Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

A Wide Dynamic-Range Halo Monitor for 8 GeV Proton Beams at FNAL

Eliminating harmful beam halos is the most important technique for high-intensity proton accelerators. Therefore, beam halo diagnosis is indispensable and becomes more and more important. At J-PARC, a wide dynamic range monitor was installed in the beam transport line in 2012. The device is a two-dimensional beam profile monitor [*, **], and it has a dynamic range of approximately six digits of magnitude by using Optical Transition Radiation and fluorescence screens. The FNAL accelerator complex has been upgrading through increased beam intensity and beam quality. A new beam halo diagnostic device is required in the beam transport line between the booster and recycler. It will be manufactured in a collaboration between J-PARC and FNAL as a part of the U.S.-Japan Science and Technology Cooperation Program in High Energy Physics. We are redesigning the monitor to satisfy FNAL specifications for beam energy, intensity, and size. The equipment will be manufactured at J-PARC and then shipped to FNAL in 2024. In this report, the design of the device will be described.

43 PARTICLE ACCELERATORS↗

Hadron Monitor Calibration System for NuMI

NuMI (Neutrinos at Main Injector) beamline at Fermi National Accelerator Laboratory provides neutrinos to various neutrino experiments. The hadron monitor consisting of a 5 by 5 array of ionization chambers is part of the diagnostics for the beamline. In order to calibrate the hadron monitor, a gamma source is needed. We present the status and progress of the development of the calibration system for the hadron monitor. The system based on Raspberry Pi controlled CNC system, motors, and position sensors would allow us to place the gamma source precisely to calibrate the signal gain of individual pixels. The ultimate outcome of the study is a prototype of the calibration system.

43 PARTICLE ACCELERATORS↗

SRS Composite Analysis Monitoring Plan (FY2019 Model Validation)

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e. end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model. The CA model validation program uses a graded and systematic approach for taking corrective action, starting with an SRS established administrative dose limit of 15 mrem/yr, below which no action is required. Based on the location of the 2010 SRS CA POAs, the only potential exposure pathway for the public is through surface water. The completion of the FY2019 CA model validation indicates that the SRS CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. These doses are well below the administrative limit; therefore, no additional action is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an In-Situ Method for Cable Condition Monitoring in Nuclear Power Plants (SBIR Phase IIB Final Report)

This is the final report of a Small Business Innovation Research (SBIR) project that Analysis and Measurement Services Corporation (AMS) has conducted for the U.S. Department of Energy (DOE) over a seven-and-a-half year period (February 2013 through April 2020 with the awards of Phase I, Phase II and Phase IIB projects). The goal of the project was to design, develop, validate, and demonstrate a technique for in-situ testing of cable insulation polymers that will identify, locate, and provide the degree of aging for cables commonly used in nuclear power plants. During the Phase I project, AMS established that the frequency domain reflectometry (FDR) technique can successfully identify and measure cable insulation degradation that can be trended with aging. In Phase II, AMS performed extensive cable aging studies to correlate FDR measurements with other laboratory condition monitoring techniques and developed aging condition categories to quantify the severity of insulation degradation. In Phase IIB, the project expanded the research to include a wider variety of cable polymers that are used in the commercial nuclear power industry. This work also involved developing acceptance criteria to objectively assess age-related cable degradation while sharing the results of this research with industry, academia, and national laboratories to advance the state of the art in cable aging management technologies. The products developed under this research project provide the nuclear industry with an effective condition monitoring tool to support safe and long-term plant operation. Throughout the project, collaborations and support were received from a variety of industry organizations and individuals including DOE National Laboratories as well as nuclear plant utilities and several other industry experts and cable manufacturers. Contributions from these organizations included the donation of new cables, naturally aged cables, and research collaboration. The validation and commercialization of the products of this project were achieved through opportunities to test and demonstrate the technologies’ capabilities on-site at nuclear power generation and research facilities as well as in the laboratory alongside industry peers and cable testing service companies. The research resulted in a technology that can be used to identify, locate, and quantify age-related degradation in several types of cable polymers. This included developing software and hardware as well as the methodology for using the FDR technique to assess age-related degradation of installed cables. The technology developed under this project can provide nuclear plant management, engineers, and technicians with an in-situ electrical test method to determine if in-service cables need to be replaced, monitored on a periodic basis, or show no evidence of significant age-related degradation that may require action. Near the end of this Phase IIB project, the FDR product was sold to a nuclear power utility in South Korea. This sale of a dedicated aging assessment tool is the beginning of a comprehensive contract with the expectation of twelve (12) units sold to that country. Additionally, the FDR technology has been sold to several industry organizations including a nuclear research institute and the Diablo Canyon nuclear power plant. This technology is also being leased by other nuclear industry service companies for incorporation into aging management programs. The cable testing technology that was developed under this project was also integrated into a comprehensive cable aging assessment service that is being offered to the nuclear industry at the request of U.S. nuclear utilities and is currently part of onsite testing services provided by AMS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2018 Long-Term Hydrologic Monitoring Program Report for Rio Blanco, Colorado, Site

