Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Titan III Feasibility for HL-20 Prototype Missions

A set of studies was performed to investigate the feasibility of using the Titan III launch vehicle to launch an unmanned prototype HL-20 personnel launch system and, potentially, operational HL-20 missions. The launch of an HL-20 spacecraft on a Titan III poses a unique set of concerns, primarily because the lifting body vehicle is carried on top of the Titan vehicle without a fairing. The Titan III/HL-20 feasibility study addressed the primary vehicle issues of performance, aerodynamics, loads, control and stability, launch availability, and vehicle configuration for the launch of an unmanned HL-20 prototype vehicle. Titan launch operations, launch site systems, and facilities were assessed to determine HL-20 operations compatibility. Additional studies determined the potential launch opportunity and window capabilities of the Titan III for the operational HL-20 mission and the existing Titan III's reliability. The feasibility study determined that the Titan III system, with minor changes, is compatible with the HL-20 vehicle and mission. It could provide nearly daily launch windows for a rendezvous with Space Station Freedom. Titan III reliability, when combined with the HL-20 launch escape system, provides a sufficiently high probability of crew survival to support its consideration as the primary vehicle for HL-20 operational missions.

Benson, Scott W.↗

An Overview of the Meteorological Instrumentation Utilized for the Design and Operations of Space Launch Vehicles

One of the first hurdles a space vehicle must overcome is the ability to successfully traverse Earth’s atmosphere. In order to achieve this goal, there must exist both climatological and real-time atmospheric data from the surface to the Karman line. The Natural Environments Branch at the National Aeronautics and Space Administration’s Marshall Space Flight Center utilizes both traditional and specialized meteorological instrumentation to aide in both the design and operations of launch vehicles. Weather balloons measuring thermodynamic and wind data from 0 - 70 kft are an example of the more traditional instrumentation. While the Tropospheric Doppler Radar Weather Profiler that measures winds from roughly 5 kft – 60 kft every five minutes is an example of a more specialized instrument. Other instruments include: 915 MHz Doppler Radar Wind Profilers, rain gauges, meteorological towers, lightning detection networks, Automated Weather Observing System stations, Mobile Launcher weather stations, and more. This presentation will give a high-level overview of which instruments are utilized, how the data are acquired, and how the data are ultimately used in design and/or operations.

Nathan L. Curtis↗

HISPASAT launch and early operations phases: Computation and monitoring of geostationary satellite positioning

Since 1974, CNES, the French National Space Agency, has been involved in the geostationary launch and early operations phases (LEOP) of moving satellites from a transfer orbit delivered by a launcher to a geostationary point. During the operations and their preparation, the Flight Dynamics Center (FDC), part of CNES LEOP facilities, is in charge of the space mechanics aspects. What is noteworthy about the Spanish HISPASAT satellite positioning is that all the operations were performed on the customer's premises, and consequently the FDC was duplicated in Madrid, Spain. The first part of this paper is the FDC presentation: its role, its hardware configuration, and its space dynamics ground control system called MERCATOR. The second part of this paper details the preparation used by the FDC for the HISPASAT mission: hardware and software installation in Madrid, integration with the other entities, and technical and operational qualifications. The third part gives results concerning flight dynamics aspects and operational activities.

Brousse, Pascal↗

Operations Assessment of Launch Vehicle Architectures using Activity Based Cost Models

The growing emphasis on affordability for space transportation systems requires the assessment of new space vehicles for all life cycle activities, from design and development, through manufacturing and operations. This paper addresses the operational assessment of launch vehicles, focusing on modeling the ground support requirements of a vehicle architecture, and estimating the resulting costs and flight rate. This paper proposes the use of Activity Based Costing (ABC) modeling for this assessment. The model uses expert knowledge to determine the activities, the activity times and the activity costs based on vehicle design characteristics. The approach provides several advantages to current approaches to vehicle architecture assessment including easier validation and allowing vehicle designers to understand the cost and cycle time drivers.

