplitude of matter fluctuations in spheres of $8$$h^{-1}\text{Mpc}$, $fσ_8$. We validate our measurements using two different sets of mocks, a series of data splits, and a large set of analysis variations, which were first performed blinded. Our analysis constrains the ratio $D_M/D_H(z_\mathrm{eff})=4.525\pm0.071$, where $D_H=c/H(z)$ is the Hubble distance, $D_M$ is the transverse comoving distance, and the effective redshift is $z_\mathrm{eff}=2.33$. This is a factor of $2.4$ tighter than the Baryon Acoustic Oscillation (BAO) constraint from the same data. When combining with Ly$α$ BAO constraints from DESI DR2, we obtain the ratios $D_H(z_\mathrm{eff})/r_d=8.646\pm0.077$ and $D_M(z_\mathrm{eff})/r_d=38.90\pm0.38$, where $r_d$ is the sound horizon at the drag epoch. We also measure $fσ_8(z_\mathrm{eff}) = 0.37\; ^{+0.055}_{-0.065} \,(\mathrm{stat})\, \pm 0.033 \,(\mathrm{sys})$, but we do not use it for cosmological inference due to difficulties in its validation with mocks. In $Λ$CDM, our measurements are consistent with both cosmic microwave background (CMB) and galaxy clustering constraints. Using a nucleosynthesis prior but no CMB anisotropy information, we measure the Hubble constant to be $H_0 = 68.3\pm 1.6\;\,{\rm km\,s^{-1}\,Mpc^{-1}}$ within $Λ$CDM. Finally, we show that Ly$α$ forest AP measurements can help improve constraints on the dark energy equation of state, and are expected to play an important role in upcoming DESI analyses.

Cuceu, Andrei [LBL, Berkeley; Chicago U., KICP] (O↗

Cosmological Constraints from Full-Scale Clustering and Galaxy-Galaxy Lensing with DESI DR1

We present constraints on cosmic structure growth from the analysis of galaxy clustering and galaxy-galaxy lensing with galaxies from the Dark Energy Spectroscopic Instrument (DESI) Data Release 1. We analyze four samples drawn from the Bright Galaxy Survey (BGS) and the Luminous Red Galaxy (LRG) target classes. Projected galaxy clustering measurements from DESI are supplemented with lensing measurements from the Dark Energy Survey (DES), the Kilo-Degree Survey (KiDS), and the Hyper Suprime-Cam (HSC) survey around the same targets. Our method relies on a simulation-based modeling framework using the AbacusSummit simulations and a complex halo occupation distribution model that incorporates assembly bias. We analyze scales down to $0.4 \, h^{-1} \, \mathrm{Mpc}$ for clustering and $2.5 \, h^{-1} \, \mathrm{Mpc}$ for lensing, leading to stringent constraints on $S_8 = σ_8 \sqrt{Ω_\mathrm{m} / 0.3}$ and $Ω_\mathrm{m}$ when fixing other cosmological parameters to those preferred by the CMB. We find $S_8 = 0.794 \pm 0.023$ and $Ω_\mathrm{m} = 0.295 \pm 0.012$ when using lensing measurements from DES and KiDS. Similarly, for HSC, we find $S_8 = 0.793 \pm 0.017$ and $Ω_\mathrm{m} = 0.303 \pm 0.010$ when assuming the best-fit photometric redshift offset suggested by the HSC collaboration. Overall, our results are in good agreement with other results in the literature while continuing to highlight the constraining power of non-linear scales.

Lange, Johannes U. [American U.] (ORCID:0000000224↗

Dark Energy Survey Year 6 Results: Galaxy-galaxy lensing

We present galaxy--galaxy lensing (GGL) measurements from the full six years of data from the Dark Energy Survey (DES Y6), covering $4031\,\mathrm{deg}^2$ and used in the DES Y6 $3\times2$pt cosmological analysis. We use the MagLim++ lens sample, containing $\sim 9$ million galaxies divided into six redshift bins, and the Metadetection source catalog, including $\sim 140$ million galaxies divided into four redshift bins. The mean tangential shear signal achieves a total signal-to-noise ratio (S/N) of $173$, corresponding to a $17\%$ improvement over DES Y3. After applying the scale cuts used in the cosmological analysis, with $R_{\min}=6\,\mathrm{Mpc}/h$ ($4\,\mathrm{Mpc}/h$) for the linear (nonlinear) galaxy-bias model, the S/N is reduced to $75$ (90). A comprehensive suite of validation tests demonstrates that the measurement is robust against observational and astrophysical systematics at the statistical precision required for the DES Y6 analysis. Although not used in the main cosmological analysis, we extract high--signal-to-noise geometric shear-ratio measurements from the galaxy--galaxy lensing signal on small angular scales. These measurements provide an internal consistency check on the photometric redshift distributions and shear calibration used in the $3\times2$pt analysis.