This report presents the monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Rio Blanco, Colorado, Site (Figure 1). The Rio Blanco site was the location of an underground nuclear test during which three nuclear devices were detonated nearly simultaneously in a single borehole in 1973. The test resulted in residual radionuclide contamination at the detonation depths of 5840, 6230, and 6690 feet (ft) (DOE 2015). Monitoring includes the collection of samples from groundwater wells and surface water locations near the site to assess for any potential impacts that may be attributed to the Rio Blanco nuclear test. This report summarizes the laboratory analytical results obtained from the sampling event conducted in 2018. This annual report and previous reports are available on the LM public website at https://www.lm.doe.gov/rio_blanco/Sites.aspx. Data collected during this and previous monitoring events are available on the Geospatial Environmental Mapping System (GEMS) website at https://gems.lm.doe.gov/#site=RBL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial development of an in-situ, passive material surveillance test article for monitoring high temperature reactor structural components

This report describes the development of a family of passively-actuated surveillance test articles, suitable for use in an in-situ reactor test program monitoring the degradation in structural material properties caused by the reactor environment. The test articles apply creep-fatigue-type cyclic load to a test section driven by changes in the reactor coolant temperature converted to mechanical force by differential thermal expansion. The report describes three types of test articles, all of which apply the load to a 316H test section using Alloy 617 as the driver material. The three types of specimens each serve a unique purpose: (1) initial proof-of-concept, (2) validation of the models used to size the specimens to achieve a given strain range, and (3) demonstration that the articles can be miniaturized for use in an actual operating reactor. In addition to the specimen design, fabrication, and testing, this report describes the outline of two types of in-situ monitoring programs, using the test article. Monitoring programs such as these could be a critical component in gaining regulator acceptance for Molten Salt Reactor (MSR) designs using structural materials for which there is little long-term experimental environmental testing or operating experience available for calibrating the component structural design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Selection of Well Locations for Saturated Zone Monitoring at the E-Area Low Level Waste Facility

Savannah River Site (SRS) has adopted a revised approach to performance monitoring of the E- Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised monitoring approach specifies that eight additional water table wells be installed near Slit Trench 1 (ST1) and Engineered Trench 2 (ET2). Six wells will be installed at locations characterized in 2017 and 2018. These include four wells near ET2 (ELF001D, ELF002D, ELF003D, and ELF004D) at locations identified by Kubilius (2019) and two wells north of ST1 (ELF005D and ELF006D) at locations finalized in this report. Additionally, two wells (ELF007D and ELF008D) are to be installed at locations south of ST1 based on characterization work completed in 2020 and documented in this report. This area is near well cluster BGX-2 between the Mixed Waste Management Facility (MWMF) and the ELLWF. The area is upgradient of ELLWF and, contamination in the water table aquifer is sourced from MWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Results for Avian Monitoring at the Technical Area 36 Minie Site, Technical Area 39 Point 6, and Technical Area 16 Burn Ground at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL) biologists in the Environmental Protection and Compliance Division initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. In this annual report we compare monitoring results from these efforts among years to monitor trends. The objectives of this study are to 1) determine whether LANL operations impact bird species richness, diversity, or abundance and 2) examine occupancy and nest success of secondary-cavity nesting birds using nestboxes. LANL biologists completed the eighth year of this effort in 2020

54 ENVIRONMENTAL SCIENCES↗

GMS Station SOH Monitoring Configuration Guide (V.1.2)

The GMS Station State-of-Health (SOH) monitoring capability provides the system controller the ability to view current SOH values and calculated statistics for stations and channels, view trend plots of SOH values, be notified when station SOH status changes, and acknowledge or quiet notifications while the station issues are being investigated. The SOH monitoring capability includes components to acquire CD 1.1 protocol station data, extract SOH information from the raw data packets, process the raw SOH information for display, store the SOH information, and display the SOH information in an interactive display. All these components use system and processing configuration to provide the system controller mission-relevant information about station health. This document is a guide to setting the processing configuration for GMS SOH monitoring.