Ruiz-Torres, Alex J.↗

Microwave Anisotrophy Probe Launch and Early Operations

The Microwave Anisotropy Probe (MAP), a follow-on to the Differential Microwave Radiometer (DMR) instrument on the Cosmic Background Explorer (COBE), was launched from the Kennedy Space Center at 19:46:46 UTC on June 30, 2001. The powered flight and separation from the Delta II appeared to go as designed, with the launch placing MAP well within sigma launch dispersion and with less than 7 Nms of tip-off momentum. Because of this relatively low momentum, MAP was able to acquire the sun within only 15 minutes with a battery state of charge of 94%. After MAP's successful launch, a six week period of in-orbit checkout and orbit maneuvers followed. The dual purpose of the in-orbit checkout period was to validate the correct performance of all of MAP's systems and, from the attitude control system (ACS) point of view, to calibrate the performance of the spacecraft ACS sensors and actuators to maximize system performance. In addition to the checkout activities performed by the MAP team, the other critical activity taking place during the first six weeks after launch were a series of orbit maneuvers necessary to get the spacecraft from its launch orbit out to its desired orbit about L2, the second Earth-Sun Lagrange point. As MAP continues its standard operations, its ACS design is meeting all of its requirements to successfully complete the mission. This paper will describe the launch and early operations summarized above in greater detail, and show the performance of the attitude control and attitude determination system versus its requirements. Additionally, some of the unexpected events that occurred during this period will be discussed, including two events which dropped the spacecraft into its Safehold Mode and the presence of an "anomalous force" observed during each of the perigee orbit maneuvers that had the potential to cause these critical maneuvers to be prematurely aborted.

ODonnell, James R., Jr.↗

Applied Virtual Reality in Reusable Launch Vehicle Design, Operations Development, and Training

Application of Virtual Reality (VR) technology offers much promise to enhance and accelerate the development of Reusable Launch Vehicle (RLV) infrastructure and operations while simultaneously reducing developmental and operational costs. One of the primary cost areas in the RLV concept that is receiving special attention is maintenance and refurbishment operations. To produce and operate a cost effective RLV, turnaround cost must be minimized. Designing for maintainability is a necessary requirement in developing RLVs. VR can provide cost effective methods to design and evaluate components and systems for maintenance and refurbishment operations. The National Aeronautics and Space Administration (NASA)/Marshall Space Flight Center (MSFC) is beginning to utilize VR for design, operations development, and design analysis for RLVs. A VR applications program has been under development at NASA/MSFC since 1989. The objectives of the MSFC VR Applications Program are to develop, assess, validate, and utilize VR in hardware development, operations development and support, mission operations training and science training. The NASA/MSFC VR capability has also been utilized in several applications. These include: 1) the assessment of the design of the late Space Station Freedom Payload Control Area (PCA), the control room from which onboard payload operations are managed; 2) a viewing analysis of the Tethered Satellite System's (TSS) "end-of-reel" tether marking options; 3) development of a virtual mockup of the International Space Welding Experiment for science viewing analyses from the Shuttle Remote Manipulator System elbow camera and as a trainer for ground controllers; and 4) teleoperations using VR. This presentation will give a general overview of the MSFC VR Applications Program and describe the use of VR in design analyses, operations development, and training for RLVs.

Hale, Joseph P.↗

Real-Time Kennedy Space Center and Cape Canaveral Air Force Station High-Resolution Model Implementation and Verification

NASA's Launch Services Program, Ground Systems Development and Operations, Space Launch System and other programs at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) use the daily and weekly weather forecasts issued by the 45th Weather Squadron (45 WS) as decision tools for their day-to-day and launch operations on the Eastern Range (ER). Examples include determining if they need to limit activities such as vehicle transport to the launch pad, protect people, structures or exposed launch vehicles given a threat of severe weather, or reschedule other critical operations. The 45 WS uses numerical weather prediction models as a guide for these weather forecasts, particularly the Air Force Weather Agency (AFWA) 1.67 km Weather Research and Forecasting (WRF) model. Considering the 45 WS forecasters' and Launch Weather Officers' (LWO) extensive use of the AFWA model, the 45 WS proposed a task at the September 2013 Applied Meteorology Unit (AMU) Tasking Meeting requesting the AMU verify this model. Due to the lack of archived model data available from AFWA, verification is not yet possible. Instead, the AMU proposed to implement and verify the performance of an ER version of the high-resolution WRF Environmental Modeling System (EMS) model configured by the AMU (Watson 2013) in real time. Implementing a real-time version of the ER WRF-EMS would generate a larger database of model output than in the previous AMU task for determining model performance, and allows the AMU more control over and access to the model output archive. The tasking group agreed to this proposal; therefore the AMU implemented the WRF-EMS model on the second of two NASA AMU modeling clusters. The AMU also calculated verification statistics to determine model performance compared to observational data. Finally, the AMU made the model output available on the AMU Advanced Weather Interactive Processing System II (AWIPS II) servers, which allows the 45 WS and AMU staff to customize the model output display on the AMU and Range Weather Operations (RWO) AWIPS II client computers and conduct real-time subjective analyses.