Giannini, G. [Barcelona, IEEC; Chicago U., KICP; B↗

Development of Supervisory Control System for Thermal Energy Distribution System

The integrated energy system (IES) refers to the combination of nuclear energy generation with other energy sources to enable the efficiency and reliability of power generations. To create technologically viable and economically competitive systems, supervisory control strategies are critical for optimizing performance and ensuring stability across different energy generation, transportation, and utilization. This work focuses on the control strategies for the thermal energy distribution system (TEDS), which is a cornerstone of the Dynamic Energy Transport and Integration Laboratory at Idaho National Laboratory. TEDS currently relies on operators to coordinate across different components to manage energy storage and ensure efficiency. This work demonstrates the use of model predictive control (MPC) with surrogate models in determining optimal setpoints for major TEDS components. The capability of MPC-based supervisory control system is evaluated by autonomously matching the power outputs from a Dymola-based TEDS with target heat demands.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Brightest Cluster Galaxy ellipticity as proxy for halo shape: Orientation bias, assembly bias, and potential selection effects in SZ-selected clusters

The orientation of triaxial galaxy clusters with respect to the line-of-sight is expected to be one of the prime sources of scatter and potential bias in optical observables (e.g., richness and weak-lensing signal) of galaxy clusters. In this work, we use the observed shape of the central Brightest Cluster Galaxy (BCG) as proxy for the orientation along the line-of-sight for clusters selected via the Sunyaev-Zel'dovich (SZ) effect from the South Pole Telescope (SPT) and Atacama Cosmology Telescope (ACT) surveys, matched to optically selected clusters from the Dark Energy Survey Year 3 (DES). We construct two samples of clusters that are designed to be identical in SZ mass estimate and redshift but with the roundest vs. the most elliptical BCGs, which we expect to correspond to BCGs (and clusters) with major axes aligned along the line-of-sight vs. in the plane of the sky, respectively. We find that the optical richness of round-BCG clusters is $\sim 10$% larger than that of elliptical-BCG clusters, in agreement with the expectation from projection effects and presenting the first such detection in data. The density profiles, however, are not in agreement with the expectation from projection effects: the 1-halo term (below $6~h^{-1}\rm{Mpc}$) of both the weak-lensing and galaxy density profiles are the same for the subsamples, contrary to previous studies based on X-ray selected clusters. In the 2-halo regime (above $6~h^{-1}\rm{Mpc}$), we find a significant excess of the elliptical-BCG cluster profiles compared to the round-BCG cluster profiles, which is the opposite of the expectation from numerical simulations. We hypothesize that the intrinsic shape of the BCG reflects not just the orientation angle, but also intrinsic properties of the cluster which can affect both the SZ signal and the amplitude of the 2-halo term.

Srinivasan, Radhakrishnan [SUNY, Stony Brook] (ORC↗

FolpsD: combining EFT and phenomenological approaches for joint power spectrum and bispectrum analyses