97 MATHEMATICS AND COMPUTING↗

GMS Station SOH Monitoring Users Guide (V.1.2)

The Geophysical Monitoring System (GMS) State-of-Health User Interface (SOH UI) is a web-based application that allows a user to view and acknowledge the SOH status of stations in the GMS system. The SOH UI will primarily be used by the System Controller, who monitors and controls the system and external data connections. The System Controller uses the station SOH UIs to monitor, detect, and troubleshoot problems with station data availability and quality.

58 GEOSCIENCES↗

2020 Mitigation and Monitoring Report for the Arroyo Las Positas Management Project

This report describes maintenance, monitoring, and mitigation conducted in 2020 as part of the Arroyo Las Positas Management Project (the project) at Lawrence Livermore National Laboratory’s (LLNL’s) Livermore Site. The purpose of this project is to enhance habitat value for the California red-legged frog (Rana draytonii) within the LLNL reach of Arroyo Las Positas and protect LLNL facilities from flooding. The project description, in addition to the monitoring and mitigation requirements for this project are described in the October 2015 Revised Mitigation and Monitoring Plan for the Arroyo Las Positas Management Project (MMP) and the Formal Consultation on the Proposed Arroyo Maintenance Project on Arroyo Las Positas at Lawrence Livermore National Laboratory (biological opinion; Service File Numbers 1-1-97-F-173 and 1-1-98-I-1562).

54 ENVIRONMENTAL SCIENCES↗

Integrated System and Application Continuous Performance Monitoring and Analysis Capability

Scientific applications run on high-performance computing (HPC) systems are critical for many national security missions within Sandia and the NNSA complex. However, these applications often face performance degradation and even failures that are challenging to diagnose. To provide unprecedented insight into these issues, the HPC Development, HPC Systems, Computational Science, and Plasma Theory & Simulation departments at Sandia crafted and completed their FY21 ASC Level 2 milestone entitled "Integrated System and Application Continuous Performance Monitoring and Analysis Capability." The milestone created a novel integrated HPC system and application monitoring and analysis capability by extending Sandia's Kokkos application portability framework, Lightweight Distributed Metric Service (LDMS) monitoring tool, and scalable storage, analysis, and visualization pipeline. The extensions to Kokkos and LDMS enable collection and storage of application data during run time, as it is generated, with negligible overhead. This data is combined with HPC system data within the extended analysis pipeline to present relevant visualizations of derived system and application metrics that can be viewed at run time or post run. This new capability was evaluated using several week-long, 290-node runs of Sandia's ElectroMagnetic Plasma In Realistic Environments ( EMPIRE ) modeling and design tool and resulted in 1TB of application data and 50TB of system data. EMPIRE developers remarked this capability was incredibly helpful for quickly assessing application health and performance alongside system state. In short, this milestone work built the foundation for expansive HPC system and application data collection, storage, analysis, visualization, and feedback framework that will increase total scientific output of Sandia's HPC users.

97 MATHEMATICS AND COMPUTING↗

Integrated System and Application Continuous Performance Monitoring and Analysis Capability (Final)