Meteorology↗

GOES-R Series GEO Side-Lobe Capable GPSR Post-Launch Refinements and Operational Capabilities

This paper addresses three topics: 1) EOPP (EOP (Earth Orientation Prediction) Parameters) file modification, 2) Kalman filter parameter tuning regarding maneuvers and 3) off-pointing GPS (Global Positioning System) tracking capability. GOES-R (Geostationary Operational Environmental Satellite-R Series) is the first in a 4-part series of new weather satellites set to replace and upgrade the older GOES constellation. Two GOES-R series have been launched to date, GOES-S and GOES-R. GOES-R is operational over the Eastern United States and GOES-S over the West. The Global Positioning System Receiver (GPSR) on board this geostationary weather satellite is a mission critical enabling technology which has been both tested on the ground and evaluated on-orbit to verify its effectivity. Since becoming operational in November 2016, the GPSR onboard has performed extremely well under nominal circumstances. Further refinements regarding a variety of facets have taken place since the launch of GOES-R. One such refinement was the implementation of a modified EOP (Earth Orientation Prediction) parameter set to improve ECEF (Earth Centered Earth Fixed) to ECI (Earth Centered Inertial) transformation by restoring zonal tides removed from the EOP parameter fit per tech note 36. Another relevant refinement combined thermal consideration with Kalman filter tuning to improve orbit determination performance during maneuvers. Now with two years of data and two vehicles in orbit many capabilities of the GPSR have been identified and defined to a higher degree. For example, metrics on side-lobe tracking and off-Nadir tracking capabilities have been quantified to a high degree. This paper will seek to supplement the ESA (European Space Agency) GNC 2017 GOES-R GPSR performance paper as a deeper dive on specific tracking capabilities and performance improvements now implemented on the GOES-R and GOES-S vehicles.

GPS Receiver↗

Equivalent Mass versus Life Cycle Cost for Life Support Technology Selection

The decision to develop a particular life support technology or to select it for flight usually depends on the cost to develop and fly it. Other criteria - performance, safety, reliability, crew time, and risk - are considered, but cost is always an important factor. Because launch cost accounts for most of the cost of planetary missions, and because launch cost is directly proportional to the mass launched, equivalent mass has been used instead of cost to select life support technology. The equivalent mass of a life support system includes the estimated masses of the hardware and of the pressurized volume, power supply, and cooling system that the hardware requires. The equivalent mass is defined as the total payload launch mass needed to provide and support the system. An extension of equivalent mass, Equivalent System Mass (ESM), has been established for use in Advanced Life Support. A crew time mass-equivalent and sometimes other non-mass factors are added to equivalent mass to create ESM. Equivalent mass is an estimate of the launch cost only. For earth orbit rather than planetary missions, the launch cost is usually exceeded by the cost of Design, Development, Test, and Evaluation (DDT&E). Equivalent mass is used only in life support analysis. Life Cycle Cost (LCC) is much more commonly used. LCC includes DDT&E, launch, and operations costs. Since LCC includes launch cost, it is always a more accurate cost estimator than equivalent mass. The relative costs of development, launch, and operations vary depending on the mission design, destination, and duration. Since DDT&E or operations may cost more than launch, LCC may give a more accurate cost ranking than equivalent mass. To be sure of identifying the lowest cost technology for a particular mission, we should use LCC rather than equivalent mass.

Jones, Harry↗

National Launch System KSC facilities and operations

The current planning for the launch site ground operations and facilities required at the Kennedy Space Center to accommodate the National Launch System (NLS) are described. Special consideration is given to the program activities associated with reducing costs for ground operations and with the ground operations vehicle processing scenarios for launching the NLS vehicles from KSC. The KSC facilities described include the Payload Encapsulation Facility, the Mobile Launcher Platform, and the Cargo Transfer Vehicle Checkout Facility. Attention is also given to the modifications of existing facilities required to accommodate the NLS facilities and the transportation and handling equipment.

Evans, R. T., Jr.↗

Progress in Operational Analysis of Launch Vehicles in Nonstationary Flight

This paper presents recent results in an ongoing effort to understand and develop techniques to process launch vehicle data, which is extremely challenging for modal parameter identification. The primary source of difficulty is due to the nonstationary nature of the situation. The system is changing, the environment is not steady, and there is an active control system operating. Hence, the primary tool for producing clean operational results (significant data lengths and data averaging) is not available to the user. This work reported herein uses a correlation-based two step operational modal analysis approach to process the relevant data sets for understanding and development of processes. A significant drawback for such processing of short time histories is a series of beating phenomena due to the inability to average out random modal excitations. A recursive correlation process coupled to a new convergence metric (designed to mitigate the beating phenomena) is the object of this study. It has been found in limited studies that this process creates clean modal frequency estimates but numerically alters the damping.