We present a theoretical model for the power spectrum and bispectrum of galaxy clustering that exploits the complementarity between small-scale power spectrum information and large-scale bispectrum measurements. We extend the FOLPS code by combining its one-loop EFT galaxy power spectrum with a tree-level galaxy bispectrum projected onto the tripolar spherical harmonics (Sugiyama) basis. To access additional small-scale information, we also consider a line-of-sight damping factor in both statistics, mirroring approaches commonly used in studies of redshift-space distortions. We test the model using DESI DR2 galaxy mocks. Even without damping, the joint analysis of the EFT power spectrum and bispectrum significantly improves constraints and reduces parameter degeneracies relative to power spectrum analyses alone. For LRG-like samples, including the damping further extends the range beyond $k\sim 0.3 \,h \text{Mpc}^{-1}$ in the power spectrum and $k \sim 0.24 \,h \text{Mpc}^{-1}$ in the bispectrum without introducing statistically significant parameter biases. This leads to up to $\sim 30\%$ tighter constraints on $A_s$ and $ω_{cdm}$. For low signal-to-noise tracers such as QSOs, however, the damping parameters are weakly constrained and can absorb noise fluctuations, leading to shifts in inferred parameters. Similar limitations may arise in models where cosmological information is encoded in power-spectrum shape features degenerate with the damping, such as scenarios with massive neutrinos. In contrast, for $w_0w_a$CDM we obtain $15\%$ and $21\%$ tighter constraints on $w_0$ and $w_a$, respectively, yielding a deviation from constant dark energy at slightly more than the $1σ$ level using full-shape information alone. The code is publicly available at https://github.com/cosmodesi/FolpsD

Bansal, P. [Michigan U., MCTP; Michigan U.] (ORCID↗

Beneficial Integration of Energy Storage and Load Management with Photovoltaic (PV)

In recent years, a number of industry activities have aimed at addressing the integration challenges posed by the variability and uncertainty of higher penetration of renewable generation sources, like solar photovoltaic (PV) – one of the key objectives of the Sustainable and Holistic Integration of Energy Storage and Solar PV (SHINES) program launched by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE). This EPRI led Beneficial Integration of Energy Storge, and Load Management with PV project aimed to design, develop, and demonstrate end-to-end distributed energy resource (DER) integration solution to build on these activities. EPRI led project team designed and implemented a local controller that uses model predictive control (MPC) algorithm to optimally manage DERs on site by planning for a receding horizon while executing the control settings for the first step of its plan. The team has also developed a system controller to interface with the local controller to demonstrate the hierarchical control and how it can leverage DER capabilities to address challenges like over voltage and thermal limit violations which typically limits the DER hosting capacity of distribution feeders. Team has demonstrated how the local controller with optimization algorithm can effectively manage controllable loads like HVAC, water heater, and pool pumps to allow for greater integration of PV with relatively smaller energy storage system requirements. Optimal utilization of the load control can also reduce the depth of discharge of batteries to meet grid export/import limit from behind-the-meter (BTM) DERs. Proper utilization of DER capabilities via local control intelligence, like the one developed and demonstrated in this project can help the industry to address integration challenges of higher penetration of solar PV in economically efficient manner. This can help to accelerate deployment of clean renewable energy systems at lower societal cost.

14 SOLAR ENERGY↗

A robust model predictive control algorithm for uncertain nonlinear systems that guarantees resolvability

A robustly stabilizing MPC (model predictive control) algorithm for uncertain nonlinear systems is developed that guarantees resolvability. With resolvability, initial feasibility of the finite-horizon optimal control problem implies future feasibility in a receding-horizon framework. The control consists of two components; (i) feed-forward, and (ii) feedback part. Feed-forward control is obtained by online solution of a finite-horizon optimal control problem for the nominal system dynamics. The feedback control policy is designed off-line based on a bound on the uncertainty in the system model. The entire controller is shown to be robustly stabilizing with a region of attraction composed of initial states for which the finite-horizon optimal control problem is feasible. The controller design for this algorithm is demonstrated on a class of systems with uncertain nonlinear terms that have norm-bounded derivatives and derivatives in polytopes. An illustrative numerical example is also provided.

feed - forward↗

LMI-Based Generation of Feedback Laws for a Robust Model Predictive Control Algorithm

This technical note provides a mathematical proof of Corollary 1 from the paper 'A Nonlinear Model Predictive Control Algorithm with Proven Robustness and Resolvability' that appeared in the 2006 Proceedings of the American Control Conference. The proof was omitted for brevity in the publication. The paper was based on algorithms developed for the FY2005 R&TD (Research and Technology Development) project for Small-body Guidance, Navigation, and Control [2].The framework established by the Corollary is for a robustly stabilizing MPC (model predictive control) algorithm for uncertain nonlinear systems that guarantees the resolvability of the associated nite-horizon optimal control problem in a receding-horizon implementation. Additional details of the framework are available in the publication.

algorithms↗