Scientific applications run on high-performance computing (HPC) systems are critical for many national security missions within Sandia and the NNSA complex. However, these applications often face performance degradation and even failures that are challenging to diagnose. To provide unprecedented insight into these issues, the HPC Development, HPC Systems, Computational Science, and Plasma Theory & Simulation departments at Sandia crafted and completed their FY21 ASC Level 2 milestone entitled "Integrated System and Application Continuous Performance Monitoring and Analysis Capability." The milestone created a novel integrated HPC system and application monitoring and analysis capability by extending Sandia’s Kokkos application portability framework, Lightweight Distributed Metric Service (LDMS) monitoring tool, and scalable storage, analysis, and visualization pipeline. The extensions to Kokkos and LDMS enable collection and storage of application data during run time, as it is generated, with negligible overhead. This data is combined with HPC system data within the extended analysis pipeline to present relevant visualizations of derived system and application metrics that can be viewed at run time or post run. This new capability was evaluated using several week-long, 290-node runs of Sandia’s ElectroMagnetic Plasma In Realistic Environments (EMPIRE) modeling and design tool and resulted in 1TB of application data and 50TB of system data. EMPIRE developers remarked this capability was incredibly helpful for quickly assessing application health and performance alongside system state. In short, this milestone work built the foundation for expansive HPC system and application data collection, storage, analysis, visualization, and feedback framework that will increase total scientific output of Sandia’s HPC users.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Project 57 Air Monitoring Report: January 1 through September 30, 2020, with a Review of the Period of Record Radionuclide Analyses

The DOE Environmental Management Nevada Program (EM NV) identified the Project 57 contaminated area as Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site, which consisted of one Corrective Action Site (CAS): NAFR-23- 02, Pu Contaminated Soil (U.S. DOE, 2014). The CAS included several Project 57 operational facilities in addition to the plutonium-contaminated soil. With approval of the State of Nevada Division of Environmental Protection, the DOE closed the Project 57 surface soil contamination site in October 2020. Closure was accomplished by installing a clean soil cap constructed over ground zero and the surrounding areas of the CA that may be entrained with wind-transported soil particles. After completion of the ground zero cap in October 2020, DRI discontinued monitoring of meteorological and associated environmental conditions at the Project 57 site as directed by DOE EM NV. Navarro dismantled air monitoring stations P57-3 and P57-4 and removed the equipment on October 20, 2020. This report presents the meteorological and dust observations and radiological analyses accomplished during the approximately 10 months when the air monitoring data collection equipment was operational during CY2020.

54 ENVIRONMENTAL SCIENCES↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247 and 173-480 were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL-Richland Campus) and in Sequim, Washington, (PNNL-Sequim Campus, which formerly was known as the Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2021 for calendar year ending 2020.

40 CFR 61 Subpart H↗

Novel Temperature Sensors and Wireless Telemetry for Active Condition Monitoring of Advanced Gas Turbines

The objective of the program is to develop and engine test hardware and software technologies that will enable active condition monitoring to be implemented on hot gas path turbine blades in large industrial gas turbines. The specific objectives are (1) to fabricate and install Smart Turbine Blades with thermally sprayed sensors and high temperature wireless telemetry systems in a gas turbine engine, (2) to integrate the component engine test data with remaining useful life (RUL) models and develop an approach for networking the component RUL data with Siemens' Power Diagnostics® engine monitoring system. These significant advances carried out in Phase 1 in temperature wide bandgap telemetry, along with new induced power driver and receiver geometry combined with an innovative approach to transmit digital data wirelessly will enable the opportunity to proceed with more technical innovation. The Phase 2 program focused on validation testing of sensor-wireless telemetry package in spin rig and advanced operation-based assessment (OBA) model utilizing artificial intelligence. Significant efforts were dedicated on the download of the technology onto components to be tested an actual gas turbine engine for full realization of active condition monitoring for Smart Turbine Blades.

03 NATURAL GAS↗

Model Validation for the FY2021 SRS Composite Analysis Monitoring Plan

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e., end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Monitoring Report, Calendar year 2020. Knolls Laboratory and Kesselring Site

The results of the effluent and environmental monitoring programs at the Knolls Laboratory and Kesselring Site are summarized and assessed in this report. Tables 1 - 4 summarize the major elements of the environmental monitoring programs at each site. Information regarding the U.S. Department of Energy – Office of Environmental Management (DOE-EM) Separations Process Research Unit (SPRU) Disposition Project (SPRU DP), is also included in this report; however, the project was completed in 2020 and will no longer be reported in subsequent reports. DOE-EM will be continuing to perform other Decontamination & Decommissioning (D&D) work at Knolls Laboratory and Kesselring Site, which may require environmental monitoring, and will be included in this report, as warranted. Operations at the Knolls Laboratory, which includes SPRU and other DOE-EM activities, and the Kesselring Site continue to have no adverse effect on human health and the quality of the environment.

54 ENVIRONMENTAL SCIENCES↗