James, George↗

Insights and Observations from Operating a Geostationary Laser Communication Relay Mission: Operational Lessons from NASA’s Laser Communications Relay Demonstration (LCRD) and Associated Optical Ground Stations (OGSs)

The NASA Laser Communications Relay Demonstration (LCRD) has operated on orbit for the last two years. The LCRD Mission consists of a geostationary payload and two optical ground stations. This technology demonstration mission is NASA’s first two-way, end-to-end optical communications relay. LCRD has performed an extensive experiment campaign to analyze laser communication performance for extended operations. This paper discusses various lessons learned while operating the optical relay mission from early commissioning through two years of operation. Before launch, engineers and operators performed analyses to generate operational procedures based on expected LCRD performance. However, only operation on orbit can supply actual performance data. Additional topics covered in this paper include pre-launch and commissioning testing, ephemeris generation and cadence, environmental configurations, and accommodation concerns. The addition of Integrated Laser Communications Relay Demonstration Low Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) to the optical network supplemented the LCRD team’s operational experiences and enabled them to garner new lessons learned. The authors of this paper include day-to-day flight leads who consulted with on-console operators, engineers, and subject matter experts analyzing data and experiment results to gather the lessons learned described in this paper. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

Lessons Learned↗

Ground operations and concepts for future space activities

The Kennedy Space Center Shuttle launch site operations concept involves launch site facilities, operations, and crews being organized for maximum flexibility and minimum impact in support of future programs. The goal is to reduce program costs by having optimum utilization of facilities resulting in a greater return on the investment for these facilities. The present paper develops the notion that the cost and lead times associated with a program such as Space Industrialization can be significantly influenced by early planning for the transition of launch site operations concepts developed for the Space Transportation System.

Mccoy, H. E.↗

Simulation of Propellant Loading System Senior Design Implement in Computer Algorithm

Propellant loading from the Storage Tank to the External Tank is one of the very important and time consuming pre-launch ground operations for the launch vehicle. The propellant loading system is a complex integrated system involving many physical components such as the storage tank filled with cryogenic fluid at a very low temperature, the long pipe line connecting the storage tank with the external tank, the external tank along with the flare stack, and vent systems for releasing the excess fuel. Some of the very important parameters useful for design purpose are the prediction of pre-chill time, loading time, amount of fuel lost, the maximum pressure rise etc. The physics involved for mathematical modeling is quite complex due to the fact the process is unsteady, there is phase change as some of the fuel changes from liquid to gas state, then conjugate heat transfer in the pipe walls as well as between solid-to-fluid region. The simulation is very tedious and time consuming too. So overall, this is a complex system and the objective of the work is student's involvement and work in the parametric study and optimization of numerical modeling towards the design of such system. The students have to first become familiar and understand the physical process, the related mathematics and the numerical algorithm. The work involves exploring (i) improved algorithm to make the transient simulation computationally effective (reduced CPU time) and (ii) Parametric study to evaluate design parameters by changing the operational conditions

Bandyopadhyay, Alak↗

Some considerations for Space Tug launch site support operations.

The study reported was undertaken to investigate the requirements placed on the Space Tug by the ground operations. On the basis of the results obtained, it will be possible to consider in future Tug systems studies the full spectrum of both ground and flight operations requirements in defining selected Tug configurations. The central core of the study consists of a functional analysis of ground operations during the Tug turnaround. Electronic system studies were initiated concurrently with the functional analysis study phase to evaluate interrelationships between ground and vehicle checkout and fault isolation capability.

Heald, D. A.↗

Very high resolution radiometer /VHRR/

Discussion of the design and performance of the very high resolution radiometer (VHRR) representing the first of a second-generation of infrared scanning radiometers of high performance. Following a description of the optical, signal-electronics, sync-generator, scan-drive, cooler, and contamination-protection design, it is pointed out that the two VHRRs presently operating have logged a total of 15,500 hrs of continuous successful operation since launch. The cooler operation has been particularly noteworthy. The cold plate heater power, required to maintain the detectors at 105 K, has undergone in almost a year's operation so small a degradation as to indicate a VHRR cooler lifetime exceeding the instrument design lifetime of one year by a large margin. High resolution, low noise, and jitter-free pictures are shown to have been derived from these instruments.

Aronson, A. I.